Chapter No. Title Acknowledgements Project Team List of Annexures About the Manual Chapter 1 Introduction 1.0 About Rajasthan State Pollution Control Board 1.1 About the Industrial Activity 1.2 Typical Sizes of Stone Crushers 1.3 Unit Operations and Technologies 1.4 Important Definitions of the Environmental Acts 1.5 Classification of Stone Crushers by RSPCB 1.6 Consent Management Delegation of Powers Environmental Acts and Legal Requirements 2.0 Legal Requirements - Water Act 2.1 Legal Requirements Air Act 2.2 Requirements of Ground Water Extraction 2.3 Legal Requirements HW Rules 2.4 Restrictions - Aravalli Range 2.5 Mount Abu Eco-Sensitive Zone Siting Guidelines for Establishment of Stone Crushers 3.0 Siting Guidelines of RSPCB Chapter 4 Statutory Clearance Process 4.0 Consent To Establish (CTE) 4.1 Consent To Operate (CTO) 4.2 Hazardous Waste Authorization 4.3 Water Cess Assessment Chapter 5 Environmental Aspects and Guidance 5.0 Sources of Emissions 5.1 Typical Emission Factors 5.2 Pollution Control Measures 5.3 Environmental Norms Checklist 6.0 Environmental Checklist Annexures
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
1 2 3 3 4 6 6
Chapter 2
7 8 8 9 9 11
Chapter 3
15
18 23 25 25
26 27 28 30
Chapter 6
31 34 - 67
ii
Acknowledgements
At the instance of Rajasthan State Pollution Control Board, the Administrative Staff College of India undertook the preparation of Environmental Guidance Manual for Stone Crushers. The initiative of RSPCB in the preparation of sector specific guidance manual is in line with National Environmental Policy 2006, which recommends code of practices for different category of industries. ASCI would like to thank the constant support extended by Dr. V.S. Singh, Chairperson and Dr. Deep Narayan Pandey, Member Secretary of RSPCB. ASCI would like to thank Shri Anand Lal Mathur, Chief Environmental Engineer for coordinating the project and for providing the guidance whenever needed. ASCI also thank the Core Group and Shri. Niraj Mathur, E.E for their valuable feedback.
iii
Project Team
Project Coordination Dr. Deep Narayan Pandey Rajasthan State Pollution Control Member Secretary Board Mr. Anand Lal Mathur Chief Environmental Engineer Core Committee - RSPCB Mr. A.K.Puri, Sr.E.E Mr. V.K. Singhal, Sr.E.E Mr. R.K.Gaur, C.S.O Mr. Pradeep Agarwal, In charge Mines, Mr. Manoj Agarwal, L.O Mr. Mahesh Rastogi, E.E Sector Group Head - RSPCB Mr. Niraj Mathur, E.E Project Team Prof. V.S. Chary ASCI Dean of Research and Management Studies Mr. V.R. Mahesh Consultant Shri. G. Bala Subramanyam Advisor, Environment Area Project Leader
iv
Annexures
Annexure No. Annexure No. 1 AnnexureNo. 2 Annexure No.3 Annexure No.4 Annexure No.5 Annexure No.6 Annexure No.7 Annexure No.8 Annexure No.9 Annexure No.10 Annexure No.11 Annexure No.12 Annexure No.13 Annexure No.14 Annexure No.15 Annexure No.16 Annexure No.17 Annexure No.18 Annexure No.19 Annexure No.20 Annexure No.21 Title Model Verification Format to be given by the Revenue Department Model Verification Format (Distance from National Parks and Sanctuaries) Model Verification Format (Distance from Reserve Forest /protected Forest ) Model format of verification format (Water Resource Dept ) Greenbelt Guidelines Consent To Establish Fee (Schedule IV)- Air Act Consent To Establish Fee (Schedule IV)- Water Act Proforma of Affidavit for CTE/CTO Areas as Identified by CGWA National Ambient Air Quality Standards Noise Ambient Air Quality Standards Certification of Capital Investment Consent To Operate Fee(Schedule IV) - Air Act Consent To Operate Fee (Schedule IV)- Water Act Consent Fee Structure with Reference To Submission Time Form V Environmental Statement HW Annual Returns Form 4 Application for HW Authorization E (P) Act Norms for Stone Crushers Noise Limits for Generator Sets run with Diesel Field Inspection Report Format Page No. 35 36 37 38 39 41 42 43 45 49 51 52 53 54 55 56 59 60 62 63 65
The manual is meant to serve as a guidance purpose only. Although every care has been taken
to avoid errors or omissions, we will not be responsible for any damage or loss to any person, for the result of any action taken on the basis of this manual. Any discrepancy found may be brought to the notice of the Board. In case of interpretation of any question related to law, the
provisions of the original law and the rules made thereunder with various government directions/resolutions will have to be read and followed. In case of amendment to the original Act/Rules/Notifications made thereunder, the provisions as amended from time to time shall be applicable.
vi
CHAPTER 1 Introduction
1.0 About Rajasthan State Pollution Control Board
The Rajasthan State Pollution Control Board (RSPCB) is a statutory authority entrusted to implement environmental laws & rules within the jurisdiction of the State of Rajasthan. The Board ensures proper implementation of the statues, judicial and legislative pronouncements related to environmental protection within the state. The Board was established in the year 1975 under the provisions of Water (Prevention & Control of Pollution) Act 1974. Over the years, RSPCB was entrusted with various responsibilities under different enactments made. Currently RSPCB is responsible, completely or partially for the implementation of following Acts and Rules: The Water (Prevention & Control of Pollution) Act, 1974 and Rules made there off The Air (Prevention & Control of Pollution) Act, 1981 and Rules made there off The Water (Prevention & Control of Pollution) Cess Act 1977 and Rules made there off The Public Liability Insurance Act, 1991 and Rules made there off The Environmental Protection Act, 1986 and Rules made there off Hazardous Wastes (Management, Handling & Transboundary Movement) Rules 2008 Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 Municipal Solid Waste (Management and Handling) Rules, 2000 Bio Medical Waste (Management and Handling) Rules, 1998 Ozone Depleting Substances (Regulation) Rules, 2000 The Batteries (Management and Handling) Rules, 2001 Fly Ash Notification as amended S.0. 2804(E) dated 3rd November 2009 Environmental Impact Assessment Notification, 2006 The Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996 The Recycled Plastic Waste (Management and Handling) Rules, 2011 The Manufacture, Use, Import, Export and Storage of Hazardous Micro Organisms, Genetically Engineered Organism or Cells Rules, 1989 Notification No. S.O. 319 (E) dated 7th May 1992 (Restricting certain activities in special specified area of Aravalli Range) Notification No. S.O. 1545 (E) dated 25th June 2009 declaring Mount Abu Eco Sensitive Zone The Noise Pollution (Regulation and Control) Rules, 2000 E-waste (Management & Handling) Rules, 2011
Tertiary crusher
Various types of crushers are used in the stone crushing industry such as Jaw Crushers, Roller Crushers, Cone Crushers, Impactor, and Rotopoctor etc. Generally, only Jaw crushers are used as Primary crushers. For secondary and tertiary crushing application either of Jaw, cone, roller, Impactor or Rotopoctor type crushers are used.
