RIO: BLANCO
AO
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SET
OCT
NOV
DIC
1960
11.485
26.880
22.802
16.153
19.729
6.954
2.369
15.122
16.192
3.593
3.555
2.410
1961
5.263
10.193
37.221
35.120
13.107
5.667
1.526
1.088
12.911
6.038
3.844
14.835
1962
8.419
41.801
27.522
38.336
15.047
5.222
1.255
2.896
7.520
2.891
12.036
8.177
1963
2.931
3.101
27.202
10.377
5.318
6.440
3.103
0.668
0.253
10.202
6.299
15.263
1964
23.114
10.788
25.125
18.625
6.291
4.682
5.953
14.120
7.393
38.475 24.452
5.800
1965
6.498
23.451
32.375
55.875
10.758
10.531 15.691
7.750
16.247
7.311
21.900 34.220
1966
30.125
13.225
9.947
14.776
34.525
2.229
1.664
7.608
9.287
24.544
7.292
6.055
1967
34.750
31.250
27.707
26.495
4.605
2.914
17.411
5.570
6.492
15.908
5.766
17.829
1968
17.136
3.908
8.138
22.357
7.056
0.570
12.758
8.611
1.987
1969
29.500
23.294
55.125
29.165
22.962
10.713
2.315
12.848
8.404
1970
30.750
12.561
44.867
25.256
28.358
27.350 10.313
5.075
1971
21.238
18.870
121.250
92.375
22.647
10.827
15.342
1972
42.875
36.925
141.312
62.312
11.692
20.129
2.777
6.131
20.291
1973
26.002
105.200
63.450
58.937
17.998
28.363
6.234
15.573
8.620
1974
23.958
38.865
18.349
14.342
9.397
10.125 21.312
1975
40.810
30.980
210.131
29.036
11.468
1976
41.906
47.002
24.970
34.272
19.080
43.523
1977
18.754
40.414
72.299
28.171
15.363
1978
14.091
14.418
68.725
12.510
13.015
1979
17.138
10.780
48.401
19.105
1980
9.895
6.345
31.550
17.750
1981
1.995
30.998
34.835
47.313
1982
5.821
5.651
8.636
24.824
1983
77.292
46.250
122.500
1984
2.539
92.216
1985
4.134
1986
1987
7.504
9.083
3.081
12.641 19.654
1.686
9.465
11.155
6.915
31.663
6.402
3.338
8.844
21.133 10.965
6.649
7.612
1.754
2.056
9.279
4.172
11.054
2.410
4.395
2.586
0.634
3.685
16.547
7.224
4.348
0.639
12.163
5.325
13.783
6.673
4.790
6.278
1.501
7.582
9.572
7.773
18.980
120.937
215.813
13.475
7.693
4.596
5.202
20.771 10.142
8.738
114.538
11.135
13.131
18.793
5.921
10.338
3.471
27.291
6.500
8.468
20.831
28.938
5.763
15.570
10.725
3.800
6.775
12.988 40.875
0.424
13.472
21.750
5.252
20.743
31.997
14.103
1.777
3.331
9.791
1.024
5.564
13.979 10.413
17.648
20.592
49.077
12.625
8.153
0.798
4.956
4.311
1.408
3.103
2.656
6.700
1988
9.009
10.709
16.447
27.075
11.350
1.906
0.347
0.380
2.538
9.263
13.863
3.772
1989
13.781
58.438
59.031
23.425
6.300
14.081
2.081
1.134
3.003
4.325
1.075
0.398
1990
13.850
14.494
22.288
8.531
4.981
20.544
9.350
0.444
1.084
30.911 18.525
9.438
1991
10.500
40.494
14.272
15.519
6.975
1.088
0.840
0.233
0.500
0.783
2.994
2.971
1992
15.675
21.338
26.950
58.131
4.100
7.594
2.591
3.184
2.730
5.512
5.409
10.101
1993
3.255
12.184
53.306
30.038
6.456
2.806
1.453
2.054
3.181
5.000
3.313
5.413
1994
5.981
14.000
51.781
17.256
7.813
3.447
3.006
1.906
4.238
2.353
14.454 18.306
1995
23.450
23.163
5.672
4.688
5.963
0.844
5.141
0.398
0.729
1.134
3.625
1996
7.625
11.125
21.000
8.944
4.475
4.013
1.488
1.936
0.850
13.094
8.375
3.388
1997
1.219
21.000
15.069
9.700
5.000
1.163
0.944
1.172
0.731
1.100
7.063
18.250
1998
431.250
579.750
400.000
297.500
99.500
14.125
6.488
2.650
3.381
1999
19.625
62.375
54.125
28.875
44.000
9.800
14.938
2.800
5.619
5.275
3.838
19.513
2000
1.306
22.625
155.000
30.125
10.644
10.438
3.925
31.000
4.075
2.619
0.406
63.125
2001
28.313
91.250
500.000
38.188
15.000
53.175 15.013
1.000
12.463
9.363
13.688 16.500
2002
14.250
58.688
117.500
301.875
17.875
3.719
5.656
2.694
0.575
2003
9.750
105.250
9.594
5.363
20.625
15.775
1.706
0.656
0.881
1.440
2.775
9.438
2004
10.425
2.519
11.500
19.250
5.575
1.794
12.713
0.666
5.691
15.156
9.750
20.000
2005
3.475
40.000
40.000
13.650
1.300
1.700
0.794
0.150
0.080
5.838
4.775
2.925
1.028
1.894
13.239
11.901
8.728
9.491
6.694
9.326
2.403
14.688
MAX
PROM
MIN
26.880
12.270
2.369
37.221
12.234
1.088
41.801
14.260
1.255
27.202
7.596
0.253
38.475
15.402
4.682
55.875
20.217
6.498
34.525
13.440
1.664
34.750
16.391
2.914
26.588
10.968
0.570
55.125
19.142
2.315
48.212
25.384
5.075
121.250
31.920
7.504
141.312
33.577
2.777
105.200
30.539
6.234
58.216
20.745
9.083
210.131
35.040
1.686
47.002
21.204
1.028
72.299
21.102
3.338
68.725
18.815
8.844
48.401
10.828
0.584
34.346
12.465
0.634
47.313
14.905
0.639
24.824
9.007
1.501
215.813
54.451
4.596
114.538
26.195
2.539
40.875
13.691
0.424
31.997
11.644
1.024
49.077
11.002
0.798
27.075
8.888
0.347
59.031
15.589
0.398
30.911
12.870
0.444
40.494
8.097
0.233
58.131
13.610
2.591
53.306
10.705
1.453
51.781
12.045
1.906
23.450
7.458
0.398
21.000
7.193
0.850
21.000
6.868
0.731
579.750
157.116
2.650
62.375
22.565
2.800
155.000
27.941
0.406
500.000
66.163
1.000
301.875
47.544
0.575
105.250
15.271
0.656
20.000
9.587
0.666
40.000
9.557
0.080
Q MAX.
26.880
37.221
41.801
27.202
38.475
55.875
34.525
34.750
26.588
55.125
48.212
121.250
141.312
105.200
58.216
210.131
47.002
72.299
68.725
48.401
34.346
47.313
24.824
215.813
114.538
40.875
31.997
49.077
27.075
59.031
30.911
40.494
58.131
53.306
51.781
23.450
21.000
21.000
579.750
62.375
155.000
500.000
301.875
105.250
20.000
40.000
4008.402
N = 46
Qm = Qi / N
Qm = 87.139
m3/s.
Desviacin Estandar:
Q = 113.5657098
Clculo de los coeficientes N, YN, de la tabla :
N = 1.1538
YN = 0.5468
Para N= 46;
Qmax= Qm - Q (YN - ln T) / N
Intervalo de Confianza:
= 1-1/T
Si 0.2 < < 0.80
======> Q = +-(N**m) * Q / (N * N)
Si > 0.90 ======> Q = +- 1.14 Q / N
T (aos)
5
10
25
50
100
200
1000
P (%)
80.00
90.00
96.00
98.00
99.00
99.50
99.90
Qmax (m3/s)
191.732
259.957
350.145
418.370
486.595
554.819
713.232
0.800
0.900
0.960
0.980
0.990
0.995
0.999
*m) * Q / (N * N)
(N**m)
2.2408
-
Qd (m3/s)
224.251
372.164
462.352
530.577
598.802
667.027
825.440
Caudales (m3/s)
Max.
