: 1.03.01.15.22
Nama Proyek
Lokasi
: KECAMATAN SUKAMULYA
Volume
: PANJANG
13,248.00
LEBAR =
3,5 ; 4 ; 6
m'
Volume Pelaksanaan
: PANJANG
9,683.00
LEBAR =
5;6
m'
Propinsi / Kabupaten
: BANTEN / TANGERANG
NO
URAIAN
JUMLAH HARGA
Rp.
I.
PEKERJAAN PENDAHULUAN
140,196,000.00
III.
PEKERJAAN TANAH
276,870,970.00
PEKERJAAN PLESTERAN
PPN
( 10 % X A )
TERBILANG :
37,142,000.00
462,740,000.00
9,077,695,904.00
DIBULATKAN
10,400,904,890.00
1,425,104,670.00
132,210,900.00
8,100,000.00
1,513,036,200.00
217,390,000.00
23,691,391,534.00
2,369,139,153.40
26,060,530,687.40
26,060,000,000.00
MUHAMMAD ARIFIN
Direktur
JENIS PEKERJAAN
KODE ANALISA
PEKERJAAN PENDAHULUAN
Pengukuran dan Pematokan Dng alat optik dan soft Drawing
Ls
Papan Nama Proyek
Ls
Pembersiahan Lokasi
BOW A.7
Mobilisasi
Dihitung
PERKIRAAN
VOLUME
1.00
2.00
11,296.00
Terlampir
HARGA PEKERJAAN
TOTAL HARGA
( Rp )
( Rp )
ls
unit
m2
10,000,000.00
500,000.00
1,000.00
10,000,000.00
1,000,000.00
11,296,000.00
117,900,000.00
140,196,000.00
III.
1
2
3
4
5
6
PEKERJAAN TANAH
Galian Tanah Keras Badan Jalan ( Mekanik )
Analisa El-312 a
Galian Biasa ( Mekanik ) PLB Bdn Jalan & Sal,Air + TPT
Analisa El-311
Urug Pasir Bawah Pasangan
SNI 2835 - 6.11 a
Timbunan Tanah Merah u/Badan Jalan
BOW B. 16
Urug Tanah Kembali Ex Galian
SNI 2835 - 6.9
Pek. Kisdam / Dewatering
BOW B. 24
1,242.25
6,461.28
168.56
1,778.00
3,248.00
435.00
m3
m3
m3
m3
m3
m'
33,000.00
40,994,250.00
11,000.00
71,074,080.00
144,000.00
24,272,640.00
64,000.00 113,792,000.00
1,000.00
3,248,000.00
54,000.00
23,490,000.00
276,870,970.00
VII.
1
2
3
4
5
6
7
Analisa EL-222
Analisa EL-222
Analisa EL-222
BOW C.27
BOW C.32
Dihitung
Dihitung ( Terlampir )
1,621.73
228.00
67.52
226.81
2,207.00
Terlampir 2
426.00
m3
m3
m3
m3
ttk
m'
420,000.00 681,126,600.00
420,000.00
95,760,000.00
420,000.00
28,358,400.00
169,000.00
38,330,890.00
7,000.00
15,449,000.00
###
2,780,000.00
###
###
X PEKERJAAN PLESTERAN
1 Pek. Plesteran U/ Tenbok Pernahan Tanah dan Saluran AirSNI 2837 - 6.14
U/ Lonengan Gorong-Gorong
928.55
m2
40,000.00
37,142,000.00
37,142,000.00
XVII.PEKERJAAN SANITASI / DRAINASE
1 Pas. Gorong-Gorong Beton Bertulang BC. 100 X 100 ( 8 ttk
Analisa
)
EL-233 k
2 Pek. Tembok Penahan Tanah Beton pada Gorong-Gorong
Dihitung
3 Pek. Trotoar
Dihitung
64.00
Terlampir 4
Terlampir 5
m'
3,510,000.00 224,640,000.00
81,910,000.00
156,190,000.00
462,740,000.00
Analisa EL-718 e
Analisa EL-713 h
Analisa EL-7115 a
2,491.12
10,960.56
19.74
m3
m3
m'
520,000.00
710,000.00
16,000.00
###
###
315,904.00
###
XX
1
2
3
101,778.33
11,861.97
39,048.00
kg
kg
kg
9,000.00 916,004,970.00
10,000.00 118,619,700.00
10,000.00 390,480,000.00
###
BOW.I.14
1,149.66
m2
115,000.00 132,210,900.00
132,210,900.00
360.00
liter
5,000.00
1,800,000.00
450.00
m2
14,000.00
6,300,000.00
8,100,000.00
a
a
a
a
1,213.48
3,507.55
2,773.65
24.00
1,834.60
m3
m3
m3
m3
m3
160,000.00
160,000.00
160,000.00
160,000.00
169,000.00
194,156,800.00
561,208,000.00
443,784,000.00
3,840,000.00
310,047,400.00
###
XXVIII.
PEKERJAAN PENGAMAN JALAN
1 Pek. Guard Raill ( 5 m' unit)
2 Pek. Pengecatan Marka Jalan
Analisa EL-847
Analisa EL-842
80.00
210.00
unit
m2
2,510,000.00 200,800,000.00
79,000.00
16,590,000.00
217,390,000.00
MUHAMMAD ARIFIN
Direktur
DAFTAR HARGA DASAR SATUAN BAHAN, UPAH DAN SEWA ALAT TAHUN
ANGGARAN 2011
MT
###
###
KODE
unit
HARGA SATUAN
( Rp. )
4
MATERIAL/ BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
BAHAN
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
###
BAHAN 46
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
47
48
49
50
51
###
BAHAN 52
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
53
54
55
56
57
58
59
60
###
BAHAN 61
###
BAHAN 62
m
kg
kg
Kg
Kg
Kg
kg
Kg
Kg
Kg
Kg
kg
kg
m
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
karung
m
kg
m
kg
m
m
m
m
m
m
buah
buah
buah
buah
55,000.00
7,000.00
7,500.00
8,200.00
8,200.00
8,200.00
8,200.00
8,200.00
8,200.00
8,000.00
8,200.00
8,000.00
8,000.00
192,000.00
8,200.00
8,200.00
115,000.00
125,000.00
125,000.00
125,000.00
125,000.00
90,000.00
125,000.00
125,000.00
107,500.00
110,000.00
120,000.00
100,000.00
115,000.00
135,000.00
91,300.00
9,680.00
132,500.00
9,900.00
30,000.00
30,000.00
15,000.00
120,000.00
120,000.00
120,000.00
577.50
300.00
300.00
300.00
180,000.00
buah
buah
buah
buah
buah
2,750.00
10,120.00
3,740.00
4,950.00
13,700.00
kg
12,500.00
m2
m2
m2
m2
m2
m2
m2
m2
47,000.00
56,600.00
52,400.00
63,300.00
72,800.00
91,000.00
81,900.00
107,000.00
buah
34,000.00
buah
38,000.00
###
BAHAN 63
###
BAHAN 64
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
65
66
67
68
69
70
71
72
73
74
75
76
77
###
BAHAN 78
###
BAHAN 79
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
80
81
82
83
84
85
###
BAHAN 86
buah
38,000.00
buah
38,000.00
bh
bh
bh
bh
buah
buah
m
m
m
m
m
m
buah
5,500.00
6,400.00
22,000.00
22,000.00
1,000.00
7,050.00
446,500.00
508,000.00
536,000.00
551,000.00
605,000.00
610,000.00
24,750.00
batang
164,000.00
batang
264,300.00
liter
kg
liter
liter
kg
kg
40,000.00
28,500.00
23,800.00
38,000.00
14,300.00
14,300.00
liter
24,200.00
###
BAHAN 87
Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Lead Red Primer (1 Ltr)
liter
28,600.00
###
BAHAN 88
Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Zinc Chromate Primer A (1
kg)
kg
24,200.00
kg
20,900.00
Kg
kg
kg
kg
kg
Lembar
liter
liter
liter
liter
liter
liter
liter
liter
liter
kg
liter
liter
kg
liter
m
m
kg
ikat
ikat
buah
buah
buah
buah
buah
buah
kg
kg
kg
kg
kg
17,750.00
21,700.00
24,900.00
7,000.00
12,000.00
4,550.00
12,150.00
14,580.00
17,460.00
4,500.00
4,500.00
2,800.00
6,000.00
1,200.00
18,300.00
11,340.00
4,400.00
10,765.01
6,800.00
2,790.00
18,500.00
31,200.00
5,000.00
9,900.00
4,600.00
12,650.00
13,550.00
16,400.00
11,250.00
24,100.00
36,400.00
5,184.00
8,793.00
8,400.00
5,180.00
6,000.00
kaleng
39,500.00
kg
kg
kg
kg
26,640.00
24,800.00
17,600.00
14,400.00
###
BAHAN 89
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
###
BAHAN 126
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
127
128
129
130
Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Zinc Chromate Primer B (1
kg)
Cat Marka Merk Delta (Produksi P.T. Catur Marga Delta Sarana)
Glass Bit
ALUS / Kalkarium
Poliphospate
Soda Api
Ampelas Kayu/Besi Halus
Minyak Cat Danapaint - Thinner Sintetis type 801-0011
Minyak Cat Danapaint - Thinner type 802-0021
Minyak Cat ICI/Dulux - Thinner A850-41
Minyak Bensin
Minyak Solar Transportasi
Minyak Tanah / Kerosene
Minyak Spiritus
Bunker Oil
Pelumas
Stempet / Gemuk
Terpentin
Residu
Residu
Bahan Bakar Residu
Filter Plastik
Geotextile 33 gr
Ijuk
Ijuk
Sapu Lidi
Sapu/Sikat Jerami
Kuas No.3
Kuas No.4
Kwas 3"
Roll Cat Tembok Lokal
Roll Cat Tembok Kualitas Baik
Plamur Tembok Danapaint - Danalac Plamur 515-0001 (5 Kg)
Plamur Tembok Danapaint - Danplamur 555-0001 (7 Kg)
Plamur Tembok Nippon Paint - Matex Putty (Water Type) (1 kg)
Plamur Tembok Nippon Paint - Pelatone PVA Putty (5 kg)
Plamur Tembok ICI/Catylac - 5kg
Plamur Tembok, PRIME MORTAR, type PM-315 Wall Putty (2 - 2.5 m / kg
tiap tebal 1.5 mm), uk. 5 kg/kaleng
Dempul DUCO (SANPOLAC)
Plamur Besi Nippon Paint - Nippe 2000-280 (Plamir Duco) (1 kg)
Plamur Besi Nippon Paint - Nippe Autolux 66 PE Putty (3 kg)
Plamur Kayu Pacific Paint - Glotek Plamur Kayu 4001 / 1 Kg
###
BAHAN 131
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
132
133
134
135
136
137
###
BAHAN 138
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
kaleng
48,000.00
buah
buah
buah
buah
buah
buah
15,600.00
5,600.00
18,220.00
14,700.00
20,300.00
9,675.00
buah
11,555.00
buah
buah
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
