LAG CALCULATION REQUIREMENTS

FIND ON MUD REPORT & BHA SHEET OR ASK DRILLER, LEAD MUD LOGGER, OR COMPANY MAN

TOTAL DEPTH BIT DIAMETER

TOTAL DEPTH ON WISE ON MUD REPORT OR ASK

SURFACE CASING I.D. SURFACE CASING SET @

USE LAST CASING RUN IN HOLE THE ONE THAT SAYS SURFACE NEXT TO IT ON MUD REPORT OR ASK IN FEET

DRILL PIPE O.D. DRILL PIPE I.D. DRILL PIPE LENGTH

ON MUD REPORT OR ASK ON MUD REPORT OR ASK TOTAL DEPTH - BHA TOTAL LENGTH ON WISE ON BHA SHEET OR ASK

AVERAGE BHA O.D. AVERAGE BHA I.D. TOTAL BHA LENGTH

MANUALLY AVERAGE FROM BHA SHEET OR MUD REPORT

BHA=TOOLS, DRILL COLLARS, AND HEAVY WEIGHT


MANUALLY AVERAGE FROM BHA SHEET OR MUD REPORT ON BHA SHEET OR MUD REPORT

PUMP LINER I.D. PUMP STROKE LENGTH

ON MUD REPORT OR ASK IN INCHES ON MUD REPORT

STROKES PER MINUTE

ON WISE

USE THESE NUMBERS IN YOUR LAG CALCULATIONS