Instrumentation & Control Commissioning Engineer Nexus Alliance Limited on behalf of Chevron Nigeria Limited (CNL) March 2012

Present (5 months) Port Hartcourt / Niger Delta, Nigeria Presently working on Chevrons OAGM (DIBI & OLERO Creek) project for Pre commissioning and Commissioning of Instrument and Control system which includes loop checking, functional testing, Cause and Effect testing of Allan Bradley s PLC control system (Process Control & Shut down), Autronica Fire & Gas system, Gai Tronics PAGA system etc. QA/QC Engineer (Electrical & Instrumentation) Germanischer Lloyd on behalf of ADMA-OPCO Privately Held; 5001-10,000 employees; Maritime industry November 2011 February 2012 (4 months) Dubai, United Arab Emirates Worked As a Third Party Representative For ADMA-OPCO's Zakum Water Injection (Capacity And Pressure) Upgrade Project At J.R. McDermott Fabrication Yard, Jabal Ali, Dubai. QA/QC Specialist (Electrical & Instrumentation) Velosi Certification Services on behalf of Dolphin Energy Limted Privately Held; 51-200 employees; Oil & Energy industry August 2010 October 2011 (1 year 3 months) Abu Dhabi, U.A.E o Elaborating and coordinating the Electrical & Instrumentation specifications, and codes/standards. o Assist the QAQC manager in the organization, maintenance and control of the quality system and in resolving any discrepancies and ambiguities. o Coordinate with the company as well as contractor QC inspectors for the resolution of site problems and to ensure that communications exist and are maintained. o Liaise with the site construction engineers and provide assistance when requested. o Review Inspection and Test Plans, work procedures, method statements for compliance with good work practices and the companys contract specializations. o Prepare nonconformance reports to the QA manager and assist in developing corrective actions. o Ensure that all inspection reports are accurate and that all attached documents are current status. o Ensure all work is correctly prepared prior to any inspection being undertaken and after inspection review all reports for compliance. o Responsible for the development and implementation of a schedule of planned audits across all processes, and to ensure the results of the analysis (including any recommendations for improvement) to top management during the companys management review meetings. o Perform quality audits on systems, suppliers, and projects and to initiate corrective, preventive and continual improvement actions where required. o Identify non-conformities, and ensure any corrections and any corrective actions are implemented and verification takes place. o Identify quality control problems, and in any serious instances initiate stop work or suspend a project if its continuation will have any adverse effect on the quality objectives of the company. o Ensure the integrity of the quality management system is maintained when changes to the quality management system are planned and implemented. o Compliance with the sites health and safety regulations. Sr. QA/QC Inspector (Electrical & Instrumentation) Intech Process Automation on behalf of Chevron Nigeria Limited

Privately Held; 201-500 employees; Industrial Automation industry March 2010 July 2010 (5 months) Performs QA/QC Inspection activities representing the owner, Chevron Nigeria Ltd. (CNL) within the Project Management Team (PMT), to ensure that all Electrical & Instrumentation construction works are carried out in accordance with AFC drawings, Specifications, International Standards, applicable regulations and approved ITPs. Liaise between the Company and Contractor Engineering & Pre-commissioning Teams (including Vendors). Monitor, check and sign-off E & I completion dossiers and Inspection & Test Records (ITRs) As-built drawing by Contractor review, verification and approval. Prepares CAR's or NCR's found at site and ensuring they are fully rectified and satisfactory. Ensures that Safety Policies and Procedures are applied diligently to all E&I works, including by other discipline. Prepare System Punch List prior to issuance of SMCC (System Mechanical Completion Certificate). Verification of Contractors declared cleared Punch list. Walk through and surveillance activities. Project Documentation works. Establish close communication and teamwork with other disciplines to ensure overall project successful completion. QA/QC Inspector (Electrical, Instrumentation & Telecommunication) Snamprogetti (ENI Group) in Saudi Arabia Privately Held; 1001-5000 employees; Oil & Energy industry March 2008 March 2010 (2 years 1 month) Ensure the Implementation of Project Quality Management System (PQMS) according to requirements of ISO 9001:2000 at different stages of project construction activities. Review & approval of Contractor's Inspection & Test Plans, Procedures, Work instructions and Vendor's Quality submittals. Well versant with International Industry Codes & Standards (NEC, NFPA 70, IEC, ISA, IEEE, NEMA, API, BS, ANSI, etc), Specifications related to Intrinsically Safe systems and Electrical systems for Instrumentation. Responsible for guidance and verification/inspection of the entire scope within discipline, reporting to the E & I QC Supervisor. Complete the discipline scope safely and monitor field construction activities to ensure design requirements are met in compliance with drawings, specifications and applicable codes. Work in close cooperation with the Completions Group and participate in final completion check out and approval of Inspection and Test Records (ITR). Inform Completion Group and/or Completion Database Coordinator of any deficiency in work performance. Participate in approval of proposed resolutions and monitoring completion of corrective actions to close non-conformances. Assist in maintaining the punch list and assist in verification of items completed. Participated in a team for Technical performance Audits & ensured that adequate QA/QC system is in place, confirmed effectiveness. Planning and performance of audits of Contractors and suppliers; Ensure project corrective

