Company background, activities Organization structure Nos of employees Work process & the chosen work process to perform HIRARC (also to simplify in form of work process flow/ diagram) 2 to 3 pages
Click to edit Master subtitle style
6/18/12
To identify 5 safety and 3 health hazards through out the work process. To assess the safety and health hazards based on the risk matrix rating and ascertained the most critical hazards. Master subtitle style Click to edit To develop effective suggestions as control measures to manage and minimize the risk.
1.
1.
To propose appropriate recommendation to the management to ensure the effectiveness of the control measures. 6/18/12
1.
3.0 METHODOLOGY (20 MARKS) 3.1 Hazard Identification Process ***Identify & described 3 methods to identify the hazards
i.
ii. iii.
6/18/12
3.0 METHODOLOGY (20 MARKS) 3.2 Risk Assessment Technique - by using (Semi-quantitative) technique: i. Likelihood table ii. Severity table
Click to edit table (High, style iii. Relative RiskMaster subtitle Medium, Low)
6/18/12
Likelihood table
6/18/12
Severity table
Table B indicates severity using the following values
6/18/12
6/18/12
6/18/12
3.0 METHODOLOGY (20 MARKS) 3.3 One example each; safety & health hazards
Hazard Fall from height Consequences Death Likelihood 3 Severity 4 3 Risk Level 12 (Medium) 12 (Medium)
6/18/12
List down 8 hazards (5 safety, 3 health) Give priority of hazard based on risk rating (1 safety & 1 health) Table form
Hazard Identification No
Risk Analysis L S
RC R Recom
Attach Pic
Work Hazard Effect Existing Control Activity Measures Click to edit Master subtitle style
6/18/12
Risk
LXS LXS
Recommendatio n
PIC
Contractor En Ahmad
Action Plan
3 weeks after 25/ 3/ 2012
6/18/12
8.0 ATTACHMENT
5. 6. 7. 8. 9.
Introduction about the workplace (1/2 slides) Work process (1 slide) in diagram form Objective (1 slide) Methodology (5 slides: method IH, likelihood table, severity table, risk matrix table, risk relative table) Hazards summary table (list out all the hazards- 1 slide) Click Result to edit Master subtitle style Recommendation (2 slides 1 safety & 1 health hazard) Action Plan Conclusion (1 slide) e.g: Lim, Teh ***Advisable to use white for background