m
m
m
Kg
kg
kg
kg
kg
kg
m
m
buah
buah
buah
buah
buah
Pasang
Pasang
Pasang
buah
buah
buah
buah
buah
buah
buah
buah
buah
m
m
kg
buah
buah
kg
kg
kg
kg
Kg
kg
buah
buah
buah
dus
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
17,730.00
24,945.00
66,800.00
75,000.00
25,000.00
35,000.00
45,000.00
120,000.00
135,000.00
98,600.00
99,000.00
71,400.00
92,600.00
100,200.00
8,500.00
10,750.00
13,200.00
52,800.00
13,100.00
12,700.00
18,200.00
13,000.00
13,300.00
2,700.00
7,000.00
13,500.00
23,130.00
99,540.00
13,230.00
4,590.00
10,000.00
23,750.00
36,000.00
72,250.00
58,500.00
4,500.00
4,500.00
1,500.00
1,500.00
9,600.00
168,000.00
8,500.00
1,200.00
900.00
11,000.00
950.00
11,500.00
13,800.00
19,650.00
51,800.00
950.00
950.00
1,900.00
9,270.00
12,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
1,650,000.00
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
###
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
BAHAN
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
###
###
###
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
m
m
batang
batang
batang
batang
btg
Lembar
Lembar
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
set
buah
buah
buah
buah
buah
buah
m
m
m
kg
kg
m'
zak
kg
kg
kg
unit
batang
batang
batang
buah
batang
buah
l/s
liter
1,650,000.00
1,650,000.00
8,500.00
10,000.00
11,500.00
23,000.00
5,000.00
12,000.00
35,000.00
1,650,000.00
1,102,833.33
556,166.67
1,500.00
2,000.00
3,000.00
2,800.00
5,200.00
58,500.00
13,000.00
1,300.00
63,180.00
46,800.00
68,000.00
6,500.00
5,200.00
11,700.00
25,450.00
11,700.00
25,450.00
4,000.00
2,033,000.00
2,033,000.00
99,589.00
4,800.00
1,200,000.00
53,000.00
63.89
73.33
1,060.00
3,570,000.00
48,000.00
165,000.00
410,000.00
200,000.00
150,000.00
100,000.00
200,000.00
18,000.00
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
35,000.00
4,375.00
40,000.00
5,000.00
40,000.00
5,000.00
50,000.00
6,250.00
40,000.00
5,000.00
50,000.00
6,250.00
40,000.00
5,000.00
50,000.00
6,250.00
40,000.00
5,000.00
40,000.00
5,000.00
40,000.00
5,000.00
55,000.00
6,875.00
UPAH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
###UPAH
###UPAH
###
###
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
###UPAH
25
26
org/hr
org/jam
50,000.00
6,250.00
27
28
29
35
36
37
38
39
47
48
49
52
57
58
59
60
61
62
63
67
71
73
75
77
81
84
85
87
90
org/hr
org/jam
org/hr
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/hr
org/jam
org/jam
org/jam
org/jam
org/hari
org/hari
org/jam
org/hari
org/hari
50,000.00
6,250.00
45,000.00
48,000.00
6,000.00
65,000.00
8,125.00
55,000.00
859.40
65,000.00
8,125.00
75,000.00
11,300.00
40,000.00
5,000.00
40,000.00
5,000.00
65,000.00
15,336.00
6,250.00
7,500.00
10,000.00
13,750.00
20,000.00
269,840.00
231,750.00
28,970.00
193,650.00
149,210.00
/ jam
/ jam
/ jam
/ jam
/Jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
/ jam
120,000.00
130,000.00
23,600.00
72,000.00
/hari
/hari
/hari
1,312,400.00
1,312,400.00
3,281,000.00
###
###
###
###ALAT
###ALAT
###ALAT
###ALAT
###ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
ALAT
###
###ALAT
###ALAT
###ALAT
SEWA ALAT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
###ALAT
34
###ALAT
###
*)
35
SEWA PERALATAN
Excavator 80-140 HP, 80 HP, Kap. 0.5 m Swakelola
Generator Set, 175 HP, Kap. 125 KVA Swakelola
Pedestrian Roller, 11 HP, Kap. 0.98 ton Swakelola
Fulvi Mixer, 75 HP, Kap. - Swakleola
Grass Cutter Swakelola
Asphalt Mixing Plant
Asphalt Finisher
Asphalt Sprayer
Dump Truck 3 - 4 m3
Dump Truck
Generator Set
Wheel Loader 1.0 - 1.6 m3
Three Wheel Roller 6 - 8 T
Tandem Roller 6 - 8 T
Tire Roller 8 - 10 T
Concrete Vibrator
Water Pump 70 - 100 mm
Water Tanker 3000 - 4500 L
Jack Hammer
Tamper, 5 HP, Kap. 0.17 ton
Asphalt Liquid Mixer
Concrete Mixer 0.3 - 0.6 m3
Crane 10 - 15 ton
Compressor 4000 - 6500 L\M
Concrete Cutter Machine
Baby Walles
62,500.00
50,000.00
12,183.46
29,323.54
41,690.10
47,593.77
52,295.26
24,138.62
29,411.05
39,026.99
6,779.22
6,186.64
26,327.95
6,342.56
6,392.73
8,528.70
11,627.51
49,349.30
24,308.83
42,857.14
42,000.00
set
333,300.00
set
328,100.00
LAMPIRAN 1
Kode Rekening Kegiatan
Kode Rekening Belanja
Kegiatan
Nama Proyek
Lokasi
Propinsi / Kabupaten
:
:
:
:
:
:
1.03.01.15.22
5.2.3.21.04 74
Pembangunan / Peningkatan Jalan Kecamatan Sukamulya
Peningkatan Jl. Jambu - Buni Ayu - Jengkol
KECAMATAN SUKAMULYA
BANTEN / TANGERANG
ITEM PEMBAYARAN
JENIS PEKERJAAN
: 1.2
: MOBILISASI / DEMOBILISASI
No.
URAIAN
SATUA PERKIRAA
N
N VOLUME
A. Sewa Tanah
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
( Rp. )
M2
B. PERALATAN
1
2
3
4
5
6
Pek. Hotmix
ASPHAL FINISHER
ASPHAL SPRAYER
TANDEM ROLLER
PNEUMATIC TIRE ROLLER
AIR COMPRESSOR
GENERATOR SET
1
2
3
4
5
6
7
8
Pek. Beton
VIBRATOR ROLLER
CONCRETE VIBRATOR
WATER TANK 3000 - 5000 L
CONCRETE CUTTER
CONCRETE MIXER
EXCAVATOR
PILE HAMMER DRIVER
CRANE ON TRACK
E02
E03
E17
E18
E05
E12
unit
unit
unit
unit
unit
unit
1.00
1.00
1.00
1.00
1.00
2.00
2,000,000.00
500,000.00
2,000,000.00
2,000,000.00
500,000.00
500,000.00
2,000,000.00
500,000.00
2,000,000.00
2,000,000.00
500,000.00
1,000,000.00
E19
E20
E23
-
unit
unit
unit
unit
unit
unit
unit
unit
3.00
4.00
2.00
4.00
6.00
3.00
1.00
1.00
2,000,000.00
200,000.00
700,000.00
200,000.00
500,000.00
1,500,000.00
3,000,000.00
3,000,000.00
6,000,000.00
800,000.00
1,400,000.00
800,000.00
3,000,000.00
4,500,000.00
3,000,000.00
3,000,000.00
D. FASILITAS LABORATORIUM
E
E.I.
1
E.II.
1
2
3
4
5
6
7
8
9
10
11
MOBILISASI LAINNYA
PEKERJAAN DARURAT
Pengecatan Reling Jembatan
LS
LAIN LAIN
Penebangan Pohon Produksi
Btg
Penebangan Pohon Non Produksi
Batang 5 s/d 10 cm
Btg
Batang 11 s/d 20 cm
Btg
Pembongkaran Pagar Bambu
M'
Pembongkaran dan Pemasangan kembali Pagar Permanen
M'
Pembebasan Tanah
M2
Pemindahan Tiang Listrik Rendah
Bh
Pemindahan Tiang Listrik Menengah
Bh
Pemindahan Tiang Listrik Tegangan Tinggi
Bh
Pemindahan Tiang Telepon
Bh
Lapis Plastik
M2
Bongkar & Pasang Kembali Selasar
M2
Total Biaya Mobilisasi
Catatan :
3,000,000.00
1.00
500,000.00
500,000.00
25.00
65,000.00
1,625,000.00
200.00
200.00
20.00
25.00
30.00
15.00
10,000.00
20,000.00
2,000,000.00
4,000,000.00
8,000,000.00
37,500,000.00
24,000,000.00
6,750,000.00
400,000.00
1,500,000.00
800,000.00
450,000.00
117,900,000.00
Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over head dan
laba serta seluruh pajak dan bea ( kecuali PPn ), dan pengeluaran lainnya.
LAMPIRAN 2
Nama Pekerjaan
Volume Pelaksanaan
No.
1
2
3
4
5
6
7
8
9
10
JENIS PEKERJAAN
H=
6 m'
HARGA
PEKERJAAN
KODE ANALISA PERKIRAAN VOLUME
( Rp. )
1,000.00
###
###
30,000.00
9,000.00
115,000.00
250,000.00
7,000.00
710,000.00
169,000.00
TOTAL HARGA
( Rp. )
183,000.00
4,114,400,000.00
4,114,400,000.00
5,550,000.00
55,110,690.00
11,088,300.00
13,750,000.00
6,405,000.00
27,285,300.00
9,464,000.00
8,357,600,000.00
LAMPIRAN 3
Nama Pekerjaan
Volume Pelaksanaan
No.
JENIS PEKERJAAN
1
2
3
4
5
6
7
8
9
10
11
12
13
H=
3 m'
HARGA
KODE ANALISA PERKIRAAN VOLUME PEKERJAAN
( Rp. )
BOW.A.07
SNI 2835 - 6.1
BOW C.15
SNI 2835 - 6.11.a
Analisa El-222
SNI 2835 - 6.9
BOW B.16
SNI 2837 - 6.14
BOW I.14
Analisa El-731
Analisa El-713 h
BOW C.32
BOW C.27
3.00
0.96
1.50
0.25
2.115
0.48
1.060
0.85
0.79
68.87
1.10
2.00
0.12
m'
m3
m3
m3
m3
m3
m3
m2
m2
Kg
m3
Titik
m3
1,000.00
30,000.00
136,000.00
144,000.00
420,000.00
1,000.00
64,000.00
40,000.00
115,000.00
9,000.00
710,000.00
7,000.00
169,000.00
TOTAL HARGA
( Rp. )
3,000.00
28,800.00
204,000.00
36,000.00
888,300.00
480.00
67,840.00
34,000.00
90,850.00
619,830.00
781,000.00
14,000.00
20,280.00
2,780,000.00
LAMPIRAN 4
Nama Pekerjaan
Volume Pelaksanaan
No.
