00 . 00 98 .1
Status:
FOR INFORMATION
N
Keyplan:
C H . 9 1 1 0 . 00 0
C
THIS DRAWING
C H . 9 1 2 0 . 00 0
H 00 . 00 97 .1
MA 1 0 TCHL 1 IE N DA : - E G DR N0 0 G. o N 0 0 . 00 -0 0 0 5 9
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
o. 1 1 .N G 005 R 0 :D 0E 00 N 0 LI - 0 H N TC G E A M DA 011
N STR EET
STRE ET
M BE
C H. 1 3 9 0 00 .0
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
C H 00 . 00 96 .1
CH. 9 1 5 0 0 .0 0
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
B R O D E W E M N S Y A T A LE S L
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
BEVI NG TO
STRE ET
FARN CO
T S L WE WA L Y E N S O D E M B R
G EO R OW GE R
PROPOSED SHAFT
T E T E SR T N KO L C FO
PROPOSED TUNNEL
MIL L
PLAN
SCALE 1:1000
120.0m CHAMBERS WHARF SHAFT EXISTING GROUND LEVEL 110.0m MEAN HIGH WATER SPRINGS 100.0m NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
90.0m
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 194.1m R -1000.0m L 194.8m L 125.2m L 309.7m
Project Name:
VERTICAL GEOMETRY
4 .5 78 1 4 .1 77 1 4 .6 76 1 4 .2 75 1 4 .6 77 2 4 .7 75 2 4 .2 77 4 4 .3 75 4 4 .0 78 0 4 .8 77 7 4 .3 77 7 4 .1 76 0 4 .9 75 7 4 .4 75 7 4 .3 78 8 4 .1 78 3 4 .4 77 9 4 .9 76 9 4 .7 76 3 4 .4 76 8 4 .2 76 3 4 .5 75 9 4 .0 75 9 4 .8 74 3 4 .8 76 6 4 .9 74 6 4 .2 78 5 4 .7 77 5 4 .3 76 5 4 .8 75 5
1 0 0 9 9
1 1 0 9 0
1 1 0 9 1
1 1 0 9 2
1 1 0 9 3
1 1 0 9 4
1 1 0 9 5
1 1 0 9 6
1 1 0 9 7
1 1 0 9 8
1 1 0 9 9
1 2 0 9 0
1 2 0 9 1
1 2 0 9 2
1 2 0 9 3
1 2 0 9 4
1 2 0 9 5
1 2 0 9 6
1 2 0 9 7
1 2 0 9 8
1 2 0 9 9
1 3 0 9 0
1 3 0 9 1
1 3 0 9 2
1 3 0 9 3
1 3 0 9 4
1 3 0 9 5
1 3 0 9 6
1 3 0 9 7
1 3 0 9 8
1 3 0 9 9
1 4 0 9 0
1 4 0 9 1
1 4 0 9 2
1 4 0 9 3
1 4 0 9 4
1 4 0 9 5
1 4 0 9 6
1 4 0 9 7
1 4 0 9 8
1 4 0 9 9
1 5 0 9 0
1 5 0 9 1
1 5 0 9 2
1 5 0 9 3
1 5 0 9 4
1 5 0 9 5
1 5 0 9 6
1 5 0 9 7
1 5 0 9 8
1 5 0 9 9
1 6 0 9 0
1 6 0 9 1
1 6 0 9 2
1 6 0 9 3
1 6 0 9 4
1 6 0 9 5
1 6 0 9 6
1 6 0 9 7
1 6 0 9 8
1 6 0 9 9
1 7 0 9 0
1 7 0 9 1
1 7 0 9 2
1 7 0 9 3
PROFILE
110-DA-GEN-00000-000510
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
RIVER BED
N
Status:
FOR INFORMATION
MA 1 0 TCHL 1 IE N DA : - E DR G N0 0 G. o N 0 0 00 -0 . 0 1 5 0
Keyplan:
THIS DRAWING
C H 00 . 00 04 .2
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR
80.0m
70.0m
60.0m
10 m
100 m
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
Project Name:
VERTICAL GEOMETRY
4 .5 69 1 4 .6 67 1 4 .0 70 2 4 .6 68 2 4 .1 68 2 4 .7 66 2 4 .1 70 4 4 .6 69 4 4 .2 68 4 4 .7 67 4 4 .4 70 0 4 .2 70 7 4 .0 69 0 4 .5 68 0 4 .3 68 7 4 .1 67 0 4 .9 66 7 4 .8 69 9 4 .3 69 8 4 .1 69 3 4 .8 68 8 4 .9 67 9 4 .4 67 8 4 .2 67 3 4 .5 66 9 4 .7 69 6 4 .2 69 6 4 .8 67 6 4 .7 68 5 4 .3 67 5 4 .8 66 5
