PASIR URUG
TANAH URUG
SIRTU
BATU KALI
SEMEN
KORAL / KERIKIL
PASIR PASANG
BATU BATA
KAYU TERENTANG
KAYU BALOK
KAYU PAPAN LISPLANK 3 CM
DOLKEN
LIST PROFIL GYPSUM
PROFIL KAYU
BAJA PROFIL WF
BAJA PROFIL SIKU
BAJA C LIPS
BESI BETON
KAWAT PENGIKAT
SENG GELOMBANG
SENG PLAT
PLAYWOOD
GYPSUM
KALSIBOARD
PAKU SEKRUP / Gypsum
PAKU BIASA
PAKU TRIPLEKS
ATAP SPANDEK
NOK SPANDEK
TALANG SPANDEK
ATAP GENTENG METAL
NOK ATAP METAL
PAKU PACING
SEMEN NAT / SEMEN WARNA
SPACER
ALAT BANTU

SATUAN

HARGA UPAH/BAHAN

Org/Hari
Org/Hari
Org/Hari
Org/Hari

Rp.
Rp.
Rp.
Rp.

40,000.00
50,000.00
42,500.00
45,000.00

M3
M3
M3
M3
Kg
M3
M3
BH
M3
M3
M3
Btg
M'
M'
KG
KG
KG
KG
KG
LBR
LBR
LBR
LBR
LBR
KG
KG
KG
M2
M'
M'
LBR
LBR
BH
KG
BH
LS

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90,000.00
80,000.00
72,000.00
135,000.00
1,200.00
150,000.00
95,000.00
1,000.00
1,800,000.00
2,000,000.00
2,850,000.00
35,000.00
75,000.00
50,000.00
12,000.00
11,900.00
11,500.00
15,000.00
15,000.00
64,800.00
46,500.00
85,000.00
95,000.00
50,000.00
25,000.00
25,000.00
25,000.00
125,000.00
50,000.00
55,000.00
35,000.00
35,000.00
740.00
10,000.00
2,000.00
4,500.00

Halaman-2

NO.

NAMA UPAH / BAHAN

SATUAN

32
33
34
35
36
37
38
39
40
41
42
43
44
45
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78

KUNCI PINTU UTAMA


KUNCI PINTU
ENGSEL PINTU
ENGSEL JENDELA
KAIT ANGIN
GRENDEL
TARIKAN JENDELA
KACA RYBEN 10 MM
KACA RYBEN 6 MM
TEGEL KERAMIK ESSENZA 60 x 60 CM
TEGEL KERAMIK SUPER MILAN 40 x 40 CM
PLINT KERAMIK ESENZA 10 x 60 CM
TEGEL KERAMIK SUPER MILAN 20 x 20 CM
TEGEL KERAMIK SUPER MILAN 20 x 25 CM
TEGEL KERAMIK MOTIF SUPER MILAN 5 x 20 CM
BATU MARMER
CAT TEMBOK
CAT KAYU
CAT MENI KAYU
CAT MENI BESI
TEER
PLAMIR TEMBOK
KAPUR
AMPELAS / KERTAS PASIR
POLITUR
MINYAK CAT
LEM KAYU
SERBUK GYPSUM
LAMP. DOWNLIGHT PIJAR 20 WATT
LAMP. BARET 20 WATT
LAMPU TEMPEL PIJAR 25 WATT
LAMPU HIAS
LAMPU RM 2 x 40 WATT
LAMPU RM 1 x 40 WATT
SAKLAR TUNGGAL
SAKLAR GANDA
STOP KONTAK
STOP KONTAK AC + MCB
MCB
INSTALASI LISTRIK + KABEL
BOX SEKRING LENGKAP ( MDP )
STOP KONTAK/INSTALASI EXAUSFANT
KRAN AIR 1/2"
PERSELIN
PIPA PVC
KLOSED JONGKOK
KLOSED DUDUK MONO BLOK (STANDART)
PLOOR DRAIN

BH
BH
BH
BH
BH
BH
BH
M2
M2
BH
BH
BH
BH
BH
BH
M2
KG
KG
KG
KG
LTR
KG
KG
LBR
KG
KG
KG
KG
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
TTK
BH
BH
BH
BH
BTG
BH
BH
BH

HARGA UPAH/BAHAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

250,000.00
150,000.00
25,000.00
15,000.00
10,000.00
12,705.00
10,000.00
250,000.00
170,000.00
103,000.00
25,000.00
5,000.00
2,500.00
2,750.00
2,000.00
400,000.00
21,500.00
30,000.00
12,500.00
29,000.00
11,600.00
13,250.00
10,000.00
3,500.00
31,625.00
13,200.00
9,250.00
19,600.00
120,000.00
115,000.00
75,000.00
1,500,000.00
350,000.00
200,000.00
30,000.00
35,000.00
35,000.00
250,000.00
115,000.00
450,000.00
4,500,000.00
125,000.00
35,000.00
2,500.00
115,000.00
250,000.00
2,000,000.00
30,000.00

Halaman-3

NO.

NAMA UPAH / BAHAN

SATUAN

79
80
81
82
83
84
85
86
86
87
88
89
90
91
92
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127

