You are on page 1of 42

PERBANDINGAN CAMPURAN BETON

Beton campuran 1 : 3 : 5
1 m Pc
3 m Ps
5 m Kr

=
=
=

1
3
5

x
x
x

1 m Beton membutuhkan :
Pc
=
1/5.385 x 0.76
=
176.4159703
Ps
Kr
Beton campuran 1 : 2 : 3
1 m Pc
2 m Ps
3 m Kr

=
=
=

1
2
3

1 m Beton membutuhkan :
Pc
=
1/3.67 x 0.76
=
258.8555858
Ps
Kr

0.760
0.675
0.520

=
=
=
=

Kg

x
x
x

0.760
0.675
0.520

Kg

=
=
=

=
=
=

=
=
=
=

0.760
2.025
2.600
5.385
0.141
4.4103993
0.376
0.483

0.760
1.350
1.560
3.670
0.207
6.4713896
0.368
0.425

m spesi basah
m spesi basah
m spesi basah
m spesi basah
m
sak ~ 5 sak
m
m

m spesi basah
m spesi basah
m spesi basah
m spesi basah
m
sak ~ 7 sak
m
m

ANALISA BETON BERTULANG


Tabel Berat Besi
mm

kg/m

0.15

8000

14400

0.22

8000

21120

4.9

0.39

8000

37440

8.3

10

0.62

8000

59520

9.5

12

0.89

8000

85440

14

1.21

8000

116160

16

1.58

8000

151680

Sloof 15/20

Begel 10/15 jarak 20cm


per m1

sat

Volume

0.03

m3

Bekisting

0.4

Perancah
d (mm)
Besi

sat

jmlh batang / m3

m2

13.3333

m2

m2

0.0000

m2

kg

96.1667

kg

7.5

per m3

sat

jmlh batang / m3

p (m)

10

2.48

0.54

2.7

0.405

Sloof 15/25

per m3

11.11111111
2.885

Begel 10/20 jarak 20cm


per m1

sat

Volume

0.0375

m3

Bekisting

0.5

m2

13.3333

m2

m2

0.0000

m2

kg

137.4400

kg

7.111111111

per m3

sat

jmlh batang / m3

Perancah
d (mm)
Besi

p (m)

12

4.45

0.64

3.2

0.704

Ringbalk 15/20

11.11111111
5.154

Begel 10/15 jarak 20cm


per m1

sat

Volume

0.03

m3

Bekisting

0.6

m2

20.0000

m2

Perancah

m2

100.0000

m2

2.885

kg

96.1667

kg

7.5

per m3

sat

jmlh batang / m3

d (mm)
Besi

p (m)

10

2.48

0.54

2.7

0.405

Ringbalk, Latey 15/15

11.11111111

Begel 10/10 jarak 20cm


per m1

sat

Volume

0.0225

m3

Bekisting

0.4

m2

17.7778

m2

Perancah

btg

88.8889

btg

1.89

kg

84.0000

kg

8.148148148

per m3

sat

jmlh batang / m3

17.7778

m2

d (mm)
Besi

p (m)

1.56

0.44

2.2

0.33

Kolom Praktis 15/15

14.81481481

Begel 10/10 jarak 20cm


per m1

sat

Volume

0.0225

m3

Bekisting

0.4

m2

Perancah

btg
d (mm)

Besi

Balok 15/25

166.666667

btg

p (m)

1.56

0.44

2.2

0.33

14.81481481
1.89

kg

84.0000

kg

8.148148148

per m3

sat

jmlh batang / m3

222.222222

Begel 10/20 jarak 20cm


per m1

sat

Volume

0.0375

m3

Bekisting

0.41

m2

10.9333

m2

Perancah

btg

80.0000

btg

Hal 2/42

d (mm)
Besi

p (m)

12

4.45

0.64

3.2

0.704

Balok 15/30

11.11111111
5.154

kg

137.4400

kg

7.111111111

per m3

sat

jmlh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.045

m3

Bekisting

0.51

m2

11.3333

m2

Perancah

btg

66.6667

btg

7.1602392

kg

159.1164

kg

7.830296296

per m3

sat

jmlh batang / m3

d (mm)
Besi

p (m)

12

0.74

5.714

Balok 20/60

6.23

4.2284 0.9302

12.96296296

Begel 10/25 jarak 10 - 20cm (15cm)


per m1

sat

Volume

0.12

m3

Bekisting

0.51

m2

11.3333

m2

Perancah

btg

66.6667

btg

7.1602392

kg

159.1164

kg

7.830296296

per m1

sat

per m3

sat

jmlh batang / m3

0.03

m3

Bekisting

0.4

m2

13.3333

m2

Perancah

0.67

btg

22.3333

btg

2.885

kg

96.1667

kg

7.5

per m3

sat

jmlh batang / m3

d (mm)
Besi

p (m)

12

0.74

5.714

Kolom 15/20

6.23

4.2284 0.9302

12.96296296

Begel 10/15 jarak 20cm

Volume

d (mm)
Besi

p (m)

10

2.48

0.54

2.7

0.405

Kolom 15/30

11.11111111

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.045

m3

Bekisting

0.51

m2

11.3333

m2

Perancah

btg

22.2222

btg

8.0502392

kg

178.8942

kg

7.830296296

per m3

sat

jmlh batang / m3

d (mm)
Besi

p (m)

12

0.74

5.714

Kolom 30/30

7.12

4.2284 0.9302

14.81481481

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.09

m3

Bekisting

0.7

m2

7.7778

m2

Perancah

btg

11.1111

btg

d (mm)
Besi

p (m)

16

6.32

12

3.56

10

1.09

5.714

Kolom 25/25

3.703703704
3.703703704

6.2283 3.8615 13.7415212

kg

152.6836

kg

5.766907407

per m3

sat

jmlh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.0625

m3

Bekisting

0.6

m2

9.6000

m2

Perancah

btg

16.0000

btg

d (mm)
Besi

p (m)

16

12

7.12

10.66666667

0.9

5.714

5.1426 3.1884

10.308412

kg

164.9346

kg

6.8568

Hal 3/42

Plat lantai t = 12cm

Jarak 25 x 25 cm (2 lapis)
per m2

sat

Volume

0.12

m3

Bekisting

Perancah

9.92

d (mm)

per m3

sat

m2

8.3333

m2

m2

8.3333

m2

kg

82.6667

kg

per m3

sat

jmlh batang / m3

p (m)

Besi

0
10

Atap t = 8cm

16

16

9.92

11.11111111

Jarak 20 x 20 cm (1 lapis)
per m2

sat

Volume

0.08

m3

Bekisting

m2

12.5000

m2

Perancah

m2

12.5000

m2

3.9

kg

48.7500

kg

per m3

sat

d (mm)

p (m)

Besi
8
Atap t = 10cm

10

10

3.9

Jarak 30 x 30 cm (2 lapis)
per m2

sat

Volume

0.1

m3

Bekisting

m2

10.0000

m2

Perancah

m2

10.0000

m2

5.20026

kg

52.0026

kg

11.11166667

per m3

sat

jmlh batang / m3

d (mm)

jmlh batang / m3

p (m)

Besi

0
8

Voet plat 80x80

13.334 13.334 5.2003

Begel 10/25 jarak 15cm


per unit

sat

Volume

0.11675

m3

Bekisting

0.48

m2

4.1113

m2

29.8128

kg

255.3559

kg

3.169164882

per m3

sat

jmlh batang / m3

Perancah
d (mm)
Besi

p (m)

12

32.4

32.4

28.836

0.74

4.44

0.9768

Voet plat 60x60

23.12633833

Begel 10/15 jarak 15cm


per unit

sat

Volume

0.054

m3

Bekisting

0.48

m2

4.1113

m2

5.861

kg

108.5370

kg

4.166666667

per m3

sat

jmlh batang / m3

Perancah
d (mm)
Besi

p (m)

10

8.8

8.8

5.456

0.54

2.7

0.405

Voet plat 100x100

13.58024691

92.59259

Begel 30/30 jarak 15cm


per unit

sat

Volume

0.281

m3

Bekisting

0.48

m2

4.1113

m2

29.8128

kg

255.3559

kg

3.169164882

per m3

sat

jmlh batang / m3

Perancah
d (mm)
Besi

balok 20/93

p (m)

12

32.4

32.4

28.836

0.74

4.44

0.9768

23.12633833

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.186

m3

Bekisting

0.6

m2

3.2258

m2

Perancah

btg

5.3763

btg

Hal 4/42

d (mm)
Besi

p (m)

16

4.74

12

10

10

8.9

2.15

5.714

balok 20/60

12.285 4.7912

5.555555556
4.480286738
18.431189

kg

99.0924

kg

5.504077061

per m3

sat

jmlh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.12

m3

Bekisting

0.6

m2

5.0000

m2

Perancah

btg

8.3333

btg

d (mm)
Besi

p (m)

16

4.74

12

5.34

1.5

5.714

8.571

3.3427

Kolom 25/25

5.555555556
4.166666667
13.42269

kg

111.8558

kg

5.952083333

per m3

sat

jmlh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)


per m1

sat

Volume

0.0625

m3

Bekisting

0.6

m2

9.6000

m2

Perancah

btg

16.0000

btg

d (mm)
Besi

p (m)

16

12

7.12

10.66666667

0.9

5.714

5.1426 3.1884

10.308412

kg

164.9346

kg

6.8568

Hal 5/42

Hal 6/42
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KOTA SEMARANG
Tahun 2011
SATUAN
NO.

URAIAN

HARGA
SATUAN
(RUPIAH)

UPAH:

Tukang Batu

hari

43,000

Tukang Besi

hari

43,000

Tukang Kayu

hari

43,000

Kepala Tukang

hari

47,000

Pekerja

hari

33,000

Mandor

hari

45,000

BAHAN/MATERIAL:

Amplas Tembok

lbr.

600

Amplas Sikkens

lbr.

2,500

Adukan ready mix K-225

m3

560,000

Alat bantu selang

lot

80,000

Batu Bata Welahan

bh.

400

Batu Belah

m3

100,000

Besi Beton

kg.

7,500

Bubungan Genteng beton flat

bh.

3,800

Cat Dasar

kg.

20,000

10

Cat Kilat

kg.

60,000

11

Cat Meni Nippon

kg.

15,000

12

Cat Dulux Ext

ltr.

70,000

13

Cat Tembok samping flinkote

kg.

26,000

14

Cat Tembok exterior mowilex

ltr.

55,000

15

Cat Tembok interior ex catylac

kg.

18,000

16

Cat plafond maxilite

kg.

8,800

17

Cat Alkali

kg.

23,750

18

Folding Gate

m2

285,000

19

Genteng beton flat

bh.

3,500

20

Gypsum 9 mm

lbr

46,000

21

Kalsiboard ex. Nusaboard 4,5 mm

lbr

45,000

22

Kaca Bening 5 mm

m2

60,000

23

Kaca Warna 10 mm

m2

250,000

24

Kawat Pengikat

kg.

