CE-406: Construction Planning and

Management
Ff0(00l.
lKl08l0 0l 10l000MM0l08ll0 ll00fl 008flM0l











Name: Ayaz Aslam
Academic session: 2011
Batch: 2007-2008
Roll No.: CE-115
Discipline: Civil Engineering
SUMMARY

Project Planned Start Date: 22-nov-2010.

Project Planned Finished Date: 21-nov-2011.

Project Planned Duration: 6 Months.

Maximum Crew Level: About 40 to 50.

Project Cost Estimate:17 million rupees.

Project Cash InIlow Requirement:
It is restricted by the client i.e. NED, it is less at the beginning & more at the
middle oI the project.

PRO1ECT BRIEF:

Project Name: Extension oI Telecommunication Engineering Department

Location: Adjacent to Electronic Engineering Department

Client: NED University oI Engg. & Tech

Architect: Fareed Associates Architecte and Engineers

Structural Design Consultant: Mohammad Hammad Shah (LOYA Associates)

eneral Contractor: Saadat-ullah Khan (Waqar & Co.)

INTRODUCTION TO THE PROJECT

ENERAL:

Construction oI the class rooms & Iaculty oIIices Ior the telecommunication engineering
department.(MEA-III)

SCOPE:

Construction oI class room and Iaculty oIIices in a 3 story Ior the Telecommunication
Engineering Department .The construction oI project has to be completed within 1 year using
Iast track technique.

OB1ECTIVES:

To construct a 3-story building Ior students and Iaculty members oI Telecommunication
Department. This work has to be completed in 6 month and the cost not to exceed Rs 17-18
million rupees. The quality oI work is not speciIied so minimum quality is needed.(assumption)



PRO1ECT PRIORITY MATRIX

TIME COST QUALITY
CONSTRAINT


ENHANCED


REDUCE



METHODLOY:

Based on the previous knowledge on similar type oI project Iollowing methodology
should be adopted in order to complete the project in the speciIic time and within the limit
resources.
As the location oI the project is very critical so it is diIIicult to do excavation and
construction activity during peak hours when students are studying, so the maximum work has to
be done in holidays and in that time when there are less people around ad Ior this machinery and
all the required resources are to be available on the site, so to utilize the available time is most
eIIicient manners



BENEFECIARIES:

NED university
Faculty members
Students
Telecommunication department.


F80ll01 0l$08lF1l08

PRO1ECT DATA:

Project eneral Information:

Project Name: Extension oI Telecommunication Engineering Department
Location:NED university ( Adjacent to Electronic Engineering Department)
Client: NED University oI Engg. & Tech
Architect: Fareed Associates Architect and Engineering
Structural Design Consultant: Mohammad Hammad Shah (LOYA Associates)
eneral Contractor: Saadat-ullah Khan (Waqar & Co.)

Miscellaneous data:
O Quality can be compromised
O Facility will be opened Ior the Iaculty and students aIter the project is Iinished.
O Plumbing, HVAS and Electrical contracts is separately awarded and this all work has to
be completed within speciIied time.


Structural Details:

The structural drawings are attached in Appendix A-1. Some oI the inIormation is given as
Iollows:

Finishing Details:

The drawings are attached in Appendix A-1.

Assumptions:

MEP and HVAS drawings will be provided when it is needed.
Windows & doors will be selected by the client.
Floors tiling will be done aIter completion.
Sub contractors are assigned when it is required Ior any speciIic work.

"uantity Estimation:

Detailed Quantity estimation is attached in Appendix A-3.

l1LM nC uLSC8l1lCn Cl l1LM nC L 8 P CuAn1l1?
(cfL)
1
fooLlngs
l1 10 76 60 33 23623
l2 3 60 36 33 31973
l3 3 86 60 33 133873
l4 2 86 70 33 62473
l3 2 100 70 33 733
l6 8 66 40 33 924
l7 1 76 46 33 17718
l8 2 60 30 33 313

LxcavaLlon for foundaLlon
"&81l1f l$1lN1l08


Excavation



1:4:8 Lean Concrete For Foundation





Sno Descr|pt|on No L 8 n 1
(ft) (ft) (ft) (ft)
2 rovldlng and Laylng 148 Lean
ConcreLe for loundaLlon
l1 10 73 6 03 223
l2 3 6 33 03 163
l3 3 83 6 03 233
l4 2 83 7 03 2973
l3 2 10 7 03 33
l6 9 33 4 03 11
l7 1 73 43 03 16873
l8 1 6 3 03 13
17212S
1:4:8 Concrete In Plinth Beams