WASTAPEL LENGKAP + KACA


URINOIR
INSTALASI AIR BERSIH
INSTALASI AIR KOTOR
SEPTIKTANK + PERESAPAN
REALLING STENLIS STEEL
REALLING KAYU HITAM (UKIR) tg=95
TIANG REALLING KAYU HITAM (Tg= 1m)
PINTU BESI
MAHKOTA BETON
PROFIL BETON PILAR
BAUT dia 14 mm
BAUT dia 16 mm
BAUT ANGKER dia 16 mm
BAUT ANGKER dia 19 mm
KAWAT ANGIN
MAHKOTA ATAP/ORNAMEN
PLAT BAJA tb. 10 mm
KAWAT GANTUNG
SPEED TEMBAGA + ACSESORIES
KABEL BRC
PIPA/PLAT PENAHAN
WATER TANK
TANGGA BESI
MOTOR DAP
INSTALASI AIR
SPRINKLER
INSTALASI SPRINKLER
KOSEN ALUMINIUM
RANGKA ALUMINIUM PINTU KACA
PINTU ALUMINIUM BERMOTIF (KACA GREIVER)
LEMARI BETON
POT BUNGA/TAMAN
SEALTIF/KARET
WASTAPEL STENLIS STEEL
ROOF GARDEN
RESERVOIR (ISI 20 M3)
ME/BATREI BACK UP PLN
AC SENTRAL
DUMP TRUCK
TANDEM ROLLER
ASPAL
FILLER
KAYU BAKAR
MOTOR GREDER
VIBRATOR ROLLER
WATER TANKER
RANGKA ATAP BAJA RINGAN
Pipa PVC 3"
PIPA PVC 4'
BAK CUCI PIRING STAINLISS STEEL
PINTU VIBER KM/WC

BH
BH
TTK
M'
BH
M'
M'
BH
M2
UNIT
BH
BH
BH
BH
BH
M'
SET
KG
LS
TTK
M'
TTK
BH
M'
BH
M'
BH
M'
M'
M'
SET
LS
LS
M'
BH
M2
LS
LS
LS
JAM
JAM
Kg
Kg
M3
JAM
JAM
JAM
M2
Bh
Bh
BH
SET

HARGA UPAH/BAHAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,300,000.00
750,000.00
500,000.00
95,000.00
4,500,000.00
550,000.00
650,000.00
225,000.00
550,000.00
450,000.00
550,000.00
7,500.00
16,000.00
24,500.00
27,500.00
25,000.00
475,000.00
12,400.00
1,500,000.00
250,000.00
130,000.00
75,000.00
2,250,000.00
350,000.00
6,000,000.00
115,000.00
275,000.00
175,000.00
135,000.00
110,000.00
850,000.00
4,000,000.00
1,000,000.00
15,000.00
625,000.00
40,000.00
15,000,000.00
350,000,000.00
750,000,000.00
250,000.00
300,000.00
7,700.00
300.00
351,550.00
300,000.00
280,000.00
300,000.00
350,000.00
63,600.00
125,200.00
227,400.00
450,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:

KONSTRUKSI RUMAH TINGGAL


PEMBANGUNAN RUMAH TINGGAL
KELURAHAN LAGARUTU

2011
Halaman-1

NO.
1

URAIAN ANALISA PEKERJAAN

HARGA SATUAN

1 M' PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK


BAHAN
0.012
M3
Kayu 5/7
Rp.
1,800,000.00
0.020
Kg
Paku
Rp.
25,000.00
0.007
M3
Kayu Papan
Rp.
1,800,000.00
TENAGA
0.100 Org/Hr. Pekerja
Rp.
40,000.00
0.100 Org/Hr. Tukang Batu
Rp.
42,500.00
0.010 Org/Hr. Kepala Tukang
Rp.
45,000.00
0.005 Org/Hr. Mandor
Rp.
50,000.00

1 M3 PEK. GALIAN TANAH BIASA


TENAGA
0.625 Org/Hr. Pekerja
0.062 Org/Hr. Mandor
1 M3 PEK. URUGAN PASIR
BAHAN
1.2
M3
Pasir Urug
TENAGA
0.300 Org/Hr. Pekerja
0.010 Org/Hr. Mandor

Rp.
Rp.
Rp.

21,600.00
500.00
12,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

4,000.00
4,250.00
450.00
250.00
43,650.00

Rp.
Rp.

40,000.00 Rp.
50,000.00 Rp.
Rp.

25,000.00
3,100.00
28,100.00

Rp.

90,000.00 Rp.

108,000.00

Rp.
Rp.

40,000.00 Rp.
50,000.00 Rp.
Rp.

12,000.00
500.00
120,500.00

1 M MEMBERSIHKAN LAPANGAN DAN PERALATAN


TENAGA
0.1 Org/Hr Pekerja
Rp
0.05 Org/Hr Mandor
Rp
1 M3 PEK. URUGAN SIRTU
BAHAN
1.2
M3
Sirtu
TENAGA
0.25 Org/Hr. Pekerja
0.025 Org/Hr. Mandor

JUMLAH HARGA

40,000.00 Rp
50,000.00 Rp
Rp

4,000.00
2,500.00
6,500.00

Rp.

72,000.00 Rp.

86,400.00

Rp.
Rp.

40,000.00 Rp.
50,000.00 Rp.
Rp.

10,000.00
1,250.00
97,650.00

Halaman-2

NO.
6

10

URAIAN ANALISA PEKERJAAN


1 M3 PEK. URUGAN TANAH BAWAH LANTAI
M3
1.2
M3
Sirtu
Org/Hr.
0.25 Org/Hr. Pekerja
0.025 Org/Hr. Mandor
1 M3 PEK. URUGAN TANAH BEKAS GALIAN
TENAGA
0.192 Org/Hr. Pekerja
0.019 Org/Hr. Mandor

1 M3 PEK. PASANG PONDASI BATU KOSONG


BAHAN
1.2
Bh
Batu Kali
0.3
M3
Pasir Urug
TENAGA
0.780 Org/Hr. Pekerja
0.390 Org/Hr. Tukang Batu
0.039 Org/Hr. Kepala Tukang
0.039 Org/Hr. Mandor

HARGA SATUAN

Rp.

80,000.00 Rp.

96,000.00

Rp.
Rp.

40,000.00 Rp.
50,000.00 Rp.
Rp.

10,000.00
1,250.00
107,250.00

Rp.
Rp.

40,000.00 Rp.
50,000.00 Rp.
Rp.

7,680.00
950.00
8,630.00

Rp.
Rp.

135,000.00 Rp.
90,000.00 Rp.

162,000.00
27,000.00

Rp.
Rp.
Rp.
Rp.