1 7 0 9 3
1 7 0 9 4
1 7 0 9 5
1 7 0 9 6
1 7 0 9 7
1 7 0 9 8
1 7 0 9 9
1 8 0 9 0
1 8 0 9 1
1 8 0 9 2
1 8 0 9 3
1 8 0 9 4
1 8 0 9 5
1 8 0 9 6
1 8 0 9 7
1 8 0 9 8
1 8 0 9 9
1 9 0 9 0
1 9 0 9 1
1 9 0 9 2
1 9 0 9 3
1 9 0 9 4
1 9 0 9 5
1 9 0 9 6
1 9 0 9 7
1 9 0 9 8
1 9 0 9 9
2 0 0 0 0
2 0 0 0 1
2 0 0 0 2
2 0 0 0 3
2 0 0 0 4
2 0 0 0 5
2 0 0 0 6
2 0 0 0 7
2 0 0 0 8
2 0 0 0 9
2 1 0 0 0
2 1 0 0 1
2 1 0 0 2
2 1 0 0 3
2 1 0 0 4
2 1 0 0 5
2 1 0 0 6
2 1 0 0 7
2 1 0 0 8
2 1 0 0 9
2 2 0 0 0
2 2 0 0 1
2 2 0 0 2
2 2 0 0 3
2 2 0 0 4
2 2 0 0 5
2 2 0 0 6
2 2 0 0 7
2 2 0 0 8
2 2 0 0 9
2 3 0 0 0
2 3 0 0 1
2 3 0 0 2
2 3 0 0 3
2 3 0 0 4
2 3 0 0 5
2 3 0 0 6
2 3 0 0 7
PROFILE
110-DA-GEN-00000-000511
1:2000@ A3 1:1000@ A1
5 0
1 0 0
30.0m
1 0 5
2 0 m 0 m
BED OF RIVER
EL EVATI ON
CH . 9 1 7 0 . 00 0
THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
CH .0 00 0 3 0 2 .
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
.0 2 1 00 CH. 0 0
CH. 0 0 . 2 0 00 0
PROPOSED SHAFT
PROPOSED TUNNEL
P T O T E Y R S T E R E T
B E R MO N D S E Y
A L LE A S T
R =
PLAN
SCALE 1:1000
120.0m NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
90.0m
M AT CHL I E: N 1 0D 1 DRG A- E . o G N N . -0 0 0 0 00 0 -0 5 1 3
Status:
SHADWELL BASIN
Keyplan:
FOR INFORMATION
N
WA P P IG N H I HS G T E R E T
THIS DRAWING
WA P I PN GW AL L
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
L EL W D AD EA SH RH E PI
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
CH. 0 0 . 0 2 9 00
2 8 00 CH. 0 0 . 0
2 7 00 CH. 0 0 . 0
2 6 00 CH. 0 0 . 0
CH. 2 0 1 0 00 .0
2 5 00 CH. 0 0 . 0
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
2 4 00 CH. 0 0 . 0
PROPOSED SHAFT
PROPOSED TUNNEL
PLAN
SCALE 1:1000
120.0m NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG
100.0m
THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 489.8m
Project Name:
VERTICAL GEOMETRY
4 .4 62 1 4 .9 61 1 4 .5 60 1 4 .5 61 2 4 .0 61 2 4 .6 59 2 4 .1 59 2 4 .1 61 4 4 .6 60 4 4 .2 59 4 4 .7 58 4 4 .4 61 0 4 .2 61 7 4 .0 60 0 4 .5 59 0 4 .3 59 7 4 .2 62 9 4 .0 62 3 4 .7 61 8 4 .8 60 9 4 .3 60 8 4 .1 60 3 4 .8 59 8 4 .9 58 9 4 .1 62 6 4 .7 60 6 4 .2 60 6 4 .8 58 6 4 .6 61 5 4 .7 59 5
2 3 0 0 6
2 3 0 0 7
2 3 0 0 8
2 3 0 0 9
2 4 0 0 0
2 4 0 0 1
2 4 0 0 2
2 4 0 0 3
2 4 0 0 4
2 4 0 0 5
2 4 0 0 6
2 4 0 0 7
2 4 0 0 8
2 4 0 0 9
2 5 0 0 0
2 5 0 0 1
2 5 0 0 2
2 5 0 0 3
2 5 0 0 4
2 5 0 0 5
2 5 0 0 6
2 5 0 0 7
2 5 0 0 8
2 5 0 0 9