JENIS PEKERJAAN
1
2
3
4
5
6
7
8
9
10
11
H=
6 m'
HARGA
KODE ANALISA PERKIRAAN VOLUME PEKERJAAN
( Rp. )
BOW A.3
SNI A.13
SNI 2835 - 6.1
BOW C.27
Analisa El-734
BOW I.14
BOW I.16
BOW C.32
Analisa El-713 h
SNI 2835 - 6.9
20.00
6.21
3.40
1.55
4,351.400
63.00
13.500
25.00
8.00
35.18
12.00
m'
m3
m3
m3
Kg
m2
m2
Titik
Bh
m3
m3
26,000.00
270,000.00
30,000.00
169,000.00
10,000.00
115,000.00
250,000.00
7,000.00
7,050.00
710,000.00
1,000.00
TOTAL HARGA
( Rp. )
520,000.00
1,676,700.00
102,000.00
261,950.00
43,514,000.00
7,245,000.00
3,375,000.00
175,000.00
56,400.00
24,977,800.00
12,000.00
81,910,000.00
LAMPIRAN 5
Nama Pekerjaan
Volume Pelaksanaan
No.
1
2
3
4
5
6
7
JENIS PEKERJAAN
- Gorong
610 m'
133 m'
130 m'
H=
H=
H=
1 m'
1.4 m'
1.4 m'
HARGA
TOTAL HARGA
KODE ANALISAPERKIRAAN VOLUMEPEKERJAAN
( Rp. )
( Rp. )
Analisa El-222
SNI 2837 - 6.14
BOW O.07 e
BOW C.27
BOW O.01 h
SNI J.32
SNI N.14b
157.68
472.40
1,012.00
120.97
604.850
112.00
353.000
m'
m2
m'
m3
m'
m'
m2
420,000.00
40,000.00
5,000.00
169,000.00
9,000.00
270,000.00
28,000.00
66,225,600.00
18,896,000.00
5,060,000.00
20,443,930.00
5,443,650.00
30,240,000.00
9,884,000.00
156,190,000.00
INFORMASI UMUM
No.
URAIAN
INFORMASI
1.
2.
3.
4.
5.
Nama Kegiatan
Nomor Rekening
Pagu Anggaran
Kabupaten / Kota
Propinsi
4.
Lokasi pekerjaan
Periksa lampiran
5.
RUSAK
6.
Panjang efektif
7.
( 2.00
7.00
2.00
) meter
8.
Lebar Rencana
( 1.50
8.00
1.50
) meter
9.
10.
11.
KABUPATEN TANGERANG
BANTEN
Lihat lampiran.
Atau :
L=
20.00 Kilometer
35.00
Km = a
22.00 Km = b
5.00
Km = c
12.
13.
14.
15.
16.
8.0
0.002
20.00
10.00
9,200
jam
x Harga Pokok Alat
%
% x Biaya Langsung
per US $
17.
a.
b.
Pekerjaan Tanah dilaksanakan untuk mengupas lapisan tanah / jalan yang rusak untuk kemudian di ganti dengan lapisan /
konstruksi baru. Dalam hal ini termasuk juga pekerjaan galian untuk konstruksi saluran maupun pekerjaan pengurugan kembali.
c.
Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk pengganti lapisan tanah pada konstruksi, sehingga tercapai daya dukung
tekanan yang memadai, dimana berfungsi sebagai lapisan awal pondasi dari konstruksi.
d.
Pekerjaan Campuran Aspal Panas dilaksanakan untuk lapisan baru konstruksi jalan, di padatkan sesuai ketebalan pada spesifikasi
umum
e.
Pekerjaan Pasangan Batu dilaksanakan untuk pondasi penahan tanah dan saluran pembuangan air / irigasi
f.
Pekerjaan Pengembalian Kondisi dilaksanakan untuk menjadikan kondisi utilitas / sarana pendukung infrastruktur lain yang ada
semasa pekerjaan proyek, yaitu yang di pindahkan / relokasi untuk di kembalikan ke posisi semula.
g.
18.
Lokasi Quarry
19.
....................................
20.
....................................
21.
....................................
22.
....................................
23.
....................................
Periksa lampiran.
HOME
TENAGA
ALAT
KAPASITAS
ALAT
HARGA
ALAT
KERJA
HARGA
ALAT
1 TAHUN
ALAT
NILAI
SISA
ALAT
FAKTOR
PENGEMBALIAN
MODAL
BIAYA
ASURANSI
TOTAL
PENGEM-
DAN
BIAYA
BAHAN
MINYAK
BALIAN
LAIN-LAIN
PASTI / JAM
BAKAR
PELUMAS
BIAYA
BIAYA
TOTAL
UPAH
(HP)
JENIS PERALATAN
(Tahun)
(Tahun)
(Jam)
(Rp.)
(Rp.)
KODE
ALAT
(Rp.)
(Rp.)
(Rp.)
Lt/HP/Jam
Ltr/HP/Jam
(Rp.)
(Rp.)
f1 x HP x
(10% X B)
i(1+i)^A
(B - C) x D
0.002 x B
-----------
-----------
-----------
(1+i)^A-1
(e1 + e2)
PEMBANTU
BIAYA
/ SOPIR
OPERATOR
OPERASI
PER
/ SOPIR
/ JAM
JAM KERJA
(Rp.)
(Rp.)
(Rp.)
(Rp.)
1 Orang
1 Orang
F+G+H+I
E+J
0.125
0.01
Harga BBM
0.125
(g1 x B')
Per
Per
s/d
s/d
s/d
-----------
Jam Kerja
Jam Kerja
0.175
0.02
f2 x HP x
0.175
Rp2,250.0
Rp2,000.0
Harga Olie
1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30
31.
32.
33.
34.
2a
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
1.
2.
3.
4.
5.
6.
7.
8.
BIAYA
SEWA ALAT
OPERATOR
MODAL
No.
TOTAL
KET.
HP
Cp
e1
e2
f1
f2
g1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
0.0100
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
2,250.00
6,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
4,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
150.0
47.0
15.0
140.0
80.0
15.0
150.0
100.0
125.0
80.0
100.0
175.0
125.0
90.0
105.0
55.0
50.0
60.0
75.0
10.0
220.0
6.0
100.0
11.0
5.0
3.0
75.0
100.0
175.0
25.0
125.0
40.0
150.0
5.0
30.0
6.0
800.0
500.0
15.0
6.0
8.0
0.5
4.0
125.0
1.6
1.5
8.0
8.0
10.0
7.0
30.0
4,000.0
1.0
0.2
8.00
10.00
2.50
35.00
250.00
2,000.0
1,000.0
T/Jam
Ton
Liter
Liter
Ton
Ton
Ton
M3
M3
KVA
M3
M3
Ton
Ton
Ton
Ton
T/Jam
Liter
Ton
Ton
M3
Ton
Ton
Ton
Amp
Meter
Liter
639,000,000
195,000,000
27,000,000
242,000,000
40,000,000
22,000,000
110,000,000
50,000,000
91,000,000
120,000,000
133,000,000
85,000,000
183,000,000
189,000,000
154,000,000
56,000,000
84,000,000
110,000,000
118,000,000
2,300,000
491,500,000
3,000,000
36,000,000
18,500,000
3,000,000
3,500,000
46,000,000
112,500,000
166,250,000
70,000,000
350,000,000
17,500,000
2,250,000,000
15,000,000
10.0
6.0
5.0
5.0
5.0
4.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.0
4.0
5.0
2.0
5.0
4.0
4.0
4.0
5.0
6.0
6.0
5.0
6.0
5.0
6.0
4.0
1,500.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
1,800.0
2,000.0
1,000.0
2,000.0
2,000.0
2,000.0
2,000.0
1,000.0
1,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
2,000.0
639,000,000
195,000,000
27,000,000
242,000,000
40,000,000
22,000,000
110,000,000
50,000,000
91,000,000
120,000,000
133,000,000
85,000,000
183,000,000
189,000,000
154,000,000
56,000,000
84,000,000
110,000,000
118,000,000
2,300,000
491,500,000
3,000,000
36,000,000
18,500,000
3,000,000
3,500,000
46,000,000
112,500,000
166,250,000
70,000,000
350,000,000
17,500,000
2,250,000,000
15,000,000
63,900,000
19,500,000
2,700,000
24,200,000
4,000,000
2,200,000
11,000,000
5,000,000
9,100,000
12,000,000
13,300,000
8,500,000
18,300,000
18,900,000
15,400,000
5,600,000
8,400,000
11,000,000
11,800,000
230,000
49,150,000
300,000
3,600,000
1,850,000
300,000
350,000
4,600,000
11,250,000
16,625,000
7,000,000
35,000,000
1,750,000
225,000,000
1,500,000
0.23852
0.30071
0.33438
0.33438
0.33438
0.38629
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.33438
0.38629
0.38629
0.33438
0.65455
0.33438
0.38629
0.38629
0.38629
0.33438
0.30071
0.30071
0.33438
0.30071
0.33438
0.30071
0.38629
91,449.62
26,386.93
4,062.71
36,413.95
6,018.83
3,824.26
16,551.80
7,523.54
13,692.85
18,056.50
20,012.63
12,790.02
27,536.17
28,438.99
23,172.51
8,426.37
12,639.55
18,390.88
20,511.95
799.62
73,956.43
883.64
5,416.95
3,215.86
1,042.98
1,216.81
6,921.66
15,223.23
22,496.55
10,532.96
47,361.15
2,633.24
304,464.57
2,607.45
852.00
195.00
27.00
242.00
40.00
22.00
110.00
50.00
91.00
120.00
133.00
85.00
183.00
189.00
154.00
56.00
84.00
122.22
118.00
4.60
491.50
3.00
36.00
18.50
6.00
7.00
46.00
112.50
166.25
70.00
350.00
17.50
2,250.00
15.00
92,301.62
26,581.93
4,089.71
36,655.95
6,058.83
3,846.26
16,661.80
7,573.54
13,783.85
18,176.50
20,145.63
12,875.02
27,719.17
28,627.99
23,326.51
8,482.37
12,723.55
18,513.11
20,629.95
804.22
74,447.93
886.64
5,452.95
3,234.36
1,048.98
1,223.81
6,967.66
15,335.73
22,662.80
10,602.96
47,711.15
2,650.74
306,714.57
2,622.45
160,162.50
6,756.25
2,156.25
20,125.00
11,500.00
2,156.25
21,562.50
14,375.00
17,968.75
11,500.00
14,375.00
25,156.25
17,968.75
12,937.50
15,093.75
7,906.25
7,187.50
8,625.00
10,781.25
1,437.50
31,625.00
862.50
14,375.00
1,581.25
718.75
431.25
10,781.25
14,375.00
25,156.25
3,593.75
17,968.75
5,750.00
21,562.50
718.75
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250
53,250.00
12,187.50
1,687.50
15,125.00
2,500.00
1,375.00
6,875.00
3,125.00
5,687.50
7,500.00
8,312.50
5,312.50
11,437.50
11,812.50
9,625.00
3,500.00
5,250.00
7,638.89
7,375.00
287.50
30,718.75
187.50
2,250.00
1,156.25
375.00
437.50
2,875.00
7,031.25
10,390.63
4,375.00
21,875.00
1,093.75
140,625.00
937.50
221,662.50
23,193.75
8,093.75
39,500.00
18,250.00
7,781.25
32,687.50
21,750.00
27,906.25
23,250.00
26,937.50
34,718.75
33,656.25
29,000.00
28,968.75
15,656.25
16,687.50
20,513.89
22,406.25
5,975.00
68,593.75
5,300.00
20,875.00
6,987.50
5,343.75
5,118.75
17,906.25
25,656.25
39,796.88
12,218.75
44,093.75
11,093.75
166,437.50
5,906.25
313,964.12
49,775.68
12,183.46
76,155.95
24,308.83
11,627.51
49,349.30
29,323.54
41,690.10
41,426.50
47,083.13
47,593.77
61,375.42
57,627.99
52,295.26
24,138.62
29,411.05
39,026.99
43,036.20
6,779.22
143,041.68
6,186.64
26,327.95
10,221.86
6,392.73
6,342.56
24,873.91
40,991.98
62,459.67
22,821.71
91,804.90
13,744.49
473,152.07
8,528.70
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Mata Pembayaran :
Analisa EI-241
VI.007
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
VI.007
Timbunan Porous / Bhn.Penyaring, dipadatkan tiap 15 cm dengan Tamper
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja / Kenek
@Mandor / Pengawas
SATUAN
Upah
Upah
2 org / jam
24 org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
2.8000
0.7000
4,375.00
6,875.00
BAHAN
Agregat Kasar
Pasir urug darat
Bahan 26
Bahan 22
m
m
0.5500
0.5500
17,062.50
110,000.00
90,000.00
PERALATAN
Tamper, 5 HP, Kap. 0.17 ton Pemborong
Alat
Alat Bantu
20
Jam
Ls
1.2851
E.
