Professional Documents
Culture Documents
OMAIRA RINCON
PROPIETARIO:
FECHA:
CANTIDADES DE OBRA
CAPITULO
PRELIMINARES
ESTRUCTURA
ITEM
UNIDAD PRINCIPAL
DEMOLICION DE VIGAS
M3
DEMOLICION DE COLUMNAS
M3
DEMOLICION DE MUROS
M2
DESMONTE DE CUBIERTA
M2
DESMONTE DE PUERTAS
UNIDAD
DESMONTE DE VENTANAS
UNIDAD
DESMONTE DE INODOROS
UNIDAD
DESMONTE DE CERCHAS
ML
DEMOLICION DE PISOS
M2
REPLANTEO Y LOCALIZACION
M2
RELLENOS
UNIDAD SECUNDARIA
ELECTRICIDAD
RED HIDRAULICA
RED SANITARIA
PAGINA 1 DE 6
5,000
5,000
1,200
M3
10,000
EXCAVACIONES
M3
19,000
CICLOPEOS
M3
120,000
120,000
18,000
$
$
$
25,000
$
$
ZAPATAS
M3
KG
M3
ML DE 15X20
KG
COLUMNAS 25X12
M3
2.09
KG
481.26
VIGAS ENTREPISO
M3
KG
LOSA DE ENTREPISO
M2
ML
69.6
ML DE 30X30
KG
VIGAS AEREAS
M3
2.80
KG
762.92
MESONES
M2
0.72
HIERRO MESONES
KG
9.60
ESCALERAS
M3
1.03
HIERRO ESCALERAS
KG
51.60
VIGA CANAL
M3
1.10
ML DE 12X20
M3
116.63
0.050
PASO
SUBTOTAL
VALOR UNITARIO
HIERRO ZAPATAS
132.82
159,378
20,000
1,392,000
200
96,252
22,000
2,565,860
200
152,583
100,000
72,000
200
1,920
600,000
620,202
200
10,320
ML
26.3
35,000
920,500
200
26,510
M3
0.37
35,000
86,450
KG
132.55
M2
2.47
KG
30.80
200
6,160
M2
132.82
9,000
1,195,335
M2
$
16,000
MURO A LA VISTA
GENERALES
May-12
M2
217.99
ML
97.35
8,000
1,743,912
MUROS DE CULATAS
M2
68.15
ML
97.35
10,000
681,450
M2
M2
435.98
6,500
2,833,857
M2
136.29
7,000
954,030
ALISTADOS E= 4CM
M2
132.82
3,800
504,697
ENCHAPES PISOS
M2
132.82
15,000
1,992,225
15,000
720,000
ENCHAPE MUROS
M2
48.00
PERFILES DE CUBIERTA
ML
78.90
CUBIERTA
M2
128.87
6,000
773,220
PUERTAS
M2
33.24
15,000
498,600
VENTANAS
M2
31.09
15,000
466,290
BARANDAS BALCON
ML
13.15
5,000
59,175
CIELORRASO DRIWALL
M2
132.82
16,000
2,125,040
435.98
4,000
1,743,912
3,500
M2
11.84
ESTUCO
M2
M2
M2
435.98
M2
136.29
SALIDA DE ILUMINACION
UN
19.00
9,000
171,000
SALIDA DE TOMA
UN
13.00
9,000
117,000
SALIDA DE INTERRUPTOR
UN
15.00
9,000
135,000
CAJA CIRCUITOS
UN
1.00
18,000
18,000
POLO A TIERRA
UN
0.00
27,000
CAJA CONTADOR
UN
0.00
27,000
UN
1.00
6,000
6,000
UN
5.00
6,000
30,000
UN
5.00
6,000
30,000
UN
5.00
6,000
30,000
UN
2.00
6,000
12,000
UN
2.00
6,000
12,000
UN
1.00
6,000
6,000
UN
5.00
6,000
30,000