1 M3 PEK. PASANG PONDASI BATU KALI 1 Pc : 5 Ps.


BAHAN
1.100
M3
Batu Kali
Rp.
136.000
Kg
Semen
Rp.
0.544
M3
Pasir Pasang
Rp.
TENAGA
1.500 Org/Hr. Pekerja
Rp.
0.600 Org/Hr. Tukang Batu
Rp.
0.060 Org/Hr. Kepala Tukang
Rp.
0.075 Org/Hr. Mandor
Rp.

1 M2 PEK. PLESTERAN LANTAI 1 Pc : 5 Psr.


BAHAN
4.320
Kg
Semen
0.022
M3
Pasir Pasang
TENAGA
0.200 Org/Hr. Pekerja
0.150 Org/Hr. Tukang Batu
0.015 Org/Hr. Kepala Tukang
0.010 Org/Hr. Mandor

JUMLAH HARGA

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

31,200.00
16,575.00
1,755.00
1,950.00
240,480.00

135,000.00 Rp.
1,200.00 Rp.
95,000.00 Rp.

148,500.00
163,200.00
51,680.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

60,000.00
25,500.00
2,700.00
3,750.00
455,330.00

Rp.
Rp.

1,200.00 Rp.
95,000.00 Rp.

5,184.00
2,090.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

8,000.00
6,375.00
675.00
500.00
22,824.00

Halaman-3

NO.

URAIAN ANALISA PEKERJAAN

11

1 M2 PEK. PASANGAN 1 BATU BATA 1 Pc : 3 Ps.


BAHAN
140
Bh
Batu Bata
32.950
Kg
Semen
0.091
M3
Pasir Pasang
TENAGA
0.650 Org/Hr. Pekerja
0.200 Org/Hr. Tukang Batu
0.020 Org/Hr. Kepala Tukang
0.030 Org/Hr. Mandor

12

13

14

1 M2 PEK. PASANGAN 1 BATU BATA 1 Pc : 5 Ps.


BAHAN
140.000
Bh
Batu Bata
22.200
Kg
Semen
0.102
M3
Pasir Pasang
TENAGA
0.650 Org/Hr. Pekerja
0.200 Org/Hr. Tukang Batu
0.020 Org/Hr. Kepala Tukang
0.030 Org/Hr. Mandor

1 M2 PEK. PLESTERAN DINDING 1 Pc : 3 Psr.


BAHAN
6.480
Kg
Semen
0.019
M3
Pasir Pasang
TENAGA
0.200 Org/Hr. Pekerja
0.150 Org/Hr. Tukang Batu
0.015 Org/Hr. Kepala Tukang
0.010 Org/Hr. Mandor

1 M2 PEK. PLESTERAN DINDING 1 Pc : 5 Psr.


BAHAN
4.320
Kg
Semen
0.022
M3
Pasir Pasang
TENAGA
0.200 Org/Hr. Pekerja
0.150 Org/Hr. Tukang Batu
0.015 Org/Hr. Kepala Tukang
0.010 Org/Hr. Mandor

HARGA SATUAN

JUMLAH HARGA

Rp.
Rp.
Rp.

1,000.00 Rp.
1,200.00 Rp.
95,000.00 Rp.

140,000.00
39,540.00
8,645.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
8,500.00
900.00
1,500.00
225,085.00

Rp.
Rp.
Rp.

1,000.00 Rp.
1,200.00 Rp.
95,000.00 Rp.

140,000.00
26,640.00
9,690.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
8,500.00
900.00
1,500.00
213,230.00

Rp.
Rp.

1,200.00 Rp.
95,000.00 Rp.

7,776.00
1,805.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

8,000.00
6,375.00
675.00
500.00
25,131.00

Rp.
Rp.

1,200.00 Rp.
95,000.00 Rp.

5,184.00
2,090.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

8,000.00
6,375.00
675.00
500.00
22,824.00

Halaman - 4

NO.
15

16

17

18

URAIAN ANALISA PEKERJAAN

HARGA SATUAN

1 M2 PEK. ACIAN KAPUR + SEMEN PORTLAND 1 : 7


BAHAN
0.100
Kg
Semen
Rp.
0.700
Kg
Kapur
Rp.
TENAGA
0.040 Org/Hr. Pekerja
Rp.
0.080 Org/Hr. Tukang
Rp.
0.008 Org/Hr. Kepala Tukang
Rp.
0.002 Org/Hr. Mandor
Rp.
1 M2 PEK. PASANG LANTAI TEGEL 40 x 40 CM
BAHAN
6.870
Bh
Tegel
8.800
Kg
Semen
0.0215
M3
Pasir Pasang
1.300
Kg
Semen Warna
TENAGA
0.672 Org/Hr. Pekerja
0.224 Org/Hr. Tukang Batu
0.022 Org/Hr. Kepala Tukang
0.034 Org/Hr. Mandor
1 M' PEK. PASANG LANTAI KERAMIK 20 x 20 CM
BAHAN
2.650
Bh
Keramik 20 x 20
1.650
Kg
Semen
0.0032
M3
Pasir Pasang
0.100
Kg
Semen Warna
TENAGA
0.900 Org/Hr. Pekerja
0.090 Org/Hr. Tukang Batu
0.009 Org/Hr. Kepala Tukang
0.0045 Org/Hr. Mandor

JUMLAH HARGA

1,200.00 Rp.
10,000.00 Rp.

120.00
7,000.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,600.00
3,400.00
360.00
100.00
12,580.00

Rp.
Rp.
Rp.
Rp.

25,000.00
1,200.00
95,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.

171,750.00
10,560.00
2,042.50
13,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

26,880.00
9,520.00
990.00
1,700.00
236,442.50

Rp.
Rp.
Rp.
Rp.

2,500.00
1,200.00
95,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.

6,625.00
1,980.00
304.00
1,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

36,000.00
3,825.00
405.00
225.00
50,364.00

2,750.00
1,200.00
95,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.