S.no. Description NO L B H "TY
(It) (It) (It) (It)
3 Providing and Laying 1:4:8
in P.B

rid A-F 1 28.984 2 0.5 28.984
rid A-C 1 16.32 1.667 0.5 13.60272
rid D-F 1 16.32 1.667 0.5 13.60272
rid D-J 1 53.16 1.667 0.5 44.30886
rid A-C' 1 11.65 1.667 0.5 9.710275
rid B-H 1 52 1.667 0.5 43.342
rid A-E 1 23.001 1.667 0.5 19.1713335
rid A-J 1 75.5 1.667 0.5 62.92925
rid E-F 1 14.334 1.667 0.5 11.947389
rid 1-2 3 22.1667 1.667 0.5 18.47594445
rid 1-2' 1 20.166 2 0.5 20.166
rid 2-4 1 11 1.667 0.5 9.1685
rid 2-3 1 8 1.667 0.5 6.668
rid 4-6 1 15.33 1.667 0.5 12.777555
rid 3-6 2 17.5 1.667 0.5 14.58625
rid 3-5 1 7.33 1.667 0.5 6.109555
rid 3-6 2 23 1.667 0.5 19.1705
rid 2-6 1 27.334 1.667 0.5 22.782889
rid 2-6' 1 29 1.667 0.5 24.1715
401.675241

1:2:4 Concrete Below round Level Including Plinth


(A)
124 Concrete for
foundat|on
1 l1 9 66 30 20 383000
2 l2 3 30 46 16 101230
3 l3 6 76 30 20 430000
4 l4 2 76 60 20 180000
3 l3 2 90 60 20 216000
6 l6 9 46 30 16 182230
7 l7 1 66 36 16 34123
8 l8 1 30 40 16 30000
17782S
Item
No
Descr|pt|on of
|tems
No
Length(L)

8reath
(8)
ne|ght
(n)
uant|ty
(Lx8xn) ft

(8)
124 Concrete for co|umn
be|ow p||nth

1 C1l1 3 20 10 39 22300
2 C2l1 4 20 08 39 20010
3 C2l2 3 20 08 43 17009
4 C2l3 1 20 08 39 3003
3 C2l6 1 20 08 43 3670
6 C2l7 1 20 08 43 3670
7 C3l1 1 28 10 39 10001
8 C3l3 1 28 10 39 10001
9 C3l3 1 28 10 39 10001
10 C4l3 1 28 08 39 6671
11 C4l4 1 28 08 39 6671
12 C4l8 1 28 08 43 7360
13 C3l1 2 28 08 39 13342
14 C3l3 2 28 08 39 13342
13 C3l8 1 28 08 43 7360
16 C6l6 8 16 08 43 34017
1S2
(C)
124 Concrete for p||nth
beam

1 1 1 308 8 26 30389
2 2 1 318 8 26 32239
3 3 1 104 8 26 17043
4 4 1 260 8 26 42900
3 3 1 218 12 26 34130
6 6 1 260 8 26 42900
7 7 3 248 8 26 118800
8 8 1 200 8 26 33000
9 9 1 200 8 26 33000
10 10 1 138 8 26 22339
4712

1oLal 124 ConcreLe 24481


SITU Wall
l1LM
nC
uLSC8l1lCn Cl l1LM nC L 8 P CuAn1l1?
(cfL)
1 Sl1u WALL
1 143 23 26 80136
1 139 23 26 8839
1 429 23 26 24046
1 166 23 26 92812
1 96 23 26 3343
1 142 23 26 7968
1 192 23 26 10968
1 204 23 26 114373
8S18

EARTH FILLIN
Providing and laying earth Iilling oI thickness 1It.which includes 6thick stone soiling,4 thick
c.c bed, 2 thick c.c bed
no Locat|ons 1ota| no Length(ft
)
8readth(f
t)
ne|ght(ft
)
uant|ty(ft

)
1ota|
qty(ft

)
1 Chalrman offlce 1 1333 1716 1 26306
2 laculLy offlce 4 12 14 1 672
3 MeeLlng room 1 24 1716 1 41184
4 pa 1 1733 12 1 20796
3 Corrldor 1 63 9 1 367
6 SLalr case 1 14066 12 1 17392
7 Llbrary 1 1916 10 1 1916
8 Male LolleL 1 13 10 1 130
9 lemale LolleL 1 833 103 1 8746
10 Wlde corrldor 1 8 23 1 200
11 laLform 2 12 14 1 672
12 Cpen space 1 23 463 1 11623
13 SLeps 4 10 138 1 632 489634
14 LolleL 1 6 12 1 72
Backfilling
Sno
Description
No
.
Lengt
h
Bread
th
Heig
ht
Total
(ft
3
)


Excavation
Of Footing

-1 10 7'-6" 6'-0" 3'-6" 1575

-2 3 6'-0" 5'-6" 3'-6" 346.5

-3 5 8'-6" 6'-0" 3'-6" 892.5

-4 2 8'-6" 7'-0" 3'-6" 416.5

-5 2 10'-0" 7'-0" 3'-6" 245

-6 9 5'-6" 4'-0" 3'-6" 696

-7 1 7'-6" 4'-6" 3'-6"
118.12
5

-8 1 6'-0" 5'-0" 3'-6" 105


4394.6
25 ft
3


Footing
SITU WaII
No
.
Lengt
h
Bread
th
Heig
ht
Total
(ft
3
)

