URAIAN PEKERJAAN
HARGA
SATUAN
(Rp.)
KODE
SATUAN
K.224
K.516
K.522
K.617
K.011
K.810
K.110
M3
M3
M3
M2
M2
M3
M3
M3
8,500.00
82,459.46
99,493.46
18,942.65
17,152.50
222,775.71
19,943.22
160,000.00
E.080
E.084
E.153
E.182
E.221
E.341
E.087
E.
E.
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
/ Jam
130,000.00
115,378.76
18,000.00
160,000.00
51,918.41
4,564.27
14,464.08
27,500.00
Cilacap, .,2005
CV. HANDAYANI
H. SUDARSONO
Direktur
URAIAN
TENAGA
Pemasak Aspal
Mandor Lapangan
Kepala Tukang
Tukang
Operator Terlatih
Operator Kurang Terlatih
Supir
Buruh Lapangan Tak Terlatih
Buruh Lapangan Kurang Terlatih
Buruh Lapangan Terlatih
Mekanik Terlatih
Tukang Batu
BAHAN
Batu Gunung atau Quarry
Pasir Urug/Timbun
Pasir Ayak Untuk Beton
Kerikil Sungai Royalty
Sirtu
Aspal Bitumen
Kerosine
Kayu Bakar
Semen PC. ( 40 Kg. )
Kawat Pengikat
Paku Jembatan
Baja Tulangan Beton
Alat-alat Bantu
Kayu untuk Perancah
Minyak Diesel/Solar
Bensin/Premium
Minyak Pelumas
Batu Pecah 15 - 20 cm
Batu Pecah 5 - 7 cm
Batu Pecah 2 - 3 cm
Batu Pecah 1 - 2 cm
Batu Pecah 0 - 0,5 cm
Batu Pecah 3 - 5 cm
Batu Pecah 10 - 15 cm
Aspal Drum
Minyak bakar
Besi Beton U - 32 (Polos)
Besi Siku L 50 mm
Begesting
Cat Besi
Cat Marka
Dolken Jati 10 - 15 cm
SATUAN
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
M3
M3
M3
M3
M3
Kg
Lt
M3
Zak
Kg
Kg
Kg
Set
M3
Lt
Lt
Lt
M3
M3
M3
M3
M3
M3
Lt.
Kg
Lt
Kg
Kg
M3
Kg
Kg
M1
KODE
L.061
L.073
L.079
L.081
L.082
L.091
L.101
L.103
L.106
L.071
M.010
M.040
M.041
MR.12
MR.42
M.061
M.065
M.070
M.080
M.162
M.166
M.167
M.170
M.180
M.183
M.184
M.185
M.020
M.022
M.024
M.025
M.026
M.023
HARGA
SATUAN
(Rp.)
45,000.00
45,000.00
45,000.00
35,000.00
45,000.00
35,000.00
50,000.00
30,000.00
35,000.00
40,000.00
45,000.00
45,000.00
125,000.00
150,000.00
180,000.00
150,000.00
150,000.00
11,000.00
12,000.00
55,000.00
58,000.00
22,000.00
17,000.00
4,500.00
55,000.00
2,500,000.00
22,000.00
4,500.00
22,000.00
160,000.00
175,000.00
200,000.00
250,000.00
250,000.00
200,000.00
160,000.00
33
34
35
36
37
38
Filler
Kerosene
Minyak Cat
Railling Galvanis 3"
Tanah Urug
Thinner
Kg
Lt
Lt
M1
M3
Lt
Cilacap,,2005
CV. HANDAYANI
H. SUDARSONO
Direktur
18.96
1,650,000.00
80,000.00
4,219.41
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
Mandor
Operator terlatih
Sopir
Buruh Tak terlatih
Buruh Semi terlatih
Buruh Terlatih
MATERIAL
Aspal
Minyak Bakar
Alat bantu (set @.)
Bt.Pecah 1 - 2 cm
Bt.Pecah 0,5 - 1 cm
PERALATAN
JML.
ORG.
7020
580
2.5
40.2
24.6
4
4
3
4
4
4
SAT.
Kg.
Lt.
