CHAPTER NO.

STONE MASONRY
DESCRIPTION OF ITEM NO 1:

Random, rubble masonry (uncoursed), in


foundation and plinth.
a) Dry Masonry

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Total
Contractor's Profit & Overheads
Total

20 Nos

300.00 Per % Cft

15.00 Each

300.00

300.00
600.00
120.00
720.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total

2.00 Nos
3.00 Nos

300.00 Per Day


140.00 Per Day

600.00
420.00
1,020.00
102.00
1,122.00

10.00 Percent

20.00 Percent

224.40
1,346.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

1,346.40
475.55

Say
Say

1,346.40
475.55

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

2,066.40
729.85

Say
Say

2,066.40
729.85

Page 1

Item No. 1

b)

In Mud Mortar

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
Total
Contractor's Profit & Overheads
Total

20 Nos
45 Cft

300.00 Per % Cft

300.00

15.00 Each
150.00 %Cft

300.00
67.50
667.50
133.50
801.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

2.50 Nos
3.50 Nos
0.25 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

750.00
490.00
40.00
1,280.00
128.00
1,408.00

10.00 Percent

20.00 Percent

281.60
1,689.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

1,689.60
596.77

Say
Say

1,689.60
596.75

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

2,490.60
879.68

Say
Say

2,490.60
879.70

Page 2

Item No. 1

c)

In Lime Mortar, Ratio (1 Lime 2 Sand).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

300.00 Per % Cft

300.00

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Lime Slaked (Ground)
Sand

20 Nos
224 Kg
30 Cft

15.00 Each
2.00 Per Kg.
350.00 Per %Cft

300.00
448.00
105.00

Total
Contractor's Profit & Overheads
Total

1,153.00
230.60
1,383.60

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.00 Nos
5.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,200.00
700.00
80.00
1,980.00
198.00
2,178.00

10.00 Percent

20.00 Percent

435.60
2,613.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,613.60
923.12

Say
Say

2,613.60
923.10

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

3,997.20
1,411.81

Say
Say

3,997.20
1,411.80

Page 3

Item No. 1

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

300.00

20 Nos
9 Bag
33.75 Cft

15.00 Each
230.00 P. Bag
350.00 Per %Cft

300.00
2,070.00
118.13
2,788.13
557.63
3,345.75

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.00 Nos
5.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,200.00
700.00
80.00
1,980.00
198.00
2,178.00

10.00 Percent

20.00 Percent

435.60
2,613.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,613.60
923.12

Say
Say

2,613.60
923.10

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,959.35
2,104.84

Say
Say

5,959.35
2,104.85

Page 4

Item No. 1

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

300.00 Per % Cft

300.00

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

20 Nos
7.20 Bag
36.0 Cft

15.00 Each
230.00 Each
350.00 Per % Cft

300.00
1,656.00
126.00

Total
Contractor's Profit & Overheads
Total

2,382.00
476.40
2,858.40

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.00 Nos
5.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,200.00
700.00
80.00
1,980.00
198.00
2,178.00

10.00 Percent

20.00 Percent

435.60
2,613.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,613.60
923.12

Say
Say

2,613.60
923.10

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,472.00
1,932.71

Say
Say

5,472.00
1,932.70

Page 5

Item No. 1

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

20 Nos
5.14 Bag
38.57 Cft

15.00 Each
230.00 Each
350.00 Per%Cft

300.00

300.00
1,182.20
135.00
1,917.20
383.44
2,300.63

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.00 Nos
5.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,200.00
700.00
80.00
1,980.00
198.00
2,178.00

10.00 Percent

20.00 Percent

435.60
2,613.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,613.60
923.12

Say
Say

2,613.60
923.10

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

4,914.23
1,735.71

Say
Say

4,914.25
1,735.70

Page 6

Item No. 1

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

20 Nos
4 Bag
40 Cft

300.00 Per % Cft

300.00

15.00 Each
230.00 Each
350.00 Per%Cft

300.00
920.00
140.00
1,660.00
332.00
1,992.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.00 Nos
5.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,200.00
700.00
80.00
1,980.00
198.00
2,178.00

10.00 Percent

20.00 Percent

435.60
2,613.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,613.60
923.12

Say
Say

2,613.60
923.10

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

4,605.60
1,626.70

Say
Say

4,605.60
1,626.70

Page 7

DESCRIPTION OF ITEM NO 2:

Coursed Rubble Masonry hammer dressed,


foundation and plinth.
a)

Dry Masonry

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Total
Contractor's Profit & Overheads
Total

20 Nos

300.00 Per % Cft

15.00 Each

300.00

300.00
600.00
120.00
720.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total

