You are on page 1of 12

All about ECDIS

Charting the way


ECDIS equipment, charts, training, regulations, global support and more

Designed for life at sea

A professional ECDIS solution

JAN-901B
23-inch

Intuitive and advanced user-interface


Featuring multi/wide-view mode

With real-time radar and AIS overlay


Also conning on screen and navtex integration

In-house technology

Anti-vibration design, silicon disk and stabilized processor

Advanced route planning


Easy to edit, save and import routes

Available in standalone and desktop


Suiting your type and size of vessel

Or a cost-effective solution

The JAN-2000, a fully type approved system, is a highly cost-effective solution for mid-small size ships & workboats with a standardized interface configuration, which as well is considered as an economical back-up solution for the JAN-901B/701B.

JAN-701B

19-inch

19- or 23-inch

JAN-2000

Standard Gyro Log GPS AIS

The purpose of this booklet is for general information only and does not constitute any form of advice or recommendation upon which a specific decision should be made with respect to classification society regulations or recommendations. JRC will not be held liable for any claims, penalties, loss, damages or expenses arising from the use or the inability to use the booklet information.

Index

3 3

Index Intro

Contents
4 4 6 7 8 10 9 Whats ECDIS? Charts IMO Training Footprint

Global support JRC ECDIS

Intro

Our newly developed multi-functional ECDIS systems do not only meet IMO requirements, but are one of the worlds most advanced and future proof e-charting solutions available today. But theres much more to it. We hope this ECDIS guide charts you in the right direction.

visit us regularly to discover all the latest ECDIS updates, news and more

jrceurope.com/ECDIS

Whats ECDIS? Charts


Whats ECDIS?
An Electronic Chart Display and Information System (ECDIS) is a computer-based navigation system that complies with IMO regulations and can function as an alternative for paper navigation charts. One of the performance standards is to have ENCs installed for the intended voyage.
ENCs Electronic Navigational Charts. These are official vector charts conforming to the specifications of the IHO, issued by or on behalf of a national hydrographic office. IHO nations are responsible for producing ENCs of their own waters and updating them with all safety-critical information. Flag/Class society The state (country) in which a ship is registered and hence under which flag it is sailing is known as the Flag State. Please always contact your Flag State/Class society to be aware of interpretation of the ECDIS mandatory regulations.

After hundreds of years of sailing with paper charts, merchant-shipping fleets will make a transition to digital navigation in little more than 20 years. The JRC ECDISs may, if flag state/class society approves, be used as the primary source of navigational information in place of paper charts.

A new approach

Probably the biggest change is the ENCs used inside an ECDIS, representing a new approach to navigation. As opposed to a paper reference, an ENC is a key component for ECDIS navigation, assisting in navigational decision-making and situational awareness as its able to continuously indicate a vessels position relative to land, objects, hazards and more.

Charts

There are two types

of electronic charts - vector and raster charts.

Vector

A vector chart is a digital database of all objects (points, lines, depths, areas etc.) represented in several layers on a chart.

Top

Raster

A raster chart is a scanned and passive image of a paper chart.

Bottom

jrceurope.com/ECDIS

Charts

When ENC is not available

In order to sail paperless, ENCs are required as primary source of navigation. RNC may be used in ECDIS in areas where ENCs are not (yet) available. If ECDIS is using RNCs, this must be together with an appropriate portfolio of up-todate paper charts.

The JRC ECDIS converts each ENC from S-57/63 ENC format into an internal format called System-ENC or SENC, a process to optimize chart display. SENC delivery is an alternative method to the standard distribution and use of official ENC data. Users are able to directly receive SENC1, a conversion which otherwise would have to happen inside the ECDIS.

ENC-to-SENC

RNCs Raster Navigational Charts. Charts conform to IHO specifications and are produced by digitally scanning the image of a paper chart. They contain significant metadata to ensure minimum functionality, such as geo-referencing, ability to update and show corrections and day/night view.

S-57 IHO special publication S-57. It contains the IHO transfer standards for digital hydrographic data. S-63 IHO standard for encrypting and securing ENC data. The S-63 standard is the official IHO standard since December 2002. Protected data can be decrypted by a user permit number assigned to each ECDIS individually. S-100 IHO has introduced (January 2010) a new hydrographic geospatial standard for marine data and information, known as S-100. This new S-100 standard is aligned with the ISO19100 series of geographic standards.

Charts inside JRC ECDIS

All new JRC ECDISs come standard (ex-factory) with Admiraltys pre-loaded range of (official) global ENCs and ready for ARCS and C-Maps Ed.3 with e-Token driver.

Pre-installed ENCs e-Token dongle

About AVCS

All new JRC ECDISs will be preloaded in the factory with all AVCS (Admiralty Vector Chart Service) charts. JRC and UKHO offer this integrated service with direct access to the UKHO portfolio of ENCs, making it easier to obtain the data required for passage planning and voyage execution. The JRCs ECDIS JAN-901B/701B/2000 series offer seafarers a great value in bridge technology, delivering seamless access to navigational data.

