Description of Works

Unit of Measur.

Quantity Unit Price $ Total Amount

1 1.1. 1.1.1.

WATER DISCHARGE DURING CONSTRUCTION Earthworks Removal of 1 m thick top soil layer at the location of the upstream cofferdam, including loading and transport of excavated material to the deposition site at the distance of up to 2 km Bulk excavation for diaphragm in Class V and VI material. Excavated material shall be incorporated in the downstream dam body Filling of coarse rock material to the elevation of -5.50 mbsl for upstream cofferdam and spreading of material into layers of the adequate thickness and compaction of material to the required level. Total Earthworks:

m3

0.00

1.1.2.

m3

0.00

1.1.3.

m3

0.00 0.00

1.2. 1.2.1.

Concrete and Reinforced Concrete Works Construction of concrete diaphragm from the elevation of -21.00 to the elevation of -5.50 mbsl by using reinforced concrete MB 30 and two-side formwork 1.80/m2 Supply, transport, straightening, cleaning, cutting, bending, fixing and incorporation of reinforcement Total Concrete Works:

m3

0.00

1.2.3.

0.00 0.00

1.3. 1.3.1.

Miscellaneous Works Water pumping during execution of works on excavation, concreting and erection. Total Miscellaneous Works: WATER DISCHARGE SUMMARY RS 0.00 0.00

1.1 1.2. 1.3.

Earthworks Concrete and reinforced concrete works Miscellaneous works Total 1. :

0.00 0.00 0.00 0.00

Description of Works 2 2.1. 2.1.1. Earthworks Removal of 1 m thick top soil layer at the location of the downstream cofferdam, including loading and transport of excavated material to the deposition site at the distance of up to 2 km Filling of coarse rock material to the elevation of -22.55 mbsl for the downstream cofferdam body, spreading of material into layers of the adequate thickness and compaction of material to the required level Total Earthworks: 2.2. 2.2.1. Miscellaneous Works Water pumping during execution of works on excavation. Total Miscellaneous Works:

Unit of Measur.

Quantity Unit Price $ Total Amount

DOWNSTREAM COFFERDAM

m3

0.00

2.1.2.

m3

0.00 0.00

RS

0.00 0.00

DOWNSTREAM COFFERDAM SUMMARY 2.1. 2.2. Earthworks Miscellaneous works Total 2. : 0.00 0.00 0.00

Description of Works 3 3.1. 3.1.1.

Unit of Measur.

Quantity Unit Price $ Total Amount

LATERAL SPILLWAY, CHUTE AND FLIP BUCKET


Earthworks Mechanical bulk excavation in Class IV material, including loading and transport of excavated material to the deposition site at the distance of up to 2 km. Mechanical bulk excavation in Class V and VI material, including loading and transport of excavated material to the deposition site at the distance of up to 2 km and securing of construction pit. Backfilling behind the structures with excavated material, spreading of material in layers of adequate thickness and compaction of material to the required compaction level Total Earthworks:

m3

0.00

3.1.2.

m3

0.00

3.1.3.

m3

0.00 0.00

3.2. 3.2.1.

Securing of Excavations Securing of excavations for lateral spillway, chute and flip bucket by using SN32 anchors. Length _____m Shotcrete 2x5cm Mesh 06 15/15 cm/cm Drilling of anchor holes through the rock mass Total Securing of Excavations: pcs m2 m2 m' 0.00 0.00 0.00 0.00 0.00

3.2.1.

3.3.

Concrete and Reinforced Concrete Works Concreting of structures by using hydraulic, watertight, compacted and reinforced concrete in the formwork with steel ribs (remenate), supports, braces (razupiraci) and load bearing and working scaffold when necessary, MB 30 concrete. Combination of flat and curved formwork.

3.3.1. 3.3.2. 3.3.3. 3.3.4. 3.3.5. 3.3.6. 3.3.7.

Massive concrete of spillway block. Formwork 0.12 m2/m3. Spillway (facing) walls. Formwork 0.60 m2/m3. Spillway retaining wall foot. Spillway slab. Bridge over spillway. Formwork 2.2 m2/m3. Retaining walls of transitional part. Formwork 1.80 m2/m3. Retaining wall foot in the transitional part

m3 m3 m m3 m3 m3 m
3 3

0.00 0.00 0.00 0.00 0.00 0.00

3.3.8. 3.3.9.