3.00 Nos
3.00 Nos

300.00 Per Day


140.00 Per Day

900.00
420.00
1,320.00
132.00
1,452.00

10.00 Percent

20.00 Percent

290.40
1,742.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

1,742.40
615.42

Say
Say

1,742.40
615.40

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

2,462.40
869.72

Say
Say

2,462.40
869.70

Page 8

Item No. 2

b)

In Mud Mortar

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
Total
Contractor's Profit & Overheads
Total

20 Nos
45 Cft

300.00 Per % Cft

300.00

15.00 Each
150.00 Per% Cft

300.00
67.50
667.50
133.50
801.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.00 Nos
4.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,200.00
560.00
80.00
1,840.00
184.00
2,024.00

10.00 Percent

20.00 Percent

404.80
2,428.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,428.80
857.85

Say
Say

2,428.80
857.85

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

3,229.80
1,140.77

Say
Say

3,229.80
1,140.75

Page 9

Item No. 2

c)

In Lime Sand Mortar. (Ratio 1:2)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Through Stone or headers


Lime Slaked (Ground)
Sand
Total
Contractor's Profit & Overheads
Total

20 Nos
5.33/ 199 Kg
26.67 Cft

300.00 Per % Cft

300.00

15.00 Each
2.00 Per Per Kg.
350.00 Per%Cft

300.00
398.00
93.35
1,091.35
218.27
1,309.61

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.75 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,425.00
700.00
120.00
2,245.00
224.50
2,469.50

10.00 Percent

20.00 Percent

493.90
2,963.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,963.40
1,046.67

Say
Say

2,963.40
1,046.65

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

4,273.01
1,509.22

Say
Say

4,273.00
1,509.20

Page 10

Item No. 2

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

35 Nos
8 Bag
30 Cft

300.00 Per % Cft

15.00 Each
230.00 Each
350.00 Per%Cft

300.00

525.00
1,840.00
105.00
2,770.00
554.00
3,324.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.75 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,425.00
700.00
120.00
2,245.00
224.50
2,469.50

10.00 Percent

20.00 Percent

493.90
2,963.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,963.40
1,046.67

Say
Say

2,963.40
1,046.65

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

6,287.40
2,220.71

Say
Say

6,287.40
2,220.70

Page 11

Item No. 2

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone including wastage

100 Cft

300.00 Per % Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(450x200x250mm) 35 Nos.
Cement
Sand

35 Nos
6.40 Bag
32 Cft

15.00 Each
230.00 Each
350.00 Per%Cft

Total
Contractor's Profit & Overheads
Total

300.00

525.00
1,472.00
112.00
2,409.00
481.80
2,890.80

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.75 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,425.00
700.00
120.00
2,245.00
224.50
2,469.50

10.00 Percent

20.00 Percent

493.90
2,963.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,963.40
1,046.68

Say
Say

2,963.40
1,046.70

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,854.20
2,067.70

Say
Say

5,854.20
2,067.70

Page 12

Item No. 2

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(450x200x250mm) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

35 Nos
4.57 Bag
34.20 Cft

15.00 Each
230.00 Each
350.00 Per%Cft

300.00

525.00
1,051.10
119.70
1,995.80
399.16
2,394.96

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.75 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,425.00
700.00
120.00
2,245.00
224.50
2,469.50

10.00 Percent

20.00 Percent

493.90
2,963.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,963.40
1,046.67

Say
Say

2,963.40
1,046.65

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,358.36
1,892.57

Say
Say

5,358.35
1,892.55

Page 13

Item No. 2

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

300.00

35 Nos
3.56 Bag
35.60 Cft

15.00 Each
230.00 Each
350.00 Per%Cft

525.00
818.80
124.60
1,768.40
353.68
2,122.08

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.75 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,425.00
700.00
120.00
2,245.00
224.50
2,469.50

10.00 Percent

20.00 Percent

493.90
2,963.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,963.40
1,046.67

Say
Say

2,963.40
1,046.65

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,085.48
1,796.19

Say
Say

5,085.50
1,796.20

Page 14

DESCRIPTION OF ITEM NO 3:

Random Rubble Masonry (uncoursed) in ground


floor or 20'(6 M) height,building/other than building.
a)

Dry Masonry

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Total
Contractor's Profit & Overheads
Total

20 Nos

300.00 Per % Cft

15.00 Each

300.00

300.00
600.00
120.00
720.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total

2.50 Nos
3.00 Nos

300.00 Per Day


140.00 Per Day

750.00
420.00
1,170.00
117.00
1,287.00

10.00 Percent

20.00 Percent

257.40
1,544.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

1,544.40
545.48

Say
Say

1,544.40
545.50

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

2,264.40
799.79

Say
Say

2,264.40
799.80

Page 15

Item No. 3

b)

In Mud Mortar

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
Total
Contractor's Profit & Overheads
Total

20 Nos
45 Cft

300.00 Per % Cft

300.00

15.00 Each
150.00 Per % Cft

300.00
67.50
667.50
133.50
801.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