14,000

25

Kayu Dolken

btg

12,000

26

Kayu Bengkirai Papan

m3

6,000,000

27

Kayu Bengkirai 6/12 x 4m

btg

200,000

28

Besi Hollow

btng

18,000

29

Kayu Usuk untuk Cor

m3

2,500,000

30

Koral Beton

m3

170,000

31

Lembar Seng

m1

25,000

32

List Gypsum

m1

12,000

33

Minyak Cat

ltr.

5,500

34

Multiplex 9mm

lbr

105,000

35

Paku bermacam-macam ukuran

kg

15,000

36

Paku Beton

bh.

500

37

Paku Biasa

kg.

15,000

38

Paku Gypsum

kg

30,000

39

Papan Cor

lbr

7,000

40

Pasir Muntilan

m3

130,000

41

Pasir Urug

m3

90,000

42

Plamir Kayu

kg.

11,000

43

Plamir Tembok

kg.

8,000

KET.

Hal 7/42
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KOTA SEMARANG
Tahun 2011
SATUAN
NO.

URAIAN

HARGA
SATUAN
(RUPIAH)

44

Split

m3

170,000

45

Semen Portland (PC)

zak

42,000

46

Semen Putih

zak

55,000

47

Tanah Urug

m3

50,000

48

Ter / Residu

ltr.

9,000

49

Thinner

ltr.

6,500

50

Alat Bantu / Steiger

Ls

18,000

51

Kayu Usuk 5/7 x 4m Bengkirai

btg

85,000

52

Kayu Reng 2/3 4 m Bengkirai

btg

13,000

53

Papan 2/30 x 4 m

lbr

110,000

54

Wood plank 2/20 x 4 m ex. Elephant

lbr

45,000

55

Keramik 40 x 40 cm ex platinum

dos

50,000

56

Keramik 33 x 33 cm platinum

dos

45,000

57

Keramik 30 x 30 cm ex asia tile

dos

35,000

58

Keramik 30 x 30 cm ex platinum

dos

35,000

59

Keramik 20 x 20 cm ex asia tile

dos

32,000

60

Keramik 25 x 33 cm platinum

dos

41,500

61

Keramik 20 x 25 cm ex asia tile

dos

35,000

62

List 25cm platinum

bh.

16,000

63

List 20cm asia tile

bh.

6,000

KET.

DAFTAR ANALISA PEKERJAAN


PEMBANGUNAN RUMAH TINGGAL
KOTA SEMARANG 2011
I.
PEKERJAAN PERSIAPAN
1. Analisa 1 m2 Pembersihan Lapangan
0.1000

Pekerja

@Rp.

33,000.00

Rp.

3,300.00

0.0500

Mandor

@Rp.

45,000.00

Rp.

2,250.00

Rp.

5,550.00

5,550.00

2. Analisa 10 M' Pasangan Bouwplank


3
0.0030 M

Kayu Cor

@Rp.

2,500,000.00

Rp.

7,500.00

6.0000 Btg

Kayu Gelam

@Rp.

12,000.00

Rp.

72,000.00

0.1000 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

1,500.00

1.0000

Tukang

@Rp.

43,000.00

Rp.

43,000.00

0.1000

Kepala Tukang

@Rp.

47,000.00

Rp.

4,700.00

1.0000

Pekerja

@Rp.

33,000.00

Rp.

33,000.00

0.0500

Mandor

@Rp.

45,000.00

Rp.

82,950.00

2,250.00
163,950.00

Untuk 1 M' = 1/10

Rp.

16,395.00

II.
PEKERJAAN PONDASI.
1. Analisa 1 M3 Galian Tanah Pondasi
0.7500

Pekerja

@Rp.

33,000.00

Rp.

24,750.00

0.0250

Mandor

@Rp.

45,000.00

Rp.

1,125.00

Rp.

25,875.00

25,875.00

2. Analisa 1 M3 Urugan Tanah Kembali


0.2500

Pekerja

@Rp.

33,000.00

Rp.

8,250.00

0.0084

Mandor

@Rp.

45,000.00

Rp.

378.00

Rp.

8,628.00

8,628.00

3. Analisa 1 M3 Urugan Pasir Bawah Pondasi


1.2000 m3

Pasir Urug

@Rp.

90,000.00

Rp.

108,000.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

118,350.00

10,350.00

4. Analisa 1 M3 Aanstamping Batu Kali


3
1.1000 M
3
M
0.5000

Batu Kali

@Rp.

100,000.00

Rp.

110,000.00

Pasir Urug

@Rp.

90,000.00

Rp.

45,000.00

1.5000

Pekerja

@Rp.

33,000.00

Rp.

49,500.00

0.0750

Mandor

@Rp.

45,000.00

Rp.

3,375.00

Rp.

207,875.00

52,875.00

5. Analisa 1 M3 Pasangan Pondasi Batu Kali ad. 1 : 8


3
1.2000 M

Batu Kali

@Rp.

100,000.00

Rp.

120,000.00

2.4000 Zak
3
0.7600 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

100,800.00

Pasir Pasang

@Rp.

130,000.00

Rp.

98,800.00

0.6000

Tukang

@Rp.

43,000.00

Rp.

25,800.00

0.0600

Kepala Tukang

@Rp.

47,000.00

Rp.

2,820.00

1.5000

Pekerja

@Rp.

33,000.00

Rp.

49,500.00

0.0750

Mandor

@Rp.

45,000.00

Rp.

3,375.00

Rp.

401,095.00

81,495.00

6. Analisa 1 M3 Urugan Tanah Urug


3
1.2000 M

Tanah Urug

@Rp.

50,000.00

Rp.

60,000.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

70,350.00

10,350.00

Hal 8/42

III.

PEK. BETON BERTULANG Ad. 1:2:3

a. Analisa 1 M3 Beton ad. 1 : 2 : 3 (site mix K-225)


7.8960 Zak
3
0.4900 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

331,632.00
63,700.00

3
0.8200 M

Koral Beton

@Rp.

170,000.00

Rp.

139,400.00

0.2500

Tukang

@Rp.

43,000.00

Rp.

10,750.00

0.0250

Kepala Tukang

@Rp.

47,000.00

Rp.

1,175.00

1.6500

Pekerja

@Rp.

33,000.00

Rp.

54,450.00

0.0800

Mandor

@Rp.

45,000.00

Rp.

3,600.00

Rp.

604,707.00

560,000.00

69,975.00

b. Analisa 1 M3 Beton ad. 1 : 2 : 3 (ready mix K-225 berikut selang)


3
1.0000 M

Adukan ready mix K-225

@Rp.

560,000.00

Rp.

0.0450

Alat bantu selang

@Rp.

80,000.00

Rp.

3,600.00

1.0000

Upah Tenaga

@Rp.

34,987.50

Rp.

34,987.50

Rp.

598,587.50

238,350.00

c. Analisa 1 M3 Beton ad. 1 : 3 : 5 (untuk konstruksi rabat, lantai kerja)


5.6750 Zak
3
0.5400 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

70,200.00

3
0.9100 M

Koral Beton

@Rp.

170,000.00

Rp.

154,700.00

1.0000

Upah Tenaga

@Rp.

69,975.00

Rp.

69,975.00

Rp.

533,225.00

d. Analisa Tulang Besi 1 Kg Besi Beton Terpasang


1.0500 Kg

Besi Beton

@Rp.

7,500.00

Rp.

7,875.00

0.0150 Kg

Kawat Pengikat

@Rp.

14,000.00

Rp.

210.00

0.0070

Tukang

@Rp.

43,000.00

Rp.

301.00

0.0007

Kepala Tukang

@Rp.

47,000.00

Rp.

32.90

0.0070

Pekerja

@Rp.

33,000.00

Rp.

231.00

0.0004

Mandor

@Rp.

45,000.00

Rp.

18.00

Rp.

8,667.90

5,833.33

582.90

e. Analisa Upah Bekisting (dengan papan cor l=20cm p=200cm) / M2 (3x pakai)
0.8333 lbr

Papan cor

@Rp.

7,000.00

Rp.

0.2000 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

3,000.00

0.2600

Tukang

@Rp.

43,000.00

Rp.

11,180.00

0.0260

Kepala Tukang

@Rp.

47,000.00

Rp.

1,222.00

0.5200

Pekerja

@Rp.

33,000.00

Rp.

17,160.00

0.0260

Mandor

@Rp.

45,000.00

Rp.

1,170.00

Rp.

39,565.33

18,750.00

30,732.00

f. Analisa Pembuatan Tiang Perancah /M2 (4x pakai)


1.5625 btg

Kayu Dolken

@Rp.

12,000.00

Rp.

0.2000 Kg

Paku

@Rp.

15,000.00

Rp.

3,000.00

0.3300

Tukang

@Rp.

43,000.00

Rp.

14,190.00

0.0300

Kepala Tukang

@Rp.

47,000.00

Rp.

1,410.00

0.6600

Pekerja

@Rp.

33,000.00

Rp.

21,780.00

0.0300

Mandor

@Rp.

45,000.00

Rp.

1,350.00

Rp.

60,480.00
598,587.50

38,730.00

1. Analisa Beton Bertulang Pondasi Foot Plat ad. 1:2:3 Kecil


3
1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

5.3333 M2

Bekisting

@Rp.

39,565.33

Rp.

211,013.79

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,152,146.80

Rp.

1,961,748.09

598,587.50

132.9211 Kg

2. Analisa Beton Bertulang Sloof Struktur ad. 1:2:3


3
1.0000 M

13.3300 M2
171.0900 Kg

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

Bekisting

@Rp.

39,565.33

Rp.

527,405.89

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,482,991.01

Rp.

2,608,984.40

Rp.

598,587.50

3. Analisa Beton Bertulang Sloof Praktis 15/20 ad. 1:2:3


3
1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Hal 9/42

13.3333 M2
138.4667 Kg

Bekisting

@Rp.

39,565.33

Rp.

527,536.46

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,200,215.51

Rp.

2,326,339.47

4. Analisa Beton Bertulang Kolom Struktur (15/20) ad. 1:2:3


3
1.0000 M

13.3333 M2
5.5833 btg
138.4667 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

Bekisting

@Rp.

39,565.33

Rp.

527,536.46

Tiang Perancah

@Rp.

7,500.00

Rp.

41,874.94

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,200,215.51

Rp.

2,374,333.91

604,707.00

5. Analisa Beton Bertulang Kolom Praktis 15/15 ad. 1:2:3


3
1.0000 M

17.7778 M2
131.7333 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

Bekisting

@Rp.

39,565.33

Rp.

703,384.58

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,141,851.33

Rp.

2,449,942.91

6. Analisa Beton Bertulang Balok 15/40 ad. 1:2:3


3
1.0000 M

11.8300 M2
1.6670 M2
213.8300 Kg

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

Bekisting

@Rp.

39,565.33

Rp.

468,057.89

Tiang Perancah

@Rp.

60,480.00

Rp.

100,820.16

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,853,457.06

Rp.

3,020,922.61

7. Analisa Beton Bertulang Balok 15/20 ad. 1:2:3


3
1.0000 M

13.3333 M2
1.6670 M2
138.4667 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

Bekisting

@Rp.

39,565.33

Rp.

