You are on page 1of 10

PT-200 Programming

Software

Presented by: SMT Indian engg


Contents
 Power Supply
 Air Supply
 LAN Setup
 PATLITE Setup
Power Supply
 Supply Power:
 200VAC ± 10V or
400VAC ± 10V
 Frequency:
 50/60 Hz ± 5%
 Rated Capacity:
 2.5 kVA
Power Supply

 Installation Procedure:
 Open the panel on the right side of
the machine
 Pass the cable through the cable
clamp and secure it by rotating
clockwise
 Connect the cable with the main
power terminal
 Connecting pin: Weidmuller H4/20D or
H6/20
 Connection order: PEL1L2L3
 Tightening torque: 0.8~1.6 Nm
Air Supply
 Supply compressed air
to A (in diagram)
 Air pressure:
0.49~0.78MPa
 Adjust to:
0.49~0.54MPa using the
regulator
 Air supply: Min.
150L/min (8L/min more
for every bulk feeder)
LAN Setup
LAN Setup
 Connect Ethernet cable to HUB in the
machine and with the line computer (PT
installed)
PATLITE Setup
 Insert the plug
into the socket
on the main
machine and fix
it with a clasp

You might also like