60,500.00
11,160.00
1,710.00
15,000.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

24,000.00
19,125.00
2,025.00
1,500.00
135,020.00

1 M2 PEK. PASANG DINDING KERAMIK 20 x 25 CM


BAHAN
22.000
Bh
Keramik
Rp.
9.300
Kg
Semen
Rp.
0.018
M3
Pasir Pasang
Rp.
1.500
Kg
Semen Warna
Rp.
TENAGA
0.600 Org/Hr. Pekerja
Rp.
0.450 Org/Hr. Tukang Batu
Rp.
0.045 Org/Hr. Kepala Tukang
Rp.
0.030 Org/Hr. Mandor
Rp.

Halaman - 5

NO.
19

20

URAIAN ANALISA PEKERJAAN

1 M2 PEK. PASANG LIS KERAMIK MOTIF 5 x 20 CM


BAHAN
5.500
Bh
Keramik
Rp.
9.300
Kg
Semen
Rp.
0.018
M3
Pasir Pasang
Rp.
1.500
Kg
Semen Warna
Rp.
TENAGA
0.600 Org/Hr. Pekerja
Rp.
0.450 Org/Hr. Tukang Batu
Rp.
0.045 Org/Hr. Kepala Tukang
Rp.
0.030 Org/Hr. Mandor
Rp.

JUMLAH HARGA

2,000.00
1,200.00
95,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.

11,000.00
11,160.00
1,710.00
15,000.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

24,000.00
19,125.00
2,025.00
1,500.00
85,520.00

1 M3 PEK. MEMBUAT SLOOF BETON BERTULANG (200 KG BESI + BEKESTING)


BAHAN
0.270
M3
Kayu Terentang
Rp.
1,800,000.00 Rp.
2.000
Kg
Paku Biasa
Rp.
25,000.00 Rp.
200.000
Kg
Besi Beton Polos
Rp.
15,000.00 Rp.
3.000
Kg
Kawat Beton
Rp.
15,000.00 Rp.
336.000
Kg
Semen
Rp.
1,200.00 Rp.
0.540
M3
Pasir
Rp.
95,000.00 Rp.
0.810
M3
Kerikil
Rp.
150,000.00 Rp.

4.850
0.350
1.560
1.400
0.331
0.170

21

HARGA SATUAN

TENAGA
Org/Hr.
Org/Hr.
Org/Hr.
Org/Hr.
Org/Hr.
Org/Hr.

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
42,500.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

486,000.00
50,000.00
3,000,000.00
45,000.00
403,200.00
51,300.00
121,500.00

194,000.00
14,875.00
66,300.00
59,500.00
14,895.00
8,500.00
4,515,070.00

1 M3 PEK. MEMBUAT KOLOM PRAKTIS BETON BERTULANG (100 KG BESI + BEKESTING)


BAHAN
0.400
M3
Kayu Terentang
Rp.
1,800,000.00 Rp.
720,000.00
4.000
Kg
Paku Biasa
Rp.
25,000.00 Rp.
100,000.00
100.000
Kg
Besi Beton
Rp.
15,000.00 Rp.
1,500,000.00
1.500
Kg
Kawat Beton
Rp.
15,000.00 Rp.
22,500.00
336.000
Kg
Semen
Rp.
1,200.00 Rp.
403,200.00
0.540
M3
Pasir
Rp.
95,000.00 Rp.
51,300.00
0.810
M3
Kerikil
Rp.
150,000.00 Rp.
121,500.00
0.150
M3
Kayu Balok
Rp.
2,000,000.00 Rp.
300,000.00
3.500
Lbr
Plyiwood
Rp.
85,000.00 Rp.
297,500.00
10.000
Btg.
Dolken
Rp.
35,000.00 Rp.
350,000.00
TENAGA
6.050 Org/Hr. Pekerja
Rp.
40,000.00 Rp.
242,000.00
0.350 Org/Hr. Tukang Batu
Rp.
42,500.00 Rp.
14,875.00
3.300 Org/Hr. Tukang Kayu
Rp.
42,500.00 Rp.
140,250.00
1.050 Org/Hr. Tukang Besi
Rp.
42,500.00 Rp.
44,625.00
0.470 Org/Hr. Kepala Tukang
Rp.
45,000.00 Rp.
21,150.00
1.105 Org/Hr. Mandor
Rp.
50,000.00 Rp.
55,250.00
Rp.
4,384,150.00

Halaman - 6

NO.
22

23

24

25

URAIAN ANALISA PEKERJAAN

HARGA SATUAN

JUMLAH HARGA

1 M3 PEK. MEMBUAT RING BALK BETON BERTULANG (200 KG BESI + BEKESTING)


BAHAN
0.400
M3
Kayu Terentang
Rp.
1,800,000.00 Rp.
4.000
Kg
Paku Biasa
Rp.
25,000.00 Rp.
200.000
Kg
Besi Beton Polos
Rp.
15,000.00 Rp.
2.250
Kg
Kawat Beton
Rp.
15,000.00 Rp.
336.000
Kg
Semen
Rp.
1,200.00 Rp.
0.540
M3
Pasir
Rp.
95,000.00 Rp.
0.810
M3
Kerikil
Rp.
150,000.00 Rp.
0.180
M3
Kayu Balok
Rp.
2,000,000.00 Rp.
2.800
Lbr
Plywood
Rp.
85,000.00 Rp.
20.000
Btg
Dolken
Rp.
35,000.00 Rp.
TENAGA
6.250 Org/Hr. Pekerja
Rp.
40,000.00 Rp.
0.350 Org/Hr. Tukang Batu
Rp.
42,500.00 Rp.
3.300 Org/Hr. Tukang Kayu
Rp.
42,500.00 Rp.
1.050 Org/Hr. Tukang Besi
Rp.
42,500.00 Rp.
0.470 Org/Hr. Kepala Tukang
Rp.
45,000.00 Rp.
1.105 Org/Hr. Mandor
Rp.
50,000.00 Rp.
Rp.
1 M3 PEK. PASANG KUSEN PINTU DAN JENDELA
BAHAN
1.2
M3
Kayu
TENAGA
6.000 Org/Hr. Pekerja
18.000 Org/Hr. Tukang Kayu
2.000 Org/Hr. Kepala Tukang
0.300 Org/Hr. Mandor
1 M2 PEK. PASANG PINTU PANIL
BAHAN
0.04
M3
Kayu, Papan
TENAGA
1.000 Org/Hr. Pekerja
2.500 Org/Hr. Tukang Kayu
0.250 Org/Hr. Kepala Tukang
0.050 Org/Hr. Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

