Washington Metropolitan Area Transit Authority

Board Action/Information Summary


Action Information MEAD Number: Resolution:
Yes No

TITLE:

5K Railcar Brake Disc Hub Investigation Report


PURPOSE:

To provide the Committee with a summary of the incident that occurred December 20, 2011.
DESCRIPTION:

The report describes the incident investigation including findings, conclusions and corrective actions.
FUNDING IMPACT:

RECOMMENDATION:

None

Page 55 of 74

fff

Page 56 of 74

Washington Metropolitan Area Transit Authority

5K Railcar Brake Disc Hub Investigation Update


Safety & Security Committee March 8, 2012

Page 57 of 74

Investigation Overview
Determine cause of recent incident Isolate root cause Take Corrective Actions Review Historic Conditions Make Process Changes

Page 58 of 74

Incident Investigation
Original hub from car 5012 fractured on December 20, 2011 Investigation Committee began review Four hubs sent to Lehigh Laboratories for testing

Page 59 of 74

Findings
Visual examination of fractured hub Chemical Analysis and Metallurgy confirm original hub made of carbon steel Root cause identified as fatigue stress

Page 60 of 74

Conclusions
Replacement hubs required on 5K rail cars Lab tests confirm new design will last the life of the car 98% of the 5K hubs have been replaced 2% fleet remaining have been nonrevenue hold

Page 61 of 74

Further Corrective Actions


Daily inspections continue Hub replacements on 6Ks scheduled to begin July 2012

Page 62 of 74

A Look Back
Committee reviewed failures in 2006 Manufacturer and WMATA agreed hubs good for 10-12 years Hubs redesigned by manufacturer with stronger and thicker material New hubs included in truck overhaul program in 2009

Page 63 of 74

Systemic Approach
Department interaction Maximo maintenance system flags Additional rail infrastructure & car analysis Second round instrumentation tests to involve third party lab 7K cars will use new hub design

Page 64 of 74