18-5/8 Casing Shoe Strengthening Plug 1: Well SA-0388 1) RIH 5-1/2 OEDP to 9092 ft.

2) Pump 35 bbls of fresh water spacer ahead. 3) Mix and Pump 145 bbls of 15.8 ppg cement slurry. 4) Pump 03 bbls of fresh water spacer behind. 5) Displace with 172.5 bbls of mud. Note: Re-Calculate all displacement volumes. 6) POH 8 stands. Flush the drill pipe with 15 bbls to clear cement inside DP. 7) POH 4 stands. 8) Close the rams and squeeze cement Attempt at 0.25 bpm and progressively increase the rate till injection is seen (Note: Injection pressures could be in the range of 1500 psi +). Squeeze 10 bbls or more. If pressures are high, resort to hesitation to enable squeeze more cement. Squeeze may be done till pressure holds or max squeeze pressure of 4000 psi is obtained. (Note: Thickening time commences from the time of mixing cement. Ensure squeezing is completed within TT. Thickening time to be confirmed by Dowell) 9) WOC under pressure till thickening time + 1 or 2 hr is completed. Meanwhile 10) Bleed off pressure. Note the returns. Open the rams 11) POOH OEDP. 12) RIH with TCI bit and slick assembly to tag cement. Note the depth of cement top. Circulate & test casing @ 4000 psi. 13) Drill out cement 10 ft above shoe. Circulate hole clean. Test the casing to 4000 psi. 14) Drill further to carry out FIT with WBM. observe pressure.

You might also like