We have defined a transaction type Misc Project Issue with the Project Flag enab led.

The Misc Traansaction is done in inventory with the Project flag enabled. T he transaction import is done. The cost is updated in the project. Now the cost of Inventory issued to the Project is visible as CIP cost. When the inventory CI P cost is capitalized through the PRC: Generate Asset Lines, the Inventory CIP c osts are not getting capitalized.