527,536.46

Tiang Perancah

@Rp.

60,480.00

Rp.

100,820.16

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,200,215.51

Rp.

2,433,279.13

7. Analisa Beton Bertulang Ring Balk 15/15 ad. 1:2:3


3
1.0000 M

17.7778 M2
1.6670 M2
131.7333 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

Bekisting

@Rp.

39,565.33

Rp.

703,384.58

Tiang Perancah

@Rp.

60,480.00

Rp.

100,820.16

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,141,851.33

Rp.

2,550,763.07

8. Analisa Beton Bertulang Balok Latey 15/15 ad. 1:2:3


3
1.0000 M

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

17.7778 M2

Bekisting

@Rp.

39,565.33

Rp.

703,384.58

84.0000 Kg

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

728,103.60

Rp.

2,036,195.18

9. Analisa Beton Bertulang Plat Lantai ad. 1:2:3 t = 12cm


3
1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

8.3330 M2

Bekisting

@Rp.

70,482.00

Rp.

587,326.51 multiplek

6.0000 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

362,880.00

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

680,066.10

Rp.

2,228,860.10

78.4580 Kg

10. Analisa Beton Bertulang Plat Atap ad. 1:2:3 t = 10cm


3
1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

10.0000 M2

Bekisting

@Rp.

70,482.00

Rp.

704,820.00

10.0000 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

604,800.00

52.0026 Kg

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

450,753.34

Rp.

2,358,960.84

11. Analisa Beton Bertulang Tangga ad. 1:2:3 t = 12cm


3
1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

8.3350 M2

Bekisting

@Rp.

70,482.00

Rp.

587,467.47

8.3520 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

505,128.96

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,482,210.90

171.0000 Kg

Hal 10/42

Rp.

3,173,394.83

12. Analisa Beton Bertulang Dapur ad. 1:2:3 t = 8cm


3
1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

12.5000 M2

Bekisting

@Rp.

33,732.00

Rp.

421,650.00 multiplek

12.5000 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

756,000.00

48.7500 Kg

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

422,560.13

Rp.

2,198,797.63

IV.
PEKERJAAN DINDING DAN PLESTERAN
1. Analisa 1 M2 Pasangan Dinding Batu Bata ad. 1 : 4
80.0000 Bh

Batu Bata Merah

@Rp.

400.00

Rp.

32,000.00

0.3962 Zak
3
0.0420 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

16,640.40

Pasir Pasang

@Rp.

130,000.00

Rp.

5,460.00

0.1000

Tukang

@Rp.

43,000.00

Rp.

4,300.00

0.0100

Kepala Tukang

@Rp.

47,000.00

Rp.

470.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0150

Mandor

@Rp.

45,000.00

Rp.

675.00

Rp.

69,445.40

15,345.00

2. Analisa 1 M2 Pasangan Dinding Batu Bata ad. 1 : 8


80.0000 Bh

Batu Bata Merah

@Rp.

400.00

Rp.

32,000.00

0.2700 Zak
3
0.0450 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

11,340.00

Pasir Pasang

@Rp.

130,000.00

Rp.

5,850.00

0.1000

Tukang

@Rp.

43,000.00

Rp.

4,300.00

0.0100

Kepala Tukang

@Rp.

47,000.00

Rp.

470.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0150

Mandor

@Rp.

45,000.00

Rp.

675.00

Rp.

64,535.00

15,345.00

3. Analisa 1 M2 Plesteran ad. 1 : 4


0.3300 Zak
3
0.0250 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

13,860.00

Pasir Pasang

@Rp.

130,000.00

Rp.

3,250.00

0.1800

Tukang

@Rp.

43,000.00

Rp.

7,740.00

0.0180

Kepala Tukang

@Rp.

47,000.00

Rp.

846.00

0.3600

Pekerja

@Rp.

33,000.00

Rp.

11,880.00

0.0180

Mandor

@Rp.

45,000.00

Rp.

810.00

Rp.

38,386.00

21,276.00

4. Analisa 1 M2 Plesteran ad. 1 : 8 tebal 2 cm


0.1950 Zak
3
0.0268 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,190.00

Pasir Pasang

@Rp.

130,000.00

Rp.

3,484.00

0.1800

Tukang

@Rp.

43,000.00

Rp.

7,740.00

0.0180

Kepala Tukang

@Rp.

47,000.00

Rp.

846.00

0.3600

Pekerja

@Rp.

33,000.00

Rp.

11,880.00

0.0180

Mandor

@Rp.

45,000.00

Rp.

810.00

Rp.

32,950.00

21,276.00

V.
PEKERJAAN LANTAI
1. Analisa 1 M3 Urugan Pasir Bawah Lantai
3
1.2000 M

Pasir Urug

@Rp.

90,000.00

Rp.

108,000.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

118,350.00

168,000.00

10,350.00

2. Analisa 1 M3 Beton Tumbuk ad. 1 : 3 : 5


4.0000 Zak
3
0.5000 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

65,000.00

3
1.0000 M

Koral Beton

@Rp.

170,000.00

Rp.

170,000.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0200

Kepala Tukang

@Rp.

47,000.00

Rp.

940.00

49,410.00

Hal 11/42

1.2000

Pekerja

@Rp.

33,000.00

Rp.

0.0060

Mandor

@Rp.

45,000.00

Rp.

39,600.00
270.00

Rp.

452,410.00

3. Analisa 1 M2 Pasangan Lantai Keramik 40 x 40 cm 1 : 6 tebal 3cm


6.5625 Bh

Keramik 40 x 40

@Rp.

8,333.33

Rp.

54,687.50

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

0.1200

Tukang

@Rp.

43,000.00

Rp.

5,160.00

0.0120

Kepala Tukang

@Rp.

47,000.00

Rp.

564.00

0.2500

Pekerja

@Rp.

33,000.00

Rp.

8,250.00

0.0130

Mandor

@Rp.

45,000.00

Rp.

585.00

Rp.

81,945.50

6.25

14,559.00

3. Analisa 1 M2 Pasangan Lantai Keramik 33 x 33 cm 1 : 6 tebal 3cm


9.6419 Bh

Keramik 33 x 33

@Rp.

5,000.00

Rp.

48,209.37

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

1.0000

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

75,467.37

9.182736455

3. Analisa 1 M2 Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm


11.6667 Bh

Keramik 30 x 30

@Rp.

3,181.82

Rp.

37,121.21

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

1.0000

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

64,379.21

11.11111111

3. Analisa 1 M Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm bagus


11.6667 Bh

Keramik 30 x 30

@Rp.

3,181.82

Rp.

37,121.21

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

1.0000

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

64,379.21

16

3. Analisa 1 M2 Pasangan Lantai Keramik 20 x 20 cm 1 : 6 tebal 3cm


26.2500 Bh

Keramik 20 x 20

@Rp.

1,280.00

Rp.

33,600.00

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

1.0000

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

60,858.00

25

3. Analisa 1 M Pasangan keramik dinding 25 x 33 cm 1 : 6 tebal 3cm


12.7273 Bh

Keramik 25 x 33

@Rp.

3,458.33

Rp.

44,015.15

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

1.0000

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

71,273.15

12.12121212

3. Analisa 1 M Pasangan Keramik dinding 20 x 25 cm 1 : 6 tebal 3cm


21.0000 Bh

Keramik 20 x 25

@Rp.

1,750.00

Rp.

36,750.00

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Zak
3
0.0321 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

1.0000

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

64,008.00

20

3. Analisa 1 M1 Pasangan List Keramik 25 x 6 cm 1 : 6 tebal 3cm


4.2000 Bh

Keramik 25 x 6

@Rp.

16,000.00

Rp.

67,200.00

0.0122 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

511.56

Zak
3
0.0019 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

250.38

Hal 12/42

0.0600

Upah Tenaga

@Rp.

14,559.00

Rp.

873.54

Rp.

68,835.48

3. Analisa 1 M1 Pasangan List Keramik 20 x 6 cm 1 : 6 tebal 3cm


5.2500 Bh

Keramik 20 x 6

@Rp.

6,000.00

Rp.

31,500.00

0.0122 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

511.56

Zak
3
0.0019 M

Semen Putih

@Rp.

55,000.00

Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

250.38

0.0600

Upah Tenaga

@Rp.

14,559.00

Rp.

873.54

Rp.

33,135.48

8. Analisa 1 M2 Pasangan Lantai Batu Koral Sikat


2
1.2000 M

Batu Koral Sikat

@Rp.

75,000.00

Rp.

90,000.00

0.3000 Zak
3
0.0321 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

12,600.00

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

0.3500

Tukang

@Rp.

43,000.00

Rp.

15,050.00

0.0350

Kepala Tukang

@Rp.

47,000.00

Rp.

1,645.00

0.7000

Pekerja

@Rp.

33,000.00

Rp.

23,100.00

0.0350

Mandor

@Rp.

45,000.00

Rp.

1,575.00

Rp.

148,143.00

41,370.00

9. Analisa 1 M2 Pasangan Dinding Batu Alam


2
1.0500 M

Batu Alam

@Rp.

130,000.00

Rp.

136,500.00

0.2030 Zak
3
0.0321 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

0.3500

Tukang

@Rp.

43,000.00

Rp.

15,050.00

0.0350

Kepala Tukang

@Rp.

47,000.00

Rp.

1,645.00

0.6200

Pekerja

@Rp.

33,000.00

Rp.

20,460.00

0.0300

Mandor

@Rp.

45,000.00

Rp.

1,350.00

Rp.

187,704.00

38,505.00

10. Analisa 1 M3 Rabat Beton ad. 1 : 2 : 3


5.6750 Zak
M3
M3
1.0000

Semen Portland (PC)

@Rp.

42,000.00

Rp.

238,350.00

Pasir Pasang

@Rp.

130,000.00

Rp.

Koral Beton

@Rp.

170,000.00

Rp.

Upah Tenaga

@Rp.

69,975.00

Rp.

69,975.00

Rp.

308,325.00

52,500.00

VI.
PEKERJAAN ATAP
1. Analisa 1 M1 Pekerjaan Murplat, Gording, Nok, Jurai
0.2625 btg

Kayu Bengkirai

@Rp.

200,000.00

Rp.

0.0190 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

285.00

0.0518

Tukang

@Rp.

43,000.00

Rp.

2,227.40

0.0052

Kepala Tukang

@Rp.

47,000.00

Rp.

243.65

0.0173

Pekerja

@Rp.

33,000.00

Rp.

570.90

0.0009

Mandor

@Rp.

45,000.00

Rp.

38.88

Rp.

55,865.83

3,080.83

2. Analisa 1 M2 Pasang Usuk dan Reng


0.5500 btg

Kayu Usuk 5/7

@Rp.

85,000.00

Rp.

46,750.00

0.8250 btg

Kayu Reng 2/3

@Rp.

13,000.00

Rp.

10,725.00

0.2500 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

3,750.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0200

Kepala Tukang

@Rp.

47,000.00

Rp.

940.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

77,815.00

16,590.00

3. Analisa 1 M2 Pasang Atap Genteng Beton flat


10.0000 Bh

Genteng Beton

@Rp.

