You are on page 1of 1
AKGEC/TAP ME-80/FM/01 REV. No. : 00 AJAY KUMAR GARG ENGINEERING COLLEGE.GHAZIABAD SESSIONAL TEST-IL Course : B.Tech. Subject Name : Quality System & Management Branch : EN/CS/TT/E&C Subject Code : OF-07 Semester : VIL ‘Max. Marks : 30 ‘Time Allowed : 1 hrs. Note: (@) Attempt All the Questions Q.1. Attempt the following. (3x3=9) (a) What is meant by process capability? How will you determine the same? (2H1=3) (b) Compare X chart and R chart. Discuss the circumstances in which either of the two or a combination of these will be used for a purpose of control 41-3) (©) What do you understand by ‘statistical control of production processes"? explain how X and R chart help in determining lack of control. What appropriate action should be taken for a process which is controlled but inconsistent with the specification (1+1+1=3) Q2. The following readings were taken for a control chart (3+3+3+3=12) | Sample No. x1 xz : x4 i 30.74 80.76 80.73 2 80.73 80.76 80.75 3 80.72 80.75 80.81 4 80.74 80.73 80.77 5 80.74 80.75 [80.74 6 80.76 30.75 | 80.74 rs 80.78 80.77 | 80.80 8 80.78 __ 80.77 a 80.81 (@) Calculate X and R for each sample (b) Calculate control limits (©) Draw X and R chart (a) Give your comments over the process Take n=4, d2=2.059, D4=2.28 and D: Q3. Write short notes on any two of the following. (3 x2 =6) (a) Objectives of Control chart. (b) Statistical Quality Assurance tools (c) Quality standards as a tool for development

You might also like