30,000
UN
5.00
6,000
UN
1.00
6,000
6,000
UN
5.00
6,000
30,000
CAJA DE INSPECCION
UN
0.00
70,000
UN
1.00
40,000
40,000
INODOROS
UN
5.00
18,000
90,000
LAVAMANOS
UN
5.00
15,000
75,000
LAVAPLATOS
UN
1.00
8,000
8,000
DUCHA SENCILLA
UN
1.00
7,000
7,000
RED SANITARIA
NOMBRE PROYECTO:
OMAIRA RINCON
PROPIETARIO:
FECHA:
CANTIDADES DE OBRA
CAPITULO
ITEM
UNIDAD PRINCIPAL
UN
1.00
SUBTOTAL
MATERIALES:
49,911,619.29
PRELIMINARES
IMPREVISTOS
10%
4,991,161.93
TOTAL MATERIALES:
54,902,781.22
PAGINA 2 DE 6
May-12
UNIDAD SECUNDARIA
6,000
SUBTOTAL
MANO DE
OBRA
TOTAL PRESUPUESTO:
80,522,748
SUBTOTAL
VALOR UNITARIO
$
6,000
23,290,879
IMPREVISTOSM
$
ANO DE OBRA
2,329,088
TOTAL MANO
DE OBRA
25,619,967
NOMBRE PROYECTO:
PROPIETARIO:
OMAIRA RINCON
PRESUPUESTO DE MATERIALES
UNIDAD
VALOR
UNITARIO
CANTIDAD
TOTAL
VALOR TOTAL
MATERIAL
VIGAS
CIMIENTO
ZAPATAS
COLUMNAS
14.62
VIGAS DE
AMARRE
ENTREPISO
PLACAS
ENTREPISO
DE PISOS
65.08
VIGAS DE
AMARRE
SUPERIOR
ALISTADOS
CEMENTO
BULTO
25,000
282.9
7,071,645.17
VARILLA DE 1/4
KG
3,500
0.0
19.59
VARILLA DE 3/8
VARILLA
8,500
137.4
1,168,111.56
47.9
67.39
VARILLA DE 1/2
VARILLA
15,000
158.1
2,371,645.00
53.36
89.42
VARILLA DE 5/8
VARILLA
0.0
7.24
1.6
8.6
0.00504
0.103
0.1105
0.04
0.007
0.15
0.1638
0.05496
19.44
0.67
3.6
9.28
2.16
0.2
1.5
1.32
2.16
50,000
9.6
481,213.77
ARENA
VIAJE 6M3
$ 270,000
5.6
1,516,816.86
0.21
0.93
0.28
TRITURADO
VIAJE 6M3
$ 700,000
2.5
1,738,516.80
0.31
1.4
0.42
RELLENO
VIAJE 6M3
25,000
BLOQUE N.4
UNIDAD
1,350
3719.7
5,021,651.70
ALAMBRE
KG
3,500
46.8
163,649.41
61.04
7.73
PLAQUET
A
ELECTRICID
ENCHAPES
TANQUE
AD
ELEV
0.35
MALLA
UNIDAD
ELECTROSOLDADA
41.3305
VIGA
CANAL
2.59
53.13
22.092
5.13
9.62
0.53
1.38
2.03
3719.74
11.6
3,500
14.5
50,688.75
3.48
5.8
TABLAS
UNIDAD
15,000
46.0
689,383.33
15.47
12.96
LONA VERDE
M2
0.0
CINCO X CINCO
UNIDAD
8,000
11.5
91,917.78
3.9
3.2
CINCO X DIEZ
UNIDAD
12,000
4.4
52,600.00
4.38
GUAFAS 6M
UNIDAD
8,000
4.4
35,066.67
4.38
ENCHAPE PISOS
M2
18,000
132.8
2,390,670.00
132.82
ENCHAPE MUROS M2
15,000
48.0
720,000.00
48.00
PEGANTE
CERAMICO
BOLSA DE 2
$
KG
10,000
53.1
531,260.00
53.13
CERCHAS
ML
32,000
78.9
2,524,800.00
78.90
PERFILES
CUBIERTA
UNIDAD
