Date
4
Oct-11
Copies
Unit
m'
6
Remarks
Hand Dryers
Nos
Total Budget - Dhs. Total Code Budget - Dhs. Provision for Future Purchase - Dhs. Attachments :
Pgs. BOQ
Other Documents Other Documents Other Documents Conditions:
15
Warranty Period :
12
Months from the date of commissioning/ handing over of the Project Years for compressors from the date of commissioning1handing over of the Project
Prepared by Designation
: IMRAN RASHEED
: PROJECT ENGINEER
ign :
All material supplied under this contract shall be mdactured to a standard set down in the specifications and supplied by one of the following manufacturers. Where specific reference has been made to a particular manufacturer in the schedules, spec5catiom, drawings or BOQ the tenderer shall be base the price on same with the other manufacturers being listed below as alternatives, equal in every respect to the specified manufactures materials.
LCP
. . .
,
' .
.;.
'
J9 Marlin Grein (France) a) Lifasa (Spain) b) ABB (Europe) Caterpillar Perkins Klochner Moeller
n b) , ~ a r l i Grein
D.Smith Asea Brown Boveri
02.
Capacitor Bank .
.
. .
0. 3
AC Generator Set
04.
1.
04.
a) Decoduct (UK)
. . . b) Marshal Tufflex
Interplast Co.
05,.
GI Boxes
. .
a) MK(UK) b) Crabtree 0
.'
06.
PVC Ducts
,
a)'
a)
07.
BICC (UK)
Ducab .Co.
b) Triveni
08.
09.
10.
I/
MK (UK)
SMKA Co.