RD-1 1 12'-8" 1'-8" 1'-6" 31.73

RD-2 1 36'-5" 1'-8" 1'-6" 91.058

RD-3 1 27'-6" 1'-8" 1'-6" 68.86

RD-4 n5 1 11'-6" 1'-8" 1'-6" 29.03

RD-6 1 42'-8" 1'-8" 1'-6" 107.08
RD-A 1
30'-
11" 1'-8" 1'-6" 77.63
RD-B 1 11'-0" 1'-8" 1'-6" 27.55

RD-C n
D 2 19'-6" 1'-8" 1'-6" 97.66
RD-E 1 9'-4" 1'-8" 1'-6" 23.17
RD- 1
34'-
11" 1'-8" 1'-6" 87.44
RD- 1 19'-9" 1'-8" 1'-6" 49.27
RD-H 1 17'-5" 1'-8" 1'-6" 43.43
RD-J 1 19'-0" 1'-8" 1'-6" 47.64
712.11
TOTAL
5103.7
3 ft
3



Lean
Concrete
-1 10 7'-6" 6'-0" 0'-6" 225
-2 3 6'-0" 5'-6" 0'-6" 49.5
-3 5 8'-6" 6'-0" 0'-6" 127.5
-4 2 8'-6" 7'-0" 0'-6" 59.5
-5 2 10'-0" 7'-0" 0'-6" 70
-6 9 5'-6" 4'-0" 0'-6" 99
-7 1 7'-6" 4'-6" 0'-6" 16.87
-8 1 6'-0" 5'-0" 0'-6" 15

Total=662.37
ft
3



oot|ng I1U
Wa||
C8lu1 1 377 18 06 3146
C8lu2 2 842 18 06 14028
C8lu3 1 607 18 06 3063
C8lu4 n3 1 249 18 06 2074
C8lu6 1 432 18 06 377
C8luA 2 234 18 06 3896
C8lu8 2 239 18 06 3979
C8luC n u 1 469 18 06 3909
C8luL 1 230 18 06 2087
C8lul 1 330 18 06 273
C8luC 1 347 18 06 2894
1oLal47398 fL
3



1oLal113833
fL
3


BACKFILL EXCAVATION - 1:4:8 5103.73- 1138.35 3965.38 ft
3

2"-4" Thick C.C. Bed
S.no. Description No. Length Breadth Height Total (It
3
)
4"TH CC BED
Room 1 ,2 ,3 ,4 4 12'-0" 14'-0" 0'-4" 221.76
Room 5 ,6 2 24'-0" 17'-2" 0'-4" 246.24
Room 7 1 24'-0" 12'-0" 0'-4" 45
Room 8 2 15'-0" 10'-0" 0'-4" 99
Bathroom 1 8'-4" 10'-0" 0'-4" 24.9
Lobby 1 1 18'-0" 12'-0" 0'-4" 64.8
Lobby 2 1 9'-0" 58'-4" 0'-4" 173.24
plateIorm 1 35'-8" 10'-0" 0'-4" 117.975
Total992.915 It
3

3"-6" Thick Stone Soling
Sno Description No. Length Breadth Height Total (ft
3
)
6" TH Stone Soling
Room 1 ,2 ,3 ,4 4 12'-0" 14'-0" 0'-6" 336
Room 5 ,6 2 24'-0" 17'-2" 0'-6" 412
Room 7 1 24'-0" 12'-0" 0'-6" 144
Room 8 2 15'-0" 10'-0" 0'-6" 75
Bathroom 1 8'-4" 10'-0" 0'-6" 41.65
Lobby 1 1 18'-0" 12'-0" 0'-6" 108
Lobby 2 1 9'-0" 58'-4" 0'-6" 264
plateform 1 35'-8" 10'-0" 0'-6" 181.2
Total=1561.865 ft
3


1:2:4 CONCRETE ROUND FLOOR

Descr|pt|on No
L
(ft)
8
(ft)
n
(ft)
ty
(ft)
1 ty (ft)
CCLUMN
C1 3 2 1 83 17 31
C2 10 2 067 83 1139 11390
C3 2 267 1 83 22693 4339
C4 4 267 067 83 1320363 6082
C3 6 267 067 83 1320363 9123
C6 8 13 067 83 83423 6834
4 ft
8LAM
81 1 33 067 2 4667 4667
82 1 2333 067 2 3377 3377
83 0 0 0 0 000 000
84 1 2333 067 2 3377 3377
83 1 2633 1 2 3266 3266
86 1 2333 067 2 3377 3377
87 3 2633 067 2 3311 10332
88 1 2333 067 2 3377 3377
89 1 2333 067 2 3377 3377
810 1 1333 067 2 1777 1777
811 1 2233 067 2 2977 2977
812 1 3383 1 2 6766 6766
813 1 14 067 2 1867 1867
814 2 14 067 2 1867 3733
813 1 393 067 2 7933 7933
816 1 3632 067 2 7309 7309
817 1 22 067 2 2933 2933
818 1 12 067 2 1600 1600
819 1 7848 067 2 10464 10464
8412 ft
LA8
Area 1 1 8317 6067 03 2322962 232296
7 sunk slab 2 17167 24 0083 3419666 6839
12 sunk
slab 1 12 13 03 90 9000