26.880
37.221
41.801
27.202
38.475
55.875
34.525
34.750
26.588
55.125
48.212
121.250
141.312
105.200
58.216
210.131
47.002
72.299
68.725
48.401
34.346
47.313
24.824
215.813
114.538
40.875
31.997
49.077
27.075
59.031
30.911
40.494
58.131
53.306
51.781
23.450
21.000
21.000
579.750
62.375
155.000
500.000
301.875
105.250
20.000
40.000
Descendentes
579.750
500.000
301.875
215.813
210.131
155.000
141.312
121.250
114.538
105.250
105.200
72.299
68.725
62.375
59.031
58.216
58.131
55.875
55.125
53.306
51.781
49.077
48.401
48.212
47.313
47.002
41.801
40.875
40.494
40.000
38.475
37.221
34.750
34.525
34.346
31.997
30.911
27.202
27.075
26.880
26.588
24.824
23.450
21.000
21.000
20.000
4008.40
log Q
2.763
2.699
2.480
2.334
2.322
2.190
2.150
2.084
2.059
2.022
2.022
1.859
1.837
1.795
1.771
1.765
1.764
1.747
1.741
1.727
1.714
1.691
1.685
1.683
1.675
1.672
1.621
1.611
1.607
1.602
1.585
1.571
1.541
1.538
1.536
1.505
1.490
1.435
1.433
1.429
1.425
1.395
1.370
1.322
1.322
1.301
80.89
log Q
7.635
7.284
6.150
5.448
5.394
4.798
4.623
4.342
4.239
4.089
4.089
3.456
3.375
3.222
3.137
3.115
3.113
3.053
3.032
2.982
2.938
2.859
2.839
2.833
2.806
2.796
2.628
2.597
2.584
2.567
2.513
2.467
2.375
2.366
2.359
2.265
2.220
2.058
2.052
2.043
2.030
1.946
1.877
1.748
1.748
1.693
147.78
log Q
21.099
19.660
15.250
12.716
12.527
10.508
9.941
9.047
8.728
8.270
8.267
6.426
6.200
5.784
5.555
5.499
5.493
5.334
5.280
5.149
5.037
4.834
4.783
4.768
4.699
4.675
4.261
4.185
4.153
4.112
3.983
3.876
3.659
3.639
3.623
3.410
3.309
2.953
2.940
2.921
2.892
2.714
2.572
2.312
2.312
2.202
281.56
(logQ-logQp)^2
1.009
0.884
0.520
0.331
0.318
0.186
0.153
0.106
0.090
0.070
0.069
0.010
0.006
0.001
0.000
0.000
0.000
0.000
0.000
0.001
0.002
0.005
0.005
0.006
0.007
0.007
0.019
0.022
0.023
0.024
0.030
0.035
0.047
0.049
0.050
0.064
0.072
0.105
0.106
0.108
0.111
0.132
0.151
0.190
0.190
0.209
5.529
PROMEDIO
X=
1.759
DESVIACION ESTANDAR
S=
0.3505
46
1.20
2.7971
T (aos)
5
10
25
50
100
200
1000
P (%)
80.00
90.00
96.00
98.00
99.00
99.50
99.90
K
0.72684
1.33216
2.08153
2.62635
3.15932
3.68413
4.88347
2.6791
477.652 m/s
Log Q
2.013
2.225
2.488
2.67911
2.866
3.050
3.470
Q (m3/s)
103.113
168.068
307.713
477.652
734.379
1121.689
2952.939
OK
ESTRUCTURAS HIDRAULICAS
METODO NASH
m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Q max.Anual
579.750
500.000
301.875
215.813
210.131
155.000
141.312
121.250
114.538
105.250
105.200
72.299
68.725
62.375
59.031
58.216
58.131
55.875
55.125
53.306
51.781
49.077
48.401
48.212
47.313
47.002
41.801
40.875
40.494
40.000
38.475
37.221
34.750
34.525
34.346
31.997
30.911
27.202
27.075
26.880
26.588
24.824
23.450
21.000
21.000
20.000
4008.402
Qp =
87.139
Xm =
-0.600
T
47.000
23.500
15.667
11.750
9.400
7.833
6.714
5.875
5.222
4.700
4.273
3.917
3.615
3.357
3.133
2.938
2.765
2.611
2.474
2.350
2.238
2.136
2.043
1.958
1.880
1.808
1.741
1.679
1.621
1.567
1.516
1.469
1.424
1.382
1.343
1.306
1.270
1.237
1.205
1.175
1.146
1.119
1.093
1.068
1.044
1.022
T/(T-1)
1.022
1.044
1.068
1.093
1.119
1.146
1.175
1.205
1.237
1.270
1.306
1.343
1.382
1.424
1.469
1.516
1.567
1.621
1.679
1.741
1.808
1.880
1.958
2.043
2.136
2.238
2.350
2.474
2.611
2.765
2.938
3.133
3.357
3.615
3.917
4.273
4.700
5.222
5.875
6.714
7.833
9.400
11.750
15.667
23.500
47.000
X
-2.030
-1.724
-1.543
-1.413
-1.311
-1.227
-1.155
-1.091
-1.035
-0.983
-0.936
-0.893
-0.852
-0.814
-0.777
-0.743
-0.710
-0.678
-0.648
-0.618
-0.590
-0.562
-0.535
-0.508
-0.482
-0.456
-0.431
-0.405
-0.380
-0.355
-0.330
-0.305
-0.279
-0.253
-0.227
-0.200
-0.173
-0.144
-0.114
-0.082
-0.049
-0.012
0.029
0.077
0.137
0.223
-27.585
m/sg.
Q*X
-1176.691
-861.938
-465.778
-304.961
-275.513
-190.161
-163.168
-132.325
-118.516
-103.503
-98.500
-64.541
-58.551
-50.752
-45.892
-43.252
-41.274
-37.906
-35.717
-32.968
-30.543
-27.581
-25.884
-24.497
-22.801
-21.437
-17.997
-16.564
-15.390
-14.197
-12.688
-11.334
-9.697
-8.743
-7.797
-6.405
-5.334
-3.916
-3.088
-2.217
-1.295
-0.294
0.689
1.625
2.878
4.465
n=
46 aos
Q
336110.063
250000.000
91128.516
46575.251
44155.037
24025.000
19969.081
14701.563
13118.953
11077.563
11067.040
5227.145
4723.126
3890.641
3484.659
3389.103
3379.213
3122.016
3038.766
2841.530
2681.272
2408.552
2342.657
2324.397
2238.520
2209.188
1747.324
1670.766
1639.764
1600.000
1480.326
1385.403
1207.563
1191.976
1179.648
1023.808
955.490
739.949
733.056
722.534
706.922
616.231
549.903
441.000
441.000
400.000
X
4.119
2.972
2.381
1.997
1.719
1.505
1.333
1.191
1.071
0.967
0.877
0.797
0.726
0.662
0.604
0.552
0.504
0.460
0.420
0.382
0.348
0.316
0.286
0.258
0.232
0.208
0.185
0.164
0.144
0.126
0.109
0.093
0.078
0.064
0.052
0.040
0.030
0.021
0.013
0.007
0.002
0.000
0.001
0.006
0.019
0.050
-4581.946 929661.509
28.091
ESTRUCTURAS HIDRAULICAS
a=
-25.966
b = Xi*Qi - N*Xm*Qm
Xi - N*Xm
b=
-188.609
T=
50 aos
T para 50 aos =
361.9661 m/sg.
Sxx =
531.2406056
Sqq =
26697142.8
Sxq = N Qi*Xi - ( Qi )( Xi )
Sxq =
-100196.669
Xi=
-2.05680612
Q =
62.89057474
424.857
m/sg.
T (aos)
P (%)
Qmax(m3/s)
Qd (m3/s)
5
10
25
50
100
200
1000
80.00
90.00
96.00
98.00
99.00
99.50
99.90
-1.01363
-1.33954
-1.75132
-2.05681
-2.36004
-2.66216
-3.36200
165.214
226.683
304.349
361.97
419.158
476.141
608.13687
201.959
269.719
358.123
424.857
491.665
558.596
714.463
1.0204
Mtodo Gamma
AO
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
Q max
26.880
37.221
41.801
27.202
38.475
55.875
34.525
34.750
26.588
55.125
48.212
121.250
141.312
105.200
58.216
210.131
47.002
72.299
68.725
48.401
34.346
47.313
24.824
215.813
114.538
40.875
31.997
49.077
27.075
59.031
30.911
40.494
58.131
53.306
51.781
23.450
21.000
21.000
579.750
62.375
155.000
500.000
301.875
105.250
20.000
40.000
4008.402
N = 46
Qm = Qi / N
Qm = 87.139
Valor Mnimo:
Xo = 20.000
m3/s.