1.4 Important Definitions of the Environmental Acts The Water (Prevention & Control of Pollution) Act, 1974
Section Section 2 (d) Key word Occupier Definition In relation to any factory or premises, means the person who has control over the affairs of the factory or the premises, and includes, in relation to any substance, the person in possession of the substance Any conduit pipe or channel, open or closed, carrying sewage or trade effluent or any other holding arrangement which causes or is likely to cause pollution Contamination of water or such alteration of the physical, chemical or biological properties of water or such discharge of any sewage or trade effluent or of any other liquid, gaseous or solid substance into water (whether directly or indirectly) as may, or is likely to, create a nuisance or render such water harmful or injurious to public health or safety, or to domestic, commercial, industrial, agricultural or other legitimate uses, or to the life and health of animals or plants or of aquatic organisms Effluent from any sewerage system or sewage disposal works and includes sullage from open drains Any conduit pipe or channel, open or closed, carrying sewage or trade effluent Includes river, water course (whether flowing or for the time being dry), inland water (whether natural or artificial), sub-terranean waters, sea or tidal waters to such extent or, as the case may be, to such point as the state government may, by notification in the official gazette specify in this behalf Includes any liquid, gaseous or solid substance, which is discharged from any premises used for carrying on any industry, operation or process, or treatment and disposal system, other than domestic sewage Any body corporate, and includes a firm or other association of individuals In relation to a firm means a partner in the firm
Section 2 (dd)
Outlet
Section 2 (e)
Pollution
Section 2 (k)
Trade effluent
Company Director
Company Director
be or tend to be injurious to human beings or other living creatures or plants or property or environment The presence in the atmosphere of any air pollutant Any equipment or gadget used for the bringing of any combustible material or for generating or consuming any fume, gas of any particulate matter and approved by the State Board Any fuel approved by the State Board for the purpose of the Act Includes any structure with an opening or outlet from or through which any air pollutant may be emitted Any apparatus, device, equipment or system to control the quality and manner of emission of any air pollutant and includes any device used for securing the efficient operation of any industrial plant Any plant used for any industrial or trade purposes and emitting any air pollutant into the atmosphere Any solid or liquid or gaseous substance coming out of any chimney, duct or flue or any other outlet The person who has control over the affairs of the factory or the premises, and includes, in relation to any substance, the person in possession of the substance Any body corporate, and includes a firm or other association of individuals In relation to a firm means a partner in the firm
The Water (Prevention & Control of Pollution) Cess Act, 1977 Section 2 (a) Local Authority Municipal corporation or a municipal council (by whatever name called) or a cantonment board or any other body, entrusted with the duty of supplying the water under the law by or under which it is constituted Any operation or process, or treatment and disposal system, which consumes water or gives rise to sewage effluent or trade effluent, but does not include any hydel power unit Any body corporate, and includes a firm or other association of individuals In relation to a firm means a partner in the firm
Section 2 (c)
Industry
Company Director
The Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008 Rule 3 (l) Hazardous waste Any waste which by reason of any of its physical, chemical, reactive, toxic, flammable, explosive or corrosive characteristics causes danger or is likely to cause danger to health or environment, whether alone or
when in contact with other wastes or substances, and shall include Waste specified under column (3) of Schedule-I Wastes having constituents specified in ScheduleII if their concentration is equal to or more than the limit indicated in the said Schedule, and Wastes specified in Part A or Part B of the Schedule-III in respect of import or export of such wastes in accordance with rules 12,13 and 14 or the wastes other than those specified in Part A or Part B if they possess any of the hazardous characteristics specified in Part C of that Schedule
Appendix A projects G.S.R 73 dated 10.12.2010 of S.No 69 Stone crusher > 600 TPD and or jaw crusher size > 15 X DOE, Govt of Rajasthan 30 Appendix B projects G.S.R 73 dated 10.12.2010 of S.No 42 Stone crushers 600 TPD or jaw crusher size 15X30 DOE, Govt of Rajasthan
Restrictions on new outlets and a. Establish or take any steps to establish any industry, operation or discharges process, or any treatment and disposal system or an extension or addition thereto, which is likely to discharge sewage or trade effluent into a stream or well or sewer or on land (such discharge being hereafter in this section referred to as discharge of sewage); or b. Bring into use any new or altered outlets for the discharge of sewage; or c. Begin to make any new discharge of sewage Whoever contravenes the provision of section 25 shall be punishable with imprisonment for a term which shall not be less than one year six months but which may extend to six years and with fine
For the purpose of obtaining any consent under section 25 or section 26, knowingly or willfully makes a statement which is false in any Penalty for material particular, shall be punishable with imprisonment for a term Certain Acts which may extend to three months or with fine which may extend to or with both Section 48 Where an offence under this Act has been committed by any Department of Government, the Head of the Department shall be Offences by deemed to be guilty of the offence and shall be liable to be proceeded Government against and punished accordingly: Departments Provided that nothing contained in this section shall render such Head of the Department liable to any punishment if he proves that the offence was committed without his knowledge or that he exercised all due diligence to prevent the commission of such offence
S. No 1.
Guidelines NOC from CGWA shall not be required for abstraction of ground water in the following cases: In case of over-exploited areas abstraction < 25m3/day In case of critical areas abstraction < 50 m3/day In case of semi critical areas abstraction < 100 m3/day 2. Industry (proposed/existing) located in safe category areas, are required to obtain NOC from CGWA if ground water abstraction exceeds 1000 m3/day for hard rock areas and 2000 m3/day for alluvial areas Please refer RPCB Circular dated 08.01.2010 for further information
Every person who is engaged in generation, processing, treatment, package, storage, transportation, use, collection, destruction, conversion, offering for sale, transfer or the like of the hazardous waste shall require to obtain an authorization from the SPCB
Clearance process
Monitoring mechanism
Electrification (laying of new transmission lines) All reserved forests, protected forests or any other area shown as forest in the land records maintained by the State Government as on the date of this notification in relation to Gurgaon District of the State of Haryana and the Alwar District of the State of Rajasthan All areas shown as a. Gair Mumkin Pahar, or b. Gair Mumkin Rada, or c. Gair Mumkin Behed, or d. Banjad Beed, or e. Rundh In the land records maintained by the State Government as on the date of this notification in relation to Gurgaon district of the State of Haryana and the Alwar district of the State of Rajasthan All areas covered by notifications issued under Section 4 and 5 of the Punjab Land Preservation Act, 1900, as applicable to the State of Haryana in the district of Gurgaon up to the date of this notification All areas of Sariska National Park and Sariska Sanctuary notified under the Wildlife (Protection) Act, 1972 (53 of 1972) Any person desirous of undertaking any of the activities mentioned in the Notification No. 319 (E) dated 7th May 1992 shall submit an application to the Secretary, Department of Environment of the Government of Haryana/Rajasthan, as the case may be. The applicant shall also furnish environment impact statement and an environment management plan and such other information as may be prescribed by such State Governments. The application after due scrutiny shall be placed before the Expert Committee for its recommendations. Based on the recommendations of the Expert Committee, the Department of Environment in the State Government concerned shall take a final decision and convey the same to the applicant within the three months. Monitoring Committee, under the Chairmanship of District Collector concerned (Gurgaon in Haryana and Alwar in Rajasthan) shall inter alia monitor the compliance of the conditions stipulated while according Environmental Clearance by State Government
The District collectors of Gurgaon in Haryana and Alwar in Rajasthan shall be authorized by the respective State Governments to take necessary action under section 5 of the said Act in respect of cases where the project proponents fail to implement the conditions Appeal The MoEF retains appellate power against rejection of any proposal and provision the National Environmental Appellate Authority constituted under the National Environment Appellate Authority Act, 1997 (22 of 1997) shall continue as an Appellate Authority against approval Refer Notification No.S.O.319 (E) dated 7th May 1992 and Notification No S.O. 1189 (E) dated 29th November, 1999
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
10
a. The said eco-sensitive zone is situated in the southern area of Rajasthan in Sirohi District between 240 3342 and 240 39 00 North latitude and between 720 41 36 and 720 48 06 East longitude and the configuration of land is hilly and rugged with high altitudinal variation ranging from 300 meter to 1727 meter. Gurushikar, the highest peak of the Aravalli, is the highest peak between the Himalayas and the Nilgiris. The boundaries of the said eco-sensitive zone comprise North - Southern boundary of Abu Forest Block No.3 South - Northern Boundary of Abu Forest Block No. 1 East - Western and Southern Boundary of Abu Forest Block No.2 West - Eastern boundary of Abu Forest Block No. 3 b. The Eco-sensitive zone covers the entire area of Notified Urban Area Limit, including Mount Abu Municipal Limits adjoining Forest Block Areas c. The list of the villages in the eco-sensitive zone Sanigaon, Machgaon, Goagaon, Delwara, Oriya, Jawal, Achalgarh, Salgaon, Torna, Dudhai, Hetamji, Ama d. All activities in the Forest Block Areas (both within and outside Municipal Areas) shall be governed by the provisions of the Rajasthan Forest Act, 1953 and the Forests (Conservation) Act, 1980 (69 of 1980) and all the activities in the Protected Areas (Sanctuary) shall be governed by the provisions of the Wildlife (Protection) Act, 1972 (53 of 1972)
Regulated Activities
Zonal Master Plan Pending the preparation of the Zonal Master Plan for Eco-sensitive zone and approval thereof by the Central Government in the MoEF, 11
there shall be no increase in the existing parameters of permissible floor area ratio, permissible ground coverage, maximum number of floors and maximum height and all new constructions shall be allowed only after the proposals are scrutinized and approved by Monitoring Committee and all other development activities including additions, alterations, demolitions, repairs, renovations and restorations of buildings shall require prior approval of the Monitoring Committee provided that these do not involve structural changes and are on the existing authorized plinth areas in the Mount Abu Municipal Limits and there shall be no consequential reduction in Tribal area, Forest area, Green area and Agricultural area Industrial units Only non-polluting, non-hazardous cottage industries like ice cream, hosiery, embroidery or ready made garments, sewing works, ayurvedic drugs, etc. situated in the villages in the Notified area and service industries, agriculture, floriculture, horticulture or agro-based industries producing products from Mount Abu shall be permitted as per the guidelines drawn by the Government of Rajasthan Structure connected with small agro-based industries activities related to the needs of the local village economy and processing or storage of local agro-based products may be allowed subject to the usual non Agricultural permission requirements and a maximum of 1/8th of the plot areas being built up The quarrying and mining activities shall be restricted in the Ecosensitive zone The monitoring committee shall have the authority to grant special permission for limited quarrying of materials required for the construction of local residential housing and traditional road making and maintenance work in Mount Abu, based on site evaluation No quarrying shall be permitted on steep hill slopes with a gradient of 20 degrees or more or areas with a high degree of erosion, or on forestland
Trees
There shall be no felling of trees whether on Forest, Government, Revenue or Private lands within the Eco-sensitive zone without the prior permission of the State Government in case of forest land and the respective District Collector in case of Government, Revenue and Private land as per the procedure which shall be laid down by the State Government 12
Water
All future and existing buildings, where possible, in the Municipal Are shall provide roof-top rain water harvesting structures with plinth area and the Institutional and commercial buildings shall not draw water from existing water supply schemes in a manner that adversely affects water supply especially to local villages or settlements In Non-Municipal Areas rain water harvesting shall be undertaken through such structures as percolation tanks and storage tanks and only other means. Ground water aquifer recharge structures shall be constructed wherever such structures do not lead to slope instabilities The extraction of ground water shall be permitted only for the bona-fide agricultural and domestic consumption of the occupier of the ply and the extraction of ground water for industrial or commercial or residential estates or complexes shall require prior written permission, including of the amount that can be extracted, from the State Ground Water Department. However, the areas rich in ground water may not be delivered for construction activities The zonal Master Plan shall indicate areas of hill slopes where development shall not be permitted No development shall be undertaken in areas having a steep slope or areas which fall in fault or hazard zones or areas falling on the spring lines and first order streams or slopes with a high degree of erosion as identified by the State Government on the basis of available scientific evidence No development on existing steep hill slopes or slopes with a high degree of erosion shall be permitted
Discharge of No untreated sewage or effluent shall be permitted to be discharged sewage and into any water body or forests within the eco-sensitive zone and the effluents local authority shall provide proper drainage and treatment system for collection, treatment and disposal of untreated/and treated effluent in accordance with the provisions of the Water (Prevention and Control of Pollution) Act, 1974. Moreover, the treated sewage and treated effluent shall be disposed only at or into a point(s) identified and approved by the local authorities and the Monitoring Committee Monitoring Under the provisions of sub-section (3) of Section 3 of the Committee Environment (Protection) Act, 1986 (29 of 1986), the Central Government shall constitute a committee to be called the Monitoring Committee to monitor the compliance of the provisions of this notification
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
13
In case of activities requiring prior permission on environmental In clearance, such activities shall be referred to the State Level Environmental Impact Assessment Authority, which shall be the Competent Authority for grant of such clearances
Refer Notification No.S.O1545 (E) dated 25th June 2009 declaring Mount Abu Eco Sensitive Zone for complete details
Important
RSPCB is not according Consent To Establish to any new stone crusher industry within Mount Abu Eco Sensitive Zone.