3,500.00

Rp.

35,000.00

0.1000

Tukang

@Rp.

43,000.00

Rp.

4,300.00

0.0100

Kepala Tukang

@Rp.

47,000.00

Rp.

470.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

11,820.00

Hal 13/42

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

46,820.00

4. Analisa 1 M' Pasang Bubungan Genteng Beton


3.5000 Bh

Bubungan Genteng Beton

@Rp.

3,800.00

Rp.

13,300.00

0.2000 Zak
3
0.0330 M

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,400.00

Pasir Pasang

@Rp.

130,000.00

Rp.

4,290.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0200

Kepala Tukang

@Rp.

47,000.00

Rp.

940.00

0.4000

Pekerja

@Rp.

33,000.00

Rp.

13,200.00

0.0200

Mandor

@Rp.

45,000.00

Rp.

900.00

Rp.

49,630.00

23,625.00

23,640.00

5. Analisa 1 M' Listplank Woodplank ex. Elephant Double


0.5250 lbr

Papan 2/20

@Rp.

45,000.00

Rp.

0.0250 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

375.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0520

Kepala Tukang

@Rp.

47,000.00

Rp.

2,444.00

0.1900

Pekerja

@Rp.

33,000.00

Rp.

6,270.00

0.0095

Mandor

@Rp.

45,000.00

Rp.

427.50

Rp.

41,741.50

17,741.50

6. Analisa 1 M' Papan Sirip


0.2625 m3

Papan 2/20

@Rp.

45,000.00

Rp.

11,812.50

0.0250 kg

Paku

@Rp.

15,000.00

Rp.

375.00

0.0200

Tukang

@Rp.

43,000.00

Rp.

860.00

0.0020

Kepala Tukang

@Rp.

47,000.00

Rp.

94.00

0.0400

Pekerja

@Rp.

33,000.00

Rp.

1,320.00

0.0040

Mandor

@Rp.

45,000.00

Rp.

180.00

Rp.

14,641.50

2,454.00

7. Analisa 10 M' Talang Datar dengan Papan Talang


10.0000 m1

Lembar Seng

@Rp.

25,000.00

Rp.

250,000.00

5.5000 lbr

Papan 2/20

@Rp.

45,000.00

Rp.

247,500.00

8.0000

Tukang

@Rp.

43,000.00

Rp.

344,000.00

0.8000

Kepala Tukang

@Rp.

47,000.00

Rp.

37,600.00

5.0000

Pekerja

@Rp.

33,000.00

Rp.

165,000.00

0.2500

Mandor

@Rp.

45,000.00

Rp.

11,250.00

Rp.

1,055,350.00

Rp.

105,535.00

Untuk 1 M' = 1/10

557,850.00

VII.
PEKERJAAN PLAFOND DAN RANGKA
1. Analisa 1 M2 Pasang Plafond Gypsum 12 mm
0.3830 lbr

Gypsum 12 mm

@Rp.

46,000.00

Rp.

17,618.00

1.0500 btng

Besi Hollow

@Rp.

18,000.00

Rp.

18,900.00

0.1300 Kg

Kawat Penggantung

@Rp.

12,000.00

Rp.

1,560.00

Skrup Board

@Rp.

25.00

Rp.

950.00

2.1000 bh

Skrup Join Hollow

@Rp.

100.00

Rp.

210.00

0.0124 dos

Paku Beton

@Rp.

20,000.00

Rp.

248.00

0.0370 rol

Lakban kain

@Rp.

15,000.00

Rp.

555.00

0.0247 zak

Compound

@Rp.

60,000.00

Rp.

1,482.00

0.4000

Tukang

@Rp.

43,000.00

Rp.

17,200.00

0.0400

Kepala Tukang

@Rp.

47,000.00

Rp.

1,880.00

0.1000

Pekerja

@Rp.

33,000.00

Rp.

3,300.00

0.0140

Mandor

@Rp.

45,000.00

Rp.

630.00

Rp.

64,533.00

38.0000 bh

23,010.00

2. Analisa 1 M2 Pasang Plafond Kalsiboard 4,5 mm


0.3830 lbr

Kalsiboard 4,5 mm

@Rp.

46,000.00

Rp.

17,618.00

1.0500 btng

Besi Hollow

@Rp.

18,000.00

Rp.

18,900.00

0.1300 Kg

Kawat Penggantung

@Rp.

12,000.00

Rp.

1,560.00

Skrup Board

@Rp.

25.00

Rp.

950.00

38.0000 bh

Hal 14/42

2.1000 bh

Skrup Join Hollow

@Rp.

100.00

Rp.

210.00

0.0124 dos

Paku Beton

@Rp.

20,000.00

Rp.

248.00

0.0370 rol

Lakban kain

@Rp.

15,000.00

Rp.

555.00

0.0247 zak

Compound

@Rp.

60,000.00

Rp.

1,482.00

0.4000

Tukang

@Rp.

43,000.00

Rp.

17,200.00

0.0400

Kepala Tukang

@Rp.

47,000.00

Rp.

1,880.00

0.1000

Pekerja

@Rp.

33,000.00

Rp.

3,300.00

0.0140

Mandor

@Rp.

45,000.00

Rp.

630.00

Rp.

64,533.00

23,010.00

3. Analisa 10 M' Pasang List Profil Gypsum


10.0000 m'

List Gypsum

@Rp.

12,000.00

Rp.

120,000.00

0.5000

Tukang

@Rp.

43,000.00

Rp.

21,500.00

0.0500

Kepala Tukang

@Rp.

47,000.00

Rp.

2,350.00

0.5000

Pekerja

@Rp.

33,000.00

Rp.

16,500.00

0.0300

Mandor

@Rp.

45,000.00

Rp.

1,350.00

Rp.

161,700.00

Rp.

16,170.00

Untuk 1 M' = 1/10

41,700.00

VIII.
PEKERJAAN PINTU DAN JENDELA
1. Analisa 1 M3 Kusen Kayu Jati (KW II)
3
1.1000 M

Kayu Jati

@Rp.

6,000,000.00

Rp.

6,600,000.00

Tukang

@Rp.

43,000.00

Rp.

967,500.00

2.2500

Kepala Tukang

@Rp.

47,000.00

Rp.

105,750.00

9.0000

Pekerja

@Rp.

33,000.00

Rp.

297,000.00

0.3750

Mandor

@Rp.

45,000.00

Rp.

16,875.00

Rp.

7,987,125.00

210,000.00

22.5000

1,387,125.00

2. Analisa 1 M2 Daun Pintu Panil Jati (KW II)


0.0350 m3

Kayu Jati

@Rp.

6,000,000.00

Rp.

0.1000 kg

Paku Biasa

@Rp.

15,000.00

Rp.

1,500.00

5.0000

Tukang

@Rp.

43,000.00

Rp.

215,000.00

0.5000

Kepala Tukang

@Rp.

47,000.00

Rp.

23,500.00

1.6500

Pekerja

@Rp.

33,000.00

Rp.

54,450.00

0.0825

Mandor

@Rp.

45,000.00

Rp.

3,712.50

Rp.

508,162.50

296,662.50

3. Analisa 1 M2 Daun Jendela Jati Kaca Bening 5 mm (KW II)


0.0132 m3

Kayu Jati

@Rp.

6,000,000.00

Rp.

0.7500 m2

Kaca Bening 5mm

@Rp.

60,000.00

Rp.

79,200.00
45,000.00

4.0000

Tukang

@Rp.

43,000.00

Rp.

172,000.00

0.4000

Kepala Tukang

@Rp.

47,000.00

Rp.

18,800.00

1.3200

Pekerja

@Rp.

33,000.00

Rp.

43,560.00

0.0600

Mandor

@Rp.

45,000.00

Rp.

2,700.00

Rp.

361,260.00

66,000.00

237,060.00

4. Analisa 1 M2 Jendela Mati Kaca Bening 5 mm


1.1000 m2

Kaca Bening 5mm

@Rp.

60,000.00

Rp.

0.0150

Tukang

@Rp.

60,000.00

Rp.

900.00

0.1500

Kepala Tukang

@Rp.

43,000.00

Rp.

6,450.00

0.0150

Pekerja

@Rp.

47,000.00

Rp.

705.00

0.0008

Mandor

@Rp.

33,000.00

Rp.

24.75

Rp.

74,079.75

275,000.00

8,079.75

5. Analisa 1 M2 Jendela Mati Kaca Bening 10 mm


1.1000 m2

Kaca Bening 10mm

@Rp.

250,000.00

Rp.

0.0150

Tukang

@Rp.

60,000.00

Rp.

900.00

0.1500

Kepala Tukang

@Rp.

43,000.00

Rp.

6,450.00

0.0150

Pekerja

@Rp.

47,000.00

Rp.

705.00

0.0008

Mandor

@Rp.

33,000.00

Rp.

24.75

Rp.

283,079.75

8,079.75

Hal 15/42

IX.
PEKERJAAN PENGECATAN
1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Dulux
1.6670 Kg

Cat Tembok 2x

@Rp.

70,000.00

Rp.

116,690.00

0.8330 Kg

Alkali 1x

@Rp.

23,750.00

Rp.

19,783.75

2.0000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

1,200.00

0.1000 bh

Rol cat

@Rp.

12,500.00

Rp.

1,250.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

0.6300

Tukang

@Rp.

43,000.00

Rp.

27,090.00

0.0630

Kepala Tukang

@Rp.

47,000.00

Rp.

2,961.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

0.0250

Mandor

@Rp.

45,000.00

Rp.

1,125.00

Rp.

181,699.75

Rp.

18,169.98

Untuk 1 M2

37,776.00

1. Analisa 10 M2 Pengecatan Tembok 3x sapu Eksterior ex. Flinkote


1.6670 Kg

Cat Tembok 2x

@Rp.

26,000.00

Rp.

43,342.00

0.8330 Kg

Alkali 1x

@Rp.

23,750.00

Rp.

19,783.75

2.0000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

1,200.00

0.1000 bh

Rol cat

@Rp.

12,500.00

Rp.

1,250.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

1.0000

Upah Tenaga

@Rp.

37,776.00

Rp.

37,776.00

Rp.

108,351.75

Rp.

10,835.18

Untuk 1 M2
2

1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Mowilex


1.6670 Kg

Cat Tembok 2x

@Rp.

55,000.00

Rp.

91,685.00

0.8330 Kg

Alkali 1x

@Rp.

23,750.00

Rp.

19,783.75

2.0000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

1,200.00

0.1000 bh

Rol cat

@Rp.

12,500.00

Rp.

1,250.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

1.0000

Upah Tenaga

@Rp.

37,776.00

Rp.

37,776.00

Rp.

156,694.75

Rp.

15,669.48

Untuk 1 M2

2. Analisa 10 M2 Pengecatan Tembok 3x sapu Interior ex. Catylac


3.7500 Kg

Cat Tembok 3x

@Rp.

18,000.00

Rp.

67,500.00

0.5000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

300.00

0.0100 bh

Rol cat

@Rp.

12,500.00

Rp.

125.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

1.0000

Upah Tenaga

@Rp.