ENC web database iho.int

AVCS information ukho.gov.uk/AVCS C-Map information c-map.com

1. Not all hydrographic offices allow SENC delivery

jrceurope.com/ECDIS

Training

Training

ECDIS is a total change from paper charts, therefore key to implementation is training. The master, first officer and other watchkeeping bridge officers should, as a minimum, undertake a generic ECDIS training course. In addition some authorities and/or class societies require a type-specific ECDIS course together with regular updated training.

Generic

ISM The International Safety Management Code (ISM Code) stands for the safe operation of ships and pollution prevention. A few examples of what is required to be up-to-date: v Voyage planning v Pre-(arrival or departure) routines v Watch-keeping routines v Chart correction routines v Service and support routines v And more

This is a standardized general course (IMO model course 1.27) consisting of a number of topics and skills on the operational use of ECDIS.

Type-specific

This is a training course for the ECDIS model in use onboard. A JRC-specific (familiarization) training is required according to ISM code.

Current IMO Standards for Training, Certification and Watch-keeping (STCW) is written around paper charts, but ECDIS is considered to be included under the term chart. From 1 January 2012, the new STCW will include mandatory ECDIS training.

The ISM code has strict wording on training, referring to the training of users of safetyrelated equipment, such as ECDIS.

UK

JRC & training


ECDIS Ltd

Germany

JRC is working together with various dedicated training establishments that provide both generic and JRC type-specific courses, in addition to other training courses. JRC continues to increase our ECDIS training partners globally. For the latest JRC training information, please visit jrceurope.com/ecdis

WEB BASED MARITIME TRAINING

Safebridge

Germany

ECDIS Ltd. ecdis.org Safebridge safebridge.de Interschalt interschalt.de

Interschalt

If you use ECDIS as a primary means of navigation, its essential to understand both your flag state and class society requirements for installation and operator certification.

jrceurope.com/ECDIS

IMO

IMO

The IMO amendments to the international convention for SOLAS (Safety of Life at Sea) makes it compulsory to fit an ECDIS. The legislation will be phased by vessel type and size and will eventually apply to almost all large merchant and passenger ships. Use below timetable to determine which of your vessel(s) will be affected and when:

NewPassengerShips NewTankers NewCargoShips NewCargoShips ExistingPassengerShips ExistingTankers ExistingCargo ExistingCargo ExistingCargo


1July 2009 1July 2010

>500gt

>3000gt >10000gt

>3000gt >500gt >3000gt >50000gt

>20000gt

1July 2011

1July 2012

1July 2013

1July 2014

1July 2015

1July 2016

1July 2017

>10000gt

1July 2018

Note that vessels may be free from installing ECDIS when they will be permanently out-of-service within 2 years after the implementation date.

Back-up

A single ECDIS does not normally qualify for compliance for paperless sailing. It is a normal requirement to have ECDIS back up with a second ECDIS, chart radar or paper charts.

UPS

A UPS may also be required due to possible blackout during switchover from vessels mains to emergency power source.

Sensor

An ECDIS must be directly connected to an electronic positioning system, gyro and log sensor. When no gyro is available, the ECDIS should be connected to the ships Transmitting Heading Device (THD).

Check your flag state and class society requirements for ECDIS back-up, power supply and connected sensor requirements.

jrceurope.com/ECDIS

Footprint

ECDIS footprint

JRC has been involved with ECDIS development for 20 years. Below timeline shows some of the key dates in the history of the development and implementation of ECDIS.

ECDIS timeline
2020
Required ECDIS implementation

2010
JAN-901

JAN-901M

JAN-901B

2000

Training will be mandatory IMO permits raster chart operation

JAN-1397

1990

JAN-1290

IMO adopts ECDIS performance standard The term ECDIS is born

1980

Elementary ECS becomes available

1970
Due to reasons of space we cannot show all of the JRC models of ECDIS and chart radar since our first model was manufactured in

1960
First suggestions to combine radar image with digitized data

1990, however JRC are more than ready for deadlines with our current range of ECDIS tracking and full ECDIS capability.

the forthcoming IMO ECDIS installation date or chart radars which combine radar, target

1950

ECDIS path

JRCs path

In-house technology
Mechanical technology
Materials Rack/pedestal

The technology integrated in the JRC ECDIS is the result of years of in-house experience.

QA technology
Assembling Test facilities Individual test

Mechnical design

Electronics technology
ASIC-PCB Components Electronic design

Application system technology


Core/kernel Engineering System design

jrceurope.com/ECDIS

Global support

Total global support

JRC continues the proud tradition of our renowned hardware and software, which is enhanced with our total product support around the world via our Starnetwork.