14
Description Minimum land 600 Tonnes Per Day (TPD) or 1.0 hectare more/Jaw size > 15/30) (At least 0.50 hectare land should be set apart for plant & machinery) Less than 600 Tonnes Per Day 0.5 hectare (At least 0.25 hectare land (TPD) /Jaw size 15/30 should be set apart for plant & machinery) 02. Land ownership Stone crusher can be established on a land owned by the promoter; this also includes land taken on lease for at least 10 years. 03.Siting requirements The project site shall not be located with in a radius of 1.5 kms (aerial from revenue village distance) from Abadi area of any revenue village as defined under the provisions of Land Revenue Act Explanation: Revenue village is the village or Dhani notified as such by revenue department of the State Government and the distance is to be verified by concerned revenue officer not below the rank of Tehsildar in the model format enclosed as Annexure 1 04.Siting requirements Aerial distance from the nearest point of boundary of the project from from National / State the State/National highway must be atleast 100 meters and from other highways /other roads it shall be atleast 50 meters roads Explanation: Distance is to be measured from the boundary of the road, to be verified by concerned revenue officer not below the rank of Tehsildar in the model format enclosed as Annexure 1
05.Siting requirements from National Park / Sanctuaries / Reserved Forest / Protected Forest
Aerial distance from the nearest point of the project boundary shall be atleast 500 meters from National park and Sanctuaries and 100 meters from Reserved Forest / Protected Forest
Explanation: In cases, where the claimed distance is equal or marginally more than the above limit, the distance is to be verified by the concerned Forest Officer not below the rank of Range Officer in the model format enclosed as Annexure 2 & 3 06.Siting requirements Aerial distance of the project boundary shall be atleast 500 meters from from prominent places any prominent public sensitive places/prominent places of worship/ etc school / hospital /notified archaeological monuments Explanation: To be verified by concerned revenue officer not below the rank of Tehsildar in the model format enclosed as Annexure 1 07.Siting requirements If there is any water body in the down-stream side of the from water bodies proposed land, the aerial distance of the nearest point of
boundary of the proposed stone crusher must be atleast 1500 meters from the water body. However, if stone crusher is likely to
have adverse effect on catchment area of the water body or is likely to obstruct the flow path of a natural stream, drain, nallah, river etc. even if the land is located beyond 1500 meter from such water body, permission shall not be granted to establish stone crusher on such land. Explanation: The distance from water body must be verified by concerned Assistant Engineer, Water Resources Department (Irrigation) in the format enclosed as Annexure 4 Note: The Above mentioned distance criteria shall not be applicable for the existing stone crushers which have been established after obtaining valid consent from the State Board prior to issuance of these guidelines and do not intend to expand capacity. Provided also that in case of stone crushers established after seeking consent from the State Board, the consent shall not be renewed if it is found that: The local community has been experiencing the air pollution from the emissions and /or The water flow to the water body in the downstream is getting obstructed, and/or The project proponent has not complied with any of the conditions laid down in the consent 08. Site layout The location of the stone crushers should be such that minimum 20 requirements meter width is available on all sides from the boundary and minimum 10 meters width in all sides within boundary be reserved for plantation 09. Plantation Minimum 33% of the area for the stone crusher industry should be requirements covered by plantation At least two rows of tall trees of suitable species should be planted along the boundary on all the sides and such plantation should be carried out within a minimum width of 10 meter
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
16
If the soil is not fit for plantation, the project proponent should import soil and ensure that sapling with minimum height of 5 feet are planted The plantation should be carried out as per guidelines issued by the Board vide circular dated 15.7.04 (Annexure 5) and the pollution control measures are so adopted that the Suspended Particulate Matter conforms with the standard prescribed under the Environmental (Protection) Rules, 1986 for stone crushing unit (Sr.No 11& 37) of schedule I annexed with the said rules
Specific EMP proposal as mentioned above should be submitted along with CTE/CTO Refer RSPCB Notification No F.14 (38) Policy /RPCB/Plg/333-362 dated 21.04.2011
17
Ownership document for land, namely copy of Jamabandi, or lease deed or registered sale deed Certificate regarding distance in the prescribed formats, as per requirement - (Annexure 1,2,3 &4) Location plan of proposed site showing distance from road and nearest Abadi Layout showing the location of plant & machinery and the green belt giving to the scale dimensions and also specifying the width of green belt and distance of plant and machinery from the boundary wall Action plan for development of green belt Copy of environmental clearance issued by Department of Environment, Government of Rajasthan in case of proposal for project in Alwar district if the land falls in the purview of notification no S.O 319 (E) dated 07-05-1992or copy of Jamabandi if the project proponent claims that such land does not fall under said notification Document confirming the authorization of signatory of the application form and enclosures Note: The application form and enclosures must be submitted in triplicate to the competent authority. CTE fee is to be paid along with CTE application as notified by the DoE, Government of Rajasthan vide Notification dated 10th December 2010. Please visit www.rpcb.nic.in for details of notification. CTE fee structure is given in Annexure 6 & 7
All projects/activities generating HW as defined under the HW (MH&TM) Rules 2008 and requiring authorization thereunder, the application for consent shall be accompanied with fee equal to one and half times of the amount of fee prescribed under the schedule, other than th HW covered under category 5.1 of schedule 1 of HW (MH&TM) Rules 2008 if the quantity of waste /used /spent oil is < 5 KL per annum Instrument Demand Draft 04. What is the mode of Infavour of Member Secretary, Rajasthan State Pollution payment of CTE fee? Control Board, payable at respective Regional Office / Head office The application along with requisite documents shall be submitted 05. Where to submit the either at the concerned Regional Office of the Board or at Head CTE application? Office, Jaipur. 06. Is there any provision The Board is in the process of upgrading the systems to accept the to apply CTE application applications on line. For details visit RSPCB web site. on-line? 07. What are the areas as The details are given in Annexure 9 identified by CGWA as
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
19
safe areas, semi critical areas, critical areas & over exploited areas? 08. Who is the authority to All CTE orders will be issued by Head Office, Jaipur accord the CTE application? 09. What is the maximum Statutory time limit: time period to process the CTE application? Section 25(7) of Water (P&CP) Act, 1974 as amended: Four months on submission of application, complete in all aspects Section 21(4) of Air (P&CP) Act, 1981 as amended: Four months after receipt of the application Administrative time limits of RPCB: Red category projects Orange category projects 6 weeks 4 weeks
10. What is the mode of communication of the Hard copy By Registered Post with Ack. approval / rejection order Due of CTE? Down loads From RSPCB web 11. Is there any appeal Section 28 (1) of Water (P&CP) Act, 1974 as amended: mechanism? Any person aggrieved by the order made by the State Board under section 25, 26 and 27 may within 30 days from the date on which is communicated to him, prefer an appeal before Appellate Authority constituted by the State Government. The appellate authority may entertain the appeal after the expiry of the said period of thirty days, if such authority is satisfied that the appellant was prevented by sufficient cause from filing the appeal in time Section 31 (1) of Air (P&CP) Act, 1981 as amended: Any person aggrieved by an order made by the State Board under this Act may, within thirty day from the date on which the order is communicated to him, prefer an appeal to Appellate Authority constituted by the State Government The appellate authority may entertain the appeal after the expiry of the said period of thirty days if such authority is satisfied that the appellant was prevented by sufficient cause from filing the appeal in time 12. Whether the CTE Where a person to whom consent has been granted by the State obtained from the board Board under section 21 (4) transfers his interest in the industry to can be transferred to any nay other person, such consent shall be deemed to have been other person? granted to such other person and he shall be bound to comply with
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
20