Set
M3
M3
KODE
K. 617
KAB. CLP.
DISIAPKAN OLEH :
TANGGAL
KODE : 01
CV. HANDAYANI
28-Feb-05
ANGGAPAN
1. Menggunakan peralatan berat kapasitas 450 M2/hari
2. Agregat ukuran 1 - 2 cm dan pemecah batu ditimbun
di lokasi pekerjaan oleh levelensir
3. Permukaan yang diaspal harus sudah dipadatkan diadakan
binding, disiram primer aspal cair 1 lt/M2
4. Bitumen Residu yang dipakai : Lapis 1, sebanyak 1,6 lt/M2
Lapis 2, Sebanyak 1,3 lt / M2
5. Clip dari Dump Truk masuk speader dgn rata - 2 50 M2/M3
HARI KODE
1
2
2
10
2
2
JML.
VOL.
L.061
L.081
L.091
L.101
L.103
L.106
JML.HR/
ORANG
4
8
6
40
8
8
KODE
UPAH(Rp.
/hr/ORANG)
45,000.00
45,000.00
50,000.00
30,000.00
35,000.00
40,000.00
BIAYA
( Rp. )
180,000.00
360,000.00
300,000.00
1,200,000.00
280,000.00
320,000.00
HARGA SAT.
(Rp.)
BIAYA
(Rp.)
M.061
M.065
M.170
M.025
M.026
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
11,000.00
160,000.00
55,000.00
250,000.00
250,000.00
77,220,000.00
92,800,000.00
137,500.00
10,050,000.00
6,150,000.00
JML. HARI
KODE
ALAT KERJA
JAM
KERJA
BIAYA
(Rp. / Jam)
BIAYA
( Rp. )
3 E.084
15
115,378.76
1,730,681.40
Dump Truck
3,5 ton / 44 HP
Mesin Penyemprot
Aspal 1000 lt
3 E.221
30
51,918.41
3 E.153
7.5
18,000.00
1,557,552.30
135,000.00
JUMLAH
( Rp. )
SUB JUMLAH
( Rp. )
2,640,000.00
SUB JUMLAH
(Rp.)
186,357,500.00
SUB JUMLAH
( Rp. )
3,423,233.70
192,420,733.70
VOLUME /
QUANTITIY
1800 Satun M2
106,900.41 per M2
P
E
K
E
R
J
A
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
PEKERJA
JML.
ORG.
Mandor
Tukang Batu
Buruh tak trampil
1
4
12
HARI KODE
1 L.061
1 L.079
1 L.101
JML.HR/
ORANG
UPAH(Rp.
/hr/ORANG)
1
4
12
45,000.00
45,000.00
30,000.00
BIAYA
( Rp. )
SUB JUMLAH
( Rp. )
45,000.00
180,000.00
360,000.00
585,000.00
MATERIAL
Batu Quarry
Alat bantu (set @.
3 alat )
Pasir Ayakan
Semen
PERALATAN
Pompa Air (50 mm)
JML.
VOL.
SAT.
HARGA SAT.
(Rp.)
KODE
BIAYA
(Rp.)
6 M3
0.7 Set
M.010 >>>>>>>
M.170 >>>>>>>
125,000.00
27,500.00
750,000.00
19,250.00
1.2 M3
19 Zak
M.041 >>>>>>>
M.080 >>>>>>>
180,000.00
58,000.00
216,000.00
1,102,000.00
JML. HARI
KODE
ALAT KERJA
1
1 E.084
JAM
KERJA
BIAYA
(Rp. / Jam)
2
4,564.27
BIAYA
( Rp. )
SUB JUMLAH
(Rp.)
2,087,250.00
SUB JUMLAH
( Rp. )
9,128.54
9,128.54
JUMLAH
( Rp. )
2,681,378.54
VOLUME /
QUANTITIY
5 Satun M3
536,275.71 per M3
PEKERJA
P
E
K
E
R
J
A
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
Mandor
Operator terlatih
Sopir
Buruh Tak terlatih
JML.
ORG.
HARI KODE
2
1
1
83
2
2
2
2
L.061
L.081
L.091
L.101
JML.HR/
ORANG
4
2
2
166
UPAH(Rp.