A268136
fL

Area 2 1 4613 2467 03 3692603 36926
SLalr case
slab 1 12 13 03 90 9000

863926
fL
8oof Shades
S1 1 7234 123 03 432123 4321
1 7234 13 033 338083 3381


Descr|pt|on No
L
(ft)
8
(ft)
n
(ft)
ty
(ft)
1 ty (ft)
S2 1 33 2 03 33 3300
1 33 1 033 1133 1133

S3 1 39 1383 03 308683 3087
1 39 133 033 171171 1712

Wlndow
Shade 16 2383 3 023 193723 3100

C20633
fL

LA8 A8+C 2228S ft


STAIR CASE:
Area oI 1 step 1/2*1*0.5 0.25 sq. It
Volume oI 1 step 5.5 * 0.25 1.375 cIt
Volume oI total steps 21 * 1.375 28.875 cIt
Volume oI landing 13 * 4.5 * 1 58.5 cIt
Volume oI waist slab (12.81 * 5.5 * 0.5)*2 70.45 cIt
Total 1:2:4 concrete Ior stair case 157.825 cIt
Total 1:2:4 concrete for ground floor 3666.285 cft

Total Concrete in 2nd Floor:
I1LM
NC
NC
LLNG1n
(L)
ft
8kLAD1n
(8)
ft
nLIGn1
(n)
ft
UAN1I1
(Lx8xn) ft
1C1AL
ft
ft ft ft ft
a) 124 concreLe for column

C1 3 1 2 83 31

C2 10 0667 2 83 11339

C3 3 1 2667 83 680083

C4 4 0667 2667 83 60482226

C3 1 0667 2667 83 131203363

C6 12 0667 13 83 102031


4100323







b)
124 concreLe for slabs

SLA8 1 1 243 3866 083 6399

SLA8 2 1 2782 4399 083 7464

SLA8 3 1 3649 1232 038 4939

SLA8 4 1 19 2766 038 4724

SLA8 3 1 434 11 038 1392


23118
c)
124 concreLe for pro[ecLlons


W1 3 63 2 033
1287

W2 1 33 2 033
363

W3 1 33 2 033
363
W4 9 408 2 033 242332
443632
d) 124 cocreLefor beams
881 1 33 0667 3 70033
88233 2 23 0667 3 10003
884 1 23833 1 3 77499
886 1 1633 10163
887 1 12667 0667 3 23346667
888 1 26167 0667 3 32360167
889 1 22333 13896
8810 1 36667 0667 3 73370667
881113 2 83167 0667 3 332834334
8812 1 48333 0667 3 96714333
8813 1 11 0667 3 22011
8814 1 24 0667 3 48024 1138833

tota| concrete |n 2nd f|oor 18444

Volume Of First Floor
Sno
uescrlpLlon no LengLh 8reaLh PelghL CuanLlLy 1 CLy

CCLUMN

C1 3 2 1 9 18 34

C2 10 2 067 9 1206 1206

C3 2 267 1 9 2403 4806

C4 4 267 067 9 161001 644004

C3 6 267 067 9 161001 966006

C6 8 13 067 9 9043 7236

436021

8LAM

81 1 33 067 241 363143 363143

82 1 2333 067 241 409 409

83 1 2333 067 241 409 409

84 1 2633 1 241 634333 634333

83 1 2333 067 241 409 409

86 1 1634 067 241 263841 263841

87 1 1333 067 241 213239 213239

88 3 2633 067 241 42313 1273431

89 1 2233 067 241 360362 360362

810 1 3683 1 241 887603 887603

811 1 832 067 241 134343 134343

812 1 4902 067 241 791323 791323

813 1 1067 067 241 172288 172288

814 1 2401 067 241 387689 387689

813 1 832 067 241 134343 134343

9467736

LA8

A8LA1 1 3683 2633 083 80467 80467

A8LA2 1 3902 2333 083 82033 82033

A8LA3 1 33 1083 038 21984 21984

A8LA4 1 7237 1034 038 43401 43401

A8LA3 1 9 2334 038 12183 12183

A8LA6 1 10 2333 038 14691 14691

A8LA7 1 1367 10 038 9088 9088

263849

8CCl SPAuLS

S1 1 7234 123 03 432123 432123

1 7234 13 033 338083 338083

S2 1 33 2 03 33 33

1 33 1 033 1133 1133

S3 1 39 1383 03 308683 308683

1 39 133 033 171171 171171

WlnuCW SPAuL 16 2383 3 023 193723 30996

2063324



124 concreLe ln slab 2843042

1AIk CAL


Area of 1 sLep Z 1 03 023 sqfL

volume of 1 sLep 33 023 1373 cfL

volume of LoLal sLeps 22 1373 28873 cfL
volume of landlng 13 43 1 383 cfL
volume of walsL slab (1291 33 03) 2
7043cfL

