You are on page 1of 3

Submitted By,

Yashwanth J G 172 Vivek Singh - 169


More Less
AGU AR Derivatives & DARI Enhancements N-III Upgr ade

New Core Product


P r o c e s s C h a n g e

New core Process Next generation process

LCA Tejas

JAG UAR Next DARI N-III Generation Upgr product ade

Product Change
Addition to Product family

Indian Multi Role Helicopter (IMRH) JAGUAR DARINIII Upgrade INTERMEDIATE JET TRAINER (IJT) Mirage Upgrade

Single department upgrade Incremental change

LCA Tejas Mark 2

LCA Tejas Naval Version

Project Name
LCA - Tejas

Type of Development Project


Break Through Project

Justification
Numerical Model: Payback period = Project Cost / Annual Cash Flow = $1200 million / $ 433 million = 3 years Non Numeric Model: Reduces dependence on Foreign companies and builds a local aerospace industry capable of creating state-of-the-art products with commercial spin-offs for a global market New core product: As it is the lightest combat aircraft upto date in the world with delta wing configuration, and no tail planes New core Process: Set up and expertise gained many critical technologies they are:o Airframe, RADAR, An electronic control system for an

unstable platform, A completely digital man/machine interface . LCA Tejas Mark 2 Plat Form Project This is a Platform extension of LCA Tejas to build a fifth generation fighter aircraft with more powerful engine (GE F414). It is not a derivative project as there is lot of changes made to the airframe to increase pay load capacity by 5000kgs, equipped with advance RADAR and avionics. Incremental changes are made to LCA-Tejas. It will be equipped for air craft-carrier operation with ski-jump takeoff and arrested landing. It will include strengthened airframe and landing gear and the nose is drooped for better cockpit vision This is a Platform extension of JAGUAR. Upgraded Jaguars will feature all weather precision attack capability with enhanced weapon load It is not a derivative project as there is lot of changes made, the aircraft will be re-engined and re-equipped with fourthgeneration cockpit and mission avionics, and self protection suite Non Numeric Model: The competitive necessity. IAF estimated that the life of JAGUAR is till 2030, so they decided to upgrade it with all new features. upgrade will bring Indias Mirages to thefull Mirage 2000v5 Mk 2 standard, including a new RDY-3 radar with greater airair and air-ground capability, a new night vision compatible all-digital cockpit, and improved electronic warfare systems. These will be tied into a joint tactical information data link system (JTIDS, usually Link 16 compatible but not always), plus helmet-mounted sights for wide-angle heat-seeking missiles. As part of the upgrade, the aircraft will also be equipped with MBDAs Mica family of medium range missiles Its a platform project. Non Numeric Model: The competitive necessity. Upgrade with new feature to be competitive with other countrys defense. This new helicopter will incorporate a multifunction display system (MFD) as well as have integrated architecture avionics, as well as a full-fledged computer on board. This computer will be comparable to the MIL 1553C computers on board the US helicopters.

LCA Tejas Naval Version

Derivative project

JAGUAR DARIN-III Upgrade

Plat Form Project

Mirage Upgrade

Plat Form Project

Indian Multi Role Helicopter (IMRH)

Break Through Project

Non Numeric Model: The operation necessity. The Navy urgently needs the MRH to replace its aging Sea King fleet inducted in 1970..
LIGHT COMBAT HELICOPTER (LCH)

Derivative project

Its a derivative project. The LCH is a derivative of the HAL Dhruv, which was inducted into the Indian armed forces. The LCH is being designed to fit into an anti-infantry and anti-armour role and will be able to operate at high altitudes (6000m). Non Numeric Model: The operation necessity. The failure of the Russian built Mi35 to perform satisfactorily in the high altitude battle zones of Kargil highlighted the requirement of an attack helicopter tailor made for such operations Its a platform project. A lot of changes has been done like new engine, light alloy body, full glass cockpit, hydraulically retractable tricycle-type landing gear, integrated digital avionics system, Active matrix liquid crystal multi-function displays. Non Numeric Model: The operation necessity. To place the ageing Surya Kiran trainer planes.

INTERMEDIATE JET TRAINER (IJT)

Platform project

You might also like