OVERHEAD
F.
G.
DIBULATKAN
60,500.00
49,500.00
110,000.00
6,392.73
1.0000
8,215.30
D.
12,250.00
4,812.50
8,215.30
135,277.80
10 % x D
13,527.78
VI.007
148,805.58
140,000.00
Mata Pembayaran :
Analisa EI-311
III.001
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KABUPATEN TANGERANG
BANTEN
III.001
Galian Biasa Dengan Excavator (Mekanik), Dibuang Dengan Dump Truck
Sejauh 2 km
m
KOMPONEN
TENAGA
@Pekerja / Kenek
@Mandor / Pengawas
SATUAN
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.1071
0.0535
4,375.00
6,875.00
836.38
BAHAN
468.56
367.81
PERALATAN
Excavator 80-140 HP, 80 HP Kap. 0.5 m Pemborong
Dump Truck 3-4 m, 100 HP,Kap. 6 ton Pemborong
Alat
Alat
Alat Bantu
1
9
Jam
Jam
Ls
0.0535
0.1116
120,000.00
29,323.54
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
6,420.00
3,272.51
9,692.51
10,528.88
10 % x D
1,052.89
III.001
11,581.77
11,000.00
Mata Pembayaran :
Analisa EI-222
VII.001
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
VII.001
Pasangan Batu Kali / Belah Dengan Mortar (mekanik), Ad. 1 : 4, 60% Batu Kali
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@ Pekerja / Kenek
@ Tukang
@ Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
4.0161
1.2048
0.4016
4,375.00
5,000.00
6,875.00
BAHAN
Batu Belah Pondasi / Batu Kali
@ Semen Tiga Roda 50 kg
Pasir Pasang
Bahan 39
Bahan 842
Bahan 28
m
kg
m
1.1000
161.0000
0.4829
26,355.44
120,000.00
1,060.00
100,000.00
PERALATAN
Concrete Mixer 0.3-0.6 m,15 HP,Kap 500 Liter Pemborong
Alat
Alat Bantu
22
jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
132,000.00
170,660.00
48,290.00
350,950.00
0.4016
11,627.51
1.0000
200.00
D.
17,570.44
6,024.00
2,761.00
4,669.61
200.00
4,869.61
382,175.05
10 % x D
38,217.50
VII.001
420,392.55
420,000.00
Mata Pembayaran :
XIX.220.a
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.220.a
Penyediaan dan Pemancangan Sheet Pile PC Corrugated Type w.600 K.1000
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.3347
0.0669
0.0335
4,375.00
5,000.00
6,875.00
BAHAN
Sheet Pile PC Corrugated Type W.600 K.1000
Bahan 838
m'
1.0500
2,029.13
1,200,000.00
PERALATAN
Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong
Crane 10 - 15 Ton, 150 HP, Kap. 15 Ton Pemborong
Alat
Alat
Alat Bantu
12
23
Jam
Jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
1,260,000.00
1,260,000.00
0.0502
0.0335
29,323.54
49,349.30
1.0000
200.00
D.
1,464.31
334.50
230.31
1,472.04
1,653.20
200.00
3,325.24
1,265,354.37
10 % x D
126,535.44
1,391,889.81
XIX.220.a
1,390,000.00
Mata Pembayaran :
XIX.220.a
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.220.a
Penyediaan dan Pemancangan Sheet Pile PC Corrugated Type w.600 K.1000
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.3347
0.0669
0.0335
4,375.00
5,000.00
6,875.00
BAHAN
Sheet Pile PC Corrugated Type W.600 K.1000
Bahan 838
m'
1.0500
2,029.13
1,200,000.00
PERALATAN
Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong
Crane 10 - 15 Ton, 150 HP, Kap. 15 Ton Pemborong
Alat
Alat
Alat Bantu
12
23
Jam
Jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
1,260,000.00
1,260,000.00
0.0502
0.0335
29,323.54
49,349.30
1.0000
200.00
D.
1,464.31
334.50
230.31
1,472.04
1,653.20
200.00
3,325.24
1,265,354.37
10 % x D
126,535.44
1,391,889.81
XIX.220.a
1,390,000.00
Mata Pembayaran :
Analisan El-233 k
XVII.079
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KABUPATEN TANGERANG
BANTEN
XVII.079
Gorong-gorong Kotak Beton Bertulang setara ROCLA,uk. 1000 x 1000 mm
tebal 12,5 cm,Panjang 1200 mm
m'
KOMPONEN
TENAGA
@ Pekerja / Kenek
@Tukang
@ Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
14.0000
1.7500
1.7500
4,375.00
5,000.00
6,875.00
BAHAN
Beton Pracetak Saluran Box Culvert, ROCLA, uk. 1000 x 1000 mm,
tebal 12,5 cm, Panjang 1200 mm
Sirtu / Material Pilihan
Timbunan Porous / Bhn.Penyaring, dipadatkan tiap 15 cm dengan
Tamper
Bahan
843
Bahan 22
Analisa El-241
82,031.25
batang
0.8333
3,574,000.00
m
m
0.4430
0.2914
90,000.00
140,000.00
4
JUMLAH HARGA BAHAN
C.
1
2
3
4
5
6
7
8
PERALATAN
Tamper,5 HP,Kap.0.17 ton Pemborong
Dump Truck 3-4 m,100 HP,Kap.6 ton Pemborong
Alat
Alat
20
12
Alat Bantu
Jam
Jam
Ls
0.1334
0.5221
E.
OVERHEAD
F.
G.
DIBULATKAN
2,978,214.20
79,489.15
40,796.00
3,098,499.35
6,392.73
29,323.54
1.0000
852.79
15,309.82
-
D.
61,250.00
8,750.00
12,031.25
16,162.61
3,196,693.21
10
% x D
319,669.32
XVII.022
3,516,362.53
3,510,000.00
Mata Pembayaran :
Analisa El-718 e
XIX.071
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.071
Beton Kelas K-125 (Bo) Readymix, Tanpa Bekisting, Tanpa Vibrator
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@ Pekerja / Kenek
@Tukang Batu
@ Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2 org / jam
4 org / jam
24 org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
1.3253
0.4418
0.4418
4,375.00
5,000.00
6,875.00
BAHAN
Beton Readymix, Mutu Beton B0, Slump 12 2 cm
Bahan 76
1.0500
11,044.56
446,500.00
468,825.00
-
4
JUMLAH HARGA BAHAN
C.
1
2
3
4
5
6
7
8
5,798.19
2,209.00
3,037.38
468,825.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
479,869.56
10 % x D
47,986.96
XIX.071
527,856.52
520,000.00
Mata Pembayaran :
Analisa El-847
XXVIII.003
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXVIII.003
Rel Pengaman Steel Guard Rail Beam Uk 3999 x 350 x 2.7 mm
SATUAN PEMBAYARAN
unit
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor
SATUAN
Upah
Upah
Upah
2
4
24
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
5.0133
1.2533
0.6267
4,375.00
5,000.00
6,875.00
BAHAN
Guard Rail Beam, panjang 4,3 m
Beton K-225 Site mix, Tanpa bekisting, tanpa pompa, tanpa vibrator
Besi beton bulat U 24
Guard Rail Post ( tiang ) tinggi 1,8 m
Blocking
Terminal End
Baut dan Kelengkapannya
Bahan
846
SNI7394-6.7 a
Bahan
Bahan
Bahan
Bahan
2
847
848
849
buah
m
kg
buah
batang
buah
LS
1.0500
0.3716
18.5806
3.0000
3.0000
2.0000
1.0000
32,508.25
410,000.00
649,000.00
7,000.00
200,000.00
150,000.00
100,000.00
200,000.00
PERALATAN
Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong
Alat
Alat Bantu
jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
430,500.00
241,168.40
130,064.20
600,000.00
450,000.00
200,000.00
200,000.00
2,251,732.60
0.1567
29,323.54
1.0000
300.00
D.
