NAME: LS CONTRCTING LIBOR SKULIMA 9538 MOODY AVE. OAK LAWN,IL.60453 PH. 1 708 932 7526 E-MAIL:Skulinalibor@gmail.

com JOB ADDRESS: 140 Ashland,Chicago I. WE HEREBY PROPOSE TO PERFORM THE LABOR NECESSARY FOR THE COMPLETION OF: PREPARING PRIMMING CAULKING PAINTING

ALL INTERIOR SURFACES INCLUDING WALLS AND WOODWORK [METAL FRAMES] IN: OPTION 1 GROUP ROOM 18 COMPUTER ROOM 22 PHLEBOTOMY OFFICE EXAM ROMMS 12, 14,15,16,17 BREAK ROOM MEDICAL RECORDS ROOM GROUP ROOM TOXICOLOGY LAB WAITING ROOM FRONT DESK OPTION 2 REPLACE NEW AREA RUG UNDER VENDNIG MACHINES REPAIR CABINETS IN PHLEBOTOMY OFFICE[HINGES] REPLACE CERAMIC TILES IN CLIENTS WOMEN BATHROOM STALLS

II .THE ABOVE STATED TO BE COMPLETED AS FOLLOWS: PRIME ALL NEW DRYWALL DUST OFF BEFORE PRIMMING SAND ALL SUFRACES BEFORE PAINTING RENAIL ALL LOOSE AND PROTRUDING NAILS (WOODWORK) SAND ALL SURFACES BEFORE PAINTING

FILL ALL NAIL HOLES WITH WOOD FILER CAULK ALL GAPS WHERE WOOD & TRIM MEET CAULK ALL WINDOW FRAME TRIM AS NEEDED SOFT SAND ALL AREAS WHERE GLOSS IS PRESENT APPLY TWO FULL FINISH COAT TO ALL AREAS (where necessary) ALL AREAS WHERE WORK IS PERFORM WILL BE COMPLETELY REMOVE ALL LOOSE CAULKING FROM AREAS TO BE PAINTED CAULK ALL GAPS WHERE CAULK WAS REMOVED CAULK ALL GAPS WHERE WOOD & TRIM MEET COVERED WITH DROP CLOTHES THERE WILL BE PLASTER DUST DUE REPAIR WORK (SANDING) COLORS WILL BE REMAIN SAME LESIAK PAINTING GROUP WILL BE PLACED AT THE FRONT OF YOUR HOME DURING WORK III. PAINT TO BE USED:

BENJAMIN MOOR PRODUCTS GLIDDEN PRODUCTS ZINNSER 123 LATEX PRIMER KILTZ OIL PRIMER IV. CAULKING TO BE USED: SHERWIN -WILLIAMS 35 YEAR LATEX CAULK V. ALL WORK COMPLETED IN A SUBSTANTIAL WORKMANLIKE MANNER FOR THE SUM OF: ..$3.200.00 PLEASE NOTE: ABOVE PRICE DONT INCLUDE COST OF MATERIAL NEEDED FOR OPTION 2 MATERIAL FOR OPTION 1 IS INCLUDED IN PRICE ABOVE

VI. PAYMENTS TO BE MADE AS FOLLOWS: 1/3 DOWN, 1/3 HALFWAY, IF JOB EXCEEDS $ 1.500.00 , AND BALANCE UPON COMPLETION WITH NO MORE THAN A 10% HOLDBACK ON ANY ITEM. VII. 1.5 % SERVICE CHARGE FOR ANY PAYMENT OVER 30 DAYS. VIII. THIS PROPOSAL MAY BY WITHDRAW BY US IF NOT ACCEPTED WITHIN 30 DAYS.

OUR GUARANTEE LESIAK PAINTING GROUP GUARANTEES FOR A PERIOD OF ONE YEAR FROM DATE OF COMPLETION THAT IF ANY BLISTERING, POPPING, PEELING OCCURS, WE WILL AT NO CHARGE RETURN AND REPAIR THE FAILING AREAS. WE DO NOT, HOWEVER, GUARANTEE PREVIOUS COATS, METAL SURFACES, HEAVY TRAFFIC AREAS OR FAILURE DUE TO MOISTURE OR WATER DAMAGE.

RESPECTFULLY SUBMITTED

ROBERT LESIAK LESIAK PAINTING GROUP CHICAGO16/APRIL/2012

ACCEPTANCE OF PROPOSAL THE ABOVE SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY AND ARE HEREBY ACCEPTED .YOU ARE AUTHORIZED TO DO THE WORK SPECIFIED. PAYMENT WILL BE MADE AS OUTLINED ABOVE.