Description of Works Transitional part slab Chute retaining walls. Formwork 1.80 m2/m3.

Unit of Measur. m3 m3 m m3 m3 m
3 3

Quantity Unit Price $ Total Amount 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.3.10. Chute retaining wall foot 3.3.11. Chute slab 3.3.12. Massive concrete of flip bucket. Formwork 0.12 m2/m3. 3.3.13. Flip bucket walls. Formwork 1.80 m2/m3. Total Concrete Works: 3.4. Reinforcement Works 3.3.1. 3.3.2. 3.3.3. 3.3.4. 3.3.5. 3.3.6. 3.3.7. 3.3.8. 3.3.9. 3.3.10. 3.3.11. 3.3.12. 3.3.13.

kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3

30.00 100.00 70.00 110.00 210.00 70.00 70.00 110.00 100.00 70.00 110.00 80.00 100.00 0.00

Total Reinforcement Works: 3.5. 3.5.1. Drainage Works Perforated concrete pipes _____mm Total Drainage Works: 3.6. 3.6.1. Miscellaneous Works Water pumping during execution of works on excavation, concreting and erection. Total Miscellaneous Works: LATERAL SPILLWAY, CHUTE AND FLIP BUCKET SUMMARY 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. Earthworks Securing of excavations Concrete works Reinforcement works Drainage works Miscellaneous works Total 3. :

0.00

m'

0.00 0.00

Working hours

0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Description of Works 4 4.1. 4.1.1. Earthworks Mechanical bulk excavation of headrace canal section in Class IV material, including loading and transport of excavated material to the deposition site at the distance of up to 2k Mechanical bulk excavation of outlet canal section in Class IV material, including loading and transport of excavated material to the deposition site at the distance of up to 2 km 4.1.3. Securing of excavation slopes by using SN32 anchors Length _____m Shotcrete 2x5cm Mesh 06 15/15 cm/cm Drilling of anchor holes through the rock Tunnel excavation in Class V and VI material, including loading and transport of excavated material to the deposition site at the distance of up to 2 km. Securing of tunnel excavation by using O32 anchors Length _____m Shotcrete 2x5cm Mesh 06 15/15 cm/cm Drilling of anchor holes through the rock Vertical tunnel excavation in Class V and VI material, including loading and transport of excavated material to the deposition site at the distance of up to 2 km. Securing of tunnel excavation by using O32 anchors Length _____m Shotcrete 2x5cm Mesh 06 15/15 cm/cm Drilling of anchor holes through the rock Backfilling behind the structures with excavated material, spreading of material in layers <25cm and compaction of material to the required compaction level. Filling around the structures with excavated material, spreading of material in layers of adequate thickness and compaction of material to the required compaction level Total Earthworks:

Unit of Measur.

Quantity Unit Price $ Total Amount

BOTTOM OUTLET

m3

0.00

4.1.2.

m3

0.00

pcs m2 m2 m'

0.00 0.00 0.00 0.00

4.1.4.

m3

0.00

4.1.5.

pcs m2 m2 m'

0.00 0.00 0.00 0.00

4.1.6.

m3

0.00

4.1.7.

pcs m2 m2 m'

0.00 0.00 0.00 0.00

4.1.8.

m3

0.00

4.1.9.

m3

0.00 0.00

4.2.

Description of Works Concrete and Reinforced Concrete Works Concreting of massive structures by using hydraulic, watertight, compacted and reinforced concrete in the formwork with steel ribs, supports and load bearing and working scaffold when necessary.

Unit of Measur.

Quantity Unit Price $ Total Amount

4.2.1.

4.2.2. 4.2.3.

