You are on page 1of 1

Jaypee Nigrie Super Thermal Power Project comprising 2 x 660 MW Super-critical Unit will be set up by JPVL at a site in Nigrie

- Village, Tehsil - Deosar, District Singrauli in Madhya Pradesh. The expected date of commissioning for Unit - I and Unit - II are end April 2013 and end October 2013 respectively. The Nigrie Thermal Project is expected to utilize coal from two captive coal blocks, the Amelia (North) and Dongri Tal II coal block with total coal reserves of 250 MT of coal. These coal blocks contain sufficient coal reserves to fuel the Nigrie Thermal project over the long term. JAL is expected to develop and mine this coal in a joint venture with MPSMCL. The joint venture has been allotted these two coal blocks solely for the purpose of supplying fuel to the Nigrie Thermal Project. The main features of the Project are:

Super critical boiler technology will achieve an unprecedented net efficiency level for brown coal power stations. This technologys higher steam temperatures and pressure parameters offer the most economical way to improve plant efficiency and operating flexibility as well as achieve fuel cost savings and lower emissions for each KWH of electricity Improved thermal efficiency Lower emissions levels Lower operating costs Greater operating flexibilty Reduced fuel consumption Reduced fuel cost Reduced ash generation Reduction of carbon dioxide emission due to less consumption of fuel Very good part load efficiency as compared to sub-critical unit Reduced NOx,Sox and SPM emission

Environmental Clearance from MoEF for Nigrie Project [Download] 1250 MW Bina Thermal Power Project JPVL has acquired Bina Power Supply Company Limited (BPSCL) from the Aditya Birla Group. BPSCL was set up by the Aditya Birla Group to set up a coal fired Thermal Power Plant at Bina in the State of Madhya Pradesh. The project with a capacity of 1250 MW is expected to be commissioned by 2012 (phase -1). 1980 MW Karchana & 3300 MW Bara Thermal Power Project The company has also acquired Sangam Power Generation Company Ltd. for setting up super critical technology boiler based 3 x 660 MW Karchana Thermal Power Project (Phase I : 2x660 MW) and Prayagraj Power Generation Company Ltd. for 5 x 660 MW Bara Thermal Power project (Phase I : 3x660 MW) from UP Power Corporation Ltd. on BOO basis. Both the projects are expected to be commissioned by 2014.

COPYRIGHT 2008. Jaiprakash Power Ventures

You might also like