3.00 Nos
4.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

900.00
560.00
80.00
1,540.00
154.00
1,694.00

10.00 Percent

20.00 Percent

338.80
2,032.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,032.80
717.99

Say
Say

2,032.80
718.00

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

2,833.80
1,000.90

Say
Say

2,833.80
1,000.90

Page 16

Item No. 3

c)

In Lime Sand Mortar. (Ratio 1:2)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

300.00 Per % Cft

300.00

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Lime Slaked (Ground)
Sand

20 Nos
224 Kg
30 Cft

15.00 Each
2.00 Per Per Kg.
350.00 Per % Cft

300.00
448.00
105.00

Total
Contractor's Profit & Overheads
Total

1,153.00
230.60
1,383.60

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.50 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,350.00
700.00
120.00
2,170.00
217.00
2,387.00

10.00 Percent

20.00 Percent

477.40
2,864.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,864.40
1,011.71

Say
Say

2,864.40
1,011.70

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

4,248.00
1,500.39

Say
Say

4,248.00
1,500.40

Page 17

Item No. 3

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

300.00

20 Nos
9 Bag
33.75 Cft

15.00 Each
230.00 Each
350.00 Per % Cft

300.00
2,070.00
118.13
2,788.13
557.63
3,345.75

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.50 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,350.00
700.00
120.00
2,170.00
217.00
2,387.00

10.00 Percent

20.00 Percent

477.40
2,864.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,864.40
1,011.71

Say
Say

2,864.40
1,011.70

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

6,210.15
2,193.42

Say
Say

6,210.15
2,193.45

Page 18

Item No. 3

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

300.00 Per % Cft

300.00

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

20 Nos
7.2 Bag
36 Cft

15.00 Each
230.00 Each
350.00 Per % Cft

300.00
1,656.00
126.00

Total
Contractor's Profit & Overheads
Total

2,382.00
476.40
2,858.40

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.50 Nos
5 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,350.00
700.00
120.00
2,170.00
217.00
2,387.00

10.00 Percent

20.00 Percent

477.40
2,864.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,864.40
1,011.71

Say
Say

2,864.40
1,011.70

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,722.80
2,021.29

Say
Say

5,722.80
2,021.30

Page 19

Item No. 3

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100.00 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

20 Nos
5.14 Bag
38.57 Cft

300.00 Per % Cft

300.00

15.00 Each
230.00 Each
350.00 Per % Cft

300.00
1,182.20
135.00
1,917.20
383.44
2,300.63

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.50 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,350.00
700.00
120.00
2,170.00
217.00
2,387.00

10.00 Percent

20.00 Percent

477.40
2,864.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,864.40
1,011.71

Say
Say

2,864.40
1,011.70

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,165.04
1,824.29

Say
Say

5,165.05
1,824.30

Page 20

Item No. 3

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250) 20 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

20 Nos
4 Bag
40 Cft

300.00 Per % Cft

300.00

15.00 Each
230.00 Each
350.00 Per % Cft

300.00
920.00
140.00
1,660.00
332.00
1,992.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

4.50 Nos
5.00 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,350.00
700.00
120.00
2,170.00
217.00
2,387.00

10.00 Percent

20.00 Percent

477.40
2,864.40

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,864.40
1,011.71

Say
Say

2,864.40
1,011.70

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

4,856.40
1,715.28

Say
Say

4,856.40
1,715.30

Page 21

DESCRIPTION OF ITEM NO 4:

Coursed Rubble Masonry hammer dressed in


ground floor or 20' (6 M) height, building other
than building.
a)

Dry Masonry

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Total
Contractor's Profit & Overheads
Total

20 Nos

300.00 Per % Cft

15.00 Each

300.00

300.00
600.00
120.00
720.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total

3.50 Nos
3.50 Nos

300.00 Per Day


140.00 Per Day

1,050.00
490.00
1,540.00
154.00
1,694.00

10.00 Percent

20.00 Percent

338.80
2,032.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

2,032.80
717.99

Say
Say

2,032.80
718.00

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

2,752.80
972.29

Say
Say

2,752.80
972.30

Page 22

Item No. 4

b)

In Mud Mortar

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 30x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
Total
Contractor's Profit & Overheads
Total

20 Nos
43 Cft

300.00 Per % Cft

300.00

15.00 Each
150.00 Per % Cft

300.00
64.50
664.50
132.90
797.40

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

5.00 Nos
5.00 Nos
0.50 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,500.00
700.00
80.00
2,280.00
228.00
2,508.00

10.00 Percent

20.00 Percent

501.60
3,009.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

3,009.60
1,063.00

Say
Say

3,009.60
1,063.00

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

3,807.00
1,344.63

Say
Say

3,807.00
1,344.65

Page 23

Item No. 4

c)

