Plant shutdown summary of April,2008

Sl no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Date

Time

2:05:00 PM
3:18:00 PM
3:56:00 PM
1/4/2008
4:54:00 PM
5:12:00 PM
6:08:00 PM
6:42:00 PM
2/4/2008
4:15:00 PM
3/4/2008
7:34:00 PM
7:38:00 PM
6/4/2008
8:36:00 PM
7/4/2008 12:19:00 PM
12:59:00 PM
9/4/2008
3:55:00 PM
10/4/2008 12:56:00 AM
11/4/2008 6:46:00 PM
17/04/08
2:43:00 PM
18/04/08 10:12:00 PM
19/04/08
4:23:00 AM
8:14:00 AM
8:12:00 PM
20/04/08
8:39:00 PM
9:37:00 PM
21/04/08
3:39:00 PM
22/04/08 12:42:00 AM
6:46:00 PM
23/04/08
6:39:00 AM
3:35:00 PM
24/04/08
7:12:00 PM
7:29:00 PM
29/04/08
8:39:00 AM

Trip description

Remarks

Under Frequency protection of generator 04


Under Frequency protection of generator 04
Under Frequency protection of generator 04
Under Frequency protection of generator 04
Control air pressure low.
Over voltage protection
Under frequency protection.
Earth fault of G4+G5.
Earth fault of E-05
Earth fault alarm G1,G2,G3
E-03 A/9 cyl. Deviation.
Unbalance current for MTC OHL problem.
G4 Ignition failure
Under under voltage protection.
G4 Ignition failure
Control air pressure low.
VFD room firing
G1 under under frequency protection
G4 Ignition failure
G4 Ignition failure
G4 Ignition failure
Under under frequency protection
Exhaust temp. before turbo of E-04
Without cause
G1,2,3 under under frequency protection
Gas pressure low
Sensor failure load signal of E-05
Sensor failure load signal of E-04
Gas pressure low
9B of E-02 & 2B of E-01 deviation
Gas supply pressure low

Plant shutdown summary of May,2008


Sl no
32
33
34
35
36
37
38
39

Date
2/5/2008
3/5/2008
5/5/2008
7/5/2008
8/5/2008

Time

Trip description

12:11:00 PM
12:58:00 PM
11:42:00 AM
1:02:00 PM
12:47:00 AM
3:58:00 AM
1:36:00 PM
8:47:00 PM

Before turbo B side of E-04


LT line shortckt.
Unbalance current of G-04
E-01 LT circulation pump trip
Earth fault of G2,3,4
Gas supply pressure low
Gas regulator maint.
G4+G5 over over voltage protection.

Remarks

40
41
42
43
44
45
46
47
48
49
50
51
52

11/5/2008
16/05/08
18/05/08
19/05/08
20/05/08
27/05/08
28/05/08
29/05/08
30/05/08

8:58:00 PM
7:32:00 PM
8:51:00 AM
9:10:00 PM
9:44:00 PM
9:22:00 AM
11:38:00 PM
5:45:00 PM
1:13:00 AM
7:39:00 PM
6:07:00 PM
6:52:00 AM
11:14:00 AM

G5 over over voltage protection.


Earth fault trip
Earth fault G-5
Feeder 04 earth fault
Feeder 04 earth fault
Feeder 04 earth fault
shortckt protection of G-05
6A cyl. Dev. Of E-03
G4+G5 under under frequency protection.
Grid over current shortckt
Grid over current shortckt
Grid earth fault.
Grid breaker trip from 33 KV substation side.

Plant shutdown summary of June,2008


Sl no
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71

Date

Time

8:48:00 AM
1/6/2008
2:48:00 PM
2/6/2008
9:16:00 AM
8:07:00 AM
4/6/2008
2:02:00 AM
2:20:00 AM
5/6/2008 12:54:00 AM
7/6/2008 12:46:00 AM
8/6/2008
2:31:00 PM
11:41:00 PM
9/6/2008
12:09:00 AM
10/6/2008 11:56:00 PM
13/06/08
9:59:00 AM
9:34:00 PM
15/06/08
12:55:00 AM
16/06/08
6:52:00 PM
11:21:00 AM
21/06/08
12:28:00 PM
25/06/08
4:02:00 PM