37,776.00

Rp.

37,776.00

Rp.

110,701.00

Rp.

11,070.10

Untuk 1 M2
2

3. Analisa 10 M Coating Batu Alam


2.0000 Kg

Coating Sicosol

@Rp.

45,000.00

Rp.

90,000.00

0.3500

Tukang

@Rp.

43,000.00

Rp.

15,050.00

0.0350

Kepala Tukang

@Rp.

47,000.00

Rp.

1,645.00

0.7000

Pekerja

@Rp.

33,000.00

Rp.

23,100.00

0.0350

Mandor

@Rp.

45,000.00

Rp.

1,575.00

Rp.

131,370.00

Rp.

13,137.00

Untuk 1 M2

41,370.00

4. Analisa 10 M2 Pengecatan Kayu Mengkilat 3x sapu


2.8400 Kg

Cat Kilat

@Rp.

60,000.00

Rp.

170,400.00

1.4200 Kg

Cat Dasar

@Rp.

20,000.00

Rp.

28,400.00

2.0000 Ltr

Minyak Cat

@Rp.

5,500.00

Rp.

11,000.00

1.2000 Kg

Cat Meni Nippon

@Rp.

15,000.00

Rp.

18,000.00

0.8000 Kg

Plamir kayu

@Rp.

11,000.00

Rp.

8,800.00

3.0000 Lbr

Amplas Niken

@Rp.

2,500.00

Rp.

7,500.00

2.2500

Tukang

@Rp.

43,000.00

Rp.

96,750.00

0.2250

Kepala Tukang

@Rp.

47,000.00

Rp.

10,575.00

1.5000

Pekerja

@Rp.

33,000.00

Rp.

49,500.00

0.0750

Mandor

@Rp.

45,000.00

Rp.

3,375.00

Rp.

404,300.00

160,200.00

Hal 16/42

Untuk 1 M1

Rp.

6,064.50

5. Analisa 10 M2 Cat Plafond 3x sapu


2.5000 Kg

Cat Tembok maxilite

@Rp.

8,800.00

Rp.

22,000.00

1.0000 Ls

Alat Bantu / Steiger

@Rp.

12,000.00

Rp.

12,000.00

0.6300

Tukang

@Rp.

43,000.00

Rp.

27,090.00

0.0630

Kepala Tukang

@Rp.

47,000.00

Rp.

2,961.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

0.0250

Mandor

@Rp.

45,000.00

Rp.

1,125.00

Rp.

71,776.00

Rp.

7,177.60

Untuk 1 M2

37,776.00

X.
PEKERJAAN LAIN-LAIN
1. Analisa 10 M2 Analisa Pembersihan Akhir Lapangan
0.7500

Pekerja

@Rp.

33,000.00

Rp.

24,750.00

0.0375

Mandor

@Rp.

45,000.00

Rp.

1,687.50

Rp.

26,437.50

Rp.

2,643.75

Untuk 1 M2 = 1/10

26,437.50

Hal 17/42

TAHAP 1 RUMAH LB=89,7 / LT=144,7 m2

nama

TAHAP 2 RUMAH LB=76,58 / LT=144,7 m2


TAHAP 1+2 RUMAH LB=166,28/ LT=144,7 m2
luas tanah
luas lt 1
luas lt 2

t1
bowplang

pondasi

144.700
89.700
76.580
166.280

luas thp 1

48.000

48.710
41.780

90.490
t1
galian tanah pondasi
0.831
75.224
urugan tanah kembali
25.075
urugan pasir
0.070

6.334

anstamping
0.140

12.669

pondasi batu belah


0.300
27.371
footplat
26.000

0.107
0.034

2.776
0.878
3.653

lantai kerja
0.832

0.030

0.000

0.038

3.512

tahap 1
0.023

0.799

tahap 2
0.023

1.013

tahap 1
0.060
0.045
0.038
0.030

0.000
4.075
0.000
0.000

tahap 2
0.060
0.045
0.038
0.030

0.000
2.363
0.000
0.000

slof 15/20

0.000
0.000
slof 15/25
90.490
-2.830
6.000
0.000
93.660

kolom praktis

KOLOM
15 30
15 25
15 20

20 20
tahap 1
BALOK
15 30

0.560

51.450
51.520

20 40

0.000
102.970

0.027

3.388

0.020

0.000

0.030

0.887

0.023

0.000

0.045

1.070

0.063

0.000

15 25

0.000
0.000
15 20
ring balk

13.450

konsol

gunungan1

balok latey1

16.110

29.560

15 15

tahap 2
15 30

17.670
6.100
0.000
23.770

15 25

0.000
0.000
RING BALK

0.608

15 20

31.550
26.400

latey 15/20

gunungan

0.000
0.000
0.000
0.000
0.000
0.000

0.866
0.866
0.866
0.866
0.866
0.866

57.950

0.030

0.120

9.882

0.120

0.000

0.100

0.000

0.100

1.738

1.739

plat 12 cm tahap 1
82.350
82.350
plat 12 cm tahap 2

0.000
plat 10 cm tahap 1

0.000

plat 10 cm tahap 2
17.380

17.380
lefel 8 cm tahap1
2.136
4.200

6.336

kantilefer
2.800 dapur
9.136

0.080

1.614

0.080

1.294

125.046
39.896

0.000

lefel 8 tahap 2
16.180
.
dapur
16.180
waterproof
compound
PLAT TANGGA
1.080

1.080
DINDING
TAHAP 1
total

pelubang

lt1
45.140
36.050
81.190
plesteran
lt2
29.350
31.100
60.450
plesteran
lt3

samping
3.400
542.492

tahap 1
P1
P2
P3

271.246

3.400
338.740

0.000
plesteran

162.960

0.000

0.000

2.000
2.000
2.000

0.075
0.075
0.075

6.700
9.200
3.560

0.000

jumlah
luas
1.000
4.000
2.000
1.000

J1
J2
J3
j4

175.780

169.370

3.550
0.000

PJ1
PJ2
PJ3

eksterior
interior
260.960
281.532 dinding pagar
19.600
31.360

4.000

6.700
2.300
1.780

panjang
unting
7.640
5.840
5.140

luas total

pjg total d kayu


7.790
23.960
10.580

6.300
6.300
4.800

13.200
13.200
12.200

4.000
4.000
3.000

0.075
0.075
0.075

6.300
0.000
0.000

13.500
0.000
0.000

4.400
3.800
2.600
1.800

11.960
11.520
8.340
7.080

4.000
4.000
4.000
4.000

0.075
0.075
0.075
0.075

0.000
0.000
10.400
0.000

0.000
0.000
34.560
0.000

36.160
72.320

90.390

melamin

d kaca

0.000

0.000

a. Engsel pintu (per pintu 3 bh / 1,5 psng)


b. Kunci tanam 2x slag + handle
c. Door stoper

TAHAP 2

jumlah

luas

panjang

unting

luas total

pjg total

P1
P2
P3

2.000
1.000

6.700
2.300
1.780

7.640
5.840
5.140

2.000
2.000
2.000

0.075
0.075
0.075

0.000
4.600
1.780

0.000
11.980
5.290

PJ1
PJ2
PJ3

1.000
1.000

6.300
6.300
4.800

13.200
13.200
12.200

4.000
4.000
3.000

0.075
0.075
0.075

0.000
6.300
4.800

0.000
13.500
12.425

J1
J2
J3
j4

1.000
1.000
3.000
1.000

4.400
3.800
2.600
1.800

11.960
11.520
8.340
7.080

4.000
4.000
4.000
4.000

0.075
0.075
0.075
0.075

4.400
3.800
7.800
1.800

12.260
11.820
25.920
7.380

d kayu

d kaca

melamin

a. Engsel pintu (per pintu 3 bh / 1,5 psng)


b. Kunci tanam 2x slag + handle
c. Door stoper

TAHAP 1 TAHAP 2
pasang batu andesit susun sirih
pasang batu alam
20.100
BETON TUMBUK
t1
95.700

t2
0.050

T1
karpot
K50
k40
K33
k30
K2525
K2533
K2020
K2025
kol kolan
ps urug

T2

74.700
6.150
5.900

45.100
19.430
2.100

24.720

9.860

70.420
4.785

54.760

PEKERJAAN ATAP
talang 1

0.000

4.785

talang 2
8.000

0.866
0.000

8.000

luas atap
tahap 1

0.000

0.866
9.238

tahap2
89.900

0.86603

KERPUS
t1

0.000

89.900

0.866025

103.808

t2
27.240

0.000

Pas. Listplank

0.866
0.000

27.240

T1

0.866
37.204

T2
40.500

0.866025
0.866025

35.280
70.560

100.575

0.000

0.000

0.000
pasang gording

T1

40.500
T2

0.000

PLAFOND

T1

LIS

T2
75.800

63.100

75.800

63.100

T1

TRITISAN

0.000

T2
89.800

61.200

89.800

61.200

T1

T2
29.840

0.000

pipa
tahap 1
5"

4"

3"

23.000

5"

X.

3/4"
12.000
25.000
11.800

4"
23.000

29.840

3"
0.000

tahap 2
1/2" panas
4"
31.600
10.000

3"
12.000

3/4"
1/2" panas
10.000
13.000
20.500

42.000

3/4"
48.800

73.600

1/2" panas
4"
10.000

3"
0.000

PEKERJAAN LAIN-LAIN

t1

Pasang railing besi tempa

11.06

Pasang lampu gantung

Pasang lampu downlight SL

Pasang lampu SL tempel

12.000

1/2"
1/2" panas
30.500
13.000

t2
19.900

m1

1.00

1.000

bh

11.00

10.000

bh
bh

Pasang lampu taman

Pasang lampu uplight kolam

1.00

Pasang lampu spot dinding

Pasang lampu downlight halogen

bh
bh
bh

6.00

6.000

bh

Pasang saklar

10.00

8.000

bh

10

Pasang stop kontak

13.00

10.000

bh

11

Pasang titik lampu + stop kontak

32.00

12

Pasang MCB

13

Pipa PVC diameter 5" D

23.00

14

Pipa PVC diameter 4" D

0.00

0.000

m1

15

Pipa PVC diameter 3" D

48.80

12.000

m1

16

Pipa PVC diameter 3/4" AW

73.60

30.500

m1

17

Pipa PVC diameter 1/2 " AW air panas

10.00

13.000

m1

18

Kran tempel

3.00

2.000

bh

19

Floor drain (avour)

2.00

7.000

bh

20

Kloset duduk

2.00

1.000

bh

21

Kloset jongkok

22

Kitchen zink

23

wastafel

24

Keran panas dingin

25

1.00

1.00
89.70

panjang

galian tanah pondasi


0.000

urugan tanah kembali


0.000
urugan pasir
0.000

anstamping
0.140

0.000

pondasi batu belah


0.300

0.000

slof 15/20
0.000

0.000
0.000

0.030

0.000

kolom praktis
0.023

2.250

0.000

ring balk 15/20


0.000

0.030

0.000

bh
bh
m1

bh

pagar

0.070

1.000

1.00

Pembersihan akhir

0.831

27.00

bh
1.00

bh

76.580

m2

Pas. Dinding Bata adukan 1 : 8

0
Plesteran Dinding Bata adukan 1 : 8

d jendela

bv
1.000

roster

skonengan
7.640
5.840
5.140

tatapan

melamin pintu

7.640
23.360
10.280
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
25.920
0.000
0.000

0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000

67.200

0.000

0.000
0.000

8.680
8.680
8.480

0.000

d jendela

1.000

18.000

2.000

18.000

bv

roster
1.000

8.410
7.800
6.480
6.360

skonengan
7.640
5.840
5.140

tatapan

melamin pintu

0.000
11.680
5.140
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

8.410
7.800
19.440
6.360

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

8.680
8.680
8.480
1.000

18.000

8.410
7.800
6.480
6.360

58.830
0.000

2.000

18.000

0.000

0.000
0.000

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 31/42
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN

Pembersihan lapangan

Volume

SAT

0.42

42.00

16,395.00

688,590.00

0.58

bln

300,000.00

600,000.00

0.50

2,000,000.00

2,000,000.00

1.67

500,000.00

1,000,000.00

0.84

4,788,090.00

4.00

Bedeng Dan Gudang

1.00

ls

Mobilisasi & demobilisasi

2.00

bln

3
4
5

Urugan tanah kembali bekas galian


Urugan pasir bawah pondasi
Pasangan pondasi batu belah ad 1 : 8
Pasangan Rolag batu belah ad 1 : 8

III.