In Lime Sand Mortar. (Ratio 1:2)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone including wastage

100 Cft

Through Stone or headers


Lime Slaked (Ground)
Sand
Total
Contractor's Profit & Overheads
Total

20 Nos
5.33 Mds(19 9)Kg
26.67 Cft

300.00 Per % Cft

300.00

15.00 Each
2.00 Per Per Kg.
350.00 Per % Cft

300.00
398.00
93.35
1,091.35
218.27
1,309.61

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

5.50 Nos
5.50 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,650.00
770.00
120.00
2,540.00
254.00
2,794.00

10.00 Percent

20.00 Percent

558.80
3,352.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

3,352.80
1,184.21

Say
Say

3,352.80
1,184.20

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

4,662.42
1,646.76

Say
Say

4,662.40
1,646.75

Page 24

Item No. 4

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

35 Nos
8 Bag
30 Cft

300.00 Per % Cft

300.00

15.00 Each
230.00 Each
350.00 Per % Cft

525.00
1,840.00
105.00
2,770.00
554.00
3,324.00

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

5.50 Nos
5.50 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,650.00
770.00
120.00
2,540.00
254.00
2,794.00

10.00 Percent

20.00 Percent

558.80
3,352.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

3,352.80
1,184.21

Say
Say

3,352.80
1,184.20

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

6,676.80
2,358.25

Say
Say

6,676.80
2,358.25

Page 25

Item No. 4

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

35 Nos
6 Bag
32 Cft

300.00 Per % Cft

300.00

15.00 Each
230.00 Each
350.00 Per % Cft

525.00
1,472.00
112.00
2,409.00
481.80
2,890.80

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

5.50 Nos
5.50 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,650.00
770.00
120.00
2,540.00
254.00
2,794.00

10.00 Percent

20.00 Percent

558.80
3,352.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

3,352.80
1,184.21

Say
Say

3,352.80
1,184.20

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

6,243.60
2,205.24

Say
Say

6,243.60
2,205.25

Page 26

Item No. 4

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

300.00

35 Nos
4.57 Bag
34.20 Cft

15.00 Each
230.00 Each
350.00 Per % Cft

525.00
1,051.10
119.70
1,995.80
399.16
2,394.96

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

5.50 Nos
5.50 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,650.00
770.00
120.00
2,540.00
254.00
2,794.00

10.00 Percent

20.00 Percent

558.80
3,352.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

3,352.80
1,184.21

Say
Say

3,352.80
1,184.20

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,747.76
2,030.11

Say
Say

5,747.75
2,030.10

Page 27

Item No. 4

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
Total
Contractor's Profit & Overheads
Total

100 Cft

300.00 Per % Cft

300.00

35 Nos
3.56 Bag
35.60 Cft

15.00 Each
230.00 Each
350.00 Per % Cft

525.00
818.80
124.60
1,768.40
353.68
2,122.08

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Overheads
Total

5.50 Nos
5.50 Nos
0.75 No

300.00 Per Day


140.00 Per Day
160.00 Per Day

1,650.00
770.00
120.00
2,540.00
254.00
2,794.00

10.00 Percent

20.00 Percent

558.80
3,352.80

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

3,352.80
1,184.21

Say
Say

3,352.80
1,184.20

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

5,474.88
1,933.73

Say
Say

5,474.90
1,933.75

Page 28

DESCRIPTION OF ITEM NO 5:

Ashlar block in course or scabbled masonry


(including dressing etc.) in ground floor or 20'
(6 M) height, Building other than building.
In Lime Sand. (Ratio 1:2)

a)
Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

200
4Md (149.30
20
30Lb (13.61
3.3Lb (1.50

Cft
Kg)
Cft
Kg)
Kg)

300.00
2.00
3.50
4.00
17.00

Per % Cft
Per Kg.
Cft
Per Kg.
Per Kg.

600.00
298.60
70.00
54.44
25.50
1,048.54
209.71
1,258.25

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

5,100.00
1,400.00
160.00
170.00
75.00
6,905.00
690.50
7,595.50

10.00 Percent

20.00 Percent

1,519.10
9,114.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

9,114.60
3,219.28

Say
Say

9,114.60
3,219.30

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

10,372.85
3,663.68

Say
Say

10,372.85
3,663.70

Page 29

Item No. 5

b)
i)

In Cement Sand Mortar


Ratio ( 1:3 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

200
6
22.50
30Lb (13.61
3.3Lb (1.50

Cft
Bag
Cft
Kg)
Kg)

300.00
230.00
3.50
4.00
17.00

Per % Cft
Each
Cft
Per Kg.
Per Kg.