actions established during investigations and reviews have been implemented and are maintained to ensure compliance. QA/QC Inspector (Instrumentation, Electrical) Consolidated Contractors Intl Company (CCIC) in Qatar October 2001 January 2008 (6 years 4 months) Perform Inspection for Hold, Witness points & Review, Approval of test records of all activities pertaining to Electrical & Instrumentation. Manage all quality activities related to Electrical & Instrumentation at site including WinPCS administration. Ensure all required testing is completed and recorded in a timely manner upon completion of each phase of construction activities. Monitor the calibration status of all measuring and testing equipments. Issue of NCRs on identification of non-conformities and Monitor for the effectiveness of Corrective actions. Ensure necessary actions are taken to avoid recurrence, including expediting any corrective actions and the close out of the NCRs. Charge hand (Instrumentation) Consolidated Contractors Intl Company (CCIC) in U.A.E June 2000 February 2001 (9 months) Quantity estimation and Engineering BOQ verification as per AFC drawing. Responsible for installation of above ground & indoor cable tray (perforated & ladder type) including support works. Responsible for mounting of indoor cabinets (marshalling/system) for DCS, ESD, MMS, Fire & Gas, Telecom/Paging systems including base frames installation. Carry out supervision for mounting of field junction boxes, different type of field instruments at ground level, on structural plate forms, vessels etc. Responsible for installation of power & control cables at field instruments, J.Bs and marshalling cabinets including laying (A/G & U/G), glanding & termination, insulation & continuity test. Provide supervision for installation and leak/pressure testing of Air piping/tubing, impulse hook up. Perform calibration of transmitter (Level, pressure, flow), switches and pressure indicators using test equipment such as HART and HONEYWELL SFC Communicator, Pneumatic Hand pump, Portable Druck calibrator and Hydraulic Pump depending upon the range of the transmitters.
Assigned in bench and field calibration of diff. kinds of valve either modulating or on-off valve (solenoid type) of diff.types of manufacturer using some test equipment like Hart communicator in a digital Valve Controller powered by a control system output card, Current Injector/Loop Calibrator and portable 24 V DC supply in case of solenoid type at same time checking their respective limit switches based on its set points and percent dead band. Generate or carry out Instrument Loop Function Checking (ILFC) prior to initial start-up of the plan.

Technician (Instrumentation)
National Fertilizers Limited (NFC) in Pakistan
January 1998 June 2000 (2 years 6 months)

Installation, Calibration, Testing and Maintenance of Pneumatic and electronics and instruments of all variables (flow, temperature, pressure, level etc.) Hands on experience with Smart transmitters of Rosemount with HART communicator, Foxboro with HHT, Honeywell SFC and Elsag Bailey with STT04E terminal. Involved in Loop checking, Pre-commissioning and commissioning of Honeywell TDC- 3000 and Bailey systems. Energization of all control panels, I/O cards testing and alarm settings, cable insulation resistance & continuity

test. Stroke check and calibration of Control valves (Fisher, Yamatake Honeywell, Masoneilan, Rotork, Limitork, Koso, Flow serve). Have ability to read Hookup drawing, P&ID and Instrument logic diagrams. Also involved in Fire & Gas instrument calibration, Installation, Loop checking and commissioning etc.

Responsibilities:

Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan preparation. Coordinating with Construction Supervisor project plan drawing review-having AFC drawing officially approved documentation. Represent Company during weekly meeting concerning schedule plan activity and project plan on all tools and equipment needed for construction. Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all concerned lead official. Ensured instrument equipment works complied with project specifications, company procedures, method statements and quality assurance and controls documentation (strictly implementing the ISO 2000 and ISO 9000).

Supervised and monitoring the flow of inspection on-site and calibration prior to meet the project deadline. Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation Workload. Able to analyzed every area to be survey and witness prior for RFI to be offered to the main client for inspection. Assigned to witnessing repair and calibration of instrumentation, commissioning of the following equipment: Smart Flow, pressure, temperature, level transmitters, different control valves, pressure gauges and Fire & Gas alarms.

Analogue and digital controllers Fire&Gas detection/protection systems, ESD (Emergency shutdown), Pneumatic and hydraulic shutdown panels and control systems.

Project Duties included review of loop folders for final acceptance by the QA/QC Dept. before transferring to Commissioning. To undertake inspection of vendor skids before final acceptance by client. On-site audits of subcontractor.

