BACKGROUND PROJECT
PROJECT TITLE : CENTRAL KOWLOON ROUTE NAME OF PROJECT PROPONENT : HIGHWAY DEPARTMENT , HKSAR GOVERNMENT PROJECT DURATION : 2005-2009 COST OF PROJECT : HK$ 2 MILLIONS LINE LENGTH : 3.8 KM NO OF STATION : 3 TYPE : HEAVY RAIL
4/17/12
Component of TBM
Trench
4/17/12
The TBM components is placing down into the trench using a crane
4/17/12
4/17/12
During the drilling process, the assemble of components is doing at the same time.
Segment installation
4/17/12
While the drilling works are carried out near the building, surveys will be conducted to monitor for any settlement that may occur in any nearest buildings during the work.
TBM work
Survey work
4/17/12
At the end of the point, the trench will be excavate similar with the start point as a receiver trench for the TBM. Upon arrival, the TBM is then dismantled and brought upon to the surface
4/17/12
Lastly, the tunnel is done when all the appliances is completely installed.
4/17/12
PROBLEM : Geotechnical environment EFFECT : Drilling different type of soil (from hard rock to soft soil)
4/17/12
4/17/12
THANK YOU