Trip description

Remarks

Grid power failure


Grid over under frequency
Grid over under frequency
Under under voltage protection of G-05
Earth fault trip
Earth fault trip
Grid power failure
G-1 Reverse power
E-04 8B cyl. Dev.
Grid breaker trip from 33 KV substation side.
Cyl dev. 2B of e-01
8B cyl. Dev. Of E-05
Cyl. Dev. 4B of E-03
Under frequency pro. Of E-03
Fiver side fuse brust
E-2,3 under frequrncy protection
Under under voltage protectrion of G1,2
Earth fault of E1,2,4
Under frequency protection of G1,2

Plant shutdown summary of July,2008


Sl no

Date

Time

Trip description

72
73

2/7/2008
5/7/2008

12:04:00 PM
12:31:00 AM

Grid power failure


Unbalance current (33 KV fuse cut)
Under voltage & under frequancy protection of
G1,3
Control air pressure low.
Earth fault of G2

74
75
76

12/7/2008
31/07/08

1:07:00 PM
1:18:00 PM
9:01:00 PM

Remarks

Plant shutdown summary of August,2008


Sl no
77
78
79

Date
5/8/2008

Time

Trip description

8:57:00 AM
9:37:00 AM
12:50:00 PM

A2 cyl. Dev. E-04


M72.7 of engine 01 Shutdown
Node 72.7 of E-04

Remarks

5/8/2008
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

5:09:00 PM
7:03:00 AM
9/8/2008
7:27:00 AM
10:35:00 AM
10/8/2008
10:49:00 AM
6:35:00 PM
12/8/2008
7:29:00 PM
15/08/08
3:41:00 PM
18/08/08
6:18:00 PM
19/08/08 11:54:00 AM
22/08/08
9:44:00 PM
23/08/08
2:44:00 PM
24/08/08
4:27:00 PM
26/08/08
2:36:00 PM
27/08/08
2:53:00 PM
30/08/08 11:53:00 AM
31/08/08 12:29:00 PM

A6 cyl. HT lead brust of E-05


Under under frequency protection of G-05
Under frequency protection of G2,3
Earth fault trip of E-05
Earth fault trip of E2,3
Earth fault trip of E-04
Under under Frequency protection of E-02
Exhaust temp. before turbo B side of E-04
Under under freq. protection of E-02
Without cause
Emergency stop from MC(M72.7) of E-03
Under under frequqncy protection of E-05
Under under frequqncy protection of E-05
A3 cyl. Dev. Of E-04
A7 cyl. Dev. Of E-04
Cyl. Dev. A3 of E-04
A7 cyl. Dev. Of E-04

Plant shutdown summary of September,2008


Sl no

Date

97
98
99
100
101
102
103
104
105
106
107
108
109
110

2/9/2008
6/9/2008

Time

5:24:00 PM
4:42:00 AM
11:39:00 AM
9/9/2008
11:55:00 AM
11/9/2008 4:53:00 PM
12/9/2008 9:32:00 AM
13/09/08
4:40:00 AM
20/09/08 12:33:00 AM
12:14:00 AM
23/09/08 12:37:00 AM
1:05:00 AM
26/09/08
4:26:00 PM
27/09/08
1:33:00 AM
28/09/08
7:29:00 AM

Trip description

Remarks

Tatas Gas shutdown


under under freq. protection.
Under under freq. pro. Of E4,5
MTC isulator flashing
G5 Under under frequency protection
Under under voltage protection of G-04
Under under voltage protection of E-05
Under under freq. pro. Of G4,5
Grid power failure
Under under frequency protection
Under frequency protection of G1,G3
Control air pressure low.
Under under freq. G4
shortckt protection of G-05

Plant shutdown summary of October,2008


Sl no

Date

Time

Trip description

111
112
113
114
115
116
117
118
119
120
121
122
123
124

1/10/2008
5/10/2008
6/10/2008

6:54:00 PM
2:08:00 PM
6:58:00 AM
8:44:00 AM
4:46:00 PM
5:42:00 PM
2.41PM
6:45:00 PM
4:43:00 AM
5:46:00 AM
8:21:00 AM
10:24:00 AM
6:33:00 AM
6:48:00 AM

9B cyl .dev. Of E-03


Oil mist concentration high of E-04
Over over voltage protection of G-05
E-04 Exhaust temp. before turbo of E-05
Over current protection of G4
Exhaust temp. before turbo B side of E-04
Diverter damper valve position fult of E-03
Cyl. Dev. 9B of E-04
Earth fault trip
Earth fault
Under under frequency protection of E-04
Under voltage protection of G1,4
Earth fault
Earth fault