2,000,000.00 Rp.
40,000.00
42,500.00
45,000.00
50,000.00

720,000.00
100,000.00
3,000,000.00
33,750.00
403,200.00
51,300.00
121,500.00
360,000.00
238,000.00
700,000.00
250,000.00
14,875.00
140,250.00
44,625.00
21,150.00
55,250.00
6,253,900.00

2,400,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

240,000.00
765,000.00
90,000.00
15,000.00
3,510,000.00

2,000,000.00 Rp.

80,000.00

40,000.00
42,500.00
45,000.00
50,000.00

1 M2 PEK. PASANG PINTU DAN JENDELA KACA hidup 5 MM


BAHAN
0.035
M3
Kayu, Papan
Rp.
2,000,000.00
1.100
M2
Kaca 5 mm
Rp.
250,000.00
TENAGA
0.800 Org/Hr. Pekerja
Rp.
40,000.00
2.000 Org/Hr. Tukang Kayu
Rp.
42,500.00
0.200 Org/Hr. Kepala Tukang
Rp.
45,000.00
0.040 Org/Hr. Mandor
Rp.
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
106,250.00
11,250.00
2,500.00
240,000.00

Rp.
Rp.

70,000.00
275,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

32,000.00
85,000.00
9,000.00
2,000.00
473,000.00

Halaman - 7

NO.
26

27

28

29

30

URAIAN ANALISA PEKERJAAN


1 M3 PEK. RANGKA KUDA-KUDA DAN GORDING
BAHAN
1.100
M3
Kayu
2.000
Kg
Paku Biasa
TENAGA
6.000 Org/Hr. Pekerja
18.000 Org/Hr. Tukang
1.800 Org/Hr. Kepala Tukang
0.300 Org/Hr. Mandor

1 M2 PAS. KASO + RENG ATAP METAL


BAHAN
0.026
M3
Kayu
0.150
Kg
Paku Biasa
TENAGA
0.100 Org/Hr. Pekerja
0.100 Org/Hr. Tukang
0.010 Org/Hr. Kepala Tukang
0.005 Org/Hr. Mandor

1 M2 PEK. PASANG NOK SPANDEK


BAHAN
1.050
M'
Nok Spandek
TENAGA
0.200 Org/Hr. Pekerja
0.100 Org/Hr. Tukang
0.010 Org/Hr. Kepala Tukang
0.001 Org/Hr. Mandor

1 M2 PEK. PASANG TALANG SPANDEK


BAHAN
1.050
M'
Nok Spandek
TENAGA
0.040 Org/Hr. Pekerja
0.400 Org/Hr. Tukang
0.025 Org/Hr. Kepala Tukang
0.00125 Org/Hr. Mandor

1 M2 PEK. PASANG ATAP GENTENG METAL


BAHAN
3.105
Lbr
Genteng Metal
0.200
Kg
Paku Biasa
TENAGA
0.200 Org/Hr. Pekerja
0.100 Org/Hr. Tukang
0.010 Org/Hr. Kepala Tukang
0.001 Org/Hr. Mandor

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

JUMLAH HARGA

2,000,000.00 Rp.
25,000.00 Rp.
40,000.00
42,500.00
45,000.00
50,000.00

2,200,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

240,000.00
765,000.00
81,000.00
15,000.00
3,351,000.00

2,000,000.00 Rp.
25,000.00 Rp.

52,000.00
3,750.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

4,000.00
4,250.00
450.00
250.00
64,700.00

Rp.

50,000.00 Rp.

52,500.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

8,000.00
4,250.00
450.00
50.00
65,250.00

Rp.

55,000.00 Rp.

57,750.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,600.00
17,000.00
1,125.00
62.50
77,537.50

Rp.
Rp.

35,000.00 Rp.
25,000.00 Rp.

108,675.00
5,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

8,000.00
4,250.00
450.00
50.00
126,425.00

Rp.
Rp.
Rp.
Rp.
Rp.

Halaman - 8

NO.
31

32

33

34

URAIAN ANALISA PEKERJAAN

HARGA SATUAN

1 M' PEK. PASANG PENUTUP PINGGIR ATAP / LISTPLANK BIASA


BAHAN
0.0072
M3
Kayu, Papan
Rp.
2,850,000.00
0.05
Kg
Paku
Rp.
25,000.00
TENAGA
0.100 Org/Hr. Pekerja
Rp.
40,000.00
0.200 Org/Hr. Tukang Kayu
Rp.
42,500.00
0.020 Org/Hr. Kepala Tukang
Rp.
45,000.00
0.005 Org/Hr. Mandor
Rp.
50,000.00

1 M' PEK. PASANG LIST PLAFOND KAYU PROFIL


BAHAN
1.100
M'
Kayu Profil
0.01
Kg
Paku
TENAGA
0.05 Org/Hr. Pekerja
0.05 Org/Hr. Tukang Kayu
0.005 Org/Hr. Kepala Tukang
0.003 Org/Hr. Mandor

Rp.
Rp.

20,520.00
1,250.00

Rp.
Rp.
Rp.
Rp.
Rp.

4,000.00
8,500.00
900.00
250.00
35,420.00

Rp.
Rp.

50,000.00 Rp.
25,000.00 Rp.