JRC Starnetwork

JRCs comprehensive Starnetwork includes over 270 qualified partners, providing support across the world through all time zones.

Rey kjav ik Tors hav n Ege rsun d St. Joh ns Toro nto Chic ago New York

Van cou ver Sea ttle San Fran cisc o Los Ang eles o San Dieg Hon olul u

Hels inki Gt ebo rg Belf ast Ams terd am Basi ldon p Rott erda m Ant wer Le Hav re Istan bul Rom e Mad rid Athe ns ssol Haif a Lisb on Lima Tun is Alex and ria

Vlad ivos tok Pusa n Shan gha i Dub ai Mum bai Hon g Kon g Han oi Ban gko k Taip ei Man ila Toky o

Hou ston mi Mia Hav ana Pan ama Gua yaq uil Lim a

Las Palm as Dak ar Abid jan

Colu mbo Kua la Lum purre Sing apo Jaka rta Suva Brisb ane

Rio de Jane iro Bue nos Aire s Cap e Tow n

Rich ards Bay Dur ban

Mel bou rne

Sydn ey

Auc klan d

JRC one-call

Talc hua no

For JRC Starnetwork support, simply call us on +81 3 3492 9201 service is available 24 hours a day, 7 days a week.

JRC First Aid Kit

Your vessel(s) cannot afford downtime. With our global First Aid Kit system, we can urgently provide requested parts within a minimum timeframe.

Our First Aid Kits are placed in 28 locations worldwide. More about JRC support jrceurope.com/support

jrceurope.com/ECDIS

The JRC ECDIS

Which ECDIS is best suitable?

Compare JRC ECDIS and find out which one suits your vessel.

JAN-2000 IMO compliant Installation style JRC display Alternative display Built-in UPS Hard disk Silicon disk CD/DVD ROM drive Power supply Serial input Analog input Sync input E-token Radar overlay AIS and TT display TCS Route transfer RMS Data transfer via LAN AVCS pre-installation Desktop (black box type) 19-inch (1280 by 1024 pixels)

JAN-701B Standalone and desktop

JAN-901B

23-inch (1600 by 1200 pixels)

Hatteland 19-inch (JH19T14MMD) and 23-inch (JH20T17MMD), Baytech 23-inch (BPM-723-DA-AC-BZ) No 1 x 160 GB (single HDD) 1 GB Yes 100-115V to 200-230V AC 10%, 60/50 Hz 5% 3 standard (optional up to 7) n/a n/a Yes No Yes No Yes Yes Yes Yes Yes Yes 11 standard (optional up to 26) 10 (optional) 2 (optional) Yes, holds up to 90 seconds until OS closes automatically1 2 x 160 GB (dual HDD) 2 GB

The 23-inch JMA-900B chart radar is also fully compliant as ECDIS terminal.

Radar overlay

The JRC JAN-701B/901B offers more than just overlaying a rough radar image. The radar image has a high resolution when interfaced with JRC radars. Priority objects on the vector charts are not hidden but overlaid on the radar image. At the same time, brilliance and clutter controls of the radar images continues to be operable.

1. When power source comes back, the ECDIS automatically turns on and goes back to last known setting/configuration

10

jrceurope.com/ECDIS

The JRC ECDIS

Brings simplicity onto the bridge

The newly developed multi-functional JAN-901B/701B/2000 ECDIS and JMA-900B series chart radars are designed to provide continuous position and navigation safety information. Our advanced ergonomics and man-machine interface is designed to enhance the working environment.

Five system choices


ECDIS ECDIS/radar overlay Chart radar ECDIS/radar overlay/conning ECDIS/conning

Bridge the advantages

Outclassing the performance and reliability of our product line up is difficult. Now, connect these together and you have a total1 IT navigation solution, the ultimate workgroup on the bridge.

Paperless sailing and more

tion g sta nnin e pla Rout

ECDIS

Radar

GPS Gyro

Conning

GPS Log

Radar

ECDIS

Typical installation for paperless sailing Active route transfer via LAN

Update the charts from both ECDIS via the route planning station

1. Not all IMO required equipment are shown. Gyro compass is non-JRC supply.

jrceurope.com/ECDIS

11

Designed for life at sea

JRC in Europe/Africa
Cessnalaan 40-42 1119 NL Schiphol-Rijk The Netherlands T +31 20 658 0750 F +31 20 658 0755 W jrceurope.com
contents are subject to change without notice

JRC in Asia/Oceania

Fujisawa bldg. 30-16 Ogikubo 4-chome Suginami-ku Tokyo 167-8540, Japan T +81 3 6832 1721 F +81 3 6832 1845 W jrc.co.jp

JRC in the Americas

1011 SW Klickitat Way, B-201 Seattle, WA 98134 United States of America T +1 206 654 5644 F +1 206 654 7030 W jrcamerica.com
JRC -10.11/10M/1

You might also like