m3/s
Desviacin Estandar:
=
113.56571
Qm = at / + Xo.(a) de donde:
at=
0.0052056
=====>
Q max = Xo + Xt / 2
Q max =
20.000
T (aos)
5
10
25
50
100
200
1000
P (%)
80.00
90.00
96.00
98.00
99.00
99.50
99.90
Xt:Obtenidos de tabla
at=
Xt (at=0.349)
1.16284
2.13620
3.46985
4.56454
5.85084
7.05856
9.89400
67.139
0.349
96.050
Qmax(m3/s)
131.691
225.183
353.281
458.426
581.976
697.978
970.323
Xt
.(1)
Q (m3/s)
579.750
500.000
301.875
215.813
210.131
155.000
141.312
121.250
114.538
105.250
105.200
72.299
68.725
62.375
59.031
58.216
58.131
55.875
55.125
53.306
51.781
49.077
48.401
48.212
47.313
47.002
41.801
40.875
40.494
40.000
38.475
37.221
34.750
34.525
34.346
31.997
30.911
27.202
27.075
26.880
26.588
24.824
23.450
21.000
21.000
20.000
Gumbel I
T (aos)
5
10
25
50
100
200
1000
Qd (m3/s)
224.251
372.164
462.352
530.577
598.802
667.027
825.440
Log-Pearson III
T (aos)
Qd (m3/s)
5
103.113
10
168.068
25
307.713
50
477.652
100
734.379
200
1121.689
1000
2952.939
Nash
T (aos)
5
10
25
50
100
200
1000
Qd(m3/s)
201.959
269.719
358.123
424.857
491.665
558.596
714.463
Gamma
T (aos)
5
10
25
50
100
200
1000
Q (m3/s)
131.691
225.183
353.281
458.426
581.976
697.978
970.323
T vs Q
T vs Q
3500
3000
Caudal (m3/s)
2500
2000
1500
1000
500
0
1
10
Log-Pearson III
Nash
Gamma
Gumbel I
T=
Qd' =
50
477.652
200
1000
1121.689
2952.939
T vs Q
T vs Q
100
stribusin registrada,
aos
m3/s
1000
1
1.2
1.5
Lm/Ls
1.0-1.2
1.2-1.5
>1.5
0.00*n6
0.15*n6
0.30*n6
0.00000
0.00630
0.01260
0.042
egetacin. (n5)
Estructuras Hidralicas
DATOS DE INICIO:
RESUMEN TOTAL
Tr aos
50.00
477.6524
log-Pearson
9.4274
Nash
Qmax 50 =
477.6524
m/s
(Caudal de diseo)
477.65
m3/s
En la bocatoma
Ubicacin de la Bocatoma:
Caudal de Diseo :
Margen derecha
Margen izquierda
Canal Mochumi
(areas cultivadas)
CULTIVO
MOD. RIEGO
menestra
algodn
maiz
caa de azucar
arroz
frijol
0.60l/s/ha
0.50l/s/ha
0.70l/s/ha
0.85l/s/ha
1.10l/s/ha
0.45l/s/ha
AREA
CULT. (ha)
3500.00
3650.00
1870.00
3892.00
2950.00
1500.00
CAUDAL
Lt/s
2100
1825
1309
3308.2
3245
675
CALCULO DE "s"
El clculo de la pendiente se ha obtenido en el perfil longitudinal, esta pendiente est
comprendida entre los tramos del kilometraje :
1.94
1300.00
COTA
87.5700
88.0000
88.5000
89.0000
50.00 m
0
0.00149
Nota:
Se tiene un material a los costados del
rio de tierra compacta
Area (m)
P (m)
R.H.^ 2/3
1/n
21.50
46.50
71.50
50.8600
51.8600
52.8600
0.5633
0.9299
1.2231
25.641
25.641
25.641
Maco Carlos Juan
Regalado La Torre Martn
Zegarra Gonzlez Rosa
89.5000
90.0000
90.5000
91.0000
91.7100
96.50
121.50
146.50
171.50
207.00
53.8600
54.8600
55.8600
56.8600
58.2800
1.4752
1.6991
1.9018
2.0876
2.3279
25.641
25.641
25.641
25.641
25.641
Estructuras Hidralicas
CURVA DE AFORO
(cota - caudales)
92.0000
91.5000
Cotas (m.s.n.m)
91.0000
90.5000
90.0000
89.5000
89.0000
88.5000
88.0000
87.5000
0.0
100.0
200.0
300.0
400.0
500.0
Caudales
T = 50.00 m.
91.71 m.s.n.m.
87.57 m.s.n.m.
B = 50.00 m.
CANAL DE DERIVACIN :
Maco Carlos Juan
Regalado La Torre Martn
Zegarra Gonzlez Rosa
Estructuras Hidralicas
=
=
=
=
=
=
0.5
3.50
12.462
0.0009
0.014
b*Yn
b+2*Yn
2/3
5/3
m.
m/s
Formula a usar
Formula a usar
2/3
Iterando se tiene:
Yn : Tirante normal =
1.800
m.
Yn =
1.800
m.
6.299
7.099
0.887
1.978
0.200
2.000
0.600
m2
m.
m.
m/s
m.
m.
m.
Usar BL =
0.60
m.
Yn + Bl + hv =
2.60
m.
Se asumira:
12.50
b
b
Canal Rectangular
Canal Trapezoidal
Lt
Longitud de transicion.
Para = 12.50
Lt = (T - t)*Ctg 12.5/2
Donde :
B=T =
6.13
b=t =
3.50
Remplazando y calculando:
Lt =
5.920
Asumimos :
Lt =
6.00
m.
Maco Carlos Juan
Regalado La Torre Martn
Zegarra Gonzlez Rosa
Estructuras Hidralicas
Z=
B=
n=
s=
Qderivacin =
1.250
2.500
0.014
0.0009
12.462
m/s
A = (b*Yn) + (Z * Yn)
0.5
P = b+[2*Yn*(1+Z) ]
0.5
2/3
Q*n/(s ) = A*(R )
5/3
2/3
5.816
= (A ) / (P )
( 2.50 Yn)
3.52875
3.54125
3.55375
3.56625
3.57875
3.59125
3.60375
( 1.25 Yn) ]
2.49042
2.50809
2.52583
2.54363
2.56149
2.57942
2.59740
Iteracin de valores:
Yn
1.4115
1.4165
1.4215
1.4265
1.4315
1.4365
1.4415
5/3
P^(2/3)
6.734500
6.749500
6.764500
6.779500
6.794500
6.809500
6.824500
Q*n/(s^0.5)
5.585005
5.623400
5.661940
5.700624
5.739454
5.778430
5.817551
Iterando tenemos :
Yn =
1.450
m.
m
m
m
m
m
m/s
m
m
m.
Asumiremos:
m.
BL =
0.50
Estructuras Hidralicas
h
K
Hvc
H = P
YNCR
Qvc
Hsed
Fondo de rio
Qvc = Qder =
12.462
m /seg.
Donde:
C=
Avc = Ancho de la ventana de captacion =
Hvc = Altura de la vantana de captacion =
Arvc = Area de la ventana de captacion = Avc*Hvc =
Qvc = Qder
Ecuacin:
Solucion :
Qvc =
Qder =
16.74*h^0.5 +
h
1.2728
Qvc =
Qder =
6.925*h Y=0
0.000
0.600
3.500
1.800
6.299
16.740*h^0.5
6.925*(K-h)
4.00 m.
27.700 =
18.886
18.886
Reemplazando haho =
Vvc = La velocidad en la ventana de captacion ser = Q/Arvc =
1.273
2.998
2.698*h^0.5 +
h
3.687
6.925*h Y=0
3.012
Qvc =
Qder =
27.700 =
5.180
2.168
Estructuras Hidralicas
Reemplazando haho =
Vvc = La velocidad en la ventana de captacion ser = Q/Arvc =
RESUMEN :
Avc =
Hvc =
3.687
5.103
3.500
1.800
0.0050
0.0100
0.0050
n = 0,000
n=
0.0000
0.0000
0.0390
BLcr
Yncr
CFC
Hsed
CFR
Donde:
CFC: Cota de fondo del canal
CFR: Cota de fondo del rio =
Hsed: Altura de sedimentos =
Yncr: Tirante Normal del canal de captacion =
hvcr: Carga de Velocidad en Canal de captacion =
Pt: Perdidas por transicion, cambio de direccion, etc. =
Maco Carlos Juan
Regalado La Torre Martn
Zegarra Gonzlez Rosa
Estructuras Hidralicas
Calculando CFC:
CFC = CFR + Hsed =
88.570
Calculando la cota en B:
Cota en B = CFC + hvcr + Yncr + Pt =
msnm
91.028
91.028
Cota en B =
89.028
88.570
CFC =
87.5700
CFR =
haho
YNCR
Hvc
H = P
Qvc
Hsed
Fondo de rio
1.000
1.800
1.273
P =
4.072
3.458
Resumen
Caso 01
Caso 02
Se asume un P =
de P
4.072
3.458
4.000
m.
m.
m.
87.5700
88.0000
88.5000
89.0000
89.5000
90.0000
Area
(m2)
Perime.
(m)
Radio h.
(m)
Pendi.