7/10/2008

8/10/2008
9/10/2008
10/10/2008
24/10/08

Remarks

24/10/08
125
126
127
128
129
130
131
132

25/10/08

26/10/08
27/10/08

9:00:00 AM
12:17:00 AM
8:41:00 AM
10:26:00 AM
4:05:00 PM
5:55:00 AM
5:28:00 AM
7:19:00 AM

Under frequency protection of E-03


Earth faultof E-05
Under under frequency protection of E-05
Sensor failure load signal of E4,5
Cyl. Dev. 9A of E-03
Under under frequency protection of E-01
Earthfault
Under under voltage protection

Plant shutdown summary of November,2008


Sl no

Date

Time

Trip description

133
134
135
136
137
138
139
140

2/11/2008
11/11/2008
13/11/08
17/11/08

2:50:00 PM
9:19:00 AM
11:12:00 AM
10:06:00 AM
10:46:00 AM
2:39:00 PM
6:30:00 PM
7:02:00 PM

Cyl. Dev. 6B of E-04


Under under voltage protection of E-01
Fresh 03 ID fan start time unbalance current
Unbalance current of fiver side
Under frequency protection of G1,3
Over under frequency of Feeder 01
Cyl .dev. 9B ofE-01
Under under frequency protection of G1,2

18/11/08
19/11/08

Remarks

Plant shutdown summary of December,2008


Sl no

Date

Time

141
142
143
144

2/12/2008 3:59:00 PM
8/12/2008 11:20:00 PM
9/12/2008 6:47:00 AM
17/12/08 12:21:00 AM

145

18/12/08

3:37:00 PM

146
147
148

22/12/08
27/12/10
28/12/08

2:00:00 PM
7:58:00 AM
3:46:00 PM

Trip description

Remarks

B4 cyl. HT lead & spark plug brust of E-03


Unbalance current of E-01
Unbalance current of E-03
Cyl. Dev. 10B of E-04
Under under voltage protection (Solt OHL fuse
brust
Spark plug brust 9A of E-03
Cyl. Dev. 2B of E-04
Cyl. Dev. A2 of E4

Plant shutdown summary of January,2009


Sl no

Date

Time

Trip description

149
150
151
152
153

2/1/2009
3/1/2009
9/1/2009
16/01/09
29/01/09

6:38:00 PM
8:24:00 AM
11:38:00 PM
1:28:00 PM
1:10:00 PM

Lube oil temp. before high og E-04


Cyl. Dev.7A ofE-04
Under under frequency protection of G-04
Earth fault of G-04
Under under frequency protection of G4,5

Remarks

Plant shutdown summary of February,2009


Sl no

Date

Time

Trip description

154

11/2/2009

5:36:00 PM

155

12/2/2009

4:04:00 AM

156
157
158
159
160

18/02/09

4:30:00 PM
10:13:00 AM
6:17:00 PM
12:55:00 AM
12:54:00 AM

shortckt protection of G-05


REB breaker open time under under frequency
protection
Battary cabinet charger fault. Of G4,5
Cyl. Dev. 6B fo E-05
Under under frequency protection of All engine.
Over frtequency protection (REB)
Grid over frequency.

20/02/09
21/02/09
23/02/09

Remarks

161
162
163
164
165
166

24/02/09
25/02/09
27/02/09
28/02/09

9:41:00 AM
3:26:00 PM
2:51:00 PM
3:43:00 AM
11:55:00 PM
12:24:00 AM

Control air pressure low.