PEK. BETON BERTULANG Ad. 1:2:3

Sloof 15/20

499,500.00

2.00

(Rp)

5,550.00

Air Kerja dan Listrik

Galian tanah pondasi

(Rp)

m1

BOBOT

m2

Pengukuran dan pasang bouwplank

PEKERJAAN PONDASI

JUMLAH

90.00

II.

harga satuan

58.72

m3

25,875.00

1,519,380.00

1.27

14.70

m3

8,628.00

126,831.60

0.11

4.95

m3

118,350.00

585,832.50

0.49

21.05

m3

401,095.00

8,443,049.75

7.05

0.70

m3

401,095.00

280,766.50

0.23

10,955,860.35

9.15

1.94

M3

2,608,984.40

5,061,429.74

4.23

Kolom Praktis 15/15 Lt.1

2.16

M3

2,449,942.91

5,291,876.69

4.42

Balok Latey 15/20 Lt.1

0.40

M3

2,550,763.07

1,020,305.23

0.85

0.48

2,198,797.63

1,055,422.86

0.88

0.09

2,198,797.63

197,891.79

0.17

0.70

2,550,763.07

1,785,534.15

1.49

1.67

2,550,763.07

4,259,774.33

3.56

18,672,234.80

15.60

4
5
6
7

Leufel t = 8 cm Lt.1
Plat dapur t = 8 cm
Kuda-kuda beton 15/20
Ringbalk 15/20

IV.

PEKERJAAN DINDING DAN PLESTERAN

Pas. Dinding Bata adukan 1 : 8 Lt.1

2
3
4
5

Plesteran Dinding Bata adukan 1 : 8 Lt.1


Tali air Aluminium
Batu Alam andesit garis
Batu Alam acak

V.

PEKERJAAN LANTAI

Rabat Beton Tumbuk t = 5 cm

2
3
4
5

Pasir Urug Bawah Lantai t=3 cm


Pas. Keramik 40/40 Ruangan ex. Platinum
Pas. Keramik 30/30 Teras,garasi ex. Platinum
Pas. Keramik Lantai KM/WC 25/25 ex Platinum

Pas. Keramik Dinding KM/WC 25/33 ex Platinum

Pas. List Keramik KM/WC 6/25 ex. Platinum

Pas. Keramik Dapur 20/20 ex Platinum

229.97

M2

64,535.00

14,841,113.95

12.40

442.62

32,950.00

14,584,329.00

12.18

1.30

15,000.00

19,500.00

0.02

2.22

187,704.00

416,702.88

0.35

3.20

187,704.00

600,652.80

0.50

30,462,298.63

25.45

2.50

M3

452,410.00

1,131,025.00

0.94

1.50

118,350.00

177,525.00

0.15

41.37

81,945.50

3,390,085.34

2.83

5.85

64,379.21

376,618.39

0.31

2.62

60,858.00

159,447.96

0.13

10.40

80,590.00

838,136.00

0.70

5.20

M'

68,835.48

357,944.50

0.30

3.00

72,340.00

217,020.00

0.18

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 32/42
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO
9

URAIAN PEKERJAAN
Perkerasan Paving Carport

Volume

SAT

13.50

M2

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

77,500.00

1,046,250.00

0.87

7,694,052.18

6.43

VI. PEKERJAAN ATAP


1
2
3

Pas. Rangka Atap Baja Ringan biasa


Pas. Gording CNP
Pas. Atap Genteng Beton Flat ex. Cemara

64.00

M2

90,000.00

5,760,000.00

4.81

44.60

M2

40,000.00

1,784,000.00

1.49

64.00

M2

46,820.00

2,996,480.00

2.50

64.00

M2

10,000.00

640,000.00

0.53

Pas. Aluminium Foil

Pas. Kerpus Genteng

6.60

M'

49,630.00

327,558.00

0.27

Pas. Genteng Tepi

5.90

M'

25,000.00

147,500.00

0.12

Pas. Listplank Woodplank ex. Elephant

18.50

M'

41,741.50

772,217.75

0.65

12,427,755.75

10.38

VII. PEKERJAAN PLAFOND DAN RANGKA


M2

64,533.00

2,597,453.25

2.17

56.75

M'

16,170.00

917,647.50

0.77

12.77

M2

64,533.00

824,086.41

0.69

4,339,187.16

3.62

Pasang Plafond Gypsum 9 mm ex. Elephant

40.25

Pasang List Profil Gypsum Ruangan

Pasang Plafond Kalsiboard (Tritisan)

VIII. PEKERJAAN PINTU DAN JENDELA


1

Kusen Aluminium 4" coklat

60.45

M'

55,000.00

3,324,750.00

2.78

Tatapan Pintu

20.10

M'

10,000.00

201,000.00

0.17

Daun Pintu Panil

4.00

lbr

1,350,000.00

5,400,000.00

4.51

Daun Pintu PVC

1.00

lbr

250,000.00

250,000.00

0.21

Daun Jendela Aluminium + Kaca Bening 5mm

7.00

lbr

450,000.00

3,150,000.00

2.63

Daun Jendela Aluminium + Kaca Bening 5mm BV

1.00

lbr

325,000.00

325,000.00

0.27

Kaca mati 5mm

1.60

bh

74,079.75

118,527.60

0.10

Pekerjaan Aksesoris Pintu dan Jendela :


35,000.00

210,000.00

0.18

a. Engsel Pintu (per pintu 3 bh/1,5 Pasang) ex Sobar

6.00 psng

b. Kunci Tanam 2x Slag Pintu Ruangan ex. SES

4.00

bh

105,000.00

420,000.00

0.35

c. Handle Pintu Ruangan ex. Dexon

4.00

bh

60,000.00

240,000.00

0.20

d. Door Stoper ex. Gerber

4.00

bh

22,500.00

90,000.00

0.08

13,729,277.60

11.47

15,669.48

1,358,700.18

1.14

11,070.10

1,600,515.06

1.34

7,177.60

423,765.50

0.35

65,000.00

900,900.00

0.75

1,500.00

85,125.00

0.07

13,137.00

71,202.54

0.06

15,000.00

90,300.00

0.08

7,177.60

459,366.40

0.38

IX.

PEKERJAAN PENGECATAN

Pengecatan tembok ext mowilex

2
3
4
5
6
7
8

Pengecatan tembok interior Eco Emulsion


Pengecatan plafond 3 x sapu Maxilite
Melamin daun pintu panil
Cat Lis Plafond Gypsum ex. Maxilite
Coating Batu Alam ex. Propan Stone Care
Compound Plat Leufel
Cat Genteng

86.71
144.58
59.04
13.86
56.75
5.42
6.02
64.00

m3
2

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 33/42
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO
9

URAIAN PEKERJAAN
Pengecatan listplank

Volume

SAT

18.50

m2

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

6,064.50

112,193.25

0.09

5,102,067.93

4.26

X.

PEKERJAAN LAIN-LAIN

Pasang Lampu Taman ex. Zetalux

2.00

bh

155,000.00

310,000.00

0.26

Pasang Lampu Fitting SL ex. Philips

7.00

bh

40,000.00

280,000.00

0.23

Pasang Lampu Halogen

2.00

bh

75,000.00

150,000.00

0.13

Pasang Saklar Tunggal ex.Clipsal

3.00

bh

15,000.00

45,000.00

0.04

Pasang Saklar Ganda ex.Clipsal

4.00

bh

20,000.00

80,000.00

0.07

Pasang Stop Kontak ex.Broco

5.00

bh

20,000.00

100,000.00

0.08

Pasang Titik Lampu + Stop Kontak ex. Supreme

16.00

bh

75,000.00

1,200,000.00

1.00

Pasang Panel MCB 6 Group

1.00

bh

300,000.00

300,000.00

0.25

Pasang Stop Kontak AC ex.Broco

2.00

bh

45,000.00

90,000.00

0.08

10

Pasang Socket Telepon + Instalasi

1.00

bh

70,000.00

70,000.00

0.06

11

Pasang Socket Antene TV + Instalasi

1.00

bh

70,000.00

70,000.00

0.06

12

Monoblok + Jet Shower ex.HCG

1.00

bh

1,350,000.00

1,350,000.00

1.13

13

Kran Tempel Plastik

2.00

bh

30,000.00

60,000.00

0.05

14

Wash bak

1.00

bh

225,000.00

225,000.00

0.19

15

Kran Bebek dapur

1.00

bh

100,000.00

100,000.00

0.08

16

Kran Shower dingin ex. Washer

1.00

bh

350,000.00

350,000.00

0.29

17

Floor Drain

1.00

bh

32,500.00

32,500.00

0.03

18

Pipa PVC diameter 4" D ex. Wafin

13.00

M'

29,000.00

377,000.00

0.31

19

Pipa PVC diameter 3" D ex. Wafin

30.00

M'

19,000.00

570,000.00

0.48

20

Pipa PVC diameter 3/4" D ex. Maspion AW

29.00

M'

9,000.00

261,000.00

0.22

21

Pipa PVC diameter 1/2" D ex. Maspion AW

15.00

M'

7,000.00

105,000.00

0.09

22

Bak Tandon Air 3000 Lt (bawah)

1.00

M'

3,000,000.00

3,000,000.00

2.51

23

Septictank & Peresapan

1.00

bh

1,600,000.00

1,600,000.00

1.34

24

Pompa Air Shimizu

1.00

bh

450,000.00

450,000.00

0.38

25

Bak Kontrol

2.00

bh

60,000.00

120,000.00

0.10

90.00

2,643.75

237,937.50

0.20

11,533,437.50

9.63

119,704,261.90

100.00

26

Pembersihan Akhir

TOTAL BIAYA PEKERJAAN

2,602,266.56

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 34/42
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO

URAIAN PEKERJAAN

Volume

SAT

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

REKAPITULASI RAB
PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
BANGKA
NO.