all the conditions subject to which it was granted as if the consent was granted to him originally 13. What is the validity CTE will be valid for a period of three years or till the period for CTE? commissioning of the unit (RPCB Office order dated. 10.08.2001) 14. Are there any The MoEF had notified the following standards vide G.S.R 422 (E) standards notified specific dated 19.05.1993: to stone crushers under the provisions of the E (P) The suspended PM contribution value at a distance of 3 to 10 Rules, 1986? meters from a controlled, isolated as well as from a unit located in cluster should be less than 600 micrograms/Nm3 15. Are there any The stone crushers must adopt the following pollution control pollution control measures vide G.S.R 422 (E) dated 19.05.1993: measures notified under Dust containment cum suppression system for the equipment the provisions of E (P) Construction of wind breaking walls Rules 1986? Construction of the metalled roads within the premises Regular cleaning and wetting of the ground within the premises Growing of a green belt along the periphery 16. Are there are any Notification No. 371(E) dated 27.05.2002 E (P) Act, 1986: specific noise standards Noise limit for Diesel Generator Sets (up to 1000 KVA) applicable to D.G. Sets? manufacture on or after the 1st July, 2003 The maximum permissible sound pressure level for new diesel generator (DG) sets with rated capacity up to 1000 KVA, manufactured on or after the 1st July, 2003 shall be 75 dB (A) at 1 meter from the enclosure surface The diesel generator sets should be provided with integral acoustic enclosure at the manufacturing stage itself Noise limit for DG sets not covered above Noise from the DG set should be controlled by providing an acoustic enclosure on by treating the room acoustically, at the users end The acoustic enclosure or acoustic treatment of the room shall be designed for minimum 25 dB (A). Insertion Loss or for meeting the ambient noise standards, whichever is on the higher side (if the actual ambient noise is on the higher side, it may not be possible to check the performance of the acoustic enclosure/acoustic treatment. Under such circumstances the performance may be checked for noise reduction up to actual ambient noise level, preferably, in the nighttime. The measurement for Insertion Loss may be done at different points at 0.5m from the acoustic enclosure/room, and then averaged The DG set shall be provided with proper exhaust muffler with
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
21
Insertion Loss of minimum 25 dB (A) Requirement of certification Every manufacturer or importer of DG set to which these regulations apply must have valid certificates of type approval and also valid certificates of conformity of production for each year, for all the product models being manufactured or imported from 1st July 2003 with the noise limit specified in the Notification. The conformance label must contain the following information a. Name and address of the supplier (if the address is described in the owners manual, it may not be included in the label) b. Statement This product confirms to the Environment (Protection) Rules, 1986 c. Noise limit viz. 75 dB (A) at 1m d. Type approval certificate number e. Date of manufacture of the product 17. Is there any guideline The CPCB had evolved the minimum height of the stack to be to calculate the minimum provided to the DG set and published in Emission Regulations Part requirement of the stack IV: COINDS/26/1986-87. of D.G set? H= h+0.2 x KVA H h Total height of stack in meter Height of the building in meters where the generator set is installed KVA Total generator capacity of the set in KVA Based on the above formula the minimum stack height to be provided with different range of generator sets may be categorized as follows: For generator Sets Total height of stack in meter 50 KVA Ht. Of the building +1.5 meter 50-100 KVA Ht. Of the building +2.0 meter 100-150 KVA Ht. Of the building +2.5 meter 150-200 KVA Ht. Of the building +3.0 meter 200-250 KVA Ht. Of the building +3.5 meter 250-300 KVA Ht. Of the building +3.5 meter 18. Is there fuel Notification No. G.S.R 371 (E) dated 17th May 2002: specification applicable The specification of commercial fuel applicable for diesel gen-sets for Diesel Gen sets? shall be the same as applicable for commercial HSD (High Speed Diesel) applicable for diesel vehicles in the area, from time to time 19. Are standards notified MoEF notified National Ambient Air Quality Standards dated 16th for ambient air quality? November 2009 (Annexure 10)
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
22
20. Where shall the The ambient air quality standards in respect of noise as notified ambient noise levels be under E (P) Act, 1986 shall be monitored at the boundary of the monitored for project for compliance (Annexure 11) compliance?
23
Detail of valid source of raw material along with the copy of the consent to operate the mine owned by the project proponent and the copy of the agreement with mining lease owner (the agreement must also give reference of consent of the State Board for the operation of such mine) if the stone is to be purchased from other source Copy of the periodical reports Status of development of green belt number of plants, number of plants surviving, area already covered etc. Copy of the Environmental Statement Form V (Annexure 16) Copy of the HW annual returns Form 4 (Annexure 17), if applicable Document confirming the authorization of the signatory of the application and enclosures The application form with enclosures shall be submitted in triplicate 03. What are the Quarterly compliance report of consent conditions to Regional periodical reports to be Office & Head Office submitted to the Board? Quarterly Ambient Air Quality Monitoring report to Regional Office & Head Office Annual Environmental Statement to Regional Office & Head Office Production and dispatch details to Regional Office & Head Office Annual production details are to be submitted in the following format Month Production (Tons) Quantity of Raw Material procured from (Tons) Source 1 Source 2 Source 3
04. Who should submit the application for consent and reply to the notices etc?
The application for consent and reply to notices etc., shall be furnished by owner (including lawfully empowered attorney for such purpose) of the crusher industry. Where the owner of the stone crusher industry is a juristic person (company, firm, association etc.,) the applications must be filed/information must be furnished under the seal and signature of a person authorized for such purpose and the document confirming the authorization shall be attached
24
25
Emissions during mining activity Fugitive emissions are generated during various mining activities such as drilling, blasting, excavation, breaking and loading etc. Emissions during transportation During transportation of mined stones by heavy vehicles like trailors, trucks, dumpers, fugitive dust emission occur due to movement of heavy vehicles on earthen roads Emissions during crushing operation During crushing operation, generation of particulate emissions is inherent and the emissions are most apparent at crusher feed and discharge points. The greater the reduction in size during subsequent crushing stages from primary, secondary to tertiary crushing, the higher the emissions. Emissions during screening Forceful movement of the crushed stones in the screening process releases fine dust, this dust gets air borne as fugitive dust emissions. The released dust particles escape from the openings around the screen as well as from the bottom of discharge locations. The screening of fines produces higher emissions than the screening of coarse sizes.
Emissions during material handling In the material handling section, various handling devices like feeders, belt conveyors, bucket elevators and screw conveyors are used to transport crushed materials from one point to another. Particulates may be emitted from any of the material handling operations.
Activity Anticipated pollution Loading & unloading Dust emissions due to inter collision between large size stone of ROM boulders. Conveyance The transit moment of the crushed stone from one point to another and return of the screen rejects, contributes for fugitive dust emissions Stockpiles Free fall dust along with the screened stone chips/powder from the conveyor belts and hoppers contributes huge quantity of fugitive emissions Handling of crushed The fine dust adhered to the crushed stone gets released during the stones manual/mechanical loading and unloading stages
Primary crushing Secondary crushing screening Tertiary crushing and 3.0 screening Re-crushing and screening 0.5 Conveying and material 1.0 handling Total 5.5 Source: Comprehensive Industry Document Stone Crushers, CPCB
27
2.
3.
Belt conveyors
28
4.
5.
6.
7.
system should be installed to ensure that the dust does not go out Openings for any enclosed structure for the passage of conveyors should be fitted with flexible seals Storage piles and Bins Wherever feasible, free falling transfer points from conveyors to stockpiles should be fitted with flexible curtains or be enclosed with chutes designed to minimize the drop height. Water sprays should also be used to prevent the dust from going in to air The surface of all surge piles and stockpiles of blasted rocks or aggregates must be kept sufficiently wet by water spraying All open stockpiles for aggregates of size in excess of 5mm must be kept sufficiently wet by water spraying. The stockpiles of aggregates 5mm in size or less must be suitably covered to ensure that the same is not carried away (or whipped out) by the wind Scattered piles gathered beneath belt conveyors, inside and around enclosures must be cleared regularly Material The approach road to site of stone crusher (including the transportation storage site if it is at different place) from the nearest metalled public road for the transportation of raw material/final products must be paved or hard surfaced (e.g. Water Bound Macadam or metalled) Active haul roads inside the works should be adequately wetted with water Exhausts of trucks for transportation of rock materials within the site should be directed upward Wheel cleaning facilities should be provided for delivery trucks leaving the works for the removal of mud Trucks carrying crushed and screened products must have their loads covered with tarpaulin sheets before leaving the premises The handling and storage of the dust collected by the dust collection system must be carried out without fugitive particulate emissions Rock drilling Appropriate dust control equipment such as wet drilling or dust equipment extraction and collection system must be used during rock drilling activities where mining activity is carried out along with the stone crushing Operation and Wetting agents should preferably be added in the water used maintenance in the spraying systems so that water consumption is reduced All spraying systems used for dust suppression must be maintained in good condition and shall be used regularly.