600.00
1,380.00
78.75
54.44
25.50
2,138.69
427.74
2,566.43

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

5,100.00
1,400.00
160.00
170.00
75.00
6,905.00
690.50
7,595.50

10.00 Percent

20.00 Percent

1,519.10
9,114.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

9,114.60
3,219.28

Say
Say

9,114.60
3,219.30

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

11,681.03
4,125.75

Say
Say

11,681.05
4,125.75

Page 30

Item No. 5

b)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

200
4.80
24
30Lb (13.61
3.3Lb (1.50

Cft
Bag
Cft
Kg)
Kg)

300.00
230.00
350.00
4.00
17.00

Per % Cft
Each
% Cft
Per Per Kg.
Per Per Kg.

600.00
1,104.00
84.00
54.44
25.50
1,867.94
373.59
2,241.53

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

5,100.00
1,400.00
160.00
170.00
75.00
6,905.00
690.50
7,595.50

10.00 Percent

20.00 Percent

1,519.10
9,114.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

9,114.60
3,219.28

Say
Say

9,114.60
3,219.30

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

11,356.13
4,010.98

Say
Say

11,356.15
4,011.00

Page 31

Item No. 5

b)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

200
3.44
25.70
30Lb (13.61
3.3Lb (1.50

Cft
Bag
Cft
Kg)
Kg)

300.00
230.00
3.50
4.00
17.00

Per % Cft
Each
Cft
Per Per Kg.
Per Per Kg.

600.00
791.20
89.95
54.44
25.50
1,561.09
312.22
1,873.31

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

5,100.00
1,400.00
160.00
170.00
75.00
6,905.00
690.50
7,595.50

10.00 Percent

20.00 Percent

1,519.10
9,114.60

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

9,114.60
3,219.28

Say
Say

9,114.60
3,219.30

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

10,987.91
3,880.93

Say
Say

10,987.90
3,880.95

Page 32

DESCRIPTION OF ITEM NO 6:

Ashlar fine masonry (including dressing etc.) in


ground floor or 20' (6 M) height, Building other
than building.
In Lime Sand Mortar. (Ratio 1:2)

a)
Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

250 Cft
2Md (74.65 Kg)
10 Cft
0.73Md(27.2 5)Kg
4Lb (1.82 Kg)

300.00
2.00
3.50
4.00
17.00

Per % Cft
Per Per Kg.
Cft
Per Per Kg.
Per Per Kg.

750.00
149.30
35.00
109.00
30.94
1,074.24
214.85
1,289.09

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

12,000.00
1,120.00
160.00
255.00
112.50
13,647.50
1,364.75
15,012.25

10.00 Percent

20.00 Percent

3,002.45
18,014.70

Labour Rate Per 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

18,014.70
6,362.79

Say
Say

18,014.70
6,362.80

Composite Rate Per 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

19,303.79
6,818.10

Say
Say

19,303.80
6,818.10

Page 33

Item No. 6

b)
i)

In Cement Sand Mortar


Ratio ( 1:3 )

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

250
3
11.25
0.73Md (27.25
4Lb (1.82

Cft
Bag
Cft
Kg)
Kg)

300.00
230.00
3.50
4.00
17.00

Per % Cft
Each
Per % Cft
Per Per Kg.
Per Per Kg.

750.00
690.00
39.38
109.00
30.94
1,619.32
323.86
1,943.18

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

12,000.00
1,120.00
160.00
255.00
112.50
13,647.50
1,364.75
15,012.25

10.00 Percent

20.00 Percent

3,002.45
18,014.70

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

18,014.70
6,362.79

Say
Say

18,014.70
6,362.80

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

19,957.89
7,049.13

Say
Say

19,957.90
7,049.15

Page 34

Item No. 6

b)
ii)

In Cement Sand Mortar


Ratio 1:4

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

250
2.40
12
60Lb (27.22
4Lb (1.82

Cft
Bag
Cft
Kg)
Kg)

300.00
230.00
3.50
4.00
17.00

Per % Cft
Each
Per % Cft
Per Per Kg.
Per Per Kg.

750.00
552.00
42.00
108.88
30.94
1,483.82
296.76
1,780.58

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

12,000.00
1,120.00
160.00
255.00
112.50
13,647.50
1,364.75
15,012.25

10.00 Percent

20.00 Percent

3,002.45
18,014.70

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

18,014.70
6,362.79

Say
Say

18,014.70
6,362.80

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

19,795.28
6,991.69

Say
Say

19,795.30
6,991.70

Page 35

Item No. 6

b)
iii)

In Cement Sand Mortar


Ratio 1:6

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Overheads
Total

250
1.73
13
60Lb (27.22
4Lb (1.82

Cft
Bag
Cft
Kg)
Kg)

300.00
230.00
350.00
4.00
17.00

Per % Cft
Each
Per % Cft
Per Per Kg.
Per Per Kg.

