GHAZIABAD
'SESSIONAL TEST — IT
QUALITY SYSTEM AND MANAGEMENT
(OPEN ELECTIVE)
B. TECH. — VII" SEM. (CS, EC & IT)
-1 HOUR M. MARKS: 30
TIME:
All Questions are Compulsory.
we
What, the type of control charts ?
In a process to menu facture the shifts, five observations of shaft diameter
@)
of 10 samples are taken on an hourly basis The recorded observations are
given below. Draw ‘X’ and ‘R’ chart. (@
i Peto. S01 [___ 8.0105 oe
- { 000 | 8.005. { 8.002 8.010
| ae 5) soos | 8.01
[4 8.05 | {nore oa
(s 8.012 | (8.065 at 8.012 5
6 8.015 { 8.07 8.08
‘* 8.06 | 8.105 8.06 |
8 8.03 8.06 ROE
9 | 8.04 8.04 80% 2
Lia 1. oes 8.04 8.01
Ae = 0.577, Ds = 0, Da = 2.115
Q.2. @) Explain the acceptance sampling and also discuss its types. 5
Oy Dea ae the test results of 10 samples of 300 items are shown below.
aw =
pn Simos it ac a ig ig ie au i >
Sumber | 30 ge (28 [24 ae 12
|
Defective t tee ay el | (shal
Q3. (@) Explain the ISO-9000 quality system. 4
6
®)
Explain the requirements for ISO-9000 quality system.
seers