PRO1ECT APPRAISAL
DESIN AND SPECIFICATION RE"UIREMENT
AREA AND SITE CONSTRUCTION PRACTISE
1. For such kind oI construction in this locality; skill labor is locally
available, drum mixers are used Ior concreting, bar bending and
placing is done on site and diIIerent works can continue
simultaneously.
2. Work cannot be carried out in night time.
3. Excavator which is used Ior excavation is charged on hourly basis,
labour on per day basis and other resources are charges as per
quantity.
4. More charges has to be paid Ior upper stories and precautions have
to be strictly Iollowed.
5. Since the strata is hard it is best to use the excavator Ior excavation
but in the presence oI students the use oI this kind oI machinery is
not allowed so the excavation should be carried out by labor.
PRO1ECT SCOPE STATEMENT

PRO1ECT 1USTIFICATION: Extension oI Telecommunication due to increase in
number oI students and Iaculty.
PRO1ECT`S PRODUCT: 3- story building with class rooms and oIIices according to
size.
SCOPE INCLUSION: All civil works as per speciIication and requirement
OB1ECTIVES DELIVERABLES MILESTONES
To construct the class
rooms and Iaculty
oIIice Ior
Telecommunications
Department within 6
months and 18 million
rupees budget.

1. SUBSTRUCTURE
2. 1
st
Iloor
3. 2
nd
Iloor
4. 3
rd
Iloor
5. RooI


Permit approved
Excavation complete

Full concreting
Finishing
Final inspection
Project Hand Over

SCOPE EXCLUSIONS :
1. Mechanical, HVAC and Electrical works are not included in the scope oI the
work.
2. Contractor is not responsible Ior any kind oI delay in the execution oI MEP works
3. Contractor is not responsible Ior govt related works.
MISCELLANIOUS: Recommended methodology Ior the execution oI work, contractor
details Ior MEP works, opening oI the Iacility Ior the students and Iaculty.


1. PROJECT KEY PLAN
RATIONALE
KEY PLAN

PROJECT WORK BREAK DOWN STRUCTURE
RATIONALE
WBS

ID WBS TASK NAME (TASK CATEORY)
0. 0 STRENTHENNIN OF NED
UNIVERSITY
Project Summary
1. 1. Feasibility Summary
2. 2. Engineering and Design Summary
3. 3. Bid Procurement Summary
4. 4. Construction Summary
5. 4.1 Initial Works Summary
6. 4.1.1 Mobilization Detailed
7. 4.1.2 Site clearance, layout and preparation Detailed
8. 4.2 Basement Summary
9. 4.2.1 Excavation Detailed
10. 4.2.2 Lean Concrete Detailed
11. 4.2.3 Foundation Detailed
12. 4.2.4 Columns below L Detailed
13. 4.2.5 Plinth Detailed
14. 4.2.6 BackIilling Detailed
15. 4.3 1
st
floor Summary
16. 4.3.1 Earthwork Detailed
17. 4.3.2 Columns F Detailed
18. 4.3.3 Beams FF Detailed
19. 4.3.4 Slab FF Detailed
20. 4.3.5 Block Masonry-F Detailed
21. 4.3.6 Stairs Detailed
22. 4.3.7 Internal Plaster F Detailed
23. 4.3.8 Doors/Windows F Detailed
24. 4.3.9 Floor Finishing F Detailed
25. 4.3.10 Plumbing Fixtures - F Detailed
26. 4.3.11 Electrical Fixture F Detailed
27. 4.3.12 Painting F Detailed
28. 4.4 2
nd
floor Summary
29. 4.4.1 Columns FF Detailed
30. 4.4.2 Beams SF Detailed
31. 4.4.3 Slab SF Detailed
32. 4.4.4 Block Masonry FF Detailed
33. 4.4.5 Stairs - SF Detailed
34. 4.4.6 Internal Plaster FF Detailed
35. 4.4.7 Doors/Windows FF Detailed
36. 4.4.8 Floor Finishing FF Detailed
37. 4.4.9 Plumbing Fixtures - FF Detailed
38. 4.4.10 Electrical Fixture FF Detailed
39. 4.4.11 Painting FF Detailed
40. 4.5 3
rd
floor Summary
41. 4.5.1 Columns SF Detailed
42. 4.5.2 Beams RooI Detailed
43. 4.5.3 Slab RooI Detailed
44. 4.5.4 Block Masonry - SF Detailed
45. 4.5.5 Stairs SF Detailed
46. 4.5.6 Plaster SF Detailed
47. 4.5.7 Doors/Windows SF Detailed
48. 4.5.8 Floor Finishing SF Detailed
49. 4.5.9 Plumbing Fixtures - SF Detailed
50. 4.5.10 Electrical Fixture SF Detailed
51. 4.5.11 Painting SF Detailed
52. 4.6 Roof Summary
53. 4.6.1 Columns above rooI Detailed
54. 4.6.2 Stair tower Detailed
55. 4.6.3 Flooring Detailed
56. 4.6.4 Parapet Detailed
57. 4.6.5 OHWT Milestone
58. 4.7 External Works Summary
59. 4.7.1 External Block Masonry Detailed
60. 4.7.2 External Plaster Detailed
61. 4.7.3 External Paint Detailed
62. 5 Project Closeout Summary
63. 5.1 Punch List Detailed
64. 5.2 Project Handover Milestone