S
21.50
46.50
71.50
96.50
121.50
50.8600
51.8600
52.8600
53.8600
54.8600
0.42273
0.89664
1.35263
1.79168
2.21473
0.00149
0.00149
0.00149
0.00149
0.00149
90.5000
90.5000
91.0000
91.5000
91.7100
146.50
146.50
171.50
196.50
207.00
55.8600
55.8600
56.8600
57.8600
58.2800
2.62263
2.62263
3.01618
3.39613
3.55182
0.00149
0.00149
0.00149
0.00149
0.00149
Estructuras Hidralicas
CURVA DE AFORO
(cota - caudales)
92.0000
91.5000
Cotas (m.s.n.m)
91.0000
90.5000
90.0000
89.5000
89.0000
88.5000
88.0000
87.5000
0.0
100.0
200.0
300.0
400.0
Caudales
Datos de bocatoma.
P =
Lbo =
Sbo =
nrio =
Tirantes
Medio
Max. Ave.
2.4510
4.140
Por Curva:
movil
Predimensionamiento:
El area hidraulica del canal de limpia tiene una relacion de 1/10 del area obstruida
teniendose:
A1 = A2 /10
por el alivia
ecuacion 01
A1 = P*Lbm
A2 = P*lbf
(ep)
0.5
2.00
50.00
m.
unidad.
m.
(ee)
0.40
Estructuras Hidralicas
lbm =
# de compuertas =
longitud de cada compuerta =
Entonces:
lbm =
Lbf =
Longitud de la bocatoma =
5
2.000
2.400
m.
m.
m.
5.00
45.00
50.00
m.
m.
m.
0.50
m.
"H":
Qbf
E
C
L
H
L1
N
Kp
Ka
:
:
:
:
:
:
:
:
:
45.00
44.434
m.
:
C = Co * K1 * K2 * K3 * K4
* Por efecto de la profundidad de llegada (Co):
P/H =
1.695
En la fig.3 (DBI), pag307 (MPG-T) tenemos que
Co =
:
3.95
1.00
3.95
Estructuras Hidralicas
K2 =
1.00
4.00
2.69
1.573
hd/he =
0.667
En la fig.8 (DBI), pag 311 (MPG-T) tenemos:
K4 =
1.00
Remplazando
tenemos que.
C =
3.95
Calculando Qbf:
Qbf =
349.98
m3/seg.
:
:
.
:
:
:
:
:
:
4.75
m.
:
= Co * K1 * K2 * K3 * K4
:
3.95
Estructuras Hidralicas
he = H
he/H = 1.00
En la
1.00
1.00
(Hd + d)/H' =
H' = Hd =
d =
1.00
4.00
0.00
1.573
hd/he =
0.667
En la fig.8 (DBI), pag 311 (MPG-T) tenemos:
K4
=
1.00
Remplazando
tenemos que.
C
3.0415
Calculando Qbm:
Qbm =
127.329
m3/seg.
Calculando Qmax:
Qmax = Qbm + Qbf
Qbm =
Qbf =
Qmax =
127.329
349.977
477.306
Lbm
Lbf
ep
ee
Lbo
P
H
H'
Qbm
Qbf
Qmax
=
=
=
=
=
=
=
=
=
=
=
Reumen
5.000
45.000
0.500
0.400
50.000
4.000
2.360
6.360
127.329
349.977
477.306
m3/seg.
m3/seg.
m3/seg.
477.652
m3/seg.
m.
m.
m.
m.
m.
m.
m.
m.
m3/seg.
m3/seg.
m3/seg.
Estructuras Hidralicas
Y
hv
H
ho
X
Yc
R1
R2
P
Xc
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
2.360
349.977
45.000
6.360
7.777
1.223
0.076
0.265
0.114
0.515
0.215
0.625
39.897
23.175
1.367
24.542
m.
m/s
m.
m.
m/s
m/s
m.
Datos
De
Monogramas
2:3
m.
m.
m.
m.
m.
0.0323
se calcula k y n.
=
=
0.507
1.855
-0.5070
*( X/Ho)
Y =
-0.2433
* X
X =
2.1424
*(Y1/1.793)
1.855
(Pt)
Creager en :
-0.855
tg a = dy/dx = tg45 = 1 =
-0.451
tenemos que:
X =
0.394
Y =
-0.043
Punto
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Estructuras Hidralicas
m
m
X (m)
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.175
Y (m)
0.000
-0.003
-0.012
-0.026
-0.044
-0.067
-0.094
-0.126
-0.161
-0.200
-0.243
-0.290
-0.341
-0.396
-0.454
-0.516
-0.582
-0.651
-0.724
-0.800
-0.880
-0.964
-1.050
-1.141
-1.234
-1.332
-1.432
-1.536
-1.643
-1.754
-1.867
-1.984
-2.105
-2.228
-2.355
-2.486
-2.619
-2.755
-2.895
-3.038
-3.184
-3.333
-3.45
0.50
1.00
1.50
2.00
2.50
-0.65
-1.15
Vertical (m).
-1.65
-2.15
-2.65
-3.15
Vertical
Estructuras Hidralicas
-3.65
-4.15
-4.65
-5.15
Horizontal (m).
Calculo de los tirantes Conjugados (y1, y2).
Y1
= d1 + h1
...................... 1
h1 = V1 / ( 2 x g)
Qbf =
Lbf =
124.8 d1 + 60.49 =
0.9
0.8
0.7
0.6
y0.5
0.4
0.3
0.2
0.1
0
0
0.2
0.4
d1
0.6
0.8
0
0
0.2
0.4
d1
0.6
0.8
Estructuras Hidralicas
d2 =
V2 =
0.33 m. x
1.305 m/s
18.098 =
Datos:
Lbf
P : Altura de la aliviadero fijo
H : Carga hidraulica sobre el aliviadero
Qbf
=
=
=
=
45.000
4.000
2.360
349.9768
S perdidas =
0.00
Perdidas de descarga dentro del tramo.
P + H =
6.360
m.
hv1 = V12/(2*g) = q2/(2*g*Y12) : perdidas de carga por velocidad.
Qbf =
349.977
m/s
Y1 =
0.329
m.
P + H =
28.77
Cumple
V1 =
23.624
m/seg.
Calculando Y1 (forma 02):
Asumiendo un espesor del colchon amortiguador:
epd =
Z = P+epd
Qbf
lbf
Yc = [Qbf/(Lbf*g)]1/3
Abf = Yc*Lbf
Vc = Qbf/Abf
hv = Vc/2g
S perdidas
Remplazando
=
=
=
=
=
=
=
=
4.650
349.977
45.000
1.834
82.516
4.241
0.917
0.000
0.65
m.
m/s
m.
m.
m2
m/s.
m.
Perdidas de descarga dentro del tramo.
3.0829
/
7Y1^2 + 3.0829=
Y1 =
V1
Caso 01: Y1 =
Caso 02: Y1 =
Y1 =
Estructuras Hidralicas
= Qbf/(lbf*Y1) =
Resumen
Caso 01: V1 =
Caso 02: V1 =
V1 =
0.329 m
0.315 m
0.329 m
Calculo de Y2:
Y2 = -Y1/2+[(2Y1*V1/g) + (Y1/4)]0.5
Y2 = Tirante conjugado en 2 =
V2 = Velocidad en 2 =
Y1
Y2
V1
V2
RESUMEN:
0.329
6.226
24.658
1.305
=
=
=
=
13.721
Caso
4.00
0.412
0.900
m.
m.
R = 5*Y1 =
1.646
m.
29.483
m.
Segn Safranez:
Lpd = 6*Y1*V1/(g*Y1)1/2 = 6*Y1*F1
Lpd =
27.103
m.
Segn Pavloski:
Lpd = 2.50*(1.90*Y2-Y1)
Lpd =
28.749
m.
Lpd = 7.00*(Y2-Y1)
Lpd =
41.276
m.
Estructuras Hidralicas
e = espesor de enrocado.
q = Caudal unitario o especifico =
Ht = Carga hidraulica total = H + P =
7.777
6.360
1.865
1.300
m.
m.
C
18
15
12
4--9
4--6
44.577
25.000
m.
m.
Lsd =
SE asume =
11.80
10.00
m.
m.
=
=
=
=
=
=
10.000
4.175
30.00
45.000
89.175
84.200
m. Depende de la topografia.
m.
m. Depende de la topografia.
m.
m.
m.
t1
s/c
Hm =
7.950
m.
Hm =
8.300
m.
0.25*(H+P) = 1.59
hp
hz
b1
t2
b1
Estructuras Hidralicas
t2
epd
0.30
1.35
0.41
0.65
0.60
7.777
6.031
0.874
epd > e1, Cumple
0.65
umbral terminal
epd
poza de disipacion
dentellon Posterior
dentellon delantero
add
ldd
Dentellon delantero.
Determinacion de la altura del dentellon delantero: (mayor informacion en MPGT))
add =
2.000
m.
Determinacion de la longitud del dentellon.
Carga total de agua = P + H + V12/(2*g) =
El espesor minimo: ldd = 0.20*(H + P + V12/(2*g)) =
Se asume un valor de ldd =
Dentellon posterior.
adp =
ldp =
2.000
2.000
m.
m.
aut =
lut =
0.600
0.700
m.
m.