Under under voltage protection of E-05
Gas supply pressure low
Under under voltage protection of G4,5
Earth fault G4,5
Under frequency protection of E-03

Plant shutdown summary of March,2009


Sl no

Date

167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188

4/3/2009
5/3/2009

Time

11:51:00 AM
7:11:00 PM
6:50:00 PM
8/3/2009
7:03:00 PM
10/3/2009 3:47:00 AM
12/3/2009 11:08:00 AM
3:44:00 PM
13/03/09
4:54:00 PM
4:58:00 AM
14/03/09
11:16:00 AM
15/03/09 12:17:00 AM
19/03/09 12:38:00 PM
7:39:00 AM
10:11:00 AM
20/03/09
10:35:00 AM
12:38:00 PM
21/03/09
3:56:00 PM
22/03/03
6:42:00 AM
8:29:00 AM
24/03/09
5:32:00 AM
25/03/09 11:37:00 AM
30/03/09
7:21:00 AM

Trip description

Remarks

Sensor failure load signal E4,5


Earth fault E1,4
Under under frequency protection of E-04
Cyl. Dev. 9B of E-01
Under under frequency protection of E-05
Control air pressure low.
Auxilairy VCB trip
Auxilairy VCB trip
Under under voltage protection of E4,5
Ignition failure of E-05
REB syncronize time Engine unbalance
Control air pressure low.
Grid shortckt.
Under under voltage protection of E2,3
Under under frequency protection of E-04
Under frequency protection of E-03
Shortckt of E-05
Under under frequency protection of E-01
33 KV power failure
33 KV power failure
Under under frequency protection of G1,3,5
Under under frequency protection of G1,2,3

Plant shutdown summary of April,2009


Sl no
189
190
191
192
193
194

Date
2/4/2009
3/4/2009
5/4/2009
6/4/2009

Time

Trip description

12:58:00 AM
5:51:00 AM
6:18:00 PM
2:03:00 AM
7:10:00 AM
4:03:00 PM

Cyl. Dev. A2 of E-04


Cyl. Dev. A2 of E-04
Cyl. Dev. A7 of E-04
Fresh trip time grid breaker open.
Under under frequency protection
Earth fault E-04
Under under voltgae & frequency protection of
E1,3,4,5
REB 33 KV breaker testing by Energypac
engineearing.
Under under frequency protection of G2
Oil mist concentration high of E-04
MM Trade side fuse brust.
Grid over under frequency

195

15/04/09

7:59:00 AM

196

23/04/09

5:44:00 PM

197
198
199
200

25/04/09

28/04/09

4:23:00 PM
5:59:00 PM
6:08:00 PM
6:32:00 AM

201

28/04/09

1:34:00 AM Under under frequency protection (33 KV out time)

202

29/04/09

4:59:00 PM

27/04/09

Over frequency protection of G5

Remarks

Plant shutdown summary of May,2008


Sl no
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233

Date

Time

12:13:00 AM
1/5/2009
12:24:00 AM
2/5/2009 12:03:00 PM
3:02:00 PM
3/5/2009
7:04:00 PM
4/5/2009
9:17:00 PM
5/5/2009 12:39:00 AM
9/5/2009 12:29:00 AM
10/5/2009 3:15:00 AM
11/5/2009 1:07:00 AM
12/5/2009 8:38:00 AM
13/05/09
2:46:00 PM
15/05/09
9:25:00 PM
16/05/09
7:00:00 AM
1:43:00 PM
17/05/09
2:14:00 PM
4:56:00 PM
18/05/09
1:16:00 AM
11:24:00 AM
19/05/09
5:17:00 PM
22/05/09
6:10:00 AM
23/05/09 10:50:00 AM
4:46:00 PM
24/05/09 10:15:00 PM
12:51:00 AM
25/05/09
5:30:00 AM
7:10:00 PM
26/05/09
7:41:00 PM
7:34:00 AM
29/05/09
1:42:00 PM
7:11:00 PM

Trip description
Under under frequency protection.
Under voltage protection of G1,4
Earth fault trip
Under under frequency protection of G-05
Sensor failure load signal of E-03
Under under frequency protection
Cyl. Dev. 4B of E-03
Under under voltage protection G3,5
Shortckt protection of Generator side
Under under frequency protection of G2,3,5
Oil mist concentration high of E-04
Under under frequency protection of All engine.
Under under frequency protection of E-05
Under under frequency protection of E-03
Grid over under protection
Grid over frequency.
Under voltage protection of G1,4,5
Under voltage protection for 33 KV failure
Under under frequency protection of G5
Over frequency protection of G3,4,5
33 KV power failure
Over under voltage protection
Excitation failure of G2,3
Under under frequency protection opf G4,5
Under under voltage protection of G2
Under frequency protection of G2,3,5
Grid power failure
Back fire of E-05
Earth fault (Feeder 03 close time)
Under under frequency protection of G2,3,5
B6 Cyl. Dev.of E-05

Remarks