2 6 0 0 0
2 6 0 0 1
2 6 0 0 2
2 6 0 0 3
2 6 0 0 4
2 6 0 0 5
2 6 0 0 6
2 6 0 0 7
2 6 0 0 8
2 6 0 0 9
2 7 0 0 0
2 7 0 0 1
2 7 0 0 2
2 7 0 0 3
2 7 0 0 4
2 7 0 0 5
2 7 0 0 6
2 7 0 0 7
2 7 0 0 8
2 7 0 0 9
2 8 0 0 0
2 8 0 0 1
2 8 0 0 2
2 8 0 0 3
2 8 0 0 4
2 8 0 0 5
2 8 0 0 6
2 8 0 0 7
2 8 0 0 8
2 8 0 0 9
2 9 0 0 0
2 9 0 0 1
2 9 0 0 2
2 9 0 0 3
2 9 0 0 4
2 9 0 0 5
2 9 0 0 6
2 9 0 0 7
2 9 0 0 8
2 9 0 0 9
2 0 0 1 0
PROFILE
110-DA-GEN-00000-000512
1:2000@ A3 1:1000@ A1
5 0
1 0 0
30.0m
1 0 5
N
Status:
T H EH IH G WA Y
FOR INFORMATION
Keyplan:
N
THIS DRAWING
J AR D
IE N
RO
AD
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE
W STR EET
CH. 1 0 . 0 2 3 00
NUMBER 100019345
0 .0 2 2 00 CH. 1
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
CH. 2 4 1 0 00 .0
NARRO
ROTHERHITHE TUNNEL
.0 00 1 0 2 1 CH.
C H. 2 1 5 0 00 .0
CH . 2 1 6 0 00 .0
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PROPOSED SHAFT
PROPOSED TUNNEL
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
EL EVATI ON
70.0m
60.0m
10 m
100 m
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
R 600.0m L 256.9m L 84.0m R 600.0m L 289.6m L 138.6m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
4 .4 53 1 4 .9 52 1 4 .5 51 1 4 .0 51 1 4 .9 53 2 4 .0 52 2 4 .6 50 2 4 .5 53 4 4 .6 51 4 4 .3 54 0 4 .1 54 7 4 .6 53 7 4 .4 52 0 4 .2 52 7 4 .7 51 7 4 .5 50 0 4 .7 53 9 4 .2 53 9 4 .0 53 3 4 .7 52 8 4 .5 52 3 4 .8 51 9 4 .3 51 9 4 .1 51 3 4 .8 50 8 4 .1 53 6 4 .2 51 6 4 .0 54 5 4 .6 52 5 4 .1 52 5 4 .7 50 5
2 0 0 1 0
2 0 0 1 1
2 0 0 1 2
2 0 0 1 3
2 0 0 1 4
2 0 0 1 5
2 0 0 1 6
2 0 0 1 7
2 0 0 1 8
2 0 0 1 9
2 1 0 1 0
2 1 0 1 1
2 1 0 1 2
2 1 0 1 3
2 1 0 1 4
2 1 0 1 5
2 1 0 1 6
2 1 0 1 7
2 1 0 1 8
2 1 0 1 9
2 2 0 1 0
2 2 0 1 1
2 2 0 1 2
2 2 0 1 3
2 2 0 1 4
2 2 0 1 5
2 2 0 1 6
2 2 0 1 7
2 2 0 1 8
2 2 0 1 9
2 3 0 1 0
2 3 0 1 1
2 3 0 1 2
2 3 0 1 3
2 3 0 1 4
2 3 0 1 5
2 3 0 1 6
2 3 0 1 7
2 3 0 1 8
2 3 0 1 9
2 4 0 1 0
2 4 0 1 1
2 4 0 1 2
2 4 0 1 3
2 4 0 1 4
2 4 0 1 5
2 4 0 1 6
2 4 0 1 7
2 4 0 1 8
2 4 0 1 9
2 5 0 1 0
2 5 0 1 1
2 5 0 1 2
2 5 0 1 3
2 5 0 1 4
2 5 0 1 5
2 5 0 1 6
2 5 0 1 7
2 5 0 1 8
2 5 0 1 9
2 6 0 1 0
2 6 0 1 1
2 6 0 1 2
2 6 0 1 3
2 6 0 1 4
PROFILE
110-DA-GEN-00000-000513
1:2000@ A3 1:1000@ A1
5 0
1 0 0
30.0m
1 0 5
AD
FOR INFORMATION
Keyplan:
N
AN
BR
THIS DRAWING
LM IE H O U S EL IK N
DLR VIADUCT
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
RO
AY PL AC E
ST RE ET
IL S A ND
L N A E
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
2 3 00 CH. 2 0 . 0
H OR S E F E R R Y
WH AR F
SP ER T
NO
RM
.0 00 2 0 2 2 CH.
