Issue 1 Revision 3
DOCUMENT CONTROL
Document Status Record Status Issue1 Revision3 Date 09 Aug 04 Prepared Standards and Systems Reviewed Section Managers Endorsed GM ISP Approved Safety Committee
2.
Reference Documents
Asset Identification Asset Register PP-120 Issue1 Revision2 PP-178 Issue1 Revision2
3.
Responsibility
The Manager Strategic Planning is responsible for the development of the 25 and 5 year Asset Management Plans
4.
In the Asset Register the asset categories are furthur broken down into asset types and sub-types and are also uniquely located within the defined i es t n tok rg n , n rt e ew r e i s t a s o corridors and sections within corridors for the purposes of condition monitoring and maintenance or renewal decisions
5.
Procedure
5.1 25 Year Plan The following methodology is applied to the development of the 25 Year Plan review and update the asset register review asset categories , types and sub-types by location and identify new works required based on the following criteria review recent asset condition issues a a s fu s tts K I , u i , C S, S S n l e a l t ii , P a d s T R T R y t a sc S t review items already identified in previous 25 Year Plan identify extent of the problem locations and priority over the years for major items : identify current method of work to address the problem. note any alternatives or improvements to technology that could improve productivity make estimates or reasoned judgements on costs 5.2 5 Year Plan The following methodology is applied to the development of the 5 Year Plan d f e fr dma tn n e ei d er n e e ie a c n review years 1 to 5 of the 25 year plan identify locations of works listed through the cyclic replacement analysis workshop any particular problems not already identified workshop risk/benefits of all projects proposed. analysis is to include consequences of not undertaking activities , the risk mitigation proposed and the risk mitigation plan assessment of sustainability needs determine priority of works to meet financial constraints compile list of works to be done over 5 year period assess against budget for years 1 to 5, reprioritise to fit 5 year targets compile list of works that are deferred . determine how long work can be deferred risk assessment of activities not to be undertaken and risk management plan for these
Engineering & Infrastructure Process Procedure No. 110 Asset Management Planning
April
Update AMP
PP110
Issue 1 Revision 3