29
The spraying system must be able to cover the areas of emission points concerned Water storage facility (minimum 3000 liters) must be provided at the stone crusher site The dust extraction and collection system must be regularly inspected and maintained in good condition and shall be used as required A high standard of housekeeping should be maintained. Any piles of materials accumulated on or around the relevant plant shall be cleaned up regularly Malfunctioning or breakdown of equipment leading to abnormal emissions should be dealt with promptly. In case of the abnormal emission due to equipment failure the process must be stopped The premises of the stone crushing industry must be clearly demarcated by barbed wire fencing/dry stone wall/stone wall boundary of adequate height 8 Standards to be The Suspended Particular matter measured between 3 meters Achieved by the Stone and 10 meters from any process equipment of a stone Crushing units crushing unit shall not exceed 600 micrograms per cubic meter as prescribed under Sr. No 11 & 37 of schedule I of Environmental (Protection) Rules, 1986. Reference: No F.14 (38) Policy / RPCB/Plg/333-362 dated 21.04.2011 of RSPCB
02.
03. 04.
05. 06.
30
CHAPTER 6 Checklist
6.0 Environmental Checklist
The project proponent and the reviewer may use the following checklist to have a better understanding on the environmental aspects and requirements
S. No
Yes
No
Remarks
1. 2.
3. 4. 5.
6.
7. 8.
Whether the proposed site meets the minimum land area requirements as per RSPCB guidelines? Whether the proposed site meets minimum aerial distance criteria from Abadi area of revenue village as defined under the provisions of Land Revenue Act? Whether the proposed site meets minimum distance criteria from the road network? Whether the proposed site meets minimum distance criteria from the national park and sanctuaries? Whether the proposed site meets the minimum distance criteria from reserve forest/protected forest/un classified forest? Whether the proposed site meets the minimum distance criteria from prominent public sensitive places/prominent places of worship /school /hospital /notified archeological monuments? Whether the proposed site meets the minimum distance criteria from water bodies? Whether the proposed project is in conformity with the approved master plan/development plan of the area, if any? Whether the proposed project requires change of land use and if so, the status of obtaining statutory approval from the competent authorities?
9.
Layout Design 10. Whether the layout is designed to meet the minimum distance criteria between plant/machinery and nearest point of any side of the boundary? Greenbelt Development 11. 12. 13. 14. Whether the greenbelt is planned in the proposed site? Whether the soil conditions of the site are suitable for development of greenbelt as per the norms? Whether the layout is designed to meet the criteria to develop greenbelt as per the guidelines? Whether availability of the water for plantation development is identified? Air Environment 16. 17. 18. 19. 20. 21. 22. 23. Whether the pollution control measures for crushing unit operation are furnished adequately? Whether the pollution control measures for Vibratory screens and Grizzlies are furnished adequately? Whether the pollution control measures for belt conveyors are furnished adequately? Whether the pollution control measures at storage piles and bins are furnished adequately? Whether the pollution control measures during material transportation are furnished adequately? Whether the pollution control measures during drilling operation are furnished adequately? Whether the reliable source, quantity and availability of the water for peek demand is furnished? Whether the provision of water meters is proposed to assess on the continuous usage of water spray system? Water Environment 24. Whether any trade effluent or sewage discharge is anticipated from the project?
Noise Environment 25. Whether noise due to unit operations of the crushers and DG set is addressed?
32
Raw material 26. Whether the stone crusher is having valid source of raw material either in self-ownership or with proper legal arrangement, namely, contracts with the owner of valid source of the raw material? Solid Waste 27. 28. Whether the generation of hazardous waste is assessed? Whether the HW disposal management system is furnished?
33
======================================================================
Annexures
======================================================================
34
35
Annexure 2
36
37
This is to certify that there is no water body within 1500 meters on the downstream of the proposed site for the stone crusher (Khasra No., Village). This is also certified that the proposed site does not adversely affect the catchment area of any water body
38
Annexure -5 Greenbelt Guidelines Copy of circular No. F. 14 (4) RPCB/plg/Policy/5804 to 5825 dated 15/07/2004 Entry no. 37 of schedule-I of Environment (Protection) Rules 1986 has stipulated that in respect of stone crushing units, the concerned unit would be required to grow a green belt along the periphery. The Board has also incorporated a condition of 33% of the units area as being required to be covered by plantation, while granting consent to these units to operate under the Air (Prevention & Control of Pollution) Act 1981. However the numbers of trees, species etc and the manner of their plantation have not been specified by either the Board or the Environment (Protection) Rules, 1986. In view of the difficulty being experienced in implementing this requirement, following clarification is hereby issued:1. Trees shall necessarily be planted along the periphery of the area in rows. The unit may also take up additional plantation in other available open areas such as along the road, on unused land etc. 2. The computation of the area under plantation shall be done on the basis of the following norms: i. Tree species like Neem, Pipal, Jamun, Gulmohar etc. shall be deemed to cover 25 M2 areas on maturity ii. Shrubs like Guava, Pomegranate, Jungle Jalebi etc. shall be deemed to cover an area of 9 M2 on maturity. The area likely to be covered by the plants mentioned above shall be computed accordingly. The herbs which require continuous watering for their maintenance shall not be counted to meet the norms though the can be planted by the management as per their need
Illustration: In case of 10 no. of trees like Sehtoot, Siris, Shisham, Babool; 5 no. of Shrubs like Eucalyptus, Ashok, Ber Kair and 20 no of Herbs like Rose, Mehandi, Duranta, Merigold are planted the total area under plantation shall be computed as follows Area covered by trees Area covered by shrubs Area covered by herbs Total Area = = = = 10x 25 = 250 m2 05x 09 = 045 m2 20x 00 = 000 m2 295 m2
-SdMember Secretary
39
40
Annexure - 6 Consent To Establish Fee (Schedule IV) Air Act S. No Capital Investment of the Industry (Rs.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Upto 5 Lacs More than 5 Lacs upto 10 Lacs More than 10 Lacs upto 25 Lacs More than 25 Lacs upto 50 Lacs More than 50 Lacs upto 1 Crore More than 1 Crore upto 5 Crore More than 5 Crore upto 10 Crore More than 10 Crore upto 25 Crore More than 25 Crore upto 50 Crore More than 50 Crore upto 100 Crore More than 100 Crore upto 250 Crore More than 250 Crore upto 500 Crore More than 500 Crore upto 750 Crore More than 750 Crore upto 100 Crore Consent Fee to Establish (Rs) Appendix A 3,000 4,500 6,000 9,000 15,000 18,000 24,000 30,000 37,500 45,000 1,05,000 1,27,500 1,50,000 1,87,500 Appendix B Other than Appendix A and B 2,000 1,000 3,000 4,000 6,000 10,000 12,000 16,000 20,000 25,000 30,000 70,000 85,000 1,00,000 1,25,000 1,500 2,000 3,000 5,000 6,000 8,000 10,000 12,500 15,000 35,000 42,500 50,000 62,500 75,000
15 Above 1000 Crore 2,25,000 1,50,000 th December, 2010 for details, DoE, Rajasthan Refer Notification dated 10
Note: 1. The categorization of the projects is as Notified by the DOE, Government of Rajasthan vide dated 10th December, 2010 2. All projects requiring environmental clearance under the Environmental (Protection) Act, 1986 shall pay an extra amount of Rs. 15,000/- as one time consent fee to establish in addition to that mentioned in Schedule. 3. All industries/process/projects/activities generating HW as defined under the HW (MH&TM) Rules 2008 and requiring authorization thereunder, the application for consent shall be accompanied with fee equal to one and half times of the amount of fee prescribed under the schedule, other than th HW covered under category 5.1 of schedule 1 of HW (MH&TM) Rules 2008 if the quantity of waste /used /spent oil is < 5 KL per annum Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
41
Annexure - 7 ConsentToEstablishFee(Schedule IV)WaterAct S. Capital Investment of the Industry No (Rs.) 1 Upto 5 Lacs 2 More than 5 Lacs upto 10 Lacs 3 More than 10 Lacs upto 25 Lacs 4 More than 25 Lacs upto 50 Lacs 5 More than 50 Lacs upto 1 Crore 6 More than 1 Crore upto 5 Crore 7 More than 5 Crore upto 10 Crore 8 More than 10 Crore upto 25 Crore 9 More than 25 Crore upto 50 Crore 10 More than 50 Crore upto 100 Crore 11 More than 100 Crore upto 250 Crore 12 More than 250 Crore upto 500 Crore 13 More than 500 Crore upto 750 Crore 14 More than 750 Crore upto 100 Crore Consent Fee to Establish (Rs) Appendix A 3,000 4,500 6,000 9,000 15,000 18,000 24,000 30,000 37,500 45,000 1,05,000 1,27,500 1,50,000 1,87,500 Appendix B Other than Appendix A and B 2,000 1,000 3,000 4,000 6,000 10,000 12,000 16,000 20,000 25,000 30,000 70,000 85,000 1,00,000 1,25,000 1,500 2,000 3,000 5,000 6,000 8,000 10,000 12,500 15,000 35,000 42,500 50,000 62,500 75,000
15 Above 1000 Crore 2,25,000 1,50,000 Refer DOE, Rajasthan Notification dated 10th December, 2010 for details
Note: 1. The categorization of the projects is as Notified by the DOE, Government of Rajasthan vide dated 10th December, 2010 2. All projects requiring environmental clearance under the Environmental (Protection) Act, 1986 shall pay an extra amount of Rs. 15,000/- as one time consent fee to establish in addition to that mentioned in Schedule. 3. All industries/process/projects/activities generating HW as defined under the HW (MH&TM) Rules 2008 and requiring authorization thereunder, the application for consent shall be accompanied with fee equal to one and half times of the amount of fee prescribed under the schedule, other than th HW covered under category 5.1 of schedule 1 of HW (MH&TM) Rules 2008 if the quantity of waste /used /spent oil is < 5 KL per annum Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
42
Annexure 8
I, _______________ (with name and designation) S/o Shri __________________ Resident of __________________ do solemnly affirm and declare as under:1. 2. 3. 4. 5. 6. 7. That I am responsible for establishing / operating the unit named M/s. _________________________ (Name & address of the unit). That I, ____________________ (with name and designation) am authorized to sign the consent application form and other enclosures with the application. That the plot area of the unit is ____________________ Sq. Meters. That the number of workers to carry out various activities in the unit is _________________________. That the total number of employees proposed in the unit is _______________. That the total capital investment on the project is Rs. _________________. That this Consent to Establish/Operate is being obtained for manufacturing of/providing service for ________________ up to _________________ per year. In case of any increase/change in capacity or addition/modification/alteration or change in process or raw material or project or discharge points, we will obtain fresh Consent to Establish. That the quantity of trade/domestic effluent shall not exceed __________ KLD. The mode of disposal shall be ________________. In case of any increase in quantity of effluent or alteration in outlet or mode of disposal, we shall obtain prior consent from the Board.