HORSEFERRY ROAD
W HARF L ANE
NORM AY PL ACE
EL EVATI ON
70.0m
60.0m
10 m
100 m
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
R 600.0m L 248.4m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
R -600.0m L 443.1m
VERTICAL GEOMETRY
4 .8 45 1 4 .4 44 1 4 .9 43 1 4 .5 42 1 4 .9 44 2 4 .0 43 2 4 .9 45 4 4 .5 44 4 4 .6 42 4 4 .3 45 0 4 .1 45 7 4 .6 44 7 4 .4 43 0 4 .2 43 7 4 .7 42 7 4 .1 46 9 4 .6 45 8 4 .4 45 3 4 .7 44 9 4 .2 44 9 4 .0 44 3 4 .7 43 8 4 .5 43 3 4 .8 42 9 4 .0 46 6 4 .5 45 6 4 .1 44 6 4 .0 45 5 4 .6 43 5 4 .1 43 5
2 6 0 1 4
2 6 0 1 5
2 6 0 1 6
2 6 0 1 7
2 6 0 1 8
2 6 0 1 9
2 7 0 1 0
2 7 0 1 1
2 7 0 1 2
2 7 0 1 3
2 7 0 1 4
2 7 0 1 5
2 7 0 1 6
2 7 0 1 7
2 7 0 1 8
2 7 0 1 9
2 8 0 1 0
2 8 0 1 1
2 8 0 1 2
2 8 0 1 3
2 8 0 1 4
2 8 0 1 5
2 8 0 1 6
2 8 0 1 7
2 8 0 1 8
2 8 0 1 9
2 9 0 1 0
2 9 0 1 1
2 9 0 1 2
2 9 0 1 3
2 9 0 1 4
2 9 0 1 5
2 9 0 1 6
2 9 0 1 7
2 9 0 1 8
2 9 0 1 9
2 0 0 2 0
2 0 0 2 1
2 0 0 2 2
2 0 0 2 3
2 0 0 2 4
2 0 0 2 5
2 0 0 2 6
2 0 0 2 7
2 0 0 2 8
2 0 0 2 9
2 1 0 2 0
2 1 0 2 1
2 1 0 2 2
2 1 0 2 3
2 1 0 2 4
2 1 0 2 5
2 1 0 2 6
2 1 0 2 7
2 1 0 2 8
2 1 0 2 9
2 2 0 2 0
2 2 0 2 1
2 2 0 2 2
2 2 0 2 3
2 2 0 2 4
2 2 0 2 5
2 2 0 2 6
2 2 0 2 7
2 2 0 2 8
PROFILE
110-DA-GEN-00000-000514
1:2000@ A3 1:1000@ A1
5 0
1 0 0
30.0m
1 0 5
2 0 m 0 m
C H . 2 1 6 0 00 .0
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
.0 00 0 1 2 2 .
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
C H. 2 7 1 0 00 .0
.0 00 2 0 2 0 CH.
CH. 1 2 8 0 0 .0 0
2 9 00 CH. 1 0 . 0
PROPOSED SHAFT
PROPOSED TUNNEL
N A R R O W S T R E E T
PLAN
SCALE 1:1000
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG
100.0m
THE TUNNEL.