/hr/ORANG)
45,000.00
45,000.00
50,000.00
30,000.00
BIAYA
( Rp. )
SUB JUMLAH
( Rp. )
180,000.00
90,000.00
100,000.00
4,980,000.00
5,350,000.00
MATERIAL
Alat bantu
Pasir Beton
Pasir Urug
Bt.Pecah 5 - 7 cm
Bt.Pecah 3 - 5 cm
Bt.Pecah 2 - 3 cm
Bt.Pecah 0,5 - 1 cm
PERALATAN
JML.
VOL.
3
40.18
27.47
56.05
53.1
8.85
14.35
JML.
ALAT
SAT.
KODE
Set
M3
M3
M3
M3
M3
M3
HARI
KERJA
M.170
M.041
M.040
M.022
M.023
M.024
M.026
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
JAM
KODE
KERJA
HARGA SAT.
(Rp.)
55,000.00
180,000.00
150,000.00
175,000.00
200,000.00
200,000.00
250,000.00
BIAYA
(Rp. / Jam)
BIAYA
(Rp.)
165,000.00
7,232,400.00
4,120,500.00
9,808,750.00
10,620,000.00
1,770,000.00
3,587,500.00
BIAYA
( Rp. )
Mesin Gilas
Bergetar
2 E.087
10
14,464.08
144,640.80
2 E.182
10
160,000.00
1,600,000.00
-
SUB JUMLAH
(Rp.)
37,304,150.00
SUB JUMLAH
( Rp. )
1,744,640.80
JUMLAH
( Rp. )
44,398,790.80
VOLUME /
QUANTITIY
150 Satun M3
295,991.94 per M3
P
E
K
E
R
J
A
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
PEKERJA
JML.
ORG.
Mandor
Operator terlatih
3
1
1 L.061
1 L.081
3
1
45,000.00
45,000.00
135,000.00
45,000.00
99
1 L.101
99
30,000.00
2,970,000.00
HARI KODE
JML.HR/
ORANG
UPAH(Rp.
/hr/ORANG)
BIAYA
( Rp. )
KODE
K. 516
TANGGAL
28-Feb-05
SUB JUMLAH
( Rp. )
3,150,000.00
MATERIAL
Batu pecah 15 - 20 cm
Batu pecah 5 - 7 cm
Alat Bantu
Urugan Pilihan
JML.
VOL.
50
20
4
30
SAT.
M3
M3
Set
M3
HARGA SAT.
(Rp.)
KODE
M.020
M.022
M.170
M.040
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
160,000.00
175,000.00
55,000.00
160,000.00
BIAYA
(Rp.)
SUB JUMLAH
(Rp.)
8,000,000.00
3,500,000.00
220,000.00
4,800,000.00
16,520,000.00
PERALATAN
Mesin Gilas 3 Roda
8 - 10 TON
JML. HARI
KODE
ALAT KERJA
1
1 E.080
JAM
KERJA
5
BIAYA
(Rp. / Jam)
BIAYA
( Rp. )
130,000.00
650,000.00
SUB JUMLAH
( Rp. )
780000
650,000.00
JUMLAH
( Rp. )
20,320,000.00
VOLUME /
QUANTITIY
80 Satun M3
254,000.00 per M3
PEKERJA
P
E
K
E
R
A
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
Mandor
Alat bantu
JML.
ORG.
HARI KODE
JML.HR/
ORANG
UPAH(Rp.
/hr/ORANG)
BIAYA
( Rp. )
1 L.061
45,000.00
45,000.00
30
1 L.101
30
30,000.00
900,000.00
1 L.106
40,000.00
80,000.00
JML.
VOL.
SAT.
1 Set
HARGA SAT.
(Rp.)
KODE
M.170 >>>>>>>
55,000.00
BIAYA
(Rp.)
SUB JUMLAH
( Rp. )
1,025,000.00
SUB JUMLAH
(Rp.)