55,000.00
250.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

2,000.00
2,125.00
225.00
150.00
59,750.00

Rp.
Rp.
Rp.
Rp.
Rp.

96,000.00
5,000.00
17,500.00
750.00
3,920.00

Rp.
Rp.
Rp.
Rp.
Rp.

34,000.00
19,125.00
2,025.00
775.00
179,095.00

Rp.
Rp.
Rp.

13,250.00 Rp.
21,500.00 Rp.
21,500.00 Rp.

1,325.00
2,150.00
5,590.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

1 M2 PEK. PASANG RANGKA PLAFOND + PLAFOND KALSIBOARD


BAHAN
0.048
M3
Kayu
Rp.
2,000,000.00
0.200
Kg
Paku Biasa
Rp.
25,000.00
0.350
Lbr
Kalsiboard
Rp.
50,000.00
0.030
Kg
Paku Gypsum
Rp.
25,000.00
0.200
Kg
Serbuk Gypsum
Rp.
19,600.00
TENAGA
0.850 Org/Hr. Pekerja
Rp.
40,000.00
0.450 Org/Hr. Tukang Kayu
Rp.
42,500.00
0.045 Org/Hr. Kepala Tukang
Rp.
45,000.00
0.0155 Org/Hr. Mandor
Rp.
50,000.00

1 M2 PEK. PENGECATAN TEMBOK


BAHAN
0.100
Kg
Plamir
0.100
Kg
Cat Dasar
0.260
Kg
Cat Akhir 2 x
TENAGA
0.0200 Org/Hr. Pekerja
0.0630 Org/Hr. Tukang Cat
0.0063 Org/Hr. Kepala Tukang
0.0025 Org/Hr. Mandor

JUMLAH HARGA

Rp.
Rp.
Rp.
Rp.
Rp.

800.00
2,677.50
283.50
125.00
12,951.00

Halaman - 9

NO.
35

36

37

38

39

URAIAN ANALISA PEKERJAAN


1 M2 PEK. PENGECATAN KAYU / LISTPLANK
BAHAN
0.200
Kg
Cat Meni
0.150
Kg
Plamir
0.170
Kg
Cat Dasar
0.350
Kg
Cat Penutup
TENAGA
0.070 Org/Hr. Pekerja
0.105 Org/Hr. Tukang Cat
0.004 Org/Hr. Kepala Tukang
0.003 Org/Hr. Mandor
1 M2 PEK. PENGECATAN PLAFOND
BAHAN
0.436
Kg
Cat Tembok
1.000
Lbr.
Kertas Pasir
0.016
Kg
Plamir
TENAGA
0.050 Org/Hr. Pekerja
0.075 Org/Hr. Tukang Cat
0.008 Org/Hr. Kepala Tukang
0.0025 Org/Hr. Mandor

1 BH PEK. PASANG KUNCI UTAMA


BAHAN
1.000
Bh
Kunci
TENAGA
0.01 Org/Hr. Pekerja
0.5 Org/Hr. Tukang Kayu
0.01 Org/Hr. Kepala Tukang
0.005 Org/Hr. Mandor

1 BH PEK. PASANG KUNCI BIASA


BAHAN
1.000
Bh
Kunci
TENAGA
0.01 Org/Hr. Pekerja
0.5 Org/Hr. Tukang Kayu
0.01 Org/Hr. Kepala Tukang
0.005 Org/Hr. Mandor

1 BH PEK. PASANG ENGSEL PINTU


BAHAN
1.000
Bh
Engsel Pintu
TENAGA
0.015 Org/Hr. Pekerja
0.15 Org/Hr. Tukang Kayu
0.015 Org/Hr. Kepala Tukang
0.00075 Org/Hr. Mandor

HARGA SATUAN

JUMLAH HARGA

Rp.
Rp.
Rp.
Rp.

12,500.00
13,250.00
30,000.00
30,000.00

Rp.
Rp.
Rp.
Rp.

2,500.00
1,987.50
5,100.00
10,500.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

2,800.00
4,462.50
180.00
125.00
27,655.00

Rp.
Rp.
Rp.

21,500.00 Rp.
3,500.00 Rp.
13,250.00 Rp.

9,374.00
3,500.00
212.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

2,000.00
3,187.50
337.50
125.00
18,736.00

250,000.00 Rp.

250,000.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

400.00
21,250.00
450.00
250.00
272,350.00

150,000.00 Rp.

150,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

400.00
21,250.00
450.00
250.00
172,350.00

Rp.

25,000.00 Rp.

25,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

600.00
6,375.00
675.00
37.50
32,687.50

Rp.
Rp.
Rp.
Rp.
Rp.

Halaman - 10

NO.
40

41

42

43

44

URAIAN ANALISA PEKERJAAN


1 BH PEK. PASANG ENGSEL JENDELA
BAHAN
1.000
Bh
Engsel Jendela
TENAGA
0.01 Org/Hr. Pekerja
0.1 Org/Hr. Tukang Kayu
0.01 Org/Hr. Kepala Tukang
0.0005 Org/Hr. Mandor
1 BH PEK. PASANG GRENDEL PINTU / JENDELA
BAHAN
1.000
Bh
Grendel
TENAGA
0.015 Org/Hr. Pekerja
0.15 Org/Hr. Tukang Kayu
0.015 Org/Hr. Kepala Tukang
0.00075 Org/Hr. Mandor

HARGA SATUAN

Rp.

15,000.00 Rp.

15,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

400.00
4,250.00
450.00
25.00
20,125.00

Rp.

12,705.00 Rp.

12,705.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

600.00
6,375.00
675.00
37.50
20,392.50

10,000.00 Rp.

10,000.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

400.00
4,250.00
450.00
25.00
15,125.00

250,000.00 Rp.
1,200.00 Rp.
95,000.00 Rp.

