No. of Printed Pages—2 OE—07
B. TECH.
SEVENTH SEMEST EXAMINATION, 2003-2004
QUALITY SYSTEM & MANAGEMENT
Time : 3 Hours Total Marks : 100
Note: Attempt All questions.
1. Answer any TWO of the following -— (10x2=20)
(a) Do we need quality systems ? Discuss.
\@) What are the different stages of quality
assurance systems ?
(What kind of responsibility management has
towards implementation of quality systems
in an indusiry ?
2. Answer any TWO of the following (10x2=20)
(a) Discuss the vasiqus steps to be observed in
implementation of ISO-9000 quality system
\-@) What are quality procedures and why do we
need to code them in black and white ?
(c) Discuss the importance of having third party
Be auditing of quality system implementation.
Bi (10x2=20)
3. Answer any TWO of the following
(a) What are the various aspects of
Manufacturing and Management that are not
covered in ISO-9000 ?
| (b) List out the reasons for transition from
=I Quality Control phase to Quality Assurance(c) Discuss the importance of inspection and
calibration of measuring instruments as
suggested in ISO+9001 standard.
Answer any TWO of the following :— (10x2=20)
(a) What is the role of training as envisaged in
1SO-9000 quality standards ?
(b) Discuss the aspect of Traceability with
respect to corrective and preventive
measures.
(c) How do we take care of non-conformance to
various clauses of ISO quality. standards ?
Answer any TWO of the following :-— {10x2=20)
(a) How are qualitative characteristics different
from quantitative characteristics ? For various
characteristics, which type of inspections can
be used? Also discuss the causes of
variations in process quality.
(b) What for is acceptance sampling carried out ?
Give the details of single sampling plan for
attributes stating the steps for its design.
(c) Describe the procedure for designing X and
R charts for the first time when process
mean and variance both are not known.