21,933.19
6,266.50
4,308.56
4,595.00
300.00
4,895.00
2,289,135.85
10 % x D
228,913.58
2,518,049.43
XXVIII.003
2,510,000.00
Mata Pembayaran :
Analisa El-842
XXVIII.002
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXVIII.002
Marka Jalan ( Thermoplastic )
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor
SATUAN
Upah
Upah
Upah
2
4
24
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.6000
0.2250
0.0750
4,375.00
5,000.00
6,875.00
BAHAN
Cat Marka Thermoplastic
Minyak Cat Nippon Paint - Thinner Melamic ( 1 ltr )
Glass Bit
Bahan
Bahan
Bahan
90
851
91
kg
liter
kg
1.9500
1.0500
0.4500
4,265.63
17,750.00
18,000.00
21,700.00
PERALATAN
Compressor 4000-6500 L\M, 80 HP, Kap. Pemborong
Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong
Alat
Alat
Alat Bantu
24
12
jam
jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
34,612.50
18,900.00
9,765.00
63,277.50
0.0750
0.0750
24,308.83
29,323.54
1.0000
400.00
D.
2,625.00
1,125.00
515.63
1,823.16
2,199.27
400.00
4,422.43
71,965.55
10 % x D
7,196.56
79,162.11
XXVIII.002
79,000.00
Mata Pembayaran :
Analisa El - 731
XX.001
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XX.001
Baja Tulangan Besi Beton Bulat U-24
SATUAN PEMBAYARAN
kg
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.1050
0.0350
0.0350
4,375.00
5,000.00
6,875.00
BAHAN
Besi Beton Bulat U-24
Kawat Beton
Bahan 2
Bahan 153
kg
kg
1.1000
0.0200
875.00
7,000.00
8,500.00
459.38
175.00
240.63
7,700.00
170.00
7,870.00
PERALATAN
Alat Bantu
Ls
1.0000
25.00
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
25.00
25.00
8,770.00
10 % x D
877.00
9,647.00
XX.001
9,000.00
Mata Pembayaran :
Analisa El - 734
XX.002
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XX.002
Baja Tulangan Ulir U-24
SATUAN PEMBAYARAN
kg
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.1050
0.0350
0.0350
4,375.00
5,000.00
6,875.00
BAHAN
Besi Beton Ulir U-32
Kawat Beton
Bahan 3
Bahan 153
kg
kg
1.1000
0.0200
875.00
7,500.00
8,500.00
459.38
175.00
240.63
8,250.00
170.00
8,420.00
PERALATAN
Alat Bantu
Ls
1.0000
50.00
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
50.00
50.00
9,345.00
10 % x D
934.50
10,279.50
XX.002
10,000.00
Mata Pembayaran :
Analisa El-635 c
XXII.042
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXII.042
Laston Permukaan ( AC-WC ), t = 5 cm padat rata-rata ( Pabrikasi )
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja / Knek
@Mandor / Pengawas
SATUAN
Upah
Upah
2
24
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.0271
0.0027
4,375.00
6,875.00
BAHAN
HOTMIX, WC
Bahan
836
kg
0.1238
137.13
99,589.00
PERALATAN
Wheel Loader 1.0-1.6 m, 105 HP, Kap 1.5 m Pemborong
Asphalt Mixing Plant, 150 HP, Kap 50 T/Jam Pemborong
Generator Set,175 HP, Kap.125 kVA Pemborong
Dump Truck, 125 HP, Kap. 18-21 m Pemborong
Asphalt Finisher, 47 HP, Kap 6 ton Pemborong
Tandem Roller 6-8 T, 50 HP, Kap 8 ton Pemborong
Tire Roller 8-10 T, 60 HP, Kap.10 ton Pemborong
Alat
Alat
Alat
Alat
Alat
Alat
Alat
Alat Bantu
15
9
5
12
10
17
18
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
12,329.12
12,329.12
0.0034
0.0032
0.0023
52,295.26
62,500.00
130,000.00
41,690.10
50,000.00
29,411.05
39,026.99
1.0000
20.00
D.
118.56
18.56
170.00
94.12
89.76
20.00
373.88
12,840.12
10 % x D
1,284.01
14,124.13
XXII.042
14,000.00
Mata Pembayaran :
Analisa El 7115 a
XIX.123
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.123
Joint Sealent Pada Rigid Pavement
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang
@Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2
4
24
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.9762
0.5267
0.3472
4,375.00
5,000.00
6,875.00
BAHAN
Joint Sealant
Bahan
17
0.0004
9,291.38
168,000.00
PERALATAN
Concrete Cutter Machine Pemborong
Alat
Alat Bantu
25
Jam
Ls
0.1389
E.
OVERHEAD
F.
G.
DIBULATKAN
67.20
67.20
42,857.14
5,952.86
1.0000
JUMLAH HARGA UPAH
D.
4,270.88
2,633.50
2,387.00
5,952.86
15,311.43
10 % x D
1,531.14
16,842.58
XIX.123
16,000.00
Mata Pembayaran :
Analisa El 312 a
III.010
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
III.010
Galian Berbatu Pakai alat berat, di buang setempat
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Mandor / Pengawas
SATUAN
Upah
Upah
2
24
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
1.0000
0.1250
4,375.00
6,875.00
5,234.38
BAHAN
PERALATAN
Compressor 4000-6500 L\M, 80 HP, Kap. - Pemborong
Jack Hammer, 3 HP, Kap. - Pemborong
Wheel Loader 1.0-1.6 m, 105 HP, Kap. 1.5 m Pemborong
Excavator 80-140 HP, 80 HP, Kap. 0.5 m Pemborong
Alat
Alat
Alat
Alat
24
22
15
4
Jam
Jam
Jam
Jam
Ls
0.1250
0.1250
0.1250
0.1250
24,308.83
6,342.56
52,295.26
120,000.00
25,368.33
D.
30,602.71
10 % x D
3,060.27
F.
G.
3,038.60
792.82
6,536.91
15,000.00
1.0000
JUMLAH HARGA UPAH
E.
4,375.00
859.38
33,662.98
III.010
33,000.00
Mata Pembayaran :
Analisa El-713 h
XIX.100
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.100
Beton K-350 Ready Mix, Tanpa Bekisting, Tanpa Pompa, Pakai Vibrator
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@ Pekerja / Kenek
@Tukang Batu
@ Mandor / Pengawas
SATUAN
Upah
Upah
Upah
2 org / jam
10 org / jam
24 org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
1.3253
0.4418
0.4418
4,375.00
5,000.00
6,875.00
BAHAN
Beton Readymix, Mutu Beton K-350, Slump 12 2 cm
Bahan 76
1.0500
11,044.56
610,000.00
PERALATAN
Concrete Vibrator, 10 HP, Kap.- Pemborong
Alat
Alat Bantu
19
jam
Ls
0.4418
E.
OVERHEAD
F.
G.
DIBULATKAN
640,500.00
640,500.00
6,779.22
1.0000
2,995.06
D.
5,798.19
2,209.00
3,037.38
2,995.06
654,539.62
10 % x D
65,453.96
XIX.100
719,993.58
710,000.00
Mata Pembayaran :
Analisa El-611
XXII.001
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXII.001
Lapis Resap Pengikat (0,8 ltr/m2 - Medium/Slow setting - 56% Aspal Cemen Pen. 80/100 / liter)
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja / Knek
@Mandor / Pengawas
SATUAN
Upah
Upah
2
24
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.0301
0.0060
4,375.00
6,875.00
BAHAN
Aspal Emulsi, LAE - Prime Coat, curah ( Prime Coat )
Minyak Tanah / Kerosene
Bahan
Bahan
837
101
kg
liter
0.6294
0.4889
172.94
4,800.00
2,800.00
PERALATAN
Asphalt Sprayer, 15 HP, Kap. 800 liter Pemborong
Compressor 4000-6500 L\M, 80 HP, Kap - Pemborong
Dump Truck 3 - 4 m, 100 HP, Kap. 6 ton Pemborong
Alat
Alat
Alat
Alat Bantu
11
24
9
Jam
Jam
Jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
3,021.12
1,368.92
4,390.04
0.0030
0.0031
0.0030
12,183.46
24,308.83
29,323.54
1.0000
D.
131.69
41.25
36.55
75.36
87.97
199.88
4,762.86
10 % x D
476.29
5,239.14
XXII.001
5,000.00
Mata Pembayaran :
Analisa El-512 a
XXIII.004
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXIII.004
Lps. Pond. Ag. Kls. B, CBR Min 35 % padat rata-rata ( Material Ditempat )
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja / Knek
@Mandor / Pengawas
SATUAN
Upah
Upah
2
24
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.6250
0.8930
4,375.00
6,875.00
BAHAN
Batu Pecah Tersaring B ( Agregat Kelas B )
Bahan
24
1.1000
8,873.75
125,000.00
PERALATAN
Tandem Roller 6-8 T, 50 HP, Kap 8 ton Pemborong
Water Tanker 5000-8500 L, 100 HP, Kap 4000 Liter Pemborong
Alat
Alat
Alat Bantu
14
18
Jam
Jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
137,500.00
137,500.00
0.0178
0.0141
29,411.05
26,327.95
1.0000
75.00
D.
2,734.38
6,139.38
523.52
371.22
75.00
969.74
147,343.49
10 % x D
14,734.35
162,077.84
XXIII.004
160,000.00
Mata Pembayaran :
BOW B.24
III.040
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KABUPATEN TANGERANG
BANTEN
III.040
Pasang/Bongkar Kisdam tinggi 2 s.d 3 m Dolken 8 - 10 cm 350 - 400 cm
Tanah Setempat
m'
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
1
3
23
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.7500
0.2625
0.0505
35,000.00
40,000.00
55,000.00
BAHAN
Dolken 8-10 x 350-400
Bahan 210
batang
1.0000
39,527.50
10,000.00
26,250.00
10,500.00
2,777.50
10,000.00
10,000.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
49,527.50
10 % x D
4,952.75
III.040
54,480.25
54,000.00
Mata Pembayaran :
BOW C.32
VII.018
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KABUPATEN TANGERANG
BANTEN
VII.018
Pasang Suling-Suling Pada Pasangan Batu Kali, PVC 2", KLlas AW,Filter
Ijuk, Untuk Turap s/d 2m
titik
KOMPONEN
TENAGA
Pekerja / Kenek
SATUAN
Upah
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.0060
35,000.00
-
BAHAN
Ijuk
Pipa PVC, WAVIN, Standard, 2" ( 60 mm), tebal 2.3 mm, kelas
AW (10 kg/cm), Panjang 4 m, SC Jointing System
Bahan
Bahan
113
844
ikat
batang
0.0625
0.1000
210.00
9,900.00
56,850.00
3
4
5
JUMLAH HARGA BAHAN
C.
1
2
3
4
5
6
7
8
210.00
-
618.75
5,685.00
6,303.75
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
6,513.75
10 % x D
651.38
VII.018
7,165.13
7,000.00
Mata Pembayaran :
BOW C.14
XIX.003
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.003
Membuat Lantai Kerja 1 pc : 2 ps : 4 Krl
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
1
9
23
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
6.0000
1.0500
0.3500
BAHAN
Pasir Beton /Kasar/Hitam
Semen Tiga Roda 50 kg
Koral Kali / Koral Beton
Bahan 29
Bahan 839
Bahan 30
m
Zak
m
0.4800
7.4630
0.9600
4
JUMLAH HARGA BAHAN
C.