55,000.00
55,000.00
PERALATAN
JML. HARI
KODE
ALAT KERJA
JAM
KERJA
BIAYA
(Rp. / Jam)
BIAYA
( Rp. )
SUB JUMLAH
( Rp. )
JUMLAH
( Rp. )
1,080,000.00
VOLUME /
QUANTITIY
50 Satun M3
21,600.00 per M3
PEKERJA
P
E
K
E
R
J
A
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
Mandor
Sopir
Buruh Tak terlatih
JML.
ORG.
HARI KODE
JML.HR/
ORANG
UPAH(Rp.
/hr/ORANG)
BIAYA
( Rp. )
1 L.061
45,000.00
45,000.00
2
36
1 L.091
1 L.101
2
36
50,000.00
30,000.00
100,000.00
1,080,000.00
SUB JUMLAH
( Rp. )
1,225,000.00
MATERIAL
Alat bantu
(Set 3 Alat)
JML.
VOL.
SAT.
1.5 Set
HARGA SAT.
(Rp.)
KODE
M.170 >>>>>>>
55,000.00
BIAYA
(Rp.)
SUB JUMLAH
(Rp.)
82,500.00
82,500.00
PERALATAN
Dump Truck
3,5 ton / 115 HP
JML. HARI
KODE
ALAT KERJA
1 E.221
JAM
KERJA
10
BIAYA
(Rp. / Jam)
51,918.41
BIAYA
( Rp. )
SUB JUMLAH
( Rp. )
519,184.10
519,184.10
JUMLAH
( Rp. )
1,826,684.10
VOLUME /
QUANTITIY
54 Satun M3
33,827.48 per M3
KODE
K. 011
TANGGAL
28-Feb-05
PEKERJA
P
E
K
E
R
J
A
M
A
T
E
R
I
A
L
P
E
R
A
L
A
T
A
N
Mandor
JML.
ORG.
HARI KODE
JML.HR/
ORANG
UPAH(Rp.
/hr/ORANG)
BIAYA
( Rp. )
20
1 L.061
20
45,000.00
900,000.00
Kepala tukang
Tukang
15
150
1 L.073
1 L.079
15
150
45,000.00
35,000.00
675,000.00
5,250,000.00
Buruh Terlatih
400
1 L.106
400
40,000.00
16,000,000.00
MATERIAL
JML.
VOL.
SAT.
HARGA SAT.
(Rp.)
KODE
BIAYA
(Rp.)
Pasir
21 M3
M.041 >>>>>>>
180,000.00
3,780,000.00
10 Set
M.170 >>>>>>>
55,000.00
550,000.00
200 Zak
M.080 >>>>>>>
58,000.00
11,600,000.00
PERALATAN
JML. HARI
KODE
ALAT KERJA
JAM
KERJA
BIAYA
(Rp. / Jam)
BIAYA
( Rp. )
SUB JUMLAH
( Rp. )
22,825,000.00
SUB JUMLAH
(Rp.)
15,930,000.00
SUB JUMLAH
( Rp. )
JUMLAH
( Rp. )
38,755,000.00
VOLUME /
QUANTITIY
1000 Satun M2
38,755.00 per M2
4 TAHUN
= (1 TAHUN =
=
KABUPATEN
CILACAP
KODE
01
DISIAPKAN OLEH :
CV. HANDAYANI
E. 341
TENAGA
UMUR BAN
8.0 HP
0.0 JAM
FACTOR ( CRF )
300 HARI KERJA
2,400.00 JAM
KODE
E. 341
Tahun
0.9 x
1,575,000.0 x
0.33271
------------------------------------------------------------------------------------------------------------= Rp.
600.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
1,575,000.00
=
0.033 x ----------------------------- = Rp.
600.00
SUB TOTAL A
= Rp.
BIAYA OPERASI ( OPERATION COST ) : (Rp./Jam)
Kebuuhan Bahan Bakar dan Pelumas tiap HP
Diesel
=
0,16 Liter / HP / Jam
Bensin
=
0,17 Liter / HP / Jam
Pelumas
=
0,006 Liter/HP / Jam
Harga Solar / Minyak
Diesel
=
Rp.
19,943.22
Bensin
=
Rp.
4,500.00
Pelumas
=
Rp.