Umbral terminal.
ldd
ldd
Estructuras Hidralicas
Segn Lfn < Lcomp, significa que la longitud de filtracion necesaria < la longitud de filtracion compensa
posicion "d" de los lloradores o filtros:
Valores del coeficiente de Filtracio "C"
Materiales
Bligh
Arena fina y limosas
15--18
Arena muy fina
Arenas comunes
9--12
Arena de grano grueso
Canto rodado, grava y arena
4--9
Suelos arcillosos
6--7
Cascajo con grava y arena
6--4
Calculo de la Longitud de filtracion necesaria "L"
Lfn = C*H
C = Valor del coeficiente de filtracion =
5.00
Segn komoy
H =
2.360
m.
Lfn = C*H =
11.800
m.
Lcomp = lv + lh/3
Donde:
lh = ldd + d
Por lo tanto: Lcomp = lv + (ldd + d)/3
Igualando: Lcomp = Lnec, se pocede a calcular d:
d = 3*(Lnec - lv) - ldd
Despejando se obtiene:
ldd =
2.75
m.
lv =
2.65
m.
d =
24.70
m.
Se asume un valor de d =
11.10
m.
0.500
m.
0.325
0.325
4.175
20.000
24.500
20.00
m.
m.
m.
m.
m.
La altura inicial del pilar se proyectara teniendo en cuenta que el borde inferior de la compuerta a de l
a mayor altura que el maximo nivel aguas arriba del tirante en funcion del tirante aguas abajo
Aguas Arriba:
Tirante maximo = H + P =
Altura de la compuerta =
6.360
2.000
api =
8.360
Borde libre =
Tirante maximo =
api =
0.500
6.226
6.726
Estructuras Hidralicas
Aguas Abajo:
Sv
P=Z
Ew
Sh1
W1
Yh
Sv
Sv
-
+
Sh3
W2
Fsp2
W3
ld
d
Fsp1
Fuerzas Actuantes:
Ew
Sp
W1
Sh
Sv
1.80
1200.00
1.00
Ew =
m
kg/m
m.
1944.000
Kg
Punto de aplicacin:
Yh = Z/3 =
0.600
Estructuras Hidralicas
m.
O
2
Fsp
Sx = (Hx - H*Lx/Lfn)*gw
Donde:
H =
lfn =
H/lfn =
1.800
5.103
0.35
m
m
m.
=
=
=
=
4.600
0.000
2.800
2.800
m.
m.
m.
m.
Reemplazando se tiene:
Sx = S2 =
4334.185
=
=
=
=
4.600
1.500
2.800
3.300
m.
m.
m.
m.
Reemplazando se tiene:
Sx = S3 =
3500.000
2.200
1.500
4.800
5.300
m.
m.
m.
m.
Reemplazando se tiene:
Sx = S4 =
433.334
2.200
5.500
4.800
6.633
Reemplazando se tiene:
Sx = Sp =
m.
m.
m.
m.
-11.110
brazo 1 = ldd*0.5 + d
brazo 2 = d*0.5
Sp
1
5876.11
Brazo (m)
4.75
844.45
2.00
Estructuras Hidralicas
El valor de W1 puede calcularse integrando las areas parciales de las franjas verticales trapezoidales, e
se puede dividir la estructura, refirinedole a ejes coordenados
X
h
Lc
A = (a+b)*h/2
Xc = h*(2*a+b)/(3*(a+b))
Yc = ((a+b)2-a*b)/(3*(a+b))
Donde.
1
2
3
4
5
6
7
8
9
10
Totales
Xacum
0.0709
0.2152
0.3661
0.5263
0.6979
0.8839
1.0893
1.3231
1.6052
2.2401
b = base mayor
a = base menor
P/10 =
0.350
a
3.501
3.152
2.801
2.451
2.101
1.750
1.400
1.050
0.700
0.350
b
3.501
3.501
3.151
2.801
2.451
2.101
1.751
1.400
1.050
0.700
X(acu)*Area
0.0869
0.2505
0.3815
0.4837
0.5562
0.5957
0.6013
0.5676
0.4912
0.4122
4.4268
Yacum
2.1460
1.9382
1.5520
1.2087
0.9083
0.6508
0.4363
0.2646
0.1359
0.0501
9.291
h(acum)
2.565
2.423
2.274
2.116
1.947
1.764
1.564
1.339
1.076
0.740
h
0.142
0.149
0.158
0.169
0.183
0.200
0.225
0.263
0.336
1.076
X =
Y =
Totales
Volumen = Area*1.00
Volumen =
7.293
m
Peso de la estructura = Volumen*2400 =
Estructuras Hidralicas
Calculo del peso W2, tenemos (espesor del azud)
W2 =
10560.00
kg.
Donde:
Xc2 =
2.750
m.
Xc3 =
4.750
m.
Sh1 =
1750.300
Kg.
Yc1 =
1.274
m.
Sh2 =
1056.000
Kg.
Yc2 =
0.400
m.
Sh3 =
720.000
Kg.
Yc3 =
1.800
m.
Sv1 =
525.090
Kg.
Xc1 =
3.393
m.
Sv2 =
316.800
Kg.
Xc2 =
2.750
m.
Sv3 =
216.000
Kg.
Xc3 =
4.750
m.
7200.00
kg.
Donde:
Donde:
Para W2:
Donde:
Para W3:
Donde:
Donde:
Para W2:
Donde:
Para W3:
Donde:
Estructuras Hidralicas
Ew
Sp1
Sp2
W1
W2
W3
Sh1
Sh2
Sh3
Sv1
Sv2
Sv3
=
=
=
=
=
=
=
=
=
=
=
=
Fuerza (kg)
1944.00
5876.11
844.45
17503.00
10560.00
7200.00
1750.30
1056.00
720.00
525.09
316.80
216.00
Brazo (m).
0.60
4.75
2.00
3.39
2.75
4.75
1.27
0.40
1.80
3.39
2.75
4.75
Mom. (kg-m)
-1166.40
-27911.53
-1688.89
59387.24
29040.00
34200.00
-2229.70
422.40
1296.00
-1781.62
-871.20
-1026.00
2.037
m.
0.713
0.9170
m.
m.
Calculo de la excentricidad.
e = Xc-1.15/2 =
e' = (ld + d)/6 =
Cumple e < e'
Factor de seguridad al volteo.
FSV = SM(+)/SM(-) > 2.00
FS =
3.390
f =
Como la fuerza resultante Fr > fuerza actuante horizontal entonces no es necesario el diseo del
dentelln.
Cumple
FSD = SFV/SFH > 2.00
FSD =
7.868
Cumple, FSD > 2.00
Estructuras Hidralicas
Esfuerzo = (SFv/(b*(d+ld)*(1+-(6*e)/(l+ld))
Reemplazando:
Esfuerzo 1 =
Esfuerzo 2 =
Kg/cm2.
Kg/cm2.
1.391
0.174
t1
s/c
hp
hz
b1
t2
b2
Datos de inicio.
gs = peso especifico del terreno =
f = coeficiente de friccion del terreno =
F'c =
st = capacidad portante del terreno =
u = coeficiente de rugosidad =
h=
s/c =
df =
1700.00
28.00
210.00
1.40
0.55
4.500
100.00
1.50
kg/m
kg/cm2
kg/cm2
m.
kg/m2
m.
Determinacion de Ka:
Ka = tag2(45-f/2) =
0.361
Asumiendo hz =
Altura de pantalla hp = h + df - hz =
t1 = ancho de corona =
0.600
5.400
0.500
h' = s/c/gs =
0.059
Pre dimensionamiento:
Determinando t2:
m.
m.
h'
P = gs*hp*Ka
1.819
Momento E*Yo =
16633.919
m.
kg*m.
27445.966
Estructuras Hidralicas
kg*m.
Mu = 0.90*b*d2*Fy*r*(1-0.59*r*Fy/F'c)
b=
Fy =
F'c =
r minimo =
1.000
4200.000
210.000
0.002
m.
kg/cm2
kg/cm2
Despejando y calculando d =
60.977
t2 = d + rec + /2
rec =
=
t2 =
Se asume un t2 =
Por lotanto el nuevo valor de d =
7.500
1/2
68.727
80.000
71.865
cm.
"
cm.
cm.
cm.
hp-d
P = gs*hp*Ka
Vc =
55195.408
kg.
7.500
87.500
80.000
cm.
cm.
cm.
5.200
m.
Calculando b1 =
2.092
m.
0.500
m.
Valores de b1 y b2:
b1/H > FSD*(Ka*gs)/(2*gm*u)
si se tiene que:
H = hp +hz =
FSD =
Ka =
gs =
gm =
u=
6.000
1.500
0.361
1700.000
2400.000
0.550
m.
kg/m
kg/m
t2 =
El nuevo valor de b1 =
Se asume un valor de b1 =
0.800
2.742
2.750
m.
m.
m.
0.800
0.800
m.
m.