1
2
3
4
5
6
7
8
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
10 % x D
XIX.003
Mata Pembayaran :
BOW C.15
XIX.003
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
III.023
Pek. Pondasi Cerucuk Dolken, Jarak 50 cm, dalam 3 m
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Kayu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
1
13
23
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.7500
0.2625
0.5050
35,000.00
40,000.00
55,000.00
BAHAN
Dolken 8-10 x 350-400 cm
Bahan 211
batang
6.0000
64,525.00
10,000.00
60,000.00
-
4
JUMLAH HARGA BAHAN
C.
1
2
3
4
5
6
7
8
26,250.00
10,500.00
27,775.00
60,000.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
124,525.00
10 % x D
12,452.50
XIX.003
136,977.50
136,000.00
Mata Pembayaran :
BOW O.07 e
XXV.031
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXV.031
Kanstin Jepit Lokal 10.20.40, K-300 warna abu-abu
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang Batu
@Kepala Tukang Batu
@Mandor
SATUAN
Upah
Upah
Upah
2
10
8
24
org / jam
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.2857
0.0571
0.0571
0.0286
4,375.00
5,000.00
6,250.00
6,875.00
BAHAN
Kanstin Jepit Lokal 10.20.40, k-300
@semen tiga roda
Pasir pasang
Bahan 64
Bahan 839
Bahan 28
buah
kg
m
2.6250
1.5843
0.0044
2,088.94
5,500.00
1,060.00
100,000.00
1,249.94
285.50
356.88
196.63
14,437.50
1,679.36
440.00
2,119.36
PERALATAN
Alat Bantu
Ls
1.0000
400.00
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
400.00
400.00
4,608.30
10 % x D
460.83
5,069.13
XXV.031
5,000.00
Mata Pembayaran :
BOW O.01 h
XXV.031
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXV.031
Paving Block Lokal Tinggi 6 cmK 350 Warna abu-abu + Abu Batu t = 5 cm
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
@Pekerja
@Tukang Batu
@Kepala Tukang Batu
@Mandor
SATUAN
Upah
Upah
Upah
Upah
2
10
8
24
org / jam
org / jam
org / jam
org / jam
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.3500
0.0700
0.0700
0.0350
4,375.00
5,000.00
6,250.00
6,875.00
BAHAN
Paving block lokal tinggi 8 cm K-250 Warna Abu-abu Batu t = 5 cm
Abu Batu ( filler )
Bahan 54
Bahan 17
buah
kg
1.0500
0.0525
2,559.38
56,600.00
115,000.00
1,531.25
350.00
437.50
240.63
59,430.00
6,037.50
6,037.50
PERALATAN
Alat Bantu
Ls
1.0000
400.00
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
400.00
400.00
8,996.88
10 % x D
899.69
9,896.56
XXV.031
9,000.00
Mata Pembayaran :
BOW I.14
XXI.009
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXI.009
Bekisting Multiplex 9 mm
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Knek
Tukang Kayu
Kepala Tukang Kayu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
Upah
1
13
11
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.2500
0.5000
0.0500
0.0250
35,000.00
40,000.00
50,000.00
55,000.00
BAHAN
Balok Meranti Palembang Basah uk.8 x 15 x 400 cm
Multiplex Uk. 4 x 8 ft ( 120 x 240 cm ), 9 mm
Paku Kayu Segala Uk.
Bahan 206
Bahan 146
Bahan 180
m
Lembar
kg
0.0170
0.3500
0.2500
32,625.00
1,650,000.00
120,000.00
8,500.00
8,750.00
20,000.00
2,500.00
1,375.00
28,050.00
42,000.00
2,125.00
72,175.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
104,800.00
10 % x D
10,480.00
115,280.00
XXI.009
115,000.00
Mata Pembayaran :
BOW I.15
XXI.010
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXI.010
Bekisting Multiplex 12 mm
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Knek
Tukang Kayu
Kepala Tukang Kayu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
Upah
1
13
11
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.2500
0.5000
0.0500
0.0250
35,000.00
40,000.00
50,000.00
55,000.00
BAHAN
Balok Meranti Palembang Basah uk.8 x 15 x 400 cm
Multiplex Uk. 4 x 8 ft ( 120 x 240 cm ), 12 mm
Paku Kayu Segala Uk.
Bahan
Bahan
Bahan
206
147
180
m
Lembar
kg
0.0170
0.3500
0.2500
32,625.00
1,650,000.00
120,000.00
8,500.00
8,750.00
20,000.00
2,500.00
1,375.00
28,050.00
42,000.00
2,125.00
72,175.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
104,800.00
10 % x D
10,480.00
115,280.00
XXI.010
115,000.00
Mata Pembayaran :
BOW I.16
XXI.011
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXI.011
Stoot Work / Sokongan Bekisting Kayu Meranti Palembang
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Knek
Tukang Kayu
Kepala Tukang Kayu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
Upah
1
13
11
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.1500
0.2000
0.2000
0.0150
35,000.00
40,000.00
50,000.00
55,000.00
BAHAN
Kaso Meranti Palembang Basah uk.5 x 7 x 400 cm
Paku Kayu Segala Uk.
Bahan
Bahan
208
180
m
kg
0.1260
0.0500
24,075.00
1,650,000.00
8,500.00
5,250.00
8,000.00
10,000.00
825.00
207,900.00
425.00
208,325.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
232,400.00
10 % x D
23,240.00
255,640.00
XXI.011
250,000.00
Mata Pembayaran :
BOW C.27
XXIII.007
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XXIII.007
Lapis Pondasi Macadam / Stell Slag ( Jalan Lingkungan )
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Knek
Mandor / Pengawas
SATUAN
Upah
Upah
1
23
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.0625
0.0089
35,000.00
55,000.00
BAHAN
Batu Pecah Tersaring B ( Agregat Kelas B )
Bahan
24
1.2000
2,678.65
125,000.00
PERALATAN
Baby Walles, 2-4 T, Pemborong
Alat
Alat Bantu
26
Jam
Ls
E.
OVERHEAD
F.
G.
DIBULATKAN
150,000.00
150,000.00
0.0312
42,000.00
1.0000
D.
2,187.50
491.15
1,310.40
1,310.40
153,989.05
10 % x D
15,398.91
169,387.96
XXIII.007
169,000.00
Mata Pembayaran :
BOW B.16
III.013
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
III.013
Urugan Kembali Tanah Bekas Galian
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja
Mandor / Pengawas
SATUAN
Upah
Upah
1
23
org / hari
org / hari
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.3000
0.0050
4,375.00
6,875.00
BAHAN
Tanah Urug / Tanah Merah (galian C / hanya tanah saja
Bahan
36
1.2000
1,346.88
42,656.00
PERALATAN
Tamper, 5 HP, Kap. 0.17 ton Pemborong
Alat
20
jam
Ls
0.9000
6,392.73
5,753.46
1.0000
5,753.46
D.
58,287.53
10 % x D
5,828.75
F.
G.
51,187.20
51,187.20
E.
1,312.50
34.38
64,116.29
III.013
64,000.00
Mata Pembayaran :
BOW A.07
I.010
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
I.010
Pekerjaan Pengukuran dan Pematokan ( Jalan dan Saluran )
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Kayu
Mandor / Pengawas
Juru Ukur
SATUAN
Upah
Upah
Upah
Upah
1
13
23
51
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.0030
0.0001
35,000.00
40,000.00
55,000.00
75,000.00
BAHAN
Kaso Meranti Jambi Basah uk. 5x7x400 cm
Bahan 834
0.0002
112.50
2,033,000.00
105.00
7.50
406.60
406.60
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
519.10
10 % x D
51.91
I.010
571.01
1,000.00
Mata Pembayaran :
BOW A.3
I.011
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
I.011
Pek.Pasangan Bowplank Kayu Meranti Jambi (75%)
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Kayu
Mandor / Pengawas
Kepala Tukang Kayu
SATUAN
Upah
Upah
Upah
Upah
1
13
23
11
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.1000
0.1000
0.0050
0.0100
35,000.00
40,000.00
55,000.00
50,000.00
BAHAN
Kaso Meranti Jambi Basah uk. 5 x 7 x 400 cm
Papan Meranti Jambi Basah uk.2 x 30 x 400 cm
Paku Kayu Segala uk.
Bahan 834
Bahan 835
Bahan 180
m
m
kg
0.0030
0.0045
0.0200
8,275.00
2,033,000.00
2,033,000.00
8,500.00
3,500.00
4,000.00
275.00
500.00
6,099.00
9,148.50
170.00
15,417.50
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
23,692.50
10 % x D
2,369.25
I.011
26,061.75
26,000.00
Mata Pembayaran :
SNI A.13
II.008
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
II.008
Bongkaran Beton Bertulang
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Mandor / Pengawas
SATUAN
Upah 1
Upah 23
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
6.6670
0.3330
35,000.00
55,000.00
251,660.00
BAHAN
233,345.00
18,315.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
251,660.00
10 % x D
25,166.00
II.008
276,826.00
270,000.00
Mata Pembayaran :
III.003
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
III.003
Galian Tanah Biasa Sedalam 1 m ( manual )
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Mandor / Pengawas
SATUAN
Upah 1
Upah 23
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.7500
0.0250
35,000.00
55,000.00
27,625.00
BAHAN
26,250.00
1,375.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
27,625.00
10 % x D
2,762.50
III.003
30,387.50
30,000.00
Mata Pembayaran :
VI.002
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
VI.002
Urugan Pasir Pasang
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Mandor / Pengawas
SATUAN
Upah
Upah
1
23
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.3000
0.0100
35,000.00
55,000.00
BAHAN
Pasir Pasang
Bahan 28
1.2000
11,050.00
100,000.00
10,500.00
550.00
-
120,000.00
120,000.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
131,050.00
10 % x D
13,105.00
VI.002
144,155.00
144,000.00
Mata Pembayaran :
X.010
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
X.010
Plesteran 1Pc : 3Ps, tebal 20 mm + Acian
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Batu
Kepala Tukang Batu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
Upah
1
9
7
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.4000
0.2000
0.0200
0.0220
35,000.00
40,000.00
50,000.00
55,000.00
BAHAN
@Semen Tiga Roda 50 kg
Pasir Pasang
Bahan 839
Bahan 28
kg
m
10.3680
0.0310
23,000.00
1,060.00
100,000.00
14,000.00
8,000.00
1,000.00
10,990.08
3,100.00
14,090.08
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
37,090.08
10 % x D
3,709.01
X.010
40,799.09
40,000.00
Mata Pembayaran :
X.019
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
X.019
Plesteran 1Pc : 3Ps, tebal 30 mm + Acian
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Batu
Kepala Tukang Batu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
Upah
1
9
7
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.5450
0.2500
0.0250
0.0285
35,000.00
40,000.00
50,000.00
55,000.00
BAHAN
@Seman Tiga Roda 50 kg
Pasir Pasang
Bahan 839
Bahan 28
kg
m
13.5020
0.0465
30,325.00
1,060.00
100,000.00
19,075.00
10,000.00
1,250.00
14,312.12
4,650.00
4,650.00
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
34,975.00
10 % x D
3,497.50
X.019
38,472.50
38,000.00
Mata Pembayaran :
SNI J.32
XVII.022
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XVII.022
Memasang pipa PVC AW 4"
SATUAN PEMBAYARAN
m'
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Pasang Pipa
Kepala Tukang Batu
Mandor / Pengawas
SATUAN
Upah
Upah
Upah
Upah
1
35
7
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.0810
0.1350
0.0135
0.0041
BAHAN
pipa PVC WAVIN standard 4" ( 114 mm), tebal 41 mm,kelas AW Bahan 845
(10kg/cm),panjang 4 m,90 jointing System
batang
1.2000
185,840.00
0.3500
64,590.00
2
3
4
5
Perlengkapan
ls
223,008.00
22,606.50
245,614.50
PERALATAN
Alat Bantu
Ls
1.0000
D.