750.00
397.90
45.50
108.88
30.94
1,333.22
266.64
1,599.86

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

300.00
140.00
160.00
170.00
75.00

Per Day
Per Day
Per Day
Per Day
Per Day

12,000.00
1,120.00
160.00
255.00
112.50
13,647.50
1,364.75
15,012.25

10.00 Percent

20.00 Percent

3,002.45
18,014.70

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

18,014.70
6,362.79

Say
Say

18,014.70
6,362.80

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

19,614.56
6,927.87

Say
Say

19,614.55
6,927.85

Page 36

DESCRIPTION OF ITEM NO 7:

Extra labour on items 3,4,5 and 6 for work in.


i)

First Floor

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total

0.40 No
1.35 No

300.00 Per Day


140.00 Per Day

120.00
189.00
309.00
30.90
339.90

10.00 Percent

20.00 Percent

67.98
407.88

Labour Rate for 100 Cft

Rs.

326.31

Say

326.30

Labour Rate P/ Cum

Rs.

115.25

Say

115.25

Page 37

Item No. 7

ii)

Second Floor

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 125 Cft.
Rate for 100 Cft.

1.20 No
2.60 Nos

300.00 Per Day


140.00 Per Day

360.00
364.00
724.00
72.40
796.40

10.00 Percent

20.00 Percent

159.28
955.68
764.54

Labour Rate for 100 Cft

Rs.

764.54

Say

764.55

Labour Rate P/ Cum

Rs.

270.04

Say

270.05

Page 38

Item No. 7

iii)

Third Floor

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies

2 Nos
3.90 Nos

Total
Sundries
Total

300.00 Per Day


140.00 Per Day

600.00
546.00
1,146.00
114.60
1,260.60

10.00 Percent

Contractor's Profit & Overheads


Total for 125 Cft.
Rate for 100 Cft.

20.00 Percent

252.12
1,512.72
1,210.18

Labour Rate for 100 Cft

Rs.

1,210.18

Say

1,210.20

Labour Rate P/ Cum

Rs.

427.43

Say

427.45

Item No. 7

iv)

Fourth Floor
Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 125 Cft.
Rate for 100 Cft.

3.60 Nos
5.60 Nos

300.00 Per Day


140.00 Per Day

1,080.00
784.00
1,864.00
186.40
2,050.40

10.00 Percent

20.00 Percent

410.08
2,460.48
1,968.38

Labour Rate for 100 Cft

Rs.

1,968.38

Say

1,968.40

Labour Rate P/ Cum

Rs.

695.23

Say

695.25

Page 39

DESCRIPTION OF ITEM NO 8:

Extra labour on items 3,4,5 and 6 above for every


5ft (1.5 M) additional height building other than
building part thereof.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Totalfor 125 Cft.
Rate for 100 Cft.

0.50 No
1 No

300.00 Per Day


140.00 Per Day

150.00
140.00
290.00
29.00
319.00

10.00 Percent

20.00 Percent

63.80
382.80
306.24

Labour Rate for 100 Cft

Rs.

306.24

Say

306.25

Labour Rate P/ Cum

Rs.

108.16

Say

108.15

Page 40

DESCRIPTION OF ITEM NO 9:

Extra labour for arch work in stone masonry


including centering and de-centering, etc.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

250.00 Per Cft


150.00 % Cft

15.00
3.00

Material
Semi circular opening 15'x1.5'x1.5' = 33.8 Cft
Kikar wood = 3.75 Cft to be used for
60 times 3.75/60 = 0.06 Cft
Earth

Contractor's Profit & Overheads


Total for 33.8 Cft
Total for 100 Cft

0.06 Cft
2.00 Cft

18.00
3.60
21.60
63.91

20.00 Percent
19.8 x 100
33.8

Labour
Mason
Unskilled Coolies
Total
Sundries
Total
Contractor's Profit & Overheads
Total
Total (i+ii)

1.50 Nos
1.50 Nos

300.00 Per Day


140.00 Per Day

450.00
210.00
660.00
66.00
726.00

10.00 Percent

20.00 Percent

145.20
871.20
935.12

Labour Rate for 100 Cft

Rs.

935.12

Say

935.10

Labour Rate P/ Cum

Rs.

330.28

Say

330.30

Page 41

DESCRIPTION OF ITEM NO 10:

Extra labour for :a)

Coping and caps etc

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material for 125 Cft.


Stone 12" (300mm) and above
Steel
Charcoal
Total
Contractor's Profit & Overheads
Total

30 Cft
0.75Lb (0.34 Kg)
10Lb (4.54 Kg)

300.00 Per % Cft


17.00 Per Kg.
4.00 Per Kg.

90.00
5.78
18.16
113.94
22.79
136.73

20.00 Percent

Labour
Mason
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 125 Cft.
Rate for 100 Cft.