22,000.00
Bahan Bakar
0.170 x
8.0
Pelumas
0.006 x
8.0
Perbaikan dan
0.600 x
786.03
Sparepart(60% x Depresiasi)
Harga Ban
----------------Ban
=
Umur Ban
SUB TOTAL B
/ Liter
/ Liter
/ Liter
x
x
0.33271
2 JAM KERJA
4,500.00 = Rp.
22,000.00 = Rp.
= Rp.
0.00
-------------------------= Rp.
2400.00
= Rp.
786.03
86.63
872.65
6,120.00
1,056.00
471.62
0.00
7,647.62
= Rp.
8,520.27 / Jam
Cilacap,.,.2005
CV. HANDAYANI
6 TAHUN
= (1 TAHUN =
=
FACTOR ( CRF )
300 HARI KERJA
9,000.00 JAM
1
x ----------------------------Tahun
0.9 x
105,696,000.0 x
0.24668
----------------------------------------------------------------------------------------------------------= Rp.
1,500.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
106,920,000.00
=
0.033 x ----------------------------- = Rp.
1,500.00
SUB TOTAL A
= Rp.
0.24668
5 JAM KERJA
/ Liter
/ Liter
/ Liter
x
x
15,643.85
2,352.24
17,996.09
19,943.22 = Rp.
22,000.00 = Rp.
= Rp.
255,273.22
10,560.00
9,386.31
1224000.00
-------------------------= Rp.
9000.00
136.00
SUB TOTAL B
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT
A + B = 17,996.09 +
275,355.53
= Rp.
= Rp.
275,355.53
293,351.62 / Jam
Cilacap,.,.2005
CV. HANDAYANI
6 TAHUN
= (1 TAHUN =
=
FACTOR ( CRF )
300 HARI KERJA
9,000.00 JAM
1
x ----------------------------Tahun
0.9 x
165,780,000.0 x
0.20483
----------------------------------------------------------------------------------------------------------= Rp.
1,500.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
167,280,000.00
=
0.033 x ----------------------------- = Rp.
1,500.00
SUB TOTAL A
= Rp.
0.20483
5 JAM KERJA
/ Liter
/ Liter
/ Liter
x
x
20,374.03
3,680.16
24,054.19
19,943.22 = Rp.
22,000.00 = Rp.
= Rp.
366,955.25
15,180.00
12,224.42
1500000.00
-------------------------= Rp.
9000.00
166.67
SUB TOTAL B
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT
A + B = 24,054.19 +
394,526.33
= Rp.
= Rp.
394,526.33
418,580.52 / Jam
Cilacap,.,.2005
CV. HANDAYANI
6 TAHUN
= (1 TAHUN =
=
FACTOR ( CRF )
300 HARI KERJA
4,500.00 JAM
0.24668
2.5 JAM KERJA
1
x ----------------------------Tahun
0.9 x
26,730,000.0 x
0.24668
----------------------------------------------------------------------------------------------------------= Rp.
750.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
26,730,000.00
=
0.033 x ----------------------------- = Rp.
750.00
SUB TOTAL A
= Rp.
BIAYA OPERASI ( OPERATION COST ) : (Rp./Jam)
Kebuuhan Bahan Bakar dan Pelumas tiap HP
Diesel
=
0,16 Liter / HP / Jam
Bensin
=
0,17 Liter / HP / Jam
Pelumas
=
0,006 Liter/HP / Jam
Harga Solar / Minyak
Diesel
=
Rp.
1,250.00
Bensin
=
Rp.
1,750.00
Pelumas
=
Rp.
17,500.00
Bahan Bakar
0.160 x
7
Pelumas
0.006 x
7
Perbaikan dan
0.600 x
7,912.51
Sparepart(60% x Depresiasi)
14.00
Harga Ban
----------------Ban
=
Umur Ban
/ Liter
/ Liter
/ Liter
x
x
7,912.51
1,176.12
9,088.63
1,250.00 = Rp.
17,500.00 = Rp.
= Rp.
1,400.00
735.00
4,747.50
0.00
-------------------------= Rp.
4500.00
SUB TOTAL B
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT
A+B=
9,088.63 +
6,882.50
= Rp.