8.
OR That there will no effluent discharge from the premises (applicable only in the case of dry units). 9. 10. That the industry is a small/medium/large scale unit with SSI Registration No. / DGTD Registration No. /Letter to Intent No. ___________________. That all adequate measures for control / treatment / disposal of water/air pollution and Hazardous solid waste from the various processes/activities will be taken to meet the prescribed standards as per the Environment (Protection) Rules, 1986 as amended to date and/ or as stipulated by the RSPCB.
43
11. 12.
That adequate pollution control measures will be provided to comply the norms That if Diesel Generator Sets (of capacity 5 KVA or more) shall be installed it will be EcoFriendly or with inbuilt acoustic enclosures to meet the prescribed norms w.r.t. noise as per the Gazette Notification on Ministry of Environment & Forests, Government of India dated 2.1.1999. Adequate stack height with D.G. Set(s) shall also be provided and maintained and shall submit noise monitoring report. That all orders and directions issued by the Board from time to time shall be complied with. That the name and addresses of Managing Director or other working Directors or Partner shall be given ____________ under. Any change there of shall be intimation immediately to the State Board. DEPONENT
13. 14.
VERIFICATION
Verified at _____________ on this __________ (day, month and year) that the above contents of this affidavit are true and correct to the best of my knowledge and belief and nothing has been concealed there from.
DEPONENT Note: The aforementioned Affidavit must be duly signed by the Deponent and duly attested by the Notary Public thereof. Note: Please omit whatever is not applicable.
44
Ajmer
1.kekri 2. Masuda
Alwar
14
1.Thanagaji
Banswara
Pipalkunt
Gadi
Baran
1.Anta
Barmer
1.Chuhtan 2.Singhri
Bharatpur
1.Bayana
Bhilwara
11
1. 2. 3.
45
8 9 10
5 4 14
1. Lunkaransar 2. Kolayat
1. Dungargarh
6.Mandalgarh 7.Raipur 8.suwana 1. Bikaner 2. Nokha 1. Hindoli 2. Nainwa 1. Amod 2. Bari Sadri 3. Begun 4. Bhadesar 5. Bhopalsagar 6. Chhotisadri 7. Chittorgarh 8. Dungla 9. Gangrar 10. Kapasan 11. Nimbahera 12. Pratapgarh 13. Rashmi 1. Rajgarh
11
Churu
1. Sujangarh -
12
Dausa
13 14 15
4 5 7
1. Bari 1. Aspur 1. Anupgarh 2. Ganganagar 3. Karanpur 4. Padampur 5. Raisingh nagar 6. Sadulshahar 7. Suratgarh 1. Bichhiwara 2. Dungarpur
46
16 Hanumangarh
1. Bhadra 2. Hanumangarh 3. Nohar 1. Dudu 2. Phagi 1. Amer 2. Bairath 3. Bassi 4. Chaksu 5. Govindgarh 6. Jamwa Ramgarh 7. Jhotwara 8. Kotputli 9. Sambher 10. Sanganer 11. Shahpura 1. Jaisalmer 2. Sankra 1. Ahore 2. Bhinmal 3. Jalore 4. Jaswantpura 5. Raniwara 6. Sanchore 7. Sayla 1. Bakani 2. Dag 3. Jhalra Patan 4. Khanpur 1. Alsisar 1. Manoha Thana 2. Pirawa
17 Jaipur
13
18 Jaisalmer 19 Jalore
3 7
1. Sam
20 Jhalawar
21 Jhunjhunu
1. Bhuhana 2. Chirawa 3. Jhunjhunu 4. Khetri 5. Nawalgarh 6. Surajgarh 7. Udaipurwati 1. Phalodi 1. Balesar 2. Bhopalgarh 3. Bilara 4. Mandore 5. Osaian 1. Hindaun 1. Sapotra 2. Karauli 3. Todabhim 1. Sultanpur 1. Itawa 2. Khairabad 3. Ladpura 4. Sangod 1. Luni 2. Shergarh
22 Jodhpur
1. Bap
23 Karauli
1. Nadauti
24 Kota
47
25 Nagaur
11
1. Nagaur
1. Ladnu
26 Pali
10
27 Rajsamand
1. Degana 2. Didwana 3. Kuchaman 4. Merla 5. Mundwa 6. Parbaisar 7. Riyan 1. Jaitaran 1. Bali 2. Kharchi 2. Desuri 3. Rani 3. Pali 4. Sojat 4. Raipur 5. Sumerpur 5. Rohit 1. Railmagra 1. Amet 2. Rajsamand 2. Bhim 3. Deogarh 4. Khamnor 5. Kumbhalgarh 1. Jayal 2. Makrana 1. Bamanwas 1. Gangapur 2. Sawai Madhopur 2. Bonli 3. Khandar
28 Sawaimadhopur 5
29 Sikar
1. Fatehpur
30 Sirohi
1. Danta Ramgarh 2. Dhod 3. Khandella 4. Lachhmangarh 5. Neem Ka Thana 6. Piprali 7. Sri Madhopur 1. Abu Road 1. Reodar 2. Pindwara 2. Sheoganj 3. Sirohi 1. Deoli 2. Malpura 3. Newai 4. Toda Rai Singh 5. Tonk 1. Kherwara 2. Kotra 3. Sarada 1. Untara
31
Tonk
32 Udaipur
11
50
48
Annexure-10
(1) 1
(3) Annual* 24 hours** Annual* 24 hours** Annual* 24 hours** Annual* 24 hours** 8 hours** 1 hour** Annual* 24 hours**
Particulate Matter (Size less than 10m) or PM10g/m3 Particulate Matter (Size less than 2.5m) or PM2.5g/m3 Ozone (O3) g/m3 Lead (Pb) g/m3
Concentration in Ambient Air Ecologically Methods of sensitive area measurement (notified by central government) (5) (6) 20 -Improved West & Gaeke -Ultraviolet fluorescence 80 30 -Modified Jacob & Hochheiser (Na80 arsenite) -Chemiluminescence 60 - Gravimetric - TOEM 100 - Beta attenuation 40 60 100 180 0.50 1.0 - Gravimetric - TOEM - Beta attenuation - UV photometric - Chemiluminescence - Chemical method -AAS/ICP method after sampling on EPM 2000 or equivalent filter paper -ED-XRF using Teflon filter -Non Dispersive Infra Red (NDIR) spectroscopy - Chemiluminescence - Indophenol blue method -Gas chromatography based continuous analyzer -Adsorption and Desorption followed by
Carbon Monoxide (CO) mg/ m3 Ammonia (NH3) g/m3 Benzene (C6H6) g/m3
02 04 100 400 05
02 04 100 400 05
49
10
11
Benzo(a)Pyrene (BaP) particulate phase only, ng/m3 Arsenic (As) ng/m3 Nickel (Ni) ng/m3
Annual*
01
01
GC analysis -Solvent extraction followed by HPLC/GC analysis -AAS/ICP method after sampling on EPM 2000 or equivalent filter paper -AAS/ICP method after sampling on EPM 2000 or equivalent filter paper
Annual*
06
06
12
Annual*
20
20
* Annual arithmetic mean of minimum 104 measurements in a year at a particular site taken
50
Note:
1. Day time shall mean from 6.00 a.m. to 10.00 p.m. 2. Night time shall mean from 10.00 p.m. to 6.00 a.m. 3. Silence zone is an area comprising not less than 100 meters around hospitals, educational institutions, courts, religious places or any other area, which is declared as such by the competent authority. 4. Mixed categories of areas may be declared as one of the four above-mentioned categories by the competent authority. * dB(A) Leq denotes the time weighted average of the level of sound in decibels on scale A which is relatable to human hearing. A decibel is a unit in which noise is measured. A, in dB(A) Leq, denotes the frequency weighting in the measurement of noise and corresponds to frequency response characteristics of the human ear. Leq: It is an energy mean of the noise level over a specified period. (Source: Noise pollution (Regulation and control) Rules, 2000)
51
Annexure- 12 Certificate of Capital Investment (To be issued by Chartered Accountant) This is to certify that the total capital investment (without deprecation) made by the project proponent M/s.. for the project situated at . as on the end of the financial year 31st March of financial year .is Rs .. .The details of investment in various subheads are as follows S.No 1 2 3 4 Item Land Building Plant & Machinery Miscellaneous fixed Assets Total Investment in Lakhs
Note: In case of Limited company (public /private) or partnership firm please enclose copy latest balance sheet In case of the project or any item of the project is taken on lease or on rent investment will include the cost of the item /project incurred by the owner / lessor of
52
S. No. 1 1 2 3 4 5 6
Upto 5 Lacs More than 5 lacs upto 10 lacs More than 10 lacs upto 25 lacs More than 25 lacs upto 50 lacs More than 50 lacs upto 1 crore More than 1 crore upto 5 6400 17000 5600 crores 7 More than 5 crores upto 10 8000 22000 7000 crores 8 More than 10 crores upto 25 9600 26000 8400 crores 9 More than 25 crores upto 50 12000 33000 10500 crores 10 More than 50 crores upto 100 22000 60000 19000 crores 11 More than 100 crores upto 250 31000 84000 26000 crores 12 More than 250 crores upto 500 44000 120000 38000 crores 13 More than 500 crores upto 750 53000 145000 45000 crores 14 More than 750 crores upto 57000 155000 49000 1000 crores 15 Above 1000 crores 61000 166000 53000 th Ref: Notification dated 10 December 2010, DoE, Govt of Rajasthan