Followed all safety practices and procedures and corrected unsafe work practices Fully conversant with relevant International (ANSI, ASTM, API, BSI, IP, ISO, IEC, IEEE etc.) standards. Oct. 2005 February 2006 Company: JAPAN GAS CORPORATION (J.G.C)

Location: Sohar Refinery Company Sohar Sultanate of Oman Position: Instrument engineer Coordination of Instrument Punch List between sub-contractor and client. Also coordination between subcontractor regarding the Inspection and Test Reports documentation related to instrumentation. April 2005 September 2005 Project Bu Hasa facilities Development Project, Abu Dhabi -UAE Company Abu Dhabi Company for Onshore Oil Operations Contractor Snamprogetti, Italy Client ADCO Position -Instrument /Automation engineer Job Description All engineering; construction; pre-commissioning activities for instrumentation. July 2004 March 2005 KINGDOM SAUDI ARABIA-Aramco-Berri gas plantI & C Engineer Construction, pre-commissioning, commissioning and maintenance during start-up. October 2003 June 2004 SIRTE OIL COMPANY- Libya Attahaddy gas field Instrument engineer Commissioning and start-up team DCS-ABB 2000. May 2002 April 2003

Tskj Bonny Island (nigeria Ltd)


Instrument supervisor Here, I worked for construction and mounted instrument and electrical equipment switchgear and MMCI, pre-commissioning and commissioning, loop check of different types of instruments and correction, DCS systems-FOXBORO, PLC, and SCADA. Maintenance during Pre-start-up activities (operational Tests) and normal operation. February 2002 May 2002 QUATAR PETROLLEUM NGL 4 Project Dukhan. Instrument supervisor Employee of SNAMPROGETTI for pre-commissioning, commissioning and start up of GTG Nuovo Pignone; MARK -V; DCS systems HONEYWELL, TDC 3000. August 2001 February 2002

Tskj Bonny Island (nigeria Ltd)


Instrument supervisor Here I worked for construction and mounted instrument and electrical equipment switchgear and MMCI, pre-commissioning and commissioning, loop check of different types of instruments and correction, DCS systems.-FOXBORO. May 2000 August 2001 ASTRA Refinery, Ploiesti, Romania Instrument dispatcher coordination refinery maintenance activities May 1999 May 2000 CHROME CONSORTIUM, PORT HARCOURT REFINERY, Nigeria Instrument supervisor Directly involved in the specific works of Turn Around Maintenance and Rehabilitation Project. Performing maintenance works on instrument and control equipment, including metering devices, automatic valves, safety devices, fire detection. Elaborating daily reports and analysis on the maintenance works executed, following up the observance of workplace safety regulations, working in close collaboration with other skilled personnel: mechanical, electrical and operation staff. Proposing improvement on maintenance modification, recommending materials and tools and necessary actions enabling carrying out properly of the instrumentation duties. April 1998 April 1999 ASTRA Refinery, Ploiesti, Romania Instrument dispatcher coordination refinery maintenance activities Familiar with various kind of instrumentation equipment, like: TAYLOR, FOXBORO, HARTMAN & BRAUN, CROWCRONE, MASONEILLAN, FEA, SHIMADEN, YOKOGAWA, FISHER ROSEMOUNT, etc. Also participating in different activities for the electric and electronic equipment for automation of machine tools. December 1996 March 1998 Telford International Ltd and Ansaldo Companies United Arabic Emirates, Mirfa Power And Deslination Plant Instrument supervisor Controlling the correct mounting of the instrumentation and control equipment, and supervising the related putting into running works. Working together with specialists of ANSALDO ENERGIA and HARTMAN BRAUN companies. Also collaborating in the control and start up of the analysis systems, such as: analyzers of water oxygen content, carbon oxide and carbon dioxide analyzer, and analyzer of water conductivity. 1991 1996 ASTRA Refinery, Ploiesti, Romania

Instrument dispatcher In charge with following up of the repairing and maintenance work schedules afferent to the instrumentation and the refinery plants, including the machine tools workshop. 1988 1990 BASRAH PETROCHEMICAL COMPLEX, Iraq Instrument foreman Involved in control of the regulating loops afferent to the pyrolysis plant, chlorine plant, and low and high pressure polyethylene. Participating in the putting into running of the plants and maintenance stage. Also working in the workshop for repairing of the instrument electronic equipment. Collaborating with American, English and Iraqi specialists of LUMMUS Company.

1987 1988
PETROMIDIA SA CONSTANTA, Romania (Petrochemical works) Instrument foreman in pyrolysis plant Participating in pre-commissioning, commissioning and start up of the plant. ASTRA Refinery, Ploiesti, Romania Instrument repairing workshop, instrument electro-mechanic In charge with repairing and maintenance of transducers and recording apparatus. Ensuring the service activities and control equipment of the following plants: CDU & VDU, gas fractionation, hydro fining of mineral oils, oils de-asphalting. Also performing repairing and maintenance activities for the electric and electronic equipment for automation of machine tools.

1974 1986
DERO LEVER SA PLOIESTI ROMANIA (D(c)tergent factory) Instrument electro-mechanic for instrument