E.
OVERHEAD
F.
G.
DIBULATKAN
245,614.50
10 % x D
24,561.45
XVII.022
270,175.95
270,000.00
Mata Pembayaran :
SNI 7394-6.7 a
XIX.029
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
XIX.029
Beton K-225 Site Mix, Tanpa Bekisting, Tanpa Pompa, Tanpa Vibrator
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja / Kenek
Tukang Batu
Kepala Tukang Batu
Mandor / pengawas
SATUAN
Upah
Upah
Upah
Upah
1
9
7
23
org / hr
org / hr
org / hr
org / hr
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
1.6500
0.2750
0.0280
0.0830
35,000.00
40,000.00
50,000.00
55,000.00
BAHAN
@Semen Tiga Roda 50 kg
Pasir Beton/Kasar/Hitam
Agregat Kasar
Air PDAM Golongan Niaga Besar (B2), Pemakaian 0 - 10 m
Bahan 839
Bahan 29
Bahan 26
Bahan 833
kg
kg
kg
liter
371.0000
698.0000
1,047.0000
215.0000
70,150.00
1,060.00
63.89
73.33
4.00
PERALATAN
Concrete Mixer 0.3-0.6 m, 15 HP, Kap. 500 Liter Pemborong
Alat
Alat Bantu
22
jam
Ls
0.4418
E.
OVERHEAD
F.
G.
DIBULATKAN
393,260.00
44,594.44
76,780.00
860.00
515,494.44
11,627.51
1.0000
5,137.03
-
D.
57,750.00
11,000.00
1,400.00
5,137.03
590,781.48
10 % x D
59,078.15
XIX.029
649,859.63
649,000.00
Mata Pembayaran :
III.013
KAB / KOTA
PROP
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
:
:
KABUPATEN TANGERANG
BANTEN
III.013
Urugan Kembali Tanah Bekas Galian
SATUAN PEMBAYARAN
No.
A.
1
2
3
4
5
6
KOMPONEN
TENAGA
Pekerja
Mandor / Pengawas
SATUAN
Upah
Upah
1
23
org / hari
org / hari
PERKIRAAN
KUANTITAS
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
0.2500
0.0083
4,375.00
6,875.00
1,150.81
BAHAN
PERALATAN
Ls
1.0000
JUMLAH HARGA UPAH
D.
E.
1,150.81
10 % x D
115.08
F.
G.
1,093.75
57.06
1,265.89
III.013
1,000.00
LAMPIRAN 10 PENAWARAN
DAFTAR LAMPIRAN - LAMPIRAN PENAWARAN
NAMA PEKERJAAN
: Jl. Raya Pondok Jagung Timur Kp. Dongkal
PAKET / KONTRAK No.
:
NAMA PESERTA LELANG : PT. DIPARO KREASI UTAMA
No.
Uraian
Salinan Kemitraan yang disahkan untuk kerja sama gabungan atau kerja
sama operasi ( dilakukan bagi yang bermitra sejak Prakualifikasi ) (*)
Perjanjian Kemitraan untuk Usulan Kerja Sama Operasi ( Jika yang diatas tidak
digunakan ) (*)
Konfirasi Kapasitas Plant Pemecah Batu, Concrete Bacth Plant & Pencampur
Aspal.
16
GINDO SITORUS
Direktur
Tanda
Periksa
Agustus 2009
war
REASI UTAMA
ITORUS
ktur
N0.
I.
1
2
3
4
III.
1
2
3
4
5
6
VII.
1
2
3
4
5
6
7
:
:
:
:
:
:
:
:
1.03.01.15.22
5.2.3.21.04
74
Pembangunan / Peningkatan Jalan Kecamatan Sukamulya
Peningkatan Jl. Jambu - Buni - Ayu - Jengkol
KECAMATAN SUKAMULYA
PANJANG =13248.0 m'
LEBAR =
3,5 ; 4 : 5 ; 6
PANJANG = 9683.0 m'
LEBAR =
5:6
BANTEN / TANGERANG
###
JENIS PEKERJAAN
PEKERJAAN PENDAHULUAN
Pengukuran dan Pematokan dng alat optik dan soft Drawing
Papan Nama Proyek
Pembersiahan Lokasi
Mobilisasi
PEKERJAAN TANAH
Galian Tanah Keras Badan Jalan ( Mekanik )
Galian Biasa ( Mekanik ) PLB Bdn Jalan & Sal,Air + TPT
Urug Pasir Bawah Pasangan
Timbunan Tanah Merah u/Badan Jalan
Urug Tanah Kembali Ex Galian
Pek. Kisdam / Dewatering
X PEKERJAAN PLESTERAN
1 Pek. Plesteran U/ Tenbok Pernahan Tanah dan Saluran Air
U/ Lonengan Gorong-Gorong
XX
1
2
3
XXVIII.
PEKERJAAN PENGAMAN JALAN
1 Pek. Guard Raill ( 5 m' unit)
2 Pek. Pengecatan Marka Jalan
PERKIRAAN
BOBOT
TERHADAP
TOTAL
1.00
2.00
11,296.00
Terlampir
ls
unit
m2
0.0422
0.0042
0.0272
0.4978
1,242.25
6,461.28
168.56
1,778.00
3,248.00
435.00
m3
m3
m3
m3
m3
m'
0.1731
0.3001
0.1025
0.4804
0.0137
0.0992
1,621.73
228.00
67.52
226.81
2,207.00
Terlampir 2
426.00
m3
m3
m3
m3
ttk
m'
2.8756
0.4043
0.1197
0.1618
0.0652
35.2842
4.9998
928.55
m2
0.1568
64.00
Terlampir 4
Terlampir 5
m'
0.9484
0.3458
0.6594
2,491.12
10,960.56
19.74
m3
m3
m'
5.4689
32.8541
0.0013
101,778.33
11,861.97
39,048.00
kg
kg
kg
3.8672
0.5008
1.6485
1,149.66
m2
0.5582
360.00
liter
0.0076
450.00
m2
0.0266
1,213.48
3,507.55
2,773.65
24.00
1,834.60
m3
m3
m3
m3
m3
0.8197
2.3693
1.8736
0.0162
1.3090
80.00
210.00
unit
m2
0.8477
0.0700
MINGGU KE
1
10
MUHAMMAD ARIFIN
Direktur
11
12
N0.
:
:
:
:
:
:
:
:
1.03.01.15.22
5.2.3.21.04
74
Pembangunan / Peningkatan Jalan Kecamatan Sukamulya
Peningkatan Jl. Jambu - Buni - Ayu - Jengkol
KECAMATAN SUKAMULYA
PANJANG =13248.0 m'
LEBAR =
3,5 ; 4 : 5 ; 6
PANJANG = 9683.0 m'
LEBAR =
5:6
BANTEN / TANGERANG
###
JENIS PEKERJAAN
I.
1
2
3
4
BOBOT
TERHADAP
TOTAL
PERKIRAAN
PEKERJAAN PENDAHULUAN
Pengukuran dan Pematokan dng alat optik dan soft Drawing
Papan Nama Proyek
Pembersiahan Lokasi
Mobilisasi
1.00
2.00
11,296.00
Terlampir
ls
unit
m2
0.0422
0.0042
0.0272
0.4978
MINGGU KE
1
###
###
10
11
12
###
###
###
###
###
###
###
###
0.099550
0.5714
III.
1
2
3
4
5
6
PEKERJAAN TANAH
Galian Tanah Keras Badan Jalan ( Mekanik )
Galian Biasa ( Mekanik ) PLB Bdn Jalan & Sal,Air + TPT
Urug Pasir Bawah Pasangan
Timbunan Tanah Merah u/Badan Jalan
Urug Tanah Kembali Ex Galian
Pek. Kisdam / Dewatering
1,242.25
6,461.28
168.56
1,778.00
3,248.00
435.00
m3
m3
m3
m3
m3
m'
0.1731
0.3001
0.1025
0.4804
0.0137
0.0992
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.07
0.07
0.07
###
###
###
###
0.02
0.02
0.03
0.03
0.03
0.02
0.02
0.02
###
1.1689
VII.
1
2
3
4
5
6
7
1,621.73
228.00
67.52
226.81
2,207.00
Terlampir 2
426.00
m3
m3
m3
m3
ttk
m'
2.8756
0.4043
0.1197
0.1618
0.0652
35.2842
4.9998
###
###
###
###
###
###
###
###
0.29
0.29
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.03
0.03
0.03
###
###
###
###
###
###
###
###
###
0.01
0.01
0.01
0.01
###
###
###
###
###
###
2.94
2.94
2.94
2.94
2.94
2.94
###
###
###
###
###
###
0.36
0.36
0.36
0.36
0.36
0.36
###
###
###
###
###
###
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.22
0.22
0.22
2.53
2.53
2.53
43.9106
X PEKERJAAN PLESTERAN
1 Pek. Plesteran U/ Tenbok Pernahan Tanah dan Saluran Air
U/ Lonengan Gorong-Gorong
928.55
m2
64.00
Terlampir 4
Terlampir 5
m'
2,491.12
10,960.56
19.74
m3
m3
m'
0.1568
0.1568
XVII.PEKERJAAN SANITASI / DRAINASE
1 Pas. Gorong-Gorong Beton Bertulang BC. 100 X 100 ( 8 ttk )
2 Pek. Tembok Penahan Tanah Beton pada Gorong-Gorong
3 Pek. Trotoar
0.9484
0.3458
0.6594
0.04
0.04
1.9536
XIX PEKERJAAN BETON
1
LC / B.0 Beton K-125 T = 5 cm
2
Beton K-350 T= 22 Cm + Circle
3
Joint Sealent Pada Rigid Pavement
5.4689
32.8541
0.0013
###
###
###
###
###
###
###
###
0.5
0.5
0.5
###
###
###
###
###
2.53
2.53
2.53
2.53
2.53
38.3243
XX
1
2
3
101,778.33
11,861.97
39,048.00
kg
kg
kg
3.8672
0.5008
1.6485
###
###
###
###
###
###
0.32
0.32
0.32
0.32
0.32
0.32
###
###
###
###
###
###
0.04
0.04
0.04
0.04
0.04
0.04
###
###
###
###
###
###
0.14
0.14
0.14
0.14
0.14
0.14
###
0.09
0.09
0.09
0.14
0.14
0.14
0.14
0.14
0.14
0.01
0.01
0.01
0.01
0.01
6.0165
XXI PEKERJAAN BEKISTING
1 Bekisting Multiplex 9 mm
1,149.66
m2
0.5582
###
###
0.5582
XXII.