For Consent To Operate Other than Appendix A Appendix A Appendix B and B For 1 For 3 Years For 1 For 5 For 1 Year For 10 Years Year Year Years 3 4 5 6 7 8 1400 4000 1200 5000 1000 9000 2100 6000 1800 8000 1500 13500 2800 8000 2400 11000 2000 18000 4000 11000 3500 16000 3000 27000 4800 13000 4200 19000 3600 32000 25000 32000 38000 48000 86000 120000 175000 205000 225000 245000 4800 6000 7200 9000 15000 21000 30000 36000 39000 42000 43000 54000 65000 81000 135000 189000 270000 324000 351000 378000
1. The categorization of the projects is as Notified by the DOE, Government of Rajasthan vide dated 10th December, 2010 2. All industries/process/projects/activities generating HW as defined under the HW (MH&TM) Rules 2008 and requiring authorization thereunder, the application for consent shall be accompanied with fee equal to one and half times of the amount of fee prescribed under the schedule, other than th HW covered under category 5.1 of schedule 1 of HW (MH&TM) Rules 2008 if the quantity of waste /used /spent oil is < 5 KL per annum 3. The Concessional fee for consent to operate shall only be applicable for the period as specified in the schedule and no concessional fee is applicable for intervening period
53
S. No. 1
2 Upto 5 Lacs More than 5 lacs upto 10 lacs More than 10 lacs upto 25 lacs More than 25 lacs upto 50 lacs More than 50 lacs upto 1 crore More than 1 crore upto 5 crores More than 5 crores upto 10 8000 22000 7000 crores 8 More than 10 crores upto 25 9600 26000 8400 crores 9 More than 25 crores upto 50 12000 33000 10500 crores 10 More than 50 crores upto 100 22000 60000 19000 crores 11 More than 100 crores upto 250 31000 84000 26000 crores 12 More than 250 crores upto 500 44000 120000 38000 crores 13 More than 500 crores upto 750 53000 145000 45000 crores 14 More than 750 crores upto 57000 155000 49000 1000 crores 15 Above 1000 crores 61000 166000 53000 Ref: Notification dated 10th December 2010, DoE, Govt of Rajasthan 1 2 3 4 5 6 7
For Consent To Operate Appendix A Appendix B Other than Appendix A and B For 1 For 3 For 1 For 5 Years For 1 Year For 10 Years Year Years Year 3 4 5 6 7 8 1400 4000 1200 5000 1000 9000 2100 6000 1800 8000 1500 13500 2800 8000 2400 11000 2000 18000 4000 11000 3500 16000 3000 27000 4800 13000 4200 19000 3600 32000 6400 17000 5600 25000 4800 43000 32000 38000 48000 86000 120000 175000 205000 225000 245000 6000 7200 9000 15000 21000 30000 36000 39000 42000 54000 65000 81000 135000 189000 270000 324000 351000 378000
1. The categorization of the projects is as Notified by the DOE, Government of Rajasthan vide dated 10th December, 2010 2. All industries/process/projects/activities generating HW as defined under the HW (MH&TM) Rules 2008 and requiring authorization thereunder, the application for consent shall be accompanied with fee equal to one and half times of the amount of fee prescribed under the schedule, other than th HW covered under category 5.1 of schedule 1 of HW (MH&TM) Rules 2008 if the quantity of waste /used /spent oil is < 5 KL per annum 3. The Concessional fee for consent to operate shall only be applicable for the period as specified in the schedule and no concessional fee is applicable for intervening period
54
Annexure 15 Consent Fee Structure with Reference to Submission Time of CTO Application Consent To Operate (First Time) S.No 1 2 Time of making an application to the State Board for Consent to Operate If made, at least four months before the expiry of period of consent to establish If made, between four to three months, before the expiry of period of consent to establish Consent Fee Fee as per Schedule IV
With additional fee of 25% of the fee prescribed in Schedule IV If made, between three to two months before the With additional fee of 50% of expiry of period of consent to establish the fee prescribed in Schedule IV If made, between two to one month, before the With additional fee of 75% of expiry of period of consent to establish the fee prescribed in Schedule IV If made, with in one months, before the expiry of With additional fee of 100% period of consent to establish (double the amount) of the fee prescribed in Schedule IV
Consent To Operate (Renewal) S.No 1 2 Time of making an application to the State Board for Consent to Operate If made, at least four months before the expiry of period of consent to operate If made, between four to three months, before the expiry of period of consent to operate Consent Fee Fee as per Schedule IV
With additional fee of 25% of the fee prescribed in Schedule IV 3 If made, between three to two months before the With additional fee of 50% of expiry of period of consent to operate the fee prescribed in Schedule IV 4 If made, between two to one month, before the With additional fee of 75% of expiry of period of consent to operate the fee prescribed in Schedule IV 5 If made, with in one months, before the expiry of With additional fee of 100% period of consent to operate (double the amount) of the fee prescribed in Schedule IV Ref: G.S.R 38 Dated 24 June 2010 of Department of Environment, Govt.of Rajasthan
55
Annexure -16
Form-V
(See rule 14) Environmental statement for the financial year ending the 31st March Part A Name and address of the owner/occupier of the industry operation or process Industry category primary- (STC Code) Secondary- (SIC Code) Production capacity Year of the establishment Date of last environmental statement submitted Part B Water and Raw Material Consumption (1) Water consumption m3/d Process Cooling Domestic Name of Products Process Water consumption per unit of product output During the Previous During the current Financial year financial year (1) (2)
Name of products
Consumption of raw material per unit of output -------------------------------------------------------------------During the previous during the current Financial year financial year
56
*Industry may use codes if disclosing details of raw material would violate contractual obligations; otherwise all industries have to name the taw materials used. Part C Pollution discharged to environment/unit of output (Parameter as specified in the consent issued) (1) Pollutants Quality of pollutants discharged (mass/day) Concentrations of pollutants discharges (Mass/volume) Percentage of variation from prescribed standards with reasons
(a) Water (b) Air Part D Hazardous Wastes (As specified under hazardous wastes (Management and Handling) Rules, 1989) Hazardous Wastes Total Quantity (Kg) During the Previous Financial year
a. From process b. From pollution control facilities Part E Solid Wastes Total Quantity -----------------------------------------------------During the Previous During the current Financial year financial year a. From process b. From pollution control facilities c. (1) Quantity recycled or reutilized within the unit. (2) Sold (3) Disposed
57
PART F Please specify the characterizations (in terms of composition of quantum) of hazardous as well as solid wastes and indicate disposal practice adopted for both these categories of wastes. PART G Impact of the pollution abatement measures taken on conservation of natural resources and on the cost of production. PART H Additional measures/investment proposal for environmental protection including abatement of pollution, prevention of pollution PART I Any other particulars for improving the quality of the environment
58
Annexure -17 HW Annual Returns FORM 4 [See rules 5 (6) and 22 (2)] To be submitted by occupier/operator of disposal facility of Sate Pollution Control Board/Pollution Control Committee by 30th June of every year for the preceding period April to March : 1. Name and address of the generator/operator of facility 2 Name of the authorized : person and full address with telephone and fax number 3. Description of hazardous : Physical form with Chemical form waste description
4.
5. 6. 7.
: : :
Mode of packing
Mode of transportation
Date of transportation
8.