18.00 Nos

300.00 Per Day

5,400.00
5,400.00
540.00
5,940.00

10.00 Percent

20.00 Percent

1,188.00
7,128.00
5,702.40

Extra Rate Per 100 Cft

Rs.

5,702.40

Say

5,702.40

Extra Rate P/ Cum

Rs.

2,014.09

Say

2,014.10

Page 42

Item No. 10

b)

Cornice and string course

Detail

Unit Rate (British System) per 100 Rft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Rft


Mason
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 125 Rft
Rate for 100 Rft

18 Nos

300.00 Per Day

5,400.00
5,400.00
540.00
5,940.00

10.00 Percent

20.00 Percent

1,188.00
7,128.00
5,702.40

Labour Rate for 100 Rft

Rs.

5,702.40

Say

5,702.40

Labour Rate P/ LM.

Rs.

187.04

Say

187.05

Page 43

DESCRIPTION OF ITEM NO 11:

Dressing Stones
a)

Hammer Dressed

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies

5 Nos
2.50 Nos

Total
Sundries
Total

300.00 Per Day


140.00 Per Day

1,500.00
350.00
1,850.00
185.00
2,035.00

10.00 Percent

Contractor's Profit & Overheads


Total for 125 Sft
Rate for 100 Sft.

20.00 Percent

407.00
2,442.00
1,953.60

Labour Rate for 100 Sft

Rs.

1,953.60

Say

1,953.60

Labour Rate P/ Sq.m

Rs.

210.21

Say

210.20

Item No. 11

b)

Rough tooled dressed

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies

10 Nos
4 Nos

Total
Sundries
Total

300.00 Per Day


140.00 Per Day

3,000.00
560.00
3,560.00
356.00
3,916.00

10.00 Percent

Contractor's Profit & Overheads


Total for 125 Sft
Rate for 100 Sft

20.00 Percent

783.20
4,699.20
3,759.36

Labour Rate for 100 Sft

Rs.

3,759.36

Say

3,759.35

Labour Rate P/ Sq.m

Rs.

404.51

Say

404.50

Item No. 11

c)

Chisel dressed
Page 44

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies

12 Nos
5 Nos

Total
Sundries
Total

300.00 Per Day


140.00 Per Day

3,600.00
700.00
4,300.00
430.00
4,730.00

10.00 Percent

Contractor's Profit & Overheads


Total for 125 Sft
Rate for 100 Sft

20.00 Percent

946.00
5,676.00
4,540.80

Labour Rate for 100 Sft

Rs.

4,540.80

Say

4,540.80

Labour Rate P/ Sq.m

Rs.

488.59

Say

488.60

Item No. 11

d)

Fine dressed

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 125 Sft
Rate for 100 Sft

28 Nos
5 Nos
1 No

300.00 Per Day


140.00 Per Day
170.00 Per Day

8,400.00
700.00
170.00
9,270.00
927.00
10,197.00

10.00 Percent

20.00 Percent

2,039.40
12,236.40
9,789.12

Labour Rate for 100 Sft

Rs.

9,789.12

Say

9,789.10

Labour Rate P/ Sq.m

Rs.

1,053.31

Say

1,053.30

DESCRIPTION OF ITEM NO 12:

Dhajji walling 5"x5" (125x125mm) thick


deodar framing with stone laid in 1:6 cement
sand mortar and (1:4) cement sand plaster on
both sides.
Page 45

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Rate Analysis for 234 Sft


a)

b)

Detail of Wood
i) Top bottom
2x18'x5x5 = 6.25 Cft
12x12
ii) Vertical post 4" (100mm) apart
6x13'x5/12x5/12 = 13.55 Cft
iii) Horizontal Pieces
3x18'x5/12x = 5.62 Cft
iv) Diagonl Strutts
20x6x5/12x1/6 = 6.25 Cft
31.67 Cft
Wastage 20% =
6.33
38.00 Cft
This wood can be used 10 time hence
wood for our operation would be = 38/10

3.80 Cft

Stone (Quarried)
1x18x13x5/12
= 98.00 Cft
Deduct Scantling = 32.00 Cft
66.00 Cft
Therefore stone required = 66 x 2

112 Cft

Material
Wood as above 2nd Class
Spikes " (20mm)
Wire nail 4" (100mm)
Wood preservative
Stone quarried
Cement for 1:6 ratio for laying
Cement for plastering " thick both
side (1:4)

3.80
0.333
0.333
0.304
112.00
3.00

Cft
Kg.
Kg.
Ltr
Cft
Bag

3.40 Bag

Page 46

300.00
30.00
45.00
625.00
300.00
230.00

Cft
Per Kg.
Per Kg.
Per Litre
Per % Cft
Per Bag

230.00 Per Bag

1,140.00
9.99
14.99
190.00
336.00
690.00
782.00

Item No. 12
Detail

Unit Rate (British System) per 100 Sft


Qty

Sand
Steel
Coal
Total
Contractor's Profit & Overheads
Total

40 Cft
3Lb (1.36 Kg)
0.5Md (18.66 Kg)

Rate
Per Unit (Rs)

Amount (Rs)

350.00 % Cft
17.00 Per Kg.
4.00 Per Kg.