1
2
3
360.00
liter
0.0076
450.00
m2
0.0266
0.0342
1,213.48
3,507.55
2,773.65
24.00
1,834.60
m3
m3
m3
m3
m3
80.00
210.00
unit
m2
0.8197
2.3693
1.8736
0.0162
1.3090
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
6.3877
XXVIII.
PEKERJAAN PENGAMAN JALAN
1 Pek. Guard Raill ( 5 m' unit)
2 Pek. Pengecatan Marka Jalan
0.8477
0.0700
0.9178
Mingguan
Rencana Kemajuan Pekerjaan
Komulatif
0.2570
0.1207
0.2570
0.2570
0.1340
0.3319
0.3911
0.3911
1.9475
1.0949
2.3386
2.3386
11.1469
18.3434
15.3240
14.8668
14.1867
13.3199
6.7670
3.4135
0.2933
6.7643
13.4854 22.6571
31.8288 39.7477
47.1528 54.5349
62.0196 69.0967
76.2063 82.7760
89.5261 93.2126
96.2932 99.3738
99.7067 99.9004
100.0000
13.4854
31.8288
47.1528
62.0196
76.2063
89.5261
96.2932
MUHAMMAD ARIFIN
Direktur
99.7067
100.0000
:
:
:
:
:
:
:
:
1.03.01.15.22
5.2.3.21.04
74
Pembangunan / Peningkatan Jalan Kecamatan Sukamulya
Peningkatan Jl. Jambu - Buni - Ayu - Jengkol
KECAMATAN SUKAMULYA
PANJANG = 13248.0 m'
PANJANG = 9683.0 m'
BANTEN / TANGERANG
N0.
JENIS PEKERJAAN
MINGGU KE
SATUAN
1
I.
PEKERJAAN PENDAHULUAN
Mobil Pick Up
Alat-alat Pertukangan
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Set
Unit
Unit
Set
Unit
Unit
Unit
Set
Unit
Unit
Set
Unit
Unit
Unit
Unit
Set
X.
XI.
10
11
Unit
Set
Unit
Unit
Set
Unit
Unit
Set
MUHAMMAD ARIFIN
Direktur
12
JADWAL BAHAN
Kode Rekening Kegiatan
Kode Rekening Belanja Modal
Kegiatan
Nama Proyek
Lokasi
Volume Keseluruhan
Perkiraan volume Pelaksanaan
Propinsi / Kabupaten
:
:
:
:
:
:
:
:
1.03.01.15.22
5.2.3.21.04
74
Pembangunan / Peningkatan Jalan Kecamatan Sukamulya
Peningkatan Jl. Jambu - Buni - Ayu - Jengkol
KECAMATAN SUKAMULYA
PANJANG =13248.0 m'
PANJANG = 9683.0 m'
BANTEN / TANGERANG
N0.
JENIS PEKERJAAN
MINGGU KE
SATUAN
1
I.
10
11
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Set
Unit
Unit
Unit
Set
Unit
Set
Unit
Unit
XI.
m3
m3
X.
PEKERJAAN PENDAHULUAN
Unit
Unit
Unit
Set
MUHAMMAD ARIFIN
Direktur
12
Uraian
Volume
Pekerjaan
Bobot
Pekerjaan
%
PEKERJAAN PENDAHULUAN
Pekerjaan Pengukuran dan Pematokan (Jalan& Saluran
564.00 )m'
0.084 0.042
Papan Nama Proyek 60
###
x 90 cm
2.00 unit
0.115 0.058
Mobilisasi / Demobilisasi
###
1.00 ls
2.386 0.239
PEKERJAAN TANAH
Galian Tanah untuk pelebaran badan jalan
105.02 m3
0.355 0.178
PEKERJAAN BETON
Beton K-350 Ready Mix Badan Jalan tebal 20 cm507.60 m3
71.608
Beton K-350 Ready Mix untuk oprit
8.10 m3
1.143
Joint Sealent pada Rigid Paverment
924.00 m
2.506
PEKERJAAN BESI / BAJA / PENGELASAN & ERECTION
Baja Tulangan (Polos ) U24 untuk Dowel
2,113.20 kg
9.521
Baja Tulangan ( Ulir ) D39 untuk Tie Bars
480.60 kg
2.173
PENGEMBALIAN KONDISI, PEKERJAAN MINOR & PEKERJAAN RUTIN
Pondasi Agregat Kls. B pelebaran badan jalan tebal
84.60
15 cm
m3
4.189
Tambal sulam Pondasi Agregat Kls. A badan Jalan
124.100 m3
5.920
Jumlah Nilai Pekerjaan
100.00
0.52
0.52
0.52
KSANAAN PEKERJAAN
Mingguan
2
10
0.042
0.058
0.239
0.239
0.239
0.239
0.239
0.239
0.239
0.239
0.239
0
0.178
1.190
0.272
###
0.163
0.313
###
0.163
0.313
###
0.163
0.313
###
0.163
0.313
###
0.163
0.313
###
0.163
0.313
###
0.163
0.313
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
1.047
1.480
1.047
1.480
1.047
1.480
1.047
1.480
0.313
1.98
12.41
12.41
12.41
12.41
14.93
14.93
14.93
3.08
1.98
12.41
12.41
12.41
12.41
14.93
14.93
14.93
3.08
2.49
14.90
27.31
39.71
52.12
67.05
81.99
96.92
100.00
GINDO SITORUS
Direktur
Nama Proyek
Lokasi
Volume Pelaksanaan
Propinsi / Kabupaten
No
:
:
:
:
TIME SCHEDULE
Jl. Raya Pondok Jagung Timur Kp. Dongkal
Kecamatan SERPONG UTARA
Panjang =
564,00 m' Lebar = 4,50 m'
Banten / Tangerang Selatan
BULAN KE I
Bobot
I
II
PEKERJAAN PENDAHULUAN
Pekerjaan Pengukuran dan Pematokan (Jalan& Saluran
0.042
)
0.042
Papan Nama Proyek 60 x 90 cm 0
0.058
0.058
Mobilisasi / Demobilisasi
0
0.239
0.239
0.239
PEKERJAAN TANAH
Galian Tanah untuk pelebaran badan jalan
0.178
0.178
PEKERJAAN BETON
Beton K-350 Ready Mix Badan Jalan tebal 20 cm
10.230
Beton K-350 Ready Mix untuk oprit
0.163
Joint Sealent pada Rigid Paverment
0.313
PEKERJAAN BESI / BAJA / PENGELASAN & ERECTION
Baja Tulangan (Polos ) U24 untuk Dowel
1.190
1.190
Baja Tulangan ( Ulir ) D39 untuk Tie Bars
0.272
0.272
PENGEMBALIAN KONDISI, PEKERJAAN MINOR & PEKERJAAN RUTIN
Pondasi Agregat Kls. B pelebaran badan jalan tebal 15 cm
Tambal sulam Pondasi Agregat Kls. A badan Jalan
JUMLAH
PROGRES RENCANA PER MINGGU
PROGRESS RENCANA KOMULATIF
0.52
0.52
1.98
2.49
12.41
14.90
GINDO SITORUS
Direktur
I.
URAIAN PEKERJAAN
PEKERJAAN
1. .
### 2. .
### 3. .
### 4. .
### 5. .
### -
II. PEKERJAAN
1. .
### 2. .
### 3. .
### 4. .
### 5. .
### III. PEKERJAAN
1. .
### 2. .
### 3. .
### 4. .
### 5. .
### IV. PEKERJAAN
1. .
### 2. .
### 3. .
### 4. .
### 5. .
### V. PEKERJAAN
VOLUME
1. .
### 2. .
### 3. .
### 4. .
### 5. .
### JUMLAH
PROGRESS
PROGRESS
PROGRESS
PROGRESS
DEVIASI
2.00
5.00
7.00
TIME SCHEDULE
p. Dongkal
ar = 4,50 m'
BULAN KE I
III
BULAN
KE III
BULAN KE II
IV
II
III
IV
Skala
Ket
0.239
0.239
0.239
0.239
0.239
0.239
10.230
0.163
0.313
10.230
0.163
0.313
10.230
0.163
0.313
10.230
0.163
0.313
10.230
0.163
0.313
10.230
0.163
0.313
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
1.190
0.272
0.239
50
0.313
12.41
27.31
12.41
39.71
GINDO SITORUS
Direktur
12.41
52.12
1.047
1.047
1.047
1.047
1.480
1.480
1.480
1.480
14.93
67.05
14.93
81.99
14.93
96.92
3.08
100.00
100
45.00
13.00
5.00
7.00
45.00
13.00
5.00
16.00
19.00
10
11
12
13
15
16
17
18
25.00
33.00
43.00
53.00
65.00
85.00
90.00
94.00
97.00
Tangerang,
PT. / CV.
19
20
SKALA
KETERANGAN
------ 100
------ 90
------ 80
------ 70
------ 60
------ 50
------ 40
------ 30
------ 20
------ 10
------ 0
99.00 100.00
Tangerang,
2008
KONTRAKTOR
PT. / CV. .
Direktur / Direktris
:
:
Tahun 2
Satuan
I
1 Pick Up
Unit
2 Alat Pertukangan
Unit
3 Beton Molen
Unit
5 Stamper
Unit
5 Alat Ukur
6 Alat Besar / Berat
II
III
IV
NAAN ALAT
Tahun 2009
V
VI
VII
VIII
IX
XI
XII
GINDO SITORUS
Direktur
Jenis Bahan
:
:
Mingg
Satuan
I
1 Tanah Merah
m3
2 Slip
m3
3 Lem Pengikat
Kg
4 Hotmix
m3
5 Aspal
m3
II
Tangerang, 03
PT. DIPARO KR
Direk
AL PENYEDIAAN BAHAN
Dongkal
Minggu Ke
III
IV
KETERANGAN
V
GINDO SITORUS
Direktur
VI
VII