250,000.00
7,200.00
950.00

1 BH PEK. PASANG KAIT ANGIN / TARIKAN JENDELA


BAHAN
1.000
Bh
Kait Angin
Rp.
TENAGA
0.010 Org/Hr. Pekerja
Rp.
0.100 Org/Hr. Tukang Kayu
Rp.
0.010 Org/Hr. Kepala Tukang
Rp.
0.0005 Org/Hr. Mandor
Rp.

1 BH PEK. PASANG CLOSET JONGKOK


BAHAN
1.000
Bh
Closet Jongkok
6.000
Kg
Semen
0.010
M3
Pasir Pasang
TENAGA
1.000 Org/Hr. Pekerja
1.500 Org/Hr. Tukang Batu
1.500 Org/Hr. Kepala Tukang
0.160 Org/Hr. Mandor
MEMASANG PIPA PVC TYPE AW DIAMETER 4"
6.3.1.
BAHAN
0.08
Bh
Pipa PVC
0.14
Kg
Perlengkapan
6.3.2.
TENAGA
0.08 Org/Hr. Pekerja
0.14 Org/Hr. Tukang Batu
0.0135 Org/Hr. Kepala Tukang
0.0041 Org/Hr. Mandor

JUMLAH HARGA

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
63,750.00
67,500.00
8,000.00
437,400.00

125,200.00 Rp.
125,200.00 Rp.

10,141.20
16,902.00

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

3,240.00
5,737.50
607.50
205.00
36,833.20

Halaman - 11

NO.
45

46

47

48

URAIAN ANALISA PEKERJAAN

HARGA SATUAN

1 BH PEK. PASANG BAK MANDI BATU BATA VOLUME 0,30 M3


BAHAN
200.000
Bh
Batu Bata
Rp.
1,000.00
120.000
Kg
Semen
Rp.
1,200.00
0.300
M3
Pasir Pasang
Rp.
95,000.00
360.000
Bh
Perselin
Rp.
2,500.00
6.000
Kg
Semen Nat
Rp.
10,000.00
TENAGA
6.000 Org/Hr. Pekerja
Rp.
40,000.00
3.000 Org/Hr. Tukang Batu
Rp.
42,500.00
0.300 Org/Hr. Kepala Tukang
Rp.
45,000.00
0.300 Org/Hr. Mandor
Rp.
50,000.00

PEK. MEMASANG SATU BUAH WESTAVEL


BAHAN
1.000
Bh
Westavel
0.120
Perlengkapan
6.000
Kg
semen abu -abu
0.010
M3
Pasir pasang
TENAGA
1.2000 Org/Hr. Pekerja
1.4500 Org/Hr. Tukang
0.1500 Org/Hr. Kepala Tukang
0.1000 Org/Hr. Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

200,000.00
144,000.00
28,500.00
900,000.00
60,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

240,000.00
127,500.00
13,500.00
15,000.00
1,728,500.00

Rp.
Rp.
Rp.
Rp.

625,000.00
625,000.00
10,000.00
95,000.00

Rp.
Rp.
Rp.
Rp.

625,000.00
75,000.00
60,000.00

Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
61,625.00
6,750.00
5,000.00
881,375.00

227,400.00 Rp.
227,400.00 Rp.

227,400.00
227,400.00

MEMASANG 1 BH BAK CUCI PIRING STAINLES STEEL


BAHAN
1.000
Bh
Bak cuci piring stainles steel Rp.
1.000
Set
Water drain + Acsesories
Rp.
TENAGA
0.0300 Org/Hr. Pekerja
Rp.
0.3 Org/Hr. Tukang
Rp.
0.0300 Org/Hr. Kepala Tukang
Rp.
0.0015 Org/Hr. Mandor
Rp.
MEMASANG 1 BH KRAN 3/5" DAN 1/2 "
BAHAN
1.0000
Bh
Keran air
0.0250
Bh
Seal tape
TENAGA
0.01 Org/Hr. Pekerja
0.1 Org/Hr. Tukang
0.01 Org/Hr. Kepala Tukang
0.005 Org/Hr. Mandor

JUMLAH HARGA

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
42,500.00
45,000.00
50,000.00

35,000.00
15,000.00
40,000.00
42,500.00
45,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,200.00
12,750.00
1,350.00
75.00
470,175.00

Rp.
Rp.

35,000.00
375.00

Rp.
Rp.
Rp.
Rp.
Rp.

400.00
4,250.00
450.00
250.00
40,725.00

RENCANA ANGGARAN BIAYA


(R.A.B)
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:
:

KONSTRUKSI RUMAH TINGGAL


PEMBANGUNAN RUMAH TINGGAL
KELURAHAN LAGARUTU
2011

No.

URAIAN PEKERJAAN

STN

VOLUME

I.

HARGA
SATUAN
(Rp.)
e

Halaman - 1
JUMLAH
HARGA
(Rp.)
f = d x e

1
3

PEKERJAAN PERSIAPAN
Pek. Pembersihan Lokasi
Pekngukuran dan pemasangan bowplank

M
Ls

224.00
1.00

6,500.00
1,500,000.00

1,456,000.00
1,500,000.00
2,956,000.00

1
2
3
4
5

PEKERJAAN TANAH DAN PASIR


Pek. Galian Tanah Untuk Pondasi
Pek. Urugan Kembali Bekas Galian
Pek. Urugan Tanah Bawah Lantai
Pek. Urugan Pasir Bawah Pondasi
Pek. Urugan Pasir Bawah Lantai