Upstream portal walls with inlet funnel, gate openings and aeration pipes. Reinforced concrete MB 30. Flat, curved and inclined two-side formwork 1.80m2/m3. Foundation slab of inlet portal. Reinforced concrete MB 30. Inlet portal slabs at the elevations of -5.50 and -10.00 mbsl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. Load-bearing columns of bottom outlet intake structure. Reinforced concrete MB 30. Flat and curved two-side formwork 1.80m2/m3. Bottom outlet intake structure slab at the elevation of 10.00 masl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. Vertical shaft of bottom outlet intake structure. Reinforced concrete MB 30. Circular formwork 0.90m2/m3. Concrete of bottom outlet tunnel. Reinforced concrete MB 30. Circular formwork 0.90m2/m3. Second-stage concrete of the plug in the bottom outlet tunnel. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. Ground-surface concrete of the vertical shaft of bottom outlet valve chamber. Reinforced concrete MB 30. Flat and circular two-side formwork 1.80m2/m3.

m3 m3

0.00 0.00

m3

0.00

4.2.4.

m3

0.00

4.2.5.

m3

0.00

4.2.6.

m3

0.00

4.2.7.

m3

0.00

4.2.8.

m3

0.00

4.2.9.

m3

4.2.10. Bridge at the elevation of 55.00 masl, from valve shaft to access road. Formwork 2.2 m2/m3. 4.2.11. Slabs in the bottom outlet valve shaft at the elevations of 48.70 and 55.00 masl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. 4.2.12. Concrete of the vertical shaft of bottom outlet valve chamber. Reinforced concrete MB 30. Circular formwork 0.50m2/m3. 4.2.13. Concrete of the bottom outlet valve chamber in the tunnel with transitional parts. Reinforced concrete MB 30. Flat and circular formwork 0.90m2/m3.

m3

0.00

m3

0.00

m3

0.00

m3

0.00

Description of Works 4.2.14. Transitional part and facing wall of the downstream portal. Reinforced concrete MB 30. Flat curved and inclined formwork 0.90m2/m3. 4.2.15. Foundation slab of the outlet structure of bottom outlet conical gate below the elevation of -30.00 mbsl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. 4.2.16. Reinforced concrete of the outlet structure of bottom outlet conical gate above the elevation of -30.00 mbsl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. 4.2.17. Reinforced (second-stage) concrete of PHASE II of the outlet structure of bottom outlet conical gate above the elevation of 30.00 mbsl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. 4.2.18. Walls of the outlet structure of bottom outlet conical gate. Reinforced concrete MB 30. Flat two-side formwork 1.80m2/m3. 4.2.19. Slab of the outlet structure of bottom outlet conical gate at the elevation of -22.55 mbsl. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. 4.2.20. Columns, beams, slabs and walls of the ground-surface building of bottom outlet conical gate. Reinforced concrete MB 30. Flat two-side formwork 1.80m2/m3. 4.2.21. Stairs in the ground-surface building of bottom outlet conical gage. Reinforced concrete MB 30. Flat formwork 0.50m2/m3. 4.2.22. Sloped roof slabs made of prefabricated reinforced gas concrete boards (Siporex), including reinforcement fixing, monolitization and treatment of joints. Total Concrete Works:

Unit of Measur.

Quantity Unit Price $ Total Amount

m3

0.00

m3

0.00

m3

0.00

m3

0.00

m3

0.00

m3

0.00

m3

0.00

m3

0.00

0.00

4.3.

Description of Works Reinforcement Works 4.2.1. 4.2.2. 4.2.3. 4.2.4. 4.2.5. 4.2.6. 4.2.7. 4.2.8. 4.2.9. 4.2.10. 4.2.11. 4.2.12. 4.2.13. 4.2.14. 4.2.15. 4.2.16. 4.2.17. 4.2.18. 4.2.19. 4.2.20. 4.2.21.

Unit of Measur.

Quantity Unit Price $ Total Amount

kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3

90 70 90 120 90 120 120 50 120 210 90 100 120 90 80 100 120 110 110 120 120

4.3.1.

Supply, transport, preparation, cutting, bending, distribution and fixing of RA 400/500 Total Reinforcement Works:

0.00

0.00 0.00

4.4. 4.4.1.

Description of Works Masonry Works Construction of walls by using hollow brick blocks d=29 cm in compo mortar Rendering of the inside and outside walls and ceilings for the conical gate by applying compo mortar in two layers, including fine floating. Emplacement of cement floor screed in the premises. Upper surface of the screed shall be polished to the black shine. Total Masonry Works:

Unit of Measur.

Quantity Unit Price $ Total Amount

m3

4.4.2.

m2

0.00

4.4.3.

m2 0.00

4.5. 4.5.1.