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN

NILAI
PEKERJAAN
Rp.
4,788,090.00

II.

PEKERJAAN PONDASI

Rp.

10,955,860.35

9.15

III. PEK. BETON BERTULANG Ad. 1:2:3

Rp.

18,672,234.80

15.60

IV. PEKERJAAN DINDING DAN PLESTERAN

Rp.

30,462,298.63

25.45

V.

Rp.

7,694,052.18

6.43

VI. PEKERJAAN ATAP

Rp.

12,427,755.75

10.38

VII. PEKERJAAN PLAFOND DAN RANGKA

Rp.

4,339,187.16

3.62

VIII. PEKERJAAN PINTU DAN JENDELA

Rp.

13,729,277.60

11.47

IX. PEKERJAAN PENGECATAN

Rp.

5,102,067.93

4.26

X.

Rp.

11,533,437.50

9.63

Rp.

119,704,261.90

100

Rp.

119,704,261.90

PEKERJAAN LANTAI

PEKERJAAN LAIN-LAIN
JUMLAH

Total Biaya Konstruksi Gedung

Semarang, Agustus 2011


Dibuat Oleh :

Ali Muhtarom, ST

NILAI
BOBOT
4.00

URAIAN BAHAN BANGUNAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO

I
1

URAIAN PEKERJAAN

PEKERJAAN PONDASI
Pasang Bowplank

2
3

Urugan Pasir Bawah Pondasi


Anstamping Batu belah

Pas Pondasi Batu Kali 1:8

II
1

VOLUME

SATUAN

42.00

m1

4.95

m3
m3

21.75

m3

PEKERJAAN BETON BERTULANG


Pondasi voet plat besar

m3

Pondasi voet plat kecil

Sloof praktis 15/20

Sloof struktur

m3

Kolom Struktur besar

m3

Kolom Struktur 15/20

m3

m3

1.940

m3

JENIS BAHAN & TNG


KERJA

Papan cor
Usuk cor 4/6
Paku
Pasir Urug
Batu Kali
Pasir urug
Batu Kali
Semen
Pasir

Kericak
Pasir
Semen
Bendrat
Paku
Papan cor
Besi 11,3
Besi 5,6
Kericak
Pasir
Semen
Bendrat
Paku
Papan cor
Besi 9,5
Besi 4,9
Kericak
Pasir
Semen
Bendrat
Paku
Papan cor
Besi 9,5
Besi 4,9
Kericak
Pasir
Semen
Bendrat
Paku
Papan cor
Besi 11,3
Besi 5,6
Kericak
Pasir
Semen
Bendrat
Paku
Papan cor
Besi 11,3
Besi 5,6
Kericak
Pasir
Semen
Bendrat
Paku
Papan cor

Hal 36/42

SATUAN
BHN

JUMLAH
BAHAN

SATUAN

0.200
0.600
0.100
1.200
1.100
0.500
1.200
2.400
0.760

8.40
25.20
4.20
5.94
0.00
0.00
26.10
52.20
16.53

lbr
btg
kg
m3
m3
m3
m3
zag
m3

0.820
0.490
7.896
2.077
2.660
4.442
23.126
3.169
0.820
0.490
7.896
2.077
2.660
4.442
13.581
4.167
0.820
0.490
7.896
2.077
2.660
11.108
11.112
7.500
0.820
0.490
7.896
2.077
2.660
11.108
11.112
7.112
0.820
0.490
7.896
1.976
2.660
11.108
14.815
7.831
0.820
0.490
7.896
1.976
3.556
11.108

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.59
0.95
15.32
4.03
5.16
21.55
21.56
14.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

m3
m3
zag
kg
kg
lbr
btg
btg
m3
m3
zag
kg
kg
lbr
btg
btg
m3
m3
zag
kg
kg
lbr
btg
btg
m3
m3
zag
kg
kg
lbr
btg
btg
m3
m3
zag
kg
kg
lbr
btg
btg
m3
m3
zag
kg
kg
lbr

URAIAN BAHAN BANGUNAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO

URAIAN PEKERJAAN

VOLUME

SATUAN

JENIS BAHAN & TNG


KERJA

Hal 37/42

SATUAN
BHN

JUMLAH
BAHAN

SATUAN

PEKERJAAN PONDASI

Tiang Praktis 15/15

Balok Struktur

Ring balk

10 Balok Latey

2.160

m3

m3

2.370

m3

0.400

m3

11 Plat lantai beton t=12cm

m3

12 Plat atap beton t=10cm

m3

13 Plat tangga beton t=12cm

m3

Besi 9,5
Besi 4,9
Kericak
Pasir
Semen
Bendrat
Paku
Papan cor
Besi 8,3
Besi 4,9
Kericak
Pasir
Semen
Bendrat
Paku
Usuk 4/6
Papan cor
Besi 11,3
Besi 5,6
Kericak
Pasir
Semen
Bendrat
Paku
Usuk 4/6
Papan cor
Besi 9,5
Besi 4,9
Kericak
Pasir
Semen
Bendrat
Paku
Usuk 4/6
Papan cor
Besi 8,3
Besi 4,9
Kericak
Pasir
Semen
Bendrat
Paku
Usuk 4/6
Papan cor
Besi 9,5
Kericak
Pasir
Semen
Bendrat
Paku
Usuk 4/6
Papan cor
Besi 8,3
Kericak
Pasir
Semen
Bendrat

11.112
7.500
0.820
0.490
7.896
1.976
3.556
14.809
14.815
8.150
0.820
0.490
7.896
1.976
3.556
11.111
9.854
12.963
7.831
0.820
0.490
7.896
1.976
3.556
8.333
14.809
11.112
7.500
0.820
0.490
7.896
1.976
3.556
2.833
14.809
14.815
8.149
0.820
0.490
7.896
0.780
2.000
8.333
6.944
11.112
0.820
0.490
7.896
0.780
4.000
3.907
8.330
11.112
0.820
0.490
7.896
0.780

0.00
0.00
1.77
1.06
17.06
4.27
7.68
31.99
32.00
17.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.94
1.16
18.71
4.68
8.43
19.75
35.10
26.34
17.78
0.33
0.20
3.16
0.79
1.42
1.13
5.92
5.93
3.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

btg
btg
m3
m3
zag
kg
kg
lbr
btg
btg
m3
m3
zag
kg
kg
btg
lbr
btg
btg
m3
m3
zag
kg
kg
btg
lbr
btg
btg
m3
m3
zag
kg
kg
btg
lbr
btg
btg
m3
m3
zag
kg
kg
btg
lbr
btg
m3
m3
zag
kg
kg
btg
lbr
btg
m3
m3
zag
kg

URAIAN BAHAN BANGUNAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO

URAIAN PEKERJAAN

VOLUME

SATUAN

JENIS BAHAN & TNG


KERJA

Hal 38/42

SATUAN
BHN

JUMLAH
BAHAN

SATUAN

PEKERJAAN PONDASI

14 Leufel dan Plat Dapur t=8

0.570

15 Beton Tumbuk

III
1

IV
1

m3

m3

PEKERJAAN DINDING DAN PLESTERAN


Pas. dinding bata ad 1:8

229.97

m2

Plesteran Dinding bata ad 1:8

442.62

m2

2.50

m3

PEKERJAAN LANTAI
Rabat Beton Tumbuk 1:3:5 t=5

Pas. keramik lantai 50/50 ruangan 1:8

Pas. keramik lantai 40/40 ruangan 1:8

41.37

m2

Pas. keramik lantai 33,3/33,3 teras 1:8

5.85

m2

Pas. lantai tangga,teras 30/30 1:8

Pas. keramik lantai 25/25 KM/WC

Pas. keramik dinding 25/33 KM/WC

Pas. Keramik lantai 20/20 KM/WC

m2

Pas. Keramik dinding 20/25 KM/WC

m2

m2

m2

2.62

m2

10.40

m2

10 Pas. Keramik dinding 20/20 dapur

3.00

m2

Pas. Lis 6/25 KM/WC

5.20

m1

Pas. Lis 6/20 KM/WC

m1

Paku
Usuk 4/6
Papan cor
Besi 9,5
Kericak
Pasir
Semen
Bendrat
Paku
Usuk 4/6
Papan cor
Besi 8,3
Kericak
Pasir
Semen

4.000
3.907
6.940
13.283
0.820
0.490
7.896
0.780
4.000
3.907
8.330
10.940
0.910
0.540
5.675

0.00
0.00
0.00
0.00
0.47
0.28
4.50
0.44
2.28
2.23
4.75
6.24
0.00
0.00
0.00

kg
btg
lbr
btg
m3
m3
zag
kg
kg
btg
lbr
btg
m3
m3
zag

Batu Bata
Semen
Pasir
Semen
Pasir

77.000
0.270
0.045
0.195
0.027

17,707.69
62.09
10.35
86.31
11.86

buah
zag
m3
zag
m3

Grosok
Semen
Keramik 50/50
Semen
Pasir
Keramik 40/40
Semen
Pasir
Keramik 33,3/33,3
Semen
Pasir
Keramik 30/30
Semen
Pasir
Keramik 25/25
Semen
Pasir
Keramik 25/33
Semen
Pasir
Keramik 20/20
Semen
Pasir
Keramik 20/25
Semen
Pasir
Keramik 20/20
Semen
Pasir
Lis 6/25
Semen
Pasir
Lis 6/20
Semen

0.000
5.675
4.000
0.203
0.032
6.250
0.203
0.032
9.183
0.203
0.032
11.111
0.203
0.032
16.000
0.203
0.032
12.121
0.203
0.032
25.000
0.203
0.032
20.000
0.203
0.032
25.000
0.203
0.032
4.000
0.012
0.002
5.000
0.012

0.00
14.19
0.00
0.00
0.00
258.56
8.40
1.33
53.72
1.19
0.19
0.00
0.00
0.00
41.92
0.53
0.08
126.06
2.11
0.33
75.00
0.61
0.10
0.00
0.00
0.00
75.00
0.61
0.10
20.80
0.06
0.01
0.00
0.00

m3
zag
lbr
zag
m3
lbr
zag
m3
doz
zag
m3
lbr
zag
m3
lbr
zag
m3
doz
zag
m3
lbr
zag
m3
lbr
zag
m3
lbr
zag
m3
bh
zag
m3
bh
zag