M
M
M
M
M

94.40
23.60
46.00
4.72
36.80

28,100.00
8,630.00
107,250.00
120,500.00
120,500.00

2,652,640.00
203,668.00
4,933,500.00
568,760.00
4,434,400.00
12,792,968.00

1
2
3

PEKERJAAN BETON
Kolom 15 x 15
Sloof 15 x 20
Ring Balk 15 x 20

M
M
M

3.42
3.54
3.54

4,384,150.00
4,515,070.00
6,253,900.00

14,993,793.00
15,983,347.80
22,138,806.00
53,115,946.80

PEKERJAAN PASANGAN DAN PLESTERAN


Pas. Batu Kosong
Pas. Pondasi Batu Kali
Pas. Dinding Batu Bata 1 Batu 1 : 5
Pas. Dinding Batu Bata 1 Batu 1 : 3
Plesteran Beton Dan Dinding 1 : 5
Plesteran Beton Dan Dinding 1 : 3
Plesteran Lantai 1 : 5
Acian
Pas. Lantai Tegel 40 x 40
Pas. Lantai Keramik 20 x 20
Pas. DindingKeramik 20 x 25
Pas. Lis Keramik Motif 5 x 20

M
M
M
M
M
M
M
M
M
M'
M
M

14.16
25.08
339.10
59.00
678.20
118.00
9.20
796.20
88.75
29.25
20.00
70.80

240,480.00
455,330.00
225,085.00
213,230.00
22,824.00
25,131.00
22,824.00
12,580.00
236,442.50
50,364.00
135,020.00
85,520.00

3,405,196.80
11,417,399.75
76,326,323.50
12,580,570.00
15,479,236.80
2,965,458.00
209,980.80
10,016,196.00
20,984,271.88
1,473,147.00
2,700,400.00
6,054,816.00
163,612,996.53

II.

III.

IV.
1
2
4
5
6
7
8
9
10
11
12
13

No.
a
V.

URAIAN PEKERJAAN

STN

VOLUME

HARGA
SATUAN
(Rp.)
e

Halaman - 2
JUMLAH
HARGA
(Rp.)
f = d x e

1
2
3
4
5
6

PEKERJAAN ATAP DAN PLFOND


Pek. Kuda - Kuda Kayu
Pek. Gording , Reng & Kaso
Atap Genteng Metal
Rangka Plafond
List Profil Plafond
Lisplank papan

M3
M2
M2
M2
M'
M'

1.50
233.80
233.80
233.80
118.00
69.32

3,351,000.00
64,700.00
126,425.00
179,095.00
59,750.00
35,420.00

5,026,500.00
15,126,860.00
29,558,165.00
41,872,411.00
7,050,500.00
2,455,314.40
101,089,750.40

1
2
3
4
5
6
7

PEKERJAAN KOSEN PINTU & JENDELA


Pek. Kusen Kayu
Pek. Pintu Panil
Pintu Viber Lengkap Untuk WC
Pas. Kunci Pintu Tanam 2 Slaag
Pas. Grendel Pintu Tanam
Pas. Engsel Pintu
Pas. Engsel Jendela

M3
M2
Unit
Bh
Bh
Bh
Bh

0.79
25.40
3.00
9.00
9.00
18.00
42.00

3,510,000.00
240,000.00
450,000.00
172,350.00
20,392.50
32,687.50
20,125.00

2,772,900.00
6,096,000.00
1,350,000.00
1,551,150.00
183,532.50
588,375.00
845,250.00
13,387,207.50

Ttk
Ttk
Ttk
Unit
Bh
Bh

5.00
5.00
5.00
2.00
1.00
1.00

500,000.00
95,000.00
40,725.00
4,500,000.00
881,375.00
470,175.00

2,500,000.00
475,000.00
203,625.00
9,000,000.00

VI.

VII.

PEKERJAAN SANITAIR
1
2
3
4
5
6

Instalasi Air Bersih


Instalasi Air Kotor
Kran Air 1/2"
Septiktenk dan Peresapan
Wastafel
Bak Cuci Piring Stainles steel

12,178,625.00
VIII.
1
2
3
4
5

PEKERJAAN MEKANIKAL & ELEKTRIKAL


Instalasi Listrik
Stop Kontak
Saklar Ganda
Saklar tunggal
Panel Box MCB Lengkap

Ttk
Bh
Bh
Bh
Unit

18.00
12.00
4.00
10.00
1.00

450,000.00
35,000.00
35,000.00
30,000.00
250,000.00

8,100,000.00
420,000.00
140,000.00
300,000.00
250,000.00
9,210,000.00

IX.

PEKERJAAN PENGECETAN
Pengecetan Tembok
Pengecetan Plafond
Pengecetan Kayu

M2
M2
M2

796.20
233.80
39.26

12,951.00
18,736.00
27,655.00

10,311,586.20
4,380,476.80
1,085,845.92
15,777,908.92

1
2
3

No.

URAIAN PEKERJAAN

STN

VOLUME

X.
1
2

PEKERJAAN LAIN - LAIN


As. Build Drawing
Pembersihan akhir

Ls
Ls

1.00
1.00

HARGA
SATUAN
(Rp.)
e

2,500,000.00
2,000,000.00

Halaman - 3
JUMLAH
HARGA
(Rp.)
f = d x e

2,500,000.00
2,000,000.00
4,500,000.00

REKAPITULASI
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:
:

No.
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.

KONSTRUKSI RUMAH TINGGAL


PEMBANGUNAN RUMAH TINGGAL
KELURAHAN LAGARUTU
2011

URAIAN PEKERJAAN

J U M L A H

PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN PASIR
PEKERJAAN BETON
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN ATAP DAN PLFOND
PEKERJAAN KOSEN PINTU & JENDELA
PEKERJAAN SANITAIR
PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN PENGECETAN
PEKERJAAN LAIN - LAIN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,956,000.00
12,792,968.00
53,115,946.80
163,612,996.53
101,089,750.40
13,387,207.50
12,178,625.00
9,210,000.00
15,777,908.92
4,500,000.00

BIAYA KONSTRUKSI

RP

388,621,403.15

DIBULATKAN

RP

388,650,000.00

TERBILANG : TIGA RATUS DELAPAN PULUH DELAPAN JUTA ENAM RATUS LIMA PULUH RIBU RUPIAH

RENCANA ANGGARAN BIAYA


(RAB)
PEMBANGUNAN RUMAH TINGGAL
KELURAHAN LAGARUTU
2011

You might also like