Mode of packing
Mode of transportation
Date of transportation
9.
Quantity in Tonnes/KL
*Delete whichever is not applicable # Enclose list of other agencies Date: .. Place: ..
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
Signature: Designation:
59
Annexure -18 Application for Hazardous Waste Authorization From: . To The Member Secretary, ..Pollution Control Board/Pollution Control Committee Sir, I/We hereby apply for authorization/renewal of authorization under sub-rule (3) of Rule 5 of the Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008 for collection/reception/treatment/transport/storage/disposal of hazardous wastes. For Office Use Only 5. Code No. 6. Whether the unit is situated in a critically polluted area as identified by Ministry of Environment and Forests To be filled in by Applicant Part A: General 3. a. Name and address of the unit and location of activity: b. Authorization required for (please tick mark appropriate activity/activities): i. Collection ii. Reception iii. Treatment iv. Transport v. Storage vi. Disposal c. In case of renewal of authorization previous authorization number and date a. Whether the unit is generating hazardous waste as defined in these rules b. If so the type and quantity of wastes (in Tonnes/KL) a. Total capital invested on the project (in rupees) b. Year of commencement of production c. Whether the industry works general/2shifts/round the clock a. List and quantum of products and by-products (in Tinnes/KL) b. List and quantum of raw material used (in Tonnes/KL)
4. 5.
6.
: : : : : : :
7. Furnish a flow diagram of manufacturing process showing input and output in terms of products, waste generated including for captive power generation and demineralised water
Rajasthan State Pollution Control Board
Environmental Guidance Manual Stone Crushers
60
Part B: Hazardous Waste 8. Hazardous Wastes: a. Type of hazardous wastes generated as defined under these rules : b. Quantum of hazardous waste generated : c. Sources and waste characteristics : (Also indicate wastes amenable to recycling, re-processing and reuse) d. Mode of storage within the plant, method of disposal and capacity : (Provide details) 9. Hazardous wastes generated as per these Rules from storage of hazardous chemicals as defined under the Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 Part C: Treatment, Storage and Disposal Facility 10. Detailed proposal of the facility (to be attached) to include i. Location of site (provide map) ii. Name of waste processing technology iii. Details of processing technology iv. Type and quantity of waste to be processed per day v. Site clearance (from local authority, if any) vi. Utilization programme for waste processed (product utilization) vii. Method of disposal(details in brief be given) viii. Quality of waste to be displayed per day ix. Nature and composition of waste x. Methodology and operational details of land filling/incineration xi. Measures to be aken for prevention and control of environmental pollution including treatment of leachate xii. Investment on project and expected returns xiii. Measures to be taken for safety of workers working in the plant Place: Date: : : : : : : : : : : : : : :
Signature:.. Designation:.
61
Annexure -19 E (P) Act Norms for Stone Crushers In case of stone crushing units, the suspended PM contribution value at a distance of 3 to 10 meters from a controlled, isolated as well as from a unit located in cluster should be less than 600 micrograms/Nm3. These units must also adopt the following pollution control measures 1. Dust containment cum suppression system for the equipment 2. Construction of wind breaking walls 3. Construction of the metalled roads within the premises 4. Regular cleaning and wetting of the ground within the premises 5. Growing of a green belt along the periphery (Source: G.S.R. 422 (E) dated 19.05.1993 as amended vide G.S.R 801 (E) dated 31.12.1993)
62
Annexure -20 Noise Limits for Generator Sets run with Diesel 1. Noise limit for diesel generator sets (up to 1000 KVA) manufacture on or after the 1st July 2003 The maximum permissible sound pressure level for new diesel generator (DG) sets with rated capacity up to 1000 KVA, manufactured on or after the 1st July, 2003 shall be 75 dB (A) at 1 meter from the enclosure surface The diesel generator sets should be provided with integral acoustic enclosure at the manufacturing stage itself The implementation of noise limit for these diesel generator sets shall be regulated as given in paragraph 3 below 2. Noise limit for DG sets not covered by paragraph 1 Noise limits for diesel generator sets not covered by paragraph 1, shall be as follows: 2.1 Noise from DG set shall be controlled by providing an acoustic enclosure or by treating the room acoustically, at the users end 2.2 The acoustic enclosure or acoustic treatment of the room shall be designed for minimum 25 dB (A) insertion loss or for meeting the ambient noise standards, whichever is on the higher side (if the actual ambient noise is on the higher side, it may not be possible to check the performance of the acoustic enclosure/acoustic treatment. Under such circumstances the performance may be checked for noise reduction up to actual ambient noise level, preferably, in the nighttime). The measurement for insertion loss may be done at different points at 0.5m from the acoustic enclosure/room, and then averaged 2.3 The DG set shall be provided with proper exhaust muffler with insertion loss of minimum 25 dB (A) 2.4 these limits shall be regulated by the State Pollution Control Boards and the State Pollution Control Committees 2.5 Guidelines for the manufacturers/users of Diesel Generator sets shall be as under: 01. The manufacturer shall offer to the user a standard acoustic enclosure of 25 dB (A) insertion loss and also a suitable exhaust muffler with insertion loss of 25 dB(A) 02. The user shall make efforts to bring down the noise levels due to the DG set; outside hid premises, within the ambient noise requirements by proper siting and control measures
63
03. Installation of a DG set must be strictly in compliance with the recommendations of the DG set manufacturer 04. A proper routine and preventive maintenance procedure for the DG set should be set and followed in consultation with the DG set manufacturer which would help prevent noise levels of the DG set from deteriorating with use 3. Limits of noise for DG Sets (Up to 1000 KVA) Manufactured on or after the 1st July 2003 3.1 Applicability 01. These Rules apply to DG sets up to 1000 KVA rated output, manufactures of imported in India, on or after 1st July 2003 02. These rules shall not apply to a. DG sets manufactures or imported for the purpose of exports outside India; and b. DG sets intended for the purpose of sample and not for sale in India (Please refer Notification No. G.S.R. 371 (E) dated 17th May, 2002 for details)
64
Annexure -21
Field Inspection Report of Stone Crushers Pollution Control Measures - Crushing Units
Name and location of the unit: Inspection conducted on Date of inspection : :
Representative of the unit : Details of pollution control measures: Crushers SNO 1. 2. 3. 4. 5. 6. 7. 8. 9. SOURCE Details of PCM Whether the crushers are placed under enclosures Inlet of secondary stone crusher The outlet of primary stone crusher Outlet of all secondary stone crusher Inlet of tertiary stone crusher Outlet of tertiary stone crusher Water sprayers at the feeding inlet of stones crushers Yes/no Whether enclosures are rigid and fitted with self closing doors and close fitting entrances and exits Whether flexible covers installed at entries and exits of the conveyors to the enclosure Vibratory Screens And Grizzlies Unit SNO 1 2 SOURCE Details of PCM Whether totally enclosed in rigid and reasonably dust tight housing Whether flexible covers installed at entries and exits of the conveyors to the house or provided a dust extraction and collection system Whether all grizzlies are enclosed on top and from three sides Whether water sprayers installed at the feeding and outlet areas Belt Conveyors SNO 1 2 SOURCE Details of PCM Whether all transfer points to and from conveyors are enclosed or placed within a totally enclosed structure Whether water sprayers installed
3 4
65
Does opening for any enclosed structures for the passage of conveyors is fitted with flexible seals Storage Piles and Bins
SNo 1 2
3 4 5
SOURCE Details of PCM For free falling transfer points from conveyors to stockpiles the industry has provided Whether water spraying system provided to keep the surface of all surge piles and stock piles of blasted rocks and aggregates sufficiently wet Whether water spraying system provided to keep wet open stockpiles for aggregates of sizes in excess of 5 mm Whether stockpiles of aggregates 5 mm in size or less are suitably covers Whether scattered piles are cleaned regularly Materials Transportation
SNO 1 2 3
SOURCE Details of PCM Whether the approach road to site of stone crusher from the nearest metalled public road is paved or hard surfaced Whether the active haul roads inside the works are adequately wetted with water Whether wheel cleaning facilities are provided for delivery trucks Operation and Maintained
SNO 1 2 3 4 5 6
Point of observation Use of wetting agent in water used for spraying Condition of water spraying system used for dust suppression Water storage facility at the site Condition of dust extraction and collection system Housekeeping Fencing /boundary wall around the premises Plantation for Environmental Care
Status
SNO 1 2 3 4 5
Point of observation Area of crusher premises Whether plantation done within premises Whether plantation done all along the boundary of the premises Whether soil in the premises is fit for survival of plant or not If plantation done on any other land ownership rights/ location
Status
66
6 7 8
SNO 1 2 3
General Conditions Condition Sign Boards displayed showing the name, address and capacity of the stone crusher industry or not Valid source for raw material Permission obtained from CGWA for withdrawal of ground water in excess of 25 kld
Status
Recommendations: A) That pollution control measures have been provided as per guidelines issued by the board (Yes / No) B) That PCM have been provided as per guidelines issued by the Board except following: (i) (ii) . .
All Regional Officers are requested to forward inspection report in respect of stone crushers along with filed up format and with remarks regarding adequacy of PCM as stated above Reference: SCMG/RPCB/(Gen-6)/503-214 dated 28.09.2010 of RSPCB
67