URAIAN BAHAN BANGUNAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO

URAIAN PEKERJAAN

VOLUME

SATUAN

JENIS BAHAN & TNG


KERJA

Hal 39/42

SATUAN
BHN

JUMLAH
BAHAN

SATUAN

PEKERJAAN PONDASI
11 Pas. Batu alam candi 20/20

m2

12 Pas. Batu alam 20x60

m2

13 Urugan Pasir Bawah Lantai t=3cm

1.50

m3

V
1

PEKERJAAN ATAP
Pek gording, nok, jurai

m1

Pasang Usuk dan reng

m2

Pekerjaan Papan Lisplank & Papan Angin

Pekerjaan papan talang dan penutup

Pasang Kerpus genteng Beton

6
7

18.50

m1
m1

5.90

m1

Pasang Genteng Beton


Gording kanal CNP15

64.00
44.60

m2
m1

PEKERJAAN PLAFOND DAN RANGKA


Pekerjaan plafond gypsum ruangan

40.25

m2

Pekerjaan plafond kalsiboard tritisan

12.77

m2

VII
1

PEKERJAAN PENGECATAN
Cat Tembok Eksterior abu2 mowilex

86.71

m2

144.58
64.00

m2
m2
m2
m2
m2

VI
1

5
6
7
8
9

Cat Tembok Interior catylac


Cat Genteng
Water proofing
Coating batu alam ex. Sicosol
Melamine daun pintu & roster

10 Cat Plafond
11 Cat kayu listplank

5.42

59.04
4.63

m2
m2

Pasir
Batu alam 20/20
Semen
Pasir
Batu alam 20/60
Semen
Pasir
Pasir urug

0.002
26.250
0.203
0.032
14.375
0.203
0.032
1.200

0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.80

m3
lembar
zag
m3
lembar
zag
m3
m3

Kayu 6/12 x 4m
Paku
Usuk 5/7 x 4m
Reng 2/3 x 4m
Paku
Papan 2/20 x 2m
Paku
Papan 2/20 x 4m
Seng datar
Kerpus beton
Semen
Pasir
Genteng Beton
Kanal C

0.263
0.190
0.550
0.825
0.250
0.263
0.025
0.550
1.050
3.675
0.200
0.033
10.500
0.167

0.00
0.00
0.00
0.00
0.00
4.86
0.46
0.00
0.00
21.68
1.18
0.19
672.00
7.43

batang
kg
btg
btg
kg
lembar
kg
lembar
m1
buah
zag
m3
lembar
btg

Jayaboard 1,2x2,4
Rangka Hollow
Skrup board
Compound
Kalsiboard 1,2x2,4
Rangka Hollow
Skrup board
Compound

0.383
0.802
38.000
0.025
0.383
0.802
38.000
0.025

15.40
32.28
1,529.50
0.99
4.89
10.24
485.26
0.32

lembar
batang
bh
zag
lembar
batang
bh
zag

0.167
0.083
0.375
0.125
0.375
0.375
0.284
0.200
0.250
0.284
0.200

14.45
7.22
54.22
8.00
0.00
2.03
0.00
0.00
14.76
1.31
0.93

Cat Tembok
Alkali
Cat Tembok
Cat Genteng
Water proofing
Coating batu
Melamine
Thinner
Cat Tembok
Cat kayu
Thinner

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

KEBUTUHAN BAHAN BANGUNAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO
I

URAIAN PEKERJAAN

1
2
3
4

PEKERJAAN PONDASI
Pasang Bowplank
Urugan Pasir Bawah Pondasi
Pasangan Aanstamping
Pas Pondasi Batu belah

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

PEKERJAAN BETON BERTULANG


Pondasi voet plat besar
Pondasi voet plat kecil
Sloof 15/20
Sloof 15/25
Kolom struktur 15/25
Kolom struktur 15/20
Tiang Praktis 15/15
Balok beton 15/25
Ringbalk 15/20
Balok latey 15/15
Plat lantai beton t=12cm
Plat atap beton t=10cm
Plat tangga beton t=12cm
Leufel t=8
Beton tumbuk

KERICAK

USUK
4/6
25.20

PAPAN
COR

BESI
11,3

BESI 9,5 BESI 8,3 BESI 5,6 BESI 4,9

PASIR
URUG

1.59
1.77
1.94
0.33
0.47

m3
6.1

16.53
16.53

52.20
52.20

0.95
1.06
1.16
0.20
0.28
3.65

15.32
17.06
18.71
3.16
4.50
58.75

4.03
4.27
4.68
0.79
0.44

10.35
11.86
22.21

62.09
86.31
148.40

1.33
0.19
0.08
0.33
0.10
0.01
0.10
-

14.19
8.40
1.19
0.53
2.11
0.61
0.06
0.61
-

2.14

27.70

4.20

BATU
BELAH

8.40
5.94
-

6.10
III PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata ad 1:8
2 Plesteran dinding ad 1:8
IV PEKERJAAN LANTAI
1 Floor Lantai Btn Tumbuk 1:3:5
2 Pas. keramik 50/50
3 Pas. Keramik 40/40
4 Pas. keramik 33,3/33,3
5 Pas. keramik 30/30
6 Pas. keramik 25/25
7 Pas. keramik 25/33
8 Pas. keramik 20/20
9 Pas. keramik 20/25
10 Pas. Lis 6/25 KM/WC
11 Pas. Lis 6/20 KM/WC
12 Pas. keramik dapur 20/20
13 Pas. Batu candi 20/20
14 Pas. Batu andesit 15/30
15 Urugan Pasir Bawah Lantai
V PEKERJAAN ATAP
1 Pek gording, nok & jurai
2 Pas. Usuk dan reng
3 Pek. Ppn. Angin & Listplank
4 Pek. Talang dan Penutup
5 Pas. Kerpus genteng beton
6 Pas. Genteng Beton
7 Gording kanal CNP15
SATUAN
TOTAL BAHAN

PAKU

4.20

II

PASIR SEMEN 40
PASANG
KG
BENDRA

5.94

26.10
26.10

25.20

8.40

5.16
7.68
8.43
1.42
2.28

19.75
1.13
2.23

21.55
31.99
35.10
5.92
4.75

14.22

24.97

23.11

99.31

47.89

44.16

53.19

btg
47.9

btg
44.2

btg
53.2

m3
7.7

m3
26.1

21.56

14.55

17.60

32.00
-

26.34

17.78
3.26

5.93
6.24

1.80
1.80

0.46
0.19

1.18

0.19

1.18

m3
44.7

zag
288.2

0.46

kg
14.2

kg
29.6

btng
48.3

lbr
107.7

btg
-

btg
-

Hal 41 / 42

REKAPITULASI KEBUTUHAN BAHAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO.
1

BAHAN/MATERIAL

SAT

JUMLAH

HARGA SATUAN

HARGA TOTAL

Semen PC 40 kg

zak

288.23

Rp

42,000.00

Rp

12,105,521.40

Pasir Pasang

m3

44.72

Rp

130,000.00

Rp

5,813,323.10

Pasir Urug

m3

7.74

Rp

90,000.00

Rp

696,600.00

Batu Belah

m3

26.10

Rp

100,000.00

Rp

2,610,000.00

Kericak

m3

6.10

Rp

170,000.00

Rp

1,037,136.00

Bendrat

kg

14.22

Rp

14,000.00

Rp

199,019.24

Paku

kg

29.63

Rp

15,000.00

Rp

444,480.12

Usuk 4/6 (Cor)

btg

48.31

Rp

5,000.00

Rp

241,547.60

Papan cor

lbr

107.71

Rp

6,000.00

Rp

646,235.94

10

Besi 12 (11,3) - 12

btg

Rp

86,080.80

Rp

11

Besi 10 (9,5) - 12

btg

47.89

Rp

59,966.40

Rp

2,871,954.00

12

Besi 9 (8,3) - 12

btg

44.16

Rp

37,720.80

Rp

1,665,833.51

13

Besi 6 (5,6) - 12

btg

Rp

22,994.40

Rp

14

Besi 5 (4,9) - 12

btg

53.19

Rp

15,678.00

Rp

833,890.87

15

Batu Bata

bh

17,707.69

Rp

400.00

Rp

7,083,076.00

16

Genteng Beton FLAT

lbr

672.00

Rp

3,500.00

Rp

2,352,000.00

17

Kerpus Genteng Beton

bh

21.68

Rp

4,500.00

Rp

97,571.25

18

Canal C15

btg

7.43

Rp

175,500.00

Rp

1,304,550.00

19

Seng datar

m1

Rp

25,000.00

Rp

20

Papan GRC 2 m

lbr

4.86

Rp

45,000.00

Rp

21

Papan kayu 2/20

lbr

Rp

110,000.00

Rp

22

Kayu Balok 6/12

btg

Rp

23

Kayu Usuk 5/7

btg

Rp

24

Kayu Reng 2/3

btg

25

Cat Exterior mowilex

kg

14.45

Rp

63,000.00

Rp

910,637.09

29

Cat Alkali

kg

7.22

Rp

34,000.00

Rp

245,580.06

30

Cat Interior catylac

kg

54.22

Rp

15,000.00

Rp

813,262.50

31

Cat plafond maxilite

kg

14.76

Rp

9,000.00

Rp

132,840.00

32

Cat Genteng

kg

8.00

Rp

25,000.00

Rp

200,000.00

33

Sicosol

kg

2.03

Rp

50,700.00

Rp

103,047.75

34

Water proofing

kg

Rp

40,000.00

Rp

35

Cat Kayu

kg

1.31

Rp

35,000.00

Rp

36

Melamine

kg

Rp

45,000.00

Rp

37

Thinner

kg

0.93

Rp

18,000.00

Rp

16,650.00

38

Scrup board

bh

2,014.76

Rp

50.00

Rp

100,738.00

39

Compound

zag

1.31

Rp

2,000.00

Rp

2,619.19

40

Gypsum Board

lbr

15.40

Rp

45,000.00

Rp

693,165.38

41

Kalsiboard

lbr

4.89

Rp

45,000.00

Rp

219,918.56

42

List Gypsum Ruangan

m1

Rp

12,000.00

Rp

43

Besi Hollow 2/4

btg

42.52

Rp

14,000.00

Rp

Batu alam

m2

45

Batu andesit 15/30

m2

46

Keramik 50/50 platinum

dos

47

Keramik 40/40 asia tile

dos

43.09

Rp

32,500.00

Rp

1,400,546.88

48

Keramik 33,3/33,3 platinum

dos

5.97

Rp

45,000.00

Rp

268,595.04

2
3
4

44

Rp

Rp

120,000.00

218,531.25

45,972.50
-

595,308.56

Rp

Rp

Rp

Hal 42 / 42

REKAPITULASI KEBUTUHAN BAHAN


PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO.

BAHAN/MATERIAL

SAT

JUMLAH

HARGA SATUAN

HARGA TOTAL

49

Keramik 30/30 asia tile

dos

Rp

35,000.00

Rp

50

Keramik Lantai 25/25 roman

dos

2.62

Rp

46,000.00

Rp

120,520.00

51

Keramik Lantai 25/33,3 platinum

dos

10.51

Rp

41,500.00

Rp

435,959.60

52

Keramik Lantai 20/20 wc asia tile

dos

3.00

Rp

32,000.00

Rp

96,000.00

53

Keramik Dinding 20/25 asia tile

dos

Rp

35,000.00

Rp

54

Keramik Dapur 20/20 asia tile

dos

3.00

Rp

32,000.00

Rp

96,000.00

55

List keramik 6/25 platinum

bh

20.80

Rp

16,000.00

Rp

332,800.00

56

List Keramik 6/20 asia tile

bh

Rp

6,000.00

Rp

JUMLAH

Rp

47,051,431.38

You might also like