= Rp.
6,882.50
15,971.13 / Jam
Cilacap,.,.2005
CV. HANDAYANI
6 TAHUN
= (1 TAHUN =
=
FACTOR ( CRF )
300 HARI KERJA
9,000.00 JAM
1
x ----------------------------Tahun
0.9 x
45,000,000.0 x
0.24668
----------------------------------------------------------------------------------------------------------= Rp.
1,500.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
45,000,000.00
=
0.033 x ----------------------------- = Rp.
1,500.00
SUB TOTAL A
= Rp.
0.24668
5 JAM KERJA
/ Liter
/ Liter
/ Liter
x
x
6,660.36
990.00
7,650.36
1,750.00 = Rp.
17,500.00 = Rp.
= Rp.
2,082.50
735.00
3,996.22
0.00
-------------------------= Rp.
9000.00
SUB TOTAL B
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT
A+B=
7,650.36 +
6,813.72
= Rp.
= Rp.
6,813.72
14,464.08 / Jam
Cilacap,.,.2005
CV. HANDAYANI
10 TAHUN
= (1 TAHUN =
=
FACTOR ( CRF )
300 HARI KERJA
15,000.00 JAM
1
x ----------------------------Tahun
0.9 x
442,200,000.0 x
0.18062
----------------------------------------------------------------------------------------------------------= Rp.
1,500.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
442,200,000.00
=
0.033 x ----------------------------- = Rp.
1,500.00
SUB TOTAL A
= Rp.
0.18062
5 JAM KERJA
/ Liter
/ Liter
/ Liter
x
x
47,922.10
9,728.40
57,650.50
1,250.00 = Rp.
17,500.00 = Rp.
= Rp.
19,000.00
9,975.00
28,753.26
0.00
-------------------------= Rp.
15000.00
SUB TOTAL B
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT
A + B = 57,650.50 +
57,728.26
= Rp.
= Rp.
57,728.26
115,378.76 / Jam
Cilacap,.,.2005
CV. HANDAYANI
10 TAHUN
= (1 TAHUN =
=
FACTOR ( CRF )
300 HARI KERJA
15,000.00 JAM
1
x ----------------------------Tahun
0.9 x
183,200,000.0 x
0.18062
----------------------------------------------------------------------------------------------------------= Rp.
1,500.00
Lain - Lain
x Harga
Asuransi 3 % + PPN 10 %
=
0.033 x ----------------------------Jam / Tahin
183,200,000.00
=
0.033 x ----------------------------- = Rp.
1,500.00
SUB TOTAL A
= Rp.
0.18062
5 JAM KERJA
/ Liter
/ Liter
/ Liter
x
x
19,853.75
4,030.40
23,884.15
1,250.00 = Rp.
17,500.00 = Rp.
= Rp.
10,200.00
5,355.00
11,912.25
0.00
-------------------------= Rp.
15000.00
SUB TOTAL B
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT
A + B = 23,884.15 +
27,467.25
= Rp.
= Rp.
27,467.25
51,351.40 / Jam
Cilacap,.,.2005
CV. HANDAYANI
DAFTAR
PEKERJAAN
LOKASI
VOLUME
HARGA
SATUAN
(Rp)
6
15.00
1.00
2.00
1.00
M2
Bh
Bh
Unit
Ls
Ls
Ls
Ls
125,000.00
750,000.00
135,000.00
250,000.00
1,875,000.00
750,000.00
270,000.00
250,000.00
3,145,000.00
3,250.00
174.60
286.25
6,882.00
118.00
M2
M3
M3
M2
M3
Ls
K.516
K.522
K.617
K.110
1,300.00
254,000.00
295,991.94
106,900.41
33,827.48
4,225,000.00
44,348,400.00
84,727,692.44
735,688,605.18
3,991,643.03
872,981,340.66
13.50
32.12
8.77
M3
M3
M3
K.224
K.810
K.011
21,600.00
536,275.71
38,755.00
291,600.00
17,225,175.74
339,881.35
17,856,657.09
1.00
Ls
525,000.00
525,000.00
URAIAN PEKERJAAN
VOLUME
1
2
3
4
PEKERJAAN PERSIAPAN
Direksi Keet 5 m x 3 m
Mobilisasi Alat
Papan Nama Proyek
Pengukuran Kembali
1
2
3
4
5
PEKERJAAN JALAN
Penyempurnaan Berm
Tambal Sulam LPB Telford
Tambal Sulam LPA Klas B
Labur Aspal Dua Lapis ( Burda )
Galian Saluran Parit
II.