ACTIVITY DURATION ESTIMATION:

RESOURCE TEAM PRODUCTIVITY IN LOCAL RESIDENTIAL BUILDIN
CONSTRUCTION

S. No. Item oI Work Resource
Team
Resource Team Productivity
1.a.

1.b.
Excavation (manual)

Excavation (mechanical)
2 UL
2 UL
1 Exc, 1 UL
90-100 cIt/day (normal soil)
25-30 cIt/day (rocky soil)
500 cIt/day
2. BackIilling 2 UL 300 cIt/day
3. Stone soiling 2 UL 200 cIt/day
4.
Damp prooIing (6
//
wide)
a. Plinth Beams
b. Bitumen Painting

1 SL 2 UL
1 SL 2 UL

200 RIt/day
400 RIt/day
5. Steel 2 SL 2 UL 300 Kg/day (cutting, bending,
binding, placing)
6. Form work
a. Footing
b. Column
c. Plinth Beams
d. Beam-Slab

1 SL 1 UL
2 SL 4 UL
1 SL 2 UL
2 SL 6 UL

150 sIt/day
100 sIt/day
100 sIt/day
150 sIt/day
7. Concreting
a. Footing
b. Column
c. Plinth Beams
d. Beam - Slab

1 SL 6 UL
2 SL 8 UL
1 SL 6 UL
2 SL 10 UL

450 cIt/day
90 cIt/day
300 cIt/day
500 cIt/day
8. Block Masonry 2 SL 2 UL 140 cIt/day (6
//
8
//
15
//
)
9. Plaster
a. Internal
b. External

2 SL 2 UL
2 SL 2 UL

150 sIt/day
125 sIt/day
10. Tiling
a. Floor
b. Walls

2 SL 2 UL
2 SL 2 UL

200 sIt/day
150 sIt/day
11.a.
11.b.
11.c.
Mosaic Flooring
Mosaic Floor rinding
Polish
2 SL 2 UL
2 UL
2 UL
200 sIt/day
100 sIt/day
300 sIt/day
12. Painting 2 SL 2 UL 200 sIt/day (distemper)
150 sIt/day (plastic emulsion)
12. Painting 2 SL 2 UL 200 sIt/day (distemper)
150 sIt/day (plastic emulsion)
13.a.
13.b.
Laying oI conduits in
slab
2 SL 2 UL

300 It/day

Laying oI conduits in
walls
2 SL 2 UL 25-30 It/day
14. Electrical Wiring 2 SL 30 It/day
15. Laying oI pipes 2 SL 3 rooms/day (size 12
/
12
/
)
16. Sanitary Fixtures 2 SL 2 UL 8 days to complete 1 house (500sq.
yd, R1)
17. Electrical Fixtures 2 SL 2 UL 5 days to complete 1 house (500sq.
yd, R1)
18. Door/Window Frames 2 SL 2 UL (5 door 5 win)/day 225 sIt/day
19. Door/Window Panels
a. Wooden
b. Aluminium