140.00
23.12
74.64
3,400.74
680.15
4,080.88

20.00 Percent

Labour
Carpenters for wood work
UnsKilled Coolies
Masons for dressing of stones including
laying
Unskilled Coolies for laying
Masson for plaster
Unskilled Coolies
Blacksmith
Bellow-man
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 234 Sft
Rate for 100 Sft

4.00 Nos
2.00 Nos
10.00
5.00
3.00
3.00
0.50
0.50

Nos
Nos
Nos
Nos
No
No

300.00 Per Day


140.00 Per Day

1,200.00
280.00

300.00
140.00
300.00
140.00
170.00
75.00

3,000.00
700.00
900.00
420.00
85.00
37.50

Per Day
Per Day
Per Day
Per Day
Per Day
Per Day

6,622.50
662.25
7,284.75

10.00 Percent

20.00 Percent

1,456.95
8,741.70
3,735.77

Labour Rate for 100 Sft


Labour Rate P/ Sqm

Rs.
Rs.

3,735.77
401.97

Say
Say

3,735.75
401.95

Composite Rate for 100 Sft


Composite Rate P/ Sqm

Rs.
Rs.

5,479.74
589.62

Say
Say

5,479.75
589.60

Page 47

DESCRIPTION OF ITEM NO 13:

Providing and fixing stone blocks from 2 Cft to 6


Cft (0.06 to 017 M) each, including lift upto
20' (6 M).

Detail

Unit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

70.00 Each
230.00 Bag
350.00 % Cft

70.00
14.03
1.05

Rate Analysis for 4 Cft


Material
Hand dressed stone average 4 Cft
Cement
Sand
Total
Contractor's Profit & Overheads
Total

1
0.06
0.30

No
Bag
Cft.

85.08
17.02
102.10

20.00 Percent

Labour
Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total
Contractor's Profit & Overheads
Total for 4 Cft
Rate for Per Cft

0.25 No
2.00 Nos
0.12 No

300.00 Per Day


140.00 Per Day
170.00 Per Day

75.00
280.00
20.40
375.40
37.54
412.94

10.00 Percent

20.00 Percent

82.59
495.53
123.88

Labour Rate Per Cft


Labour Rate P/ Cum

Rs.
Rs.

123.88
4,375.43

Say
Say

123.90
4,375.45

Composite Rate Per Cft


Composite Rate P/ Cum

Rs.
Rs.

149.41
5,277.02

Say
Say

149.40
5,277.00

Page 48

DESCRIPTION OF ITEM NO 14:

Providing and fixing stone blocks under 2 Cft


(0.05 M) each, including lift upto 20 Cft (6 M).

Detail

Unit Rate (British System) per Cft


Qty

Material

Amount (Rs)

35.00 Each
230.00 Bag
350.00 % Cft

35.00
6.90
0.60

Rate Analysis for 2 Cft

Hand dressed stone average (2 Cft)


Cement
Sand
Total
Contractor's Profit & Overheads
Total
Labour

Rate
Per Unit (Rs)

1
0.03
0.17

No
Bag
Cft.

42.50
8.50
51.00
25.50

20.00 Percent
51.00
2.00

Rate Analysis for 1 Cft

Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total
Contractor's Profit & Overheads
Total

0.05 No
0.25 No
0.03 No

300.00 Per Day


140.00 Per Day
170.00 Per Day

15.00
35.00
5.10
55.10
5.51
60.61

10.00 Percent

20.00 Percent

12.12
72.73

Labour Rate Per Cft


Labour Rate P/ Cum

Rs.
Rs.

72.73
2,568.89

Say
Say

72.75
2,568.90

Composite Rate Per Cft


Composite Rate P/ Cum

Rs.
Rs.

98.23
3,469.62

Say
Say

98.25
3,469.65

Page 49

Page 50

Page 51

Page 52

Page 53

Page 54

Page 55

Page 56

Page 57

Page 58

Page 59

Page 60

Page 61

Page 62

Page 63

Page 64

Page 65

Page 66

Page 67

Page 68

Page 69

Page 70

Page 71

Page 72

Page 73

Page 74

Page 75

Page 76

Page 77

Page 78

Page 79

Page 80

Page 81

Page 82

Page 83

Page 84

Page 85

Page 86

Page 87

Page 88

Page 89

Page 90

Page 91

Page 92

Page 93

Page 94

Page 95

Page 96

Page 97

You might also like