VI.
ANA
LIS
SA
TU
AN
4
No.
I.
III.
PEKERJAAN TURAP
1 Galian Tanah
2 Pek. Pas. Batu Kali
3 Pek. Plesteran
DOKUMENTASI
1 Dokumentasi dan Uji Bahan
Bouwsom
PPN 10 %
Jumlah
Dibulatkan
JUMLAH
HARGA
(Rp)
7
894,507,997.75
89,450,799.77
983,958,797.52
210,000,000.00
H. SUDARSONO
Direktur
REKAPITULASI
DAFTAR
PEKERJAAN
LOKASI
VOLUME
No.
JUMLAH
HARGA
(Rp.)
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
3,145,000.00
II.
PEKERJAAN JALAN
872,981,340.66
III.
PEKERJAAN TURAP
17,856,657.09
IV.
DOKUMENTASI
525,000.00
Bouwsom
PPN 10 %
Jumlah
Dibulatkan
894,507,997.75
89,450,799.77
983,958,797.52
210,000,000.00
H. SUDARSONO
Direktur
22 (1)
3.1 (a)
3.14
3.2 (1)
3.2 (2)
5.1 (1)
5.1 (2)
6.1 (1)
6.3 (5)
7.1 (1)
7.2 (10/11)
7.1 (2)
7.3 (1)
7.8 (2)
7.10
7.11
8.4
8.4 (1)
8.13
8.14
SAT
2
3
BAB 1. UMUM
MOBILISASI :
- Mobilisasi
Ls
1.00
PEMELIHARAAN THD ARUS LALU-LINTAS
- Pengaturan Lalu-lintas
Ls
1.00
JUMLAH HARGA BAB 1.
BAB 2. DRAINASE
Pasangan Batu dengan Mortar
m3
39.60 536,275.71
JUMLAH HARGA BAB 2.
BAB 3. PEKERJAAN TANAH
Galian Tanah biasa
m3
443.25 21,600.00
Kisdam
Ls
1.00
Urugan Biasa
m3
72.74
Urugan Pilihan
m3
87.96
JUMLAH HARGA BAB 3.
BAB 4. BAHU JALAN
JUMLAH HARGA BAB 4.
BAB 5. PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas A
m3
37.68
Lapis Pondasi Agregat Kelas B
m3
75.62 295,991.94
JUMLAH HARGA BAB 5.
BAB 6. PEKERJAAN ASPAL
Lapis resap Pengikat
Lt
262.50
ATB
m2
210.00
JUMLAH HARGA BAB 6.
BAB 7. STRUKTUR
Beton Sturktur K - 275
m3
62.89
Pemancangan Tiang Pancang Dolken
m1
588.00
Diameter 10 - 15 cm
Beton Non Struktur K - 175
m3
24.00
Baja Tulangan U - 24
Kg
9678.80
Pasangan Batu dengan Mortar
m3
353.00 536,275.71
Pembongkaran Struktur
Ls
1.00
Pelindung Trotoar (Besi Siku L 50 mm )
m1
39.40
JUMLAH HARGA BAB 7.
BAB 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MONITOR
Marmer Nama Jembatan
Bh
2.00
Marka Jalan
m2
10.00
Pengecatan
m2
36.00
Railling
m1
50.00
JUMLAH HARGA BAB 8.
BAB 9. PEKERJAAN HARIAN
JUMLAH HARGA BAB 9.
BAB 10. PEMELIHARAAN RUTIN
JUMLAH HARGA BAB 10.
536,315.31
536,315.31
22043.25
22043.25
296067.5587
296067.5587
536628.71
536628.708
(A)
(B)
(C)
(D)