Professional Documents
Culture Documents
DATA:
Solution:
3.8
unit weight of soil:
unit weight of concrete:
grade of concrete:
grade of Steel:
Angle of reose:
Thickness of slab:
Width of slab:
Height of slab:
Superimposed load:
Live load :
Cover:
18
25
35
415
30
0.3
3.8
3.8
12
50
75
KN/m3
KN/m3
effective span :
effective height :
Factor of safety :
4.1
4.1
1.5
m
m
m
m
m
KN/m2
KN/m2
mm
3.8
0.3
CASE:1
Loads:
Weight of slab
Superimposed load
Live load
7.5
12
50
kN/m2
kN/m2
kN/m2
Number of wall
Weight of wall
15
kN/m2
Total load 15
kN/m2
kN/m2
Total
84.5
kN/m2
Analysis
= 20.66667 kN/m2
3.8
= 43.46667 kN/m2
= -83.6317
KNm
Mba
= 83.63167 KNm
Mdc
= 101.6817 KNm
Mcd
= -101.682
KNm
Mad
= 35.84329 KNm
Mda
= -41.3305
KNm
Mcb
= 41.33049 KNm
Mbc
= -35.8433
KNm
20.66667 kN/m2
Distribution factor (D.F)
DC
0.263158
DA
0.263158
AD
0.263158
D.F
0.5
69.5
kN/m2
20.66667
kN/m2
0.526316
0.5
0.5
0.526316
AB
0.263158
0.5
43.46667 kN/m2
84.5
(C)
D
DC
0.5
A
DA
0.5
AD
0.5
B
AB
0.5
BA
0.5
FEM
101.6817 -41.3305
35.84329 -83.6317
Balance
-30.1756
C.O.V
Balance
-13.5174
C.O.V
Balance
-6.75872
C.O.V
Balance
-3.37936
-30.1756
-13.5174
-6.75872
-3.37936
73.07643 -73.0764
-11.9471
-6.75872
-23.8942
0.5
-13.5174
-6.75872
30.17559 30.17559
-15.0878
13.51744 13.51744
-6.75872
6.758722 6.758722
-3.37936
-3.37936
3.379361 3.379361
58.16713 -58.1671
73.07643 -73.0764
Net BM of AB
67.28037 KNm
Net BM of CD
79.44607 KNm
57.88033 KNm
CD
0.5
41.33049 -101.682
0.5
CB
C
BC
83.63167 -35.8433
kN/m2
73.36322 KNm
43.46667
kN/m2
-58.1671
-58.1671
+
-
73.36322
73.36322
-73.0764
Solution
-73.0764
CASE:2
for the vertical wall water ressure intensity will vary from Zero at the top
37.278
Net ressure at topl
kN/m2
at bottom
20.66667 kN/m2
kN/m2
20.66667
kN/m2
69.5
kN/m2
20.66667
43.46667
kN/m2
84.5
kN/m2
37.278
kN/m2
43.46667
kN/m2
Mab
= -83.6317
KNm
Mba
= 83.63167 KNm
Mdc
= 101.6817 KNm
Mcd
= -101.682
KNm
Mad
= 17.90014 KNm
Mda
= -14.4158
KNm
Mcb
= 14.41577 KNm
Mbc
= -17.9001
KNm
0.263158
DA
0.263158
AD
0.263158
D.F
0.5
0.526316
0.5
0.5
0.526316
AB
0.263158
0.5
D
DC
0.5
A
DA
0.5
AD
0.5
B
AB
0.5
BA
0.5
FEM
101.6817 -14.4158
17.90014 -83.6317
Balance
-43.6329
C.O.V
Balance
-19.1247
C.O.V
Balance
-9.56234
C.O.V
Balance
-4.78117
-43.6329
-19.1247
-9.56234
-4.78117
60.74052 -60.7405
-16.4329
0.5
-19.1247
-9.56234
43.63295 43.63295
-21.8165
19.12468 19.12468
-9.56234
9.562338 9.562338
-4.78117
-4.78117
4.781169 4.781169
48.07411 -48.0741
60.74052 -60.7405
Net BM of AB
77.37339 KNm
Net BM of CD
91.78198 KNm
57.88033 KNm
CD
0.5
14.41577 -101.682
-32.8658
CB
0.5
83.63167 -17.9001
C
BC
-3.47302
KNm
KNm
-48.0741
KNm
-48.0741
+
-
-3.47302
KNm
-3.47302
-
KNm
-60.7405
KNm
Solution:
-60.7405
KNm
CASE:3
for the vertical wall water ressure intensity will vary from Zero at the top
37.278
kN/m2
at bottom
= 0
= 3.8
= 4
KN/m^2
= 26.8
KN/m^2
kN/m2
69.5
kN/m2
4
kN/m2
4
26.8
kN/m2
84.5
kN/m2
37.278
kN/m2
26.8
kN/m2
Mab
= -83.6317
KNm
Mba
= 83.63167 KNm
Mdc
= -101.682
KNm
Mcd
= 101.6817 KNm
Mad
= -0.23008
KNm
Mda
= 12.37845 KNm
KNm
Mcb
= 0
Mbc
KNm
=
=
=
50
75
118.924
KNm
mm
<
225
mm
mm
0.02
Hence safe
Effective depth
Diameter of rod
225
mm
20
mm
Mu/(bd^2)
Pt (%)
Ast
ast
Spacing
Provide
1.481481
2250
314
139.5556
100mm
=
=
Chek depth
100 KNm
150 KNm
= 168.18357
20
effective depth
<
215
mm
Hence safe
Effective depth
Diameter of rod
215
mm
20
mm
Mu/(bd^2)
Pt (%)
Ast
ast
Spacing
Provide
3.244997
2150
314
146.0465
100mm
m
=
=
Chek depth
100 KNm
150 KNm
= 168.18357
20
effective depth
<
300
Hence safe
Effective deth
215
mm
Diameter of rod
20
mm
mm
Mu/(bd^2)
Pt (%)
Ast
ast
Spacing
Provide
3.244997
2150
314
146.0465
100mm
mm
0.02
12
mm
150
mm
Distributor rod