2 SL 2 UL
2 SL 2 UL

150 sIt/day
120 sIt/day

NOTE : SL Skilled Labor
UL Unskilled Labor

SAMPLE CALCULATION

1. EXCAVATION (mechanical)

I =
0AN1I1 0P w0RK
PR00C1IvI1 LPP0R1


II = H H II E H

I = co = co

I =
99 c

c
o
= os

BackIilling
I =
0AN1I1 0P w0RK
PR00C1IvI1 LPP0R1

II = H H II E H

I = co = 9 co

I =
9.8 c
9 co
= os
2. Stone soiling
I =
I K
II

II = H H II E H

I = co = co

I =
.8 c
co
= os

3. Foundation (Concreting)
I =
I K
II

II = H H II E H

I = co = co

I =
8. c
co
= os

4. Column (Concreting)
I =
I K
II

II = H H II E H

I = 9 co = co

I =
9.8 c
co
= os

5. Plinth Beams (Concreting)

I =
I K
II

II = H H II E H

I = co = co
I =
. c
co
= os




7. Beams (Concreting)
I =
I K
II

II = H H II E H

I = co = co

I =
9. c
co
= os

1. Slab (Concreting)
I =
I K
II

II = H H II E H
I = co = co
I =
9. c
co
= os
2. Block Masonry
I =
I K
II

II = H H II E H

I = so = 8 co

I =
8. c
8 co
= os

3. Plaster (Internal)

I =
I K
II

II = H H II E H

I = so = 9 co

I =
. c
9 co
= os

ID WBS TASK NAME ACTIVITY
DURATION
0. 0 STRENTHENNIN OF NED UNIVERSITY
1. 1. Feasibility
2. 2. Engineering and Design
3. 3. Bid Procurement
4. 4. Construction
5. 4.1 Initial Works
6. 4.1.1 Mobilization 7
7. 4.1.2 Site clearance, layout and preparation 3
8. 4.2 Basement
9. 4.2.1 Excavation 7
10. 4.2.2 Lean Concrete 2
11. 4.2.3 Foundation 4
12. 4.2.4 Columns below L 3
13. 4.2.5 Plinth 5
14. 4.2.6 BackIilling 4
15. 4.3 1
st
floor
16. 4.3.1 Earthwork 8
17. 4.3.2 Columns F 5
18. 4.3.3 Beams FF 4
19. 4.3.4 Slab FF 6
20. 4.3.5 Block Masonry-F 6
21. 4.3.6 Stairs 4
22. 4.3.7 Internal Plaster F 11
23. 4.3.8 Doors/Windows F 14
24. 4.3.9 Floor Finishing F 10
25. 4.3.10 Plumbing Fixtures - F 8
26. 4.3.11 Electrical Fixture F 5
27. 4.3.12 Painting F 12
28. 4.4 2
nd
floor
29. 4.4.1 Columns FF 3
30. 4.4.2 Beams SF 4
31. 4.4.3 Slab SF 6
32. 4.4.4 Block Masonry FF 6
33. 4.4.5 Stairs - SF 4
34. 4.4.6 Internal Plaster FF 11
35. 4.4.7 Doors/Windows FF 14
36. 4.4.8 Floor Finishing FF 10
37. 4.4.9 Plumbing Fixtures - FF 8
38. 4.4.10 Electrical Fixture FF 3
39. 4.4.11 Painting FF 12
40. 4.5 3
rd
floor
41. 4.5.1 Columns SF 5
42. 4.5.2 Beams RooI 4
43. 4.5.3 Slab RooI 6
44. 4.5.4 Block Masonry - SF 6
45. 4.5.5 Stairs SF 4
46. 4.5.6 Plaster SF 11
47. 4.5.7 Doors/Windows SF 14
48. 4.5.8 Floor Finishing SF 10
49. 4.5.9 Plumbing Fixtures - SF 8
50. 4.5.10 Electrical Fixture SF 5
51. 4.5.11 Painting SF 12
52. 4.6 Roof
53. 4.6.1 Columns above rooI 3
54. 4.6.2 Stair tower 4
55. 4.6.3 Flooring 7
56. 4.6.4 Parapet 7
57. 4.6.5 OHWT 2
58. 4.7 External Works
59. 4.7.1 External Block Masonry 4
60. 4.7.2 External Plaster 5
61. 4.7.3 External Paint 6
62. 5 Project Closeout
63. 5.1 Punch List 14
64. 5.2 Project Handover 0












