You are on page 1of 2

Project No.

Date

Shair and Partners

DESIGN CALCULATION SHEET

GHENIA
Sheet No.

#######
Computed by

1
Subject

of

M A-bakry
Approved by

Checked by

A-bakry Application Type Club

Qty 0 0 1 0 1

Fixtures Selected Bathtubs Kitchen Sinks Private Lavatory Public Lavatory Showers

* * * * *

20 20 2 6 150

gph gph gph gph gph

= = = = =

0 0 2 0 150

gph gph gph gph gph

CALCULATION RESULTS Possible Maximum Demand: Demand Factor: Probable Maximum Demand: Heater Recovery Capacity: Storage Factor: Strorage Tank Capacity: Hot Water Tank Inlet / Outlet Temperatures: T in (Deg F): 40 T out (Deg F): 140 Heater or Coil Capacity: 38000 Btu/hr 11.1372 KW 0.9 41.04 gal 0.3 45.6 45.6 gph gph 152 gph

Calculations are done using the " Number of Fixtures" method as per ASHREA 1976 Systems Handbook Chap 37.

Data
Apartement House Private lavatory Public lavatory Bathtubs Dishwashers Foot Basins Kitchen Sinks Laundry Tubs Pantry Sinks Showers Slop Sink Hydrotherapeutic Showers Hubbard Baths Leg Baths Arm Baths Sitz Baths Continous Flow Baths Circular Wash Sinks Semicircular Wash Sinks Demand Factor: Storage Factor: 2 4 20 15 3 10 20 5 30 20 Club Gymnasium Hospital Hotel Industrial Office Private School Y.M.C.A Plant Buildin Residenc g e 2 2 2 2 2 12 6 15 8 20 30 60 15 60 60 12 3 3 12 20 20 10 20 20 20 28 10 5 10 10 225 30 30 225 225 20 20 15 20 20

2 6 20 100 3 20 28 10 150 20

2 8 30 12

225

2 6 20 100 3 20 28 10 75 20 400 600 100 35 30 165 20 10

2 8 20 100 3 30 28 10 75 30

20 10 0.25 0.8

30 15 0.4 1

20 10 0.3 2 0.3 0.7

30 15 0.4 1 0.4 1

0.3 1.25

0.3 0.9

0.4 1

0.25 0.6

Apartment House Club Gymnasium Hospital Hotel Industrial Plant Office Building Private Residence School Y.M.C.A

2 3 4 5 6 7 8 9 10 11

Page 2

You might also like