Estructuras Hidralicas
b2 = (u*FSV/(3*FSD) - b1/(2*u))*H
FSV =
b2 =
1.750
-0.092
b2 = hz (como minimo) =
Por lo tanto b2 =
Verificacion de la estabilidad.
t1
h'
P1
P2
hp
P3
Yo
lzi
hz
P4
lze
b1
b2
E = 0.5*Ka*gs*H*(H+2*h')
Ka =
gs =
H = Hes =
h' =
0.361
1700.000
6.000
0.059
kg/m
m.
m.
E=
11264.309
kg.
Yo = H*(H + 3*h')/(3*(H+2*h'))
Yo =
2.019
2.750
0.800
2.350
1700.000
0.800
m.
m.
m.
kg/m
m.
22365.000
6240.000
1872.000
6816.000
37293.000
kg.
kg.
kg.
kg.
kg.
SP=
Momentos
M1 =
M2 =
M3 =
M4 =
SM=
53116.875
4056.000
1872.000
12098.400
71143.275
Estructuras Hidralicas
Chequeo por deslizamineto.
FSD = S P*u/E =
1.821
22745.240
71143.275
3.128
kg*m.
kg*m.
Cumple FSV > 1.75
1.908
3.550
1.232
m.
m.
m.
e = L*0.50 - (X - Z) =
9066.099
kg/cm2
0.907
-2720.009
kg/cm2
-0.272
Diseo de la pantalla.
Momento en la base de la pantalla Mu =
t2 =
d2 =
b=
F'c =
Fy =
Smin =
Sasum =
Asmin =
27445.966
80.000
71.865
100.000
210.000
4200.000
kg*m.
m.
m.
m.
kg/cm2
kg/cm2
Asmin = 0.0018*b*hf =
9.79
cm.
12.50
cm.
0.5 @ 12.5
a =
Mumin =
Mumin =
tn*m
Mto
27.45
b(cm)
100.00
d(cm)
71.87
3.04
3440799.05
34.41
As (cm2)
80.17
a
18.86
E3
hp-d
Y3
P = gs*hp*Ka
1.580
10890.087
m.
kg*m.
tn*m
Mto
17.97
17968.643
0.770
0.040
1/2
1.00
0.724
13.027
9.72
12.50
kg*m.
m.
m.
"
m.
cm.
cm2
cm.
cm.
0.5 @ 12.5
Estructuras Hidralicas
3.07
34.90
b(cm)
100.00
d(cm)
72.37
3489538.58
tn*m.
a
11.89
Refuerzo horizontal
Para 5/8" o mayores r = 0.002
Otros casos r = 0.0025
Si t2 > 25 cm.: Usar doble refuerzo horizontal en dos capas, colocar 2/3 As en la cara expuesta y 1/3 As en cara protegida.
Refuerzo en la parte interior:
As = 0.0025*b*t2 =
2/3 As =
1/3 As =
20.000
13.333
Smin
Sasum
Asmin
6.670
Smin
Sasum
Asmin
cm2
cm2
=
=
=
9.50
12.50
cm.
cm.
0.5 @ 12.5
10.69
12.50
cm.
cm.
0.375 @ 12.5
11.69
12.50
cm.
cm.
0.5 @ 12.5
13.15
15.00
cm.
cm.
0.375 @ 15
cm2
=
=
=
1/3 As =
0.650
16.250
10.830
Smin
Sasum
Asmin
5.417
Smin
Sasum
Asmin
m.
cm2
cm2
=
=
=
cm2
=
=
=
Estructuras Hidralicas
Caudal por
margen
3.925
4.617
3.920
12.462
s^ 1/2
0.039
0.039
0.039
Q (m/s)
11.995
42.828
86.621
Maco Carlos Juan
Regalado La Torre Martn
Zegarra Gonzlez Rosa
0.039
0.039
0.039
0.039
0.039
600.0
141.004
204.482
275.969
354.6230
477.312
Estructuras Hidralicas
700.0
= 477.652 m/s
BL =Yn / 3 = 1.38 m.
Usar = 0.40 m.
BL =
0.40 m.
Yn =
4.14 m.
Estructuras Hidralicas
Canal Trapezoidal
Estructuras Hidralicas
Estructuras Hidralicas
NCR
m.
m.
m.
m.
m/seg.
12.462
2.698*h^0.5
6.925*(K-h)
0
Estructuras Hidralicas
m.
m/seg.
msnm
m.
m.
m.
m.
Maco Carlos Juan
Regalado La Torre Martn
Zegarra Gonzlez Rosa
Estructuras Hidralicas
msnm
Rugosi.
n
Caudal
(m3/seg)
0.039
0.039
0.039
0.039
0.039
11.9953
42.8283
86.6210
141.0044
204.4817
Tirante
0.430
0.930
1.430
1.930
2.430
275.9688
275.9688
354.6230
439.7608
477.3118
0.039
0.039
0.039
0.039
0.039
500.0
600.0
Datos de bocatoma.
4.000
50.000
0.00149
0.03900
A
e 1/10 del area obstruida
2.930
2.930
3.430
3.930
4.140
Estructuras Hidralicas
700.0
m.
m.
%
por el aliviadero,
5.000 m
45.000 m
45.000 m
m.
Estructuras Hidralicas
m.
2.00
0.010
0.10
Tajamar redondo
Estribos redondeados muros a 90
477.65
m3/seg.
Estructuras Hidralicas
m.
2.00
0.01
0.00
6.36
uni.
Tajamar redondo.
No hay estribo.
m.
Estructuras Hidralicas
350.323
Estructuras Hidralicas
1.855
Estructuras Hidralicas
Puntos de Tangencia.
l Aliviadero.
3.00
3.50
4.00
Estructuras Hidralicas
Y2
Yn
aut
epd
349.98 m/s
45.00 m.
y=
57.68
55.50
52.70
49.28
46.998
45.24
40.58
35.31
V1 = 23.624 m/s
hV1 = 28.45 m.
Estructuras Hidralicas
5.96 m.
m.
m.
m.
m3/seg.
ol que se localiza
como se muestra
1/2g)
+ S perdidas
m.
m.
0.315
2.378
m.
24.658
m/s.
23.624
24.658
24.658
m/seg
m/seg
m/seg
6.226
1.249
m.
m/seg.
Estructuras Hidralicas
sumen
*V1/g) + (Y1/4)]0.5
RESUMEN:
m.
m.
m/seg
m/seg.
41.28
20.00
m.
m.
Estructuras Hidralicas
m/s/m
m.
6.360
m.
7.777
m/s/m
epende de la clase de material del
15.00
Depende de la topografia.
Depende de la topografia.
hm
Hes
Df
Estructuras Hidralicas
b2
m.
m.
m.
m.
m/s
m.
m.
m.
lut
aut
adp
dentellon Posterior
ldp
37.351
7.470
2.750
m.
m.
m.
aut
Estructuras Hidralicas
Komoy
8--10
5--6
6--7
2.5--4
1.6--3
1.6--3
3--6
3--6
3--6
m.
m.
m.
Estructuras Hidralicas
m.
m.
m.
m.
2400.00
210.00
1.40
1200.00
1000.00
kg/m
kg/cm2
kg/cm2
kg/m
kg/m
Sh2
Fsp2
4
3
Estructuras Hidralicas
Fsp2
Fsp1
kg/m2
kg/m2
kg/m2
kg/m2
azo 1 = ldd*0.5 + d
Momento (kg*m)
27911.523
Estructuras Hidralicas
1688.890
Area
1.226
1.164
1.042
0.919
0.797
0.674
0.552
0.429
0.306
0.184
7.293
Xc
0.071
0.073
0.078
0.083
0.089
0.097
0.108
0.125
0.157
0.478
3.393
m.
1.274
m.
17503.00
Kg.
Yc
1.750
1.665
1.490
1.315
1.140
0.965
0.794
0.617
0.443
0.273
Estructuras Hidralicas
Estructuras Hidralicas
SFh =
SFv =
5470.30
43041.44
SM(+) =
SM(-) =
124345.64
-36675.33
35.00
Estructuras Hidralicas
Cumple Ok
Cumple Ok
h
Hes
Df
E =0.5*Ka*gs*hp*(hp+2*h')
Donde:
Ka =
gs =
hp =
h' =
0.361
1700.00
5.400
0.059
kg/m
m.
m.
Calculando E =
9143.586
kg/m.
Estructuras Hidralicas
cms
Vd = 0.5*Ka*gs*(hp-d)*((hp-d)+2*h'))
hp =
d=
h' =
Ka =
Calculcando Vd =
Vud = 1.65*Vd =
5.400
0.719
0.059
0.361
m.
m.
m.
6894.305
11375.603
kg.
kg.
kg.
Estructuras Hidralicas
h'
h
Hes
Df
t1 =
t2 =
lze =
gca =
hp =
0.500
0.800
0.400
2400.000
5.200
Y1 = lzi*0.50 + t2 + lze =
Y2 = lze + t1*0.50 =
Y3 = lze + t1 +(t2-t1)/3 =
Y4 = (b1 + b2)/2 =
m.
m.
m.
kg/m
m.