CRAFTSMAN WORKS Insulation Works

4.5.1.1. Emplacement of floor slab hydro-insulation. The hydro-insulation shall consist of the following layers: Cold bitulite coat Hot bitumen coat Bitumen strip Hot bitumen coat 4.5.1.2. Emplacement of faade thermal insulation made of Stiropor boards for control room, including preparations for faade t ti 4.5.1.3. Emplacement of hydro-insulation of roof slab for the ground-surface building of conical t Total Insulation Works: 4.5.2. Flooring Works

m2

m2

m2 0.00

4.5.2.1. Emplacement of floor PVC linings in the control room. PVC boards shall be fixed to previously prepare base by using adequate adhesive. Adequate wall border lines shall be emplaced. Total Flooring Works:

m2

0.00

0.00 4.5.3. Metal Works

4.5.4.1. Manufacture, transport and installation of steel roof truss. Calculation shall be made per m2 horizontal roof projection.

m2

0.00

Description of Works 4.5.3.2. Manufacture, transport and installation of metal straight and inclined railing, including corrosion protection 4.5.3.3. Manufacture, transport and installation of metal ladders with protective railing, including corrosion protection 4.5.3.4. Manufacture, transport and installation of fixed glazed canopies with steel substructure, including corrosion protection 4.5.3.5. Manufacture, transport and installation of entrance door made of eloxidated aluminium sections, including fan-light and jalousies (on diesel unit, elevation 214.00), dimensions 300x250+50 cm. 4.5.3.6. Manufacture, transport and installation of aluminium roll doors with opening and closing electric mechanism. Door dimensions 300x400cm. 4.5.3.7. Manufacture, transport and emplacement of ribbed metal sheets, dimensions 100x100cm. 4.5.3.8. Manufacture, transport and installation of multiple-piece windows made of eloxidated aluminium sections and glazed with double clear glass (4+12+4). Dimensions 250x160cm. Total Metal Works: 4.5.4. Sheet Metal Works

Unit of Measur.

Quantity Unit Price $ Total Amount

m'

0.00

m'

0.00

pcs

0.00

pcs

0.00

m2 pcs

0.00 0.00

pcs

0.00 0.00

4.5.4.1. Lining of roof edges with sheet metal d=0.55 mm, including emplacement of horizontal gutters made of galvanized metal sheets with welts. 4.5.4.2. Manufacture and emplacement of vertical gutters made of galvanized metal sheets, d=0.55mm. 4.5.4.3. Manufacture and emplacement of window horizontal sheeting made of galvanized metal sheets, d=0.55 mm. Total Sheet Metal Works:

m'

0.00

m'

0.00

m' 0.00

4.5.5.

Description of Works Painting Works

Unit of Measur.

Quantity Unit Price $ Total Amount

4.5.5.1. Painting of ceilings by applying dispersive paint in two layers and in the colour and shade selected by the designer, including skimming. 4.5.5.2. Painting of inside rendered walls by applying dispersive paint in two layers and in the colour and shade selected by the designer, including skimming. 4.5.5.3. Painting of faade surfaces by using acryllic paint resistant to moisture, in the colour and shade selected by the designer. Total Painting Works: 4.5.6. Roofing Works 4.5.6.1. Covering of sloped roof with moulded aluminium sheets and required scantling substructure. The works include installation of ridges-sections, bolts, insulation etc. Total Roofing Works: 4.5.7. Miscellaneous Works 4.5.7.1. Complete cleaning and washing of the structure after completion of all works. 4.5.7.2. Supply and installation of PVC pipes 100 for the passage of electrical installations through the foundation wall. Total Miscellaneous Works:

m2

0.00

m2

0.00

m2

0.00 0.00

m2

0.00 0.00

lump sum

0.00

0.00

Description of Works 4.5.

Unit of Measur.

Quantity Unit Price $ Total Amount

CRAFTSMAN WORKS SUMMARY Insulation works Flooring works Metal works Sheet metal works Painting works Roofing works Miscellaneous works 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BOTTOM OUTLET SUMMARY Earthworks Concrete and reinforced concrete works Reinforcement works Masonry works Craftsman works Total 4. : 0.00 0.00 0.00 0.00 0.00 0.00

4.5.1. 4.5.2. 4.5.3. 4.5.4. 4.5.5. 4.5.6. 4.5.7. 4.5.8.

Total 4.5. : 4