0.0
TEJA N.4
UNIDAD
16,000
0.0
TEJA N.6
UNIDAD
29,000
107.4
3,114,358.33
TEJA N.8
UNIDAD
36,000
0.0
TEJA N.10
UNIDAD
43,000
0.0
ZINC 3M
UNIDAD
22,500
0.0
VENTANAS
LAMINA
M2
95,000
31.1
2,953,170.00
PUERTAS LAMINA M2
$ 110,000
33.2
3,656,400.00
VIDRIOS
M2
35,000
51.0
1,786,050.00
VINILO TIPO 2
CANECA
$ 250,000
3.6
908,287.50
ESTUCO
CANECA
0.0
CIELORRASO
M2
35,000
132.8
4,648,525.00
TUBO CONDUIT
1/2
UNIDAD
3,500
78.3
274,166.67
ROSETA
UNIDAD
3,000
19.0
57,000.00
PAGINA 3 DE 6
17.533
4.4
107.39
19.00
NOMBRE PROYECTO:
PROPIETARIO:
OMAIRA RINCON
PRESUPUESTO DE MATERIALES
UNIDAD
VALOR
UNITARIO
CANTIDAD
TOTAL
VALOR TOTAL
MATERIAL
ZAPATAS
VIGAS
CIMIENTO
VIGAS DE
AMARRE
ENTREPISO
COLUMNAS
PLACAS
ENTREPISO
DE PISOS
VIGAS DE
AMARRE
SUPERIOR
ALISTADOS
PLAQUET
A
ELECTRICID
ENCHAPES
TANQUE
AD
ELEV
VIGA
CANAL
TOMAS
UNIDAD
7,000
13.0
91,000.00
13.00
INTERRUPTORES
UNIDAD
4,500
15.0
67,500.00
15.00
1,500
19.0
28,500.00
19.00
CAJA DOBLE
UNIDAD
2,000
13.0
26,000.00
13.00
CAJA SENCILLA
UNIDAD
1,800
15.0
27,000.00
15.00
CAJA CIRCUITOS
UNIDAD
25,000
1.0
25,000.00
1.00
ALAMBRE N12
ML
1,500
423.0
634,500.00
423.00
ALAMBRE N.14
ML
1,350
211.5
285,525.00
211.50
600
80.0
48,000.00
7,000
15.0
105,000.00
12,000
3.0
36,000.00
1/8 GALON
18,000
2.0
36,000.00
UNIDAD
8,500
36.0
306,000.00
UNIDAD
65,000
18.0
1,170,000.00
UNIDAD
50,000
24.0
1,200,000.00
$ 200,000
1.0
200,000.00
950,000.00
ACCESORIOS
MENORES
(ADAPTADORES, UNIDAD
BUJES, CODOS,
UNIONES)
TUBOS 1/2 PULG
UNIDAD
PRESION
TUBOS PRESION 1
UNIDAD
PULG
PEGANTE PVC
ACCESORIOS
MENORES (
BUJES, CODOS,
UNIONES, YEES)
TUBO SANIT 4
PULG
TUBOS SANIT 3
PULG
TANQUE ELEVADO
UNIDAD
1000 LT
COMBO =
INODORO +
LAVAMANOS
UNIDAD
$ 190,000
5.0
LAVAPLATOS
UNIDAD
90,000
1.0
90,000.00
28,000
5.0
140,000.00
$ 230,000
1.0
230,000.00
60,000
0.0
3,000
66.0
198,000.00
49,911,619.29
LAVADERO
0,9X0,65
UNIDAD
DIA
PAGINA 4 DE 6
12
12
10
10
May-12
FECHA:
HIDRAULIC
OS Y
ORNAMENT.
SANITARIO
S
10.17
31.09
33.24
51.03
3.63
132.82
78.3
PAGINA 5 DE 6
CUBIERTA
PINTURA
MUROS
CIELORRASO
May-12
FECHA:
HIDRAULIC
OS Y
ORNAMENT.
SANITARIO
S
PINTURA
MUROS
CUBIERTA
CIELORRASO
80.00
15.00
3.00
2
36
18
24
1
5
1
5
1
PAGINA 6 DE 6