2.375
0.650
1.000
1.775
kg*m.
kg*m.
kg*m.
kg*m.
kg.
Estructuras Hidralicas
1.099
m.
tn/m2
tn/m2
mininmo:
A =
1/2
1.27
cm2
cm2
12.94
3440799.05
tn*m.
kg*cm
r=As/(b*d)
0.0120
E =0.5*Ka*gs*hp*(hp+2*h')
Donde:
Ka =
gs =
hp - d =
h' =
0.361
1700.000
4.681
0.059
kg*m.
m.
m.
Calculando E =
6894.305
kg/m.
mininmo:
1/2
A =
1.27
Estructuras Hidralicas
kg*cm
As (cm2)
50.54
r=As/(b*d)
0.0070
mininmo:
A =
1/2
1.27
cm2
mininmo:
A =
3/8
0.71
cm2
mininmo:
A =
1/2
1.27
cm2
mininmo:
A =
3/8
0.71
cm2
"DISEO DE BOCATOMAS"
CALCULO HIDRAULICO
I. CONSTRUCCION DE CURVA DE AFORO PARA CANAL DE CONDUCCIN AGUAS ABAJO
Q max =
389.687 m/s
Q medio =
3.000 m/s
Q min =
1.000 m/s
Qmax =
389.687 m/s
= 389.687 m/s
= 3.000 m/s
= 1.000 m/s
CAUDAL DE DERIVACION
Este caudal depende de las reas a irrigar, el proyecto
que asimismo ser descrito de la informacion basica:
800 Y 1000
Cultivo a Irrigar
ARROZ Y ALFALFA
900 Y 1200
ALFALFA Y MENESTRAS
1000 Y 1400
MENESTRAS Y ALGODN
1400 Y 1650
ALGODN Y ARROZ
1660 Y 1800
ALFALFA Y MENESTRAS
1800 Y 2000
MENESTRAS Y ALGODN
2000 Y 2200
ALGODN Y ARROZ
2200 Y 2400
ARROZ Y ALFALFA
2400 Y 600
ALFALFA Y ALGODN
10
800 Y 2500
MENESTRAS Y ALGODN
11
900 Y 2700
ARROZ Y ALFALFA
12
1000 Y 2650
ALGODN Y MENESTRAS
13
1100 Y 2800
ALFALFA Y ALGODN
14
1200 Y 3000
MENESTRAS Y ALGODN
15
1600 Y 3200
ALFAFA Y ARROZ
16
1600 Y 3300
ALGODN Y MENESTRAS
17
1700 Y 3500
ARROZ Y ALFALFA
18
1800 Y 3650
MENESTRAS Y ALGODN
19
20
2000 Y 3500
2200 Y 3600
ALFALFA Y ARROZ
ALGODN Y ALFALFA
Frejol
1580
0.94 l/s/ha
Producto
Ha a irri.
M.Riego
Q necesario
ARROZ
90
1.71 l/s/ha
153.90 l/s
ALFALFA
2700
1.30 l/s/ha
3510.00 l/s
CANAL ZAA
TOTAL
3663.90 l/s
0.014
0.005
0.005
0
0.005
0
0.029
n = 0.029
CALCULO DE "s"
El calculo de la pendiente se ha obtenido en el perfil longitudinal, esta pendiente est
comprendida entre los tramos del kilometraje .
comprendiendo una distancia de 2900.10 metros que son suficientes para mantener la uniformidad del tirante del agua
0.2
110.00
Ancho de plantila (B) :
Talud (Z) :
Pendiente (S) :
31.98
6.18
0.001818182
Nota:
Se tiene un material a los castados
del rio de tierra compacta
s=
b=
s=
Q derivado =
Talud (Z) =
COTA
90.5
91
91.5
92
92.5
93
93.5
94
94.5
95
0.18 %
31.98
0.001818182
3.6639
6.18
Area (m)
P (m)
R.H.^ 2/3
1/n
s^ 1/2
19.08
38.24
0.629077408
34.48275862
0.042640143
17.6483097
44.34
44.50
0.997590098
34.48275862
0.042640143
65.03819443
75.78
50.76
1.3062173
34.48275862
0.042640143
145.542788
113.40
57.02
1.581428063
34.48275862
0.042640143
263.6836205
157.20
63.28
1.834208115
34.48275862
0.042640143
423.9569993
207.18
69.54
2.070455265
34.48275862
0.042640143
630.7167103
263.34
75.80
2.293796224
34.48275862
0.042640143
888.1622741
325.68
82.06
2.506660766
34.48275862
0.042640143
1200.348379
394.20
88.32
2.710776606
34.48275862
0.042640143
1571.198321
El valor de H para Qd
Cotas (m.s.n.m.)
95
94
93
92
Q (m/s)
292.27
m3/seg
Cotas (m.s.n.m.)
92
91
90
89
88
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
Q (m3/s)
BL =Yn/3=
Valor aprox. En el aforo
93.09 m.s.n.m.
0.863
Yn = 2.59 m.
90.50 m.s.n.m.
B = 31.98
0.863
1600.00
1800.00
Qcaptacin=
3.664 m/s
Lt
Longitud de transicion.
LT
Donde:
(T t )
( 2 tg a )
a : angulo de inclinacion.
T : ancho sub canal trapezoidal
t : ancho canal rectangular
Para
a
T =
t =
74.64943508
31.98
Lt
96.23469183
Lt
98.00
12.50
Remplazando :
Asumimos :
m.
DISEO HIDRALICO
II. DISEO DE CANAL.
A. Diseo de canal de aduccion:
BL
Yn
b = 2.50
Remplazando estos valores, tenemos que:
Asumimos un valor de b =
Q
s
n
A
P
=
=
=
=
=
3.664 m/s
0.001
0.015
b Yn
b + 2Yn
2.50
m.
(Caudal de derivacin)
( Revestido de concreto )
[ ( b Yn)5/3] / [ (b + 2Yn)2/3]
5/3
( 2.50 Yn)
( 2.50 Yn) 5 / 3
/ ( 2.500 + 2Yn )
( 2.500 + 2Yn )
4.674
4.698
4.721
4.744
4.767
4.791
4.814
2.733
2.735
2.738
2.740
2.743
2.745
2.747
Yn =
1.021 m.
Iterando :
2/3
2/3
Y
1.710
1.717
1.724
1.731
1.738
1.745
1.752
0.3403 m.
BL =
0.40
Resultados:
B.L. = 0.4
Yn = 1.021
b = 2.50
BL
Yn
Adoptamos :
Z
b
n
s
=
=
=
=
1.00
2
0.015
0.001
Revestido
:
A = (b Yn) + (Z Yn)
0.5
P = b + [2 Yn (1 + Z) ]
De donde se obtiene:
1.738
(A5/3) / (P2/3)
5/3
[ ( 2.00 Yn) +
( 1.00 Yn) ] /
[ 2.00 +
Yn
( 2.00 Yn)
( 2.83 Yn)2]/ 3
0.87
0.873
0.876
0.879
0.882
0.885
0.888
1.74
1.746
1.752
1.758
1.764
1.77
1.776
0.7569
0.762129
0.767376
0.772641
0.777924
0.783225
0.788544
2.460732
2.469217
2.477702
2.486187
2.494673
2.503158
2.511643
1.695891
1.706458
1.717058
1.727691
1.738357
1.749056
1.759788
Yn =
0.882 m.
Iterando :
= 2.542
= 4.495
= 0.566
( 2.83 Yn) ]
2/3
1.738
Espejo
Velocidad (m/s)
hv
E = Yn + hv
3.764
= 1.441
0.105891987
0.987891987
BL = Yn /3 =
m.
0.294
Usaremos :
B.L. = 0.30 m.
4.364
Resultados:
T = 4 m.
0.3
Yn = 0.88 m.
b = 2.00 m.
Qcaptacin=
T
3.664 m/s
Lt
Longitud de transicion.
LT
Donde:
(T t )
( 2 tg a )
a : angulo de inclinacion.
T : ancho sub canal trapezoidal
t : ancho canal rectangular
Para
a
T =
t =
12.50
4.364
2.5
Remplazando :
Lt
4.203980325
Lt
4.5
Asumimos :
CFC
CFC
CFR
0.60
Yn
hv
0.20
= Altura de sedimentos
= Tirante Normal del canal (m)
= Carga de velocidad de Canal
= Perdidas por transicion, cambio de direccion, etc.
Remplazando se tiene:
CFC =
CFC =
Yn
=
hv
=
90.500 +
91.10 m.s.n.m.
1.021 m.
0.105 m.
0.6
Elev. B =
92.43 m.s.n.m.
Elev. B =
92
m.s.n.m.
P =
1.5
P =
Por lo tanto :
Resumen:
Elev. B = 92.00 m.s.n.m.
0.4
Yn = 1.02 m.