ID WBS TASK NAME ACTIVITY
DURATION
PREDECESSOR
65. 0 STRENTHENNIN OF NED
UNIVERSITY

66. 1. Feasibility
67. 2. Engineering and Design
68. 3. Bid Procurement
69. 4. Construction
70. 4.1 Initial Works
71. 4.1.1 Mobilization 7
72. 4.1.2 Site clearance, layout and
preparation
3 6
73. 4.2 Basement
74. 4.2.1 Excavation 7 7
75. 4.2.2 Lean Concrete 2 9
76. 4.2.3 Foundation 4 10
77. 4.2.4 Columns below L 3 11SS+3d
78. 4.2.5 Plinth 5 12
79. 4.2.6 BackIilling 4 13
80. 4.3 1
st
floor
81. 4.3.1 Earthwork 8 14
82. 4.3.2 Columns F 5 16
83. 4.3.3 Beams FF 4 17
84. 4.3.4 Slab FF 6 18SS + 2d
85. 4.3.5 Block Masonry-F 6 19SS + 3d
86. 4.3.6 Stairs 4 19SS + 3d
87. 4.3.7 Internal Plaster F 11 21
88. 4.3.8 Doors/Windows F 14 22
89. 4.3.9 Floor Finishing F 10 23
90. 4.3.10 Plumbing Fixtures - F 8 24
91. 4.3.11 Electrical Fixture F 5 23
92. 4.3.12 Painting F 12 26
93. 4.4 2
nd
floor
94. 4.4.1 Columns FF 3 27
95. 4.4.2 Beams SF 4 29
96. 4.4.3 Slab SF 6 30
97. 4.4.4 Block Masonry FF 6 31SS + 2d
98. 4.4.5 Stairs - SF 4 32SS + 3d
99. 4.4.6 Internal Plaster FF 11 32SS + 3d
100. 4.4.7 Doors/Windows FF 14 34
101. 4.4.8 Floor Finishing FF 10 33
102. 4.4.9 Plumbing Fixtures - FF 8 36
103. 4.4.10 Electrical Fixture FF 3 37
104. 4.4.11 Painting FF 12 38
105. 4.5 3
rd
floor
106. 4.5.1 Columns SF 5 39
107. 4.5.2 Beams RooI 4 41
108. 4.5.3 Slab RooI 6 42
109. 4.5.4 Block Masonry - SF 6 43SS + 2d
110. 4.5.5 Stairs SF 4 44SS + 3d
111. 4.5.6 Plaster SF 11 44SS + 3d
112. 4.5.7 Doors/Windows SF 14 46
113. 4.5.8 Floor Finishing SF 10 47
114. 4.5.9 Plumbing Fixtures - SF 8 48
115. 4.5.10 Electrical Fixture SF 5 49
116. 4.5.11 Painting SF 12 30
117. 4.6 Roof
118. 4.6.1 Columns above rooI 3 31
119. 4.6.2 Stair tower 4 33SS + 2d
120. 4.6.3 Flooring 7 34
121. 4.6.4 Parapet 7 33SS + 2d
122. 4.6.5 OHWT 2 36
123. 4.7 External Works
124. 4.7.1 External Block Masonry 4 37
125. 4.7.2 External Plaster 5 60
126. 4.7.3 External Paint 6 61
127. 5 Project Closeout
128. 5.1 Punch List 14 61
129. 5.2 Project Handover 0 63
















CuAn1l1? unl1 8CuuC1lvl1?
nC Cl
1LAM uu8A1lCn
Mobilization
Site clearance, layout and
preparation
Excavation 699693 cfL/day 300
2 699693
Lean Concrete 3738002 sfL/day 130
2 191266747
Foundation 1778623 cfL/day 430
1 39323
Columns below L
1930263 cfL/day 90 1 216693899
Plinth
4671613 cfL/day 300 1 1337203
BackIilling
396338 cfL/day 300 2 660896667
Earthwork
743141 cfL/day 200 3 743141
Columns F
43069 cfL/day 90 4 119636111
Beams FF
84912 cfL/day 300 2 084912
Slab FF
222863 cfL/day 300 2 222863
Block Masonry-F
4877714 cfL/day 140 6 38068023
Stairs
128873 cfL/day 90 1 143194444
Internal Plaster F
122202 sfL/day 130 6 133780046
Doors/Windows F
176873 sfL/day 300 3 117916667
Floor Finishing F
22063 sfL/day 200 3 36773
Plumbing Fixtures - F
Electrical Fixture F
Painting F
33204 sfL/day 200 4 41303
Columns FF 436021 cfL/day 90 4 1266723
Beams SF
9467736 cfL/day 300 2 09467736
Slab SF
263849 cfL/day 300 2 263849
Block Masonry FF 3336333 cfL/day 140 6 421016043
Stairs - SF
93663 cfL/day 90 3 021238889
Internal Plaster FF
122102 sfL/day 130 6 133668934
Doors/Windows FF
30 sfL/day 300 3 002
Floor Finishing FF
22063 sfL/day 200 3 36773
Plumbing Fixtures - FF

Electrical Fixture FF

Painting FF
33204 sfL/day 200 4 41303
Columns SF
4100323 cfL/day 90 4 113903412
Beams RooI
23118 cfL/day 300 2 023118
Slab RooI
1138833 cfL/day 300 2 113883317
Block Masonry - SF
3336333 cfL/day 140 6 421016043
Stairs SF
32744 cfL/day 90 3 072764444
Plaster SF
122102 sfL/day 130 6 133668934
Doors/Windows SF
176873 sfL/day 300 3 117916667
Floor Finishing SF
22063 sfL/day 200 3 36773
Plumbing Fixtures - SF

Electrical Fixture SF

Painting SF
33204 sfL/day 200 4 41303
Columns above rooI
633 cfL/day 90 4 181944444
Stair tower
2234 cfL/day 90 3 300888889
Flooring
2302 sfL/day 300 3 278
Parapet
334 cfL/day 140 6 042142837
OHWT
7687 cfL/day 300 2 07687
LxLernal 8lock Masonry 1363 cfL/day 140 3 223371429
LxLernal lasLer 6338 sfL/day 123 4 13116
LxLernal alnL 1002 sfL/day 200 3 1002
unch LlsL
ro[ecL Pandover