P = 2.00 m.
b = 2.50 m.
0.979
A1
Ld
A2
31.98 - Ld
31.98
A2 = P x (31.98 - Ld)
P (32.0 - Ld) / 10
P = 2.00 m.
L d = 2.907 m.
31.98 - Ld = 29.073 m.
Entonces:
Ld = 3.000 m.
70 - Ld = 28.980 m.
1.500 m.
0.375 m.
e=
0.35
Consideremos
28.980 m.
31.980 m.
A1
1
A2
10
A1 = ( 2.00 Ld) (P)
A2 = 28.98 (P)
Ld =
2.898 m.
b. Resumen:
Dimensiones reales del canal de limpia y barraje fijo.
0.35
0.35
P= 2
1.099
1.099
29.082
31.98
= 2.90 m.
= 29.08 m.
= 31.98 m.
= 0.35 m.
= 1.10 m.
"H":
hv
he
hd
h1= V1 / (2g)
P = 2.00
d2
d1
En este calculo se tendr que considerar que las compuertas deben estar abiertas ,
para ello el caudal de diseo se compartira entre el barraje movil y fijo.
"H" se calcula asumiendo un valor , calcular el coeficiente de descarga "c" y calcular
el caudal para el barraje fijo y movil
El caudal calculado debe ser igual al caudal de diseo.
L1 - 2( N Kp + Ka) H =
Descarga del aliviadero
Coeficiente de reduccion = 0.55
coeficiente de descarga
Longitud efectiva de la cresta
Carga sobre la cresta incluyendo hv
Longitud bruta de la cresta
=
Numero de pilares que atraviesa el aliviadero =
Coef. de contrac. de pilares (triangular) =
0.7
29.08
2.00
0.00
0.20
C = Co * K1 * K2 * K3 * K4
Prof. Llegada (Co)
P/H =
2.857
1.00
1.00
3.857142857
En la fig.8 tenemos:
0.467
0.667
K4 = 1.00
Remplazando tenemos que.
C = 3.95
Remplazando en la formula de "L" tenemos que.
L= 28.802
Remplazando en la formula de "Q" (caudal sobre la cresta de barraje fijo) tenemos que.
Q al = 36.646 m/s
C L'' hi3/2
Donde:
hi
C
L'
H
= P + H = 2.70 m.
= 0.75 (trabaja solo como orificio considerado por perdidas de arrastre)
= 2.20 m.
= 0.70 m.
2.7
L1 =
N =
Kp =
Ka =
2.20
0.00
0.00
0.00
2.198
Q cl = 7.314 m/s
c. Descarga mxima total "Qt"
Qt = Q al + Q cl
Sumando los dos caudales:
Qt
= 43.960 m/s
292.265 m/s
H
Q al
Q cl
Qt
3.456
402.0157165
21.00876359
423.0244801
3.4575
402.2774739
21.01742799
423.2949019
3.459
402.5392881
21.02609358
423.5653817
3.4605
402.801159
21.03476036
423.8359194
3.462
403.0630867
21.04342833
424.1065151
Q max
Q aliviadero
Q barraje movil
=
=
=
649.813 m/s
91.350 m/s
10.310 m/s
3.461 m.
Ho = 3.461 m.
5.461 m.
P = 2.00 m.
Y / Ho = - K (x / Ho)n
Donde:
K y n, son constantes cuyos valores dependen de la inclinacion aguas arriba y la velocidad de llegada.
Ho , es la carga hidraulica total.
H
3.461 m.
Y
Xc = 0.283 Ho
R1 = 0.53 Ho
Yc = 0.128 Ho
EJE DE LA
CRESTA VERTEDORA
R2 = 0.234 Ho
Y / Ho = -K (x / Ho)n
R2 - R1 = 0.298 Ho
Datos :
H =
Xc = 0.283 H
Yc = 0.128 H
R1 = 0.530 H
R2 = 0.235 H
R1 - R2 = 0.296 H
3.461 m.
0.979 m.
0.443 m.
1.834 m.
0.813 m.
1.021 m.
0.809757
Datos :
P
=
Qbf
=
b
=
P+H
=
q = Qbf / b =
V = q / (P+H) =
hv = V2 / 2g
a (asumido) =
2.00 m.
402.801 m/s
29.08 m.
5.461 m.
13.851 m/s
2.536 m/s
0.33 m.
0.90 m.
y
Eje de la cresta vertedora
X
Xc = 0.979 m.
Yc = 0.443 m.
0.813 m.
1.834 m.
1.021 m.
P = 2.00 m.
X = 3.723 m.
Pt (3.723 ; 2.012287994
- 0.012 m.
1
a = 45.00
q = 45.00
Pt = Pto de tangencia.
a = 0.90 m.
1
P1
a
P2
n
0.888 m.
5.590 m.
Con la relacion hv / H =
0.09 m.
Usaremos los nomogramas para valores N y K (Fig. 1, de Diseo de Bocatomas Parte I)
K
n
=
=
-0.508
1.85
-0.508
1.85
1.85
-0.177 X
1=
0.327 X
Pt (3.723 ; -2.012287994
Resumen de coordenadas que se utilizan para graficar la curva desde el punto 1 hasta el pto. "Pt".
0.85
n = 0.72 m.
X (m)
Y (m)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Pt
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.72
0
-0.009005362
-0.032464347
-0.068734614
-0.117034031
-0.176846181
-0.247788412
-0.329558527
-0.421907897
-0.524626013
-0.637530811
-0.760462226
-0.893277683
-1.035848832
-1.188059099
-1.349801816
-1.520978751
-1.701498942
-1.891277749
-2.012555213
Po
q
q/2
R = 1.730 m.
1
1
P1
b
a = 45
b
P2
n = 0.72 m.
n = 0.72 m.
Del grafico:
R = 0.5 Ho
R = 1.730 m.
b = ((180 - a)/2 )
b 67.50
q / 2 = (90 - b ) = 22.50
\ q = 45.00
Tg q/2 = n / R
n = 0.717 m.
n = 0.72 m.
5. Colchon Amortiguador.
El objetivo de disear el colchon amortiguador aguas debajo de barraje es con el fin de contar con las condiciones
adesuadas para que el cambio brusco del tirante se verifique dentro de una longitud minima del cauce, que es la
que debe protegerse.
Salto Hidraulico en colchon amortiguador.
Al presentarse un escurrimiento con regimen rapido sobre el barraje y teniendo el rio una pendiente fuerte, se tendra
al pie del barraje un tirante Y1, cuyo conjugado Y2 tratara de formarse rapidamente. Al producirse Y2 la energia
cinetica se transformara; una parte en energia de presion y la otra se pierde por el cambio de regimen.
(asumido)
Yc = 2.694 m.
3.4605
Z = 3.000 m.
P = 2.00 m.
Y2 = 4.86 m.
a
Y1 = 1.31 m.
Lp = 10.800 m.
Z Yc
V2
Vc 2
Y1 1 hp
2g
2g
Yn = 2.69 m.
Yc
L2 g
)= 2.694 m.
Velocidad Critica: Vc
Vc = Q / A =
Vc2 / 2 g =
5.141 m/s.
1.347 m.
Reemplazando :
[ Y1 + ( Vc2 / 2 g ) ] = 7.0412
Donde :
V1 = Q / L Y1
7.04 - Y1 =
1.00 Y1 -
7.04 Y1 +
Y1
1.30527
1.305325
1.30538
1.305435
1.30549
1.305545
1.3056
1.305655
y=
0.005126626
0.004396756
0.003666867
0.002936959
0.002207031
0.001477085
0.000747121
1.71368E-05
9.78 =
9.78 / Y1
Iterando:
Y1 = 1.306 m.
V1 = 10.608 m/s
Y2
Y 2 2V 2Y
Y1
1 1 1
2
4 g
Y2 = 4.859 m.
a = 2.89 m
correcto
L = 17.767 m.
Segn Safranez:
6 Y1 V1
g Y1
L = 23.220 m.
V1
g Y1
F = 3.0
V1 = 10.608 m/s
2.964
(Poza Tipo I)
L = 10.690 m.
Conclusion:
L = 10.800 m.
ESTANQUE TIPO I
Lo = 17.303 m.
Tomamos:
Lo = 17.300 m.
e ' 0 .2
Donde:
Reemplazando :
q ( H Y 2 ) 0 . 25
H = P + Ho =
q = Qal / b =
5.4605
13.851 m/s
e' = 0.655 m.
Por criterio:
e' = 0.8
Le = L' - Lp
Le 0.642 C
Donde:
L' = Longitud de poza mas el enrocado.
Lp = Longitu de poza.
C = 4 (arena segun Bligh)
H q Lp
Le = 11.533 m.
Asumimos :
Le = 11.500 m.
3.4605
H = 5.461 m.
P = 2.00 m.
Lo = 17.300 m.
5.590 m.
L = 10.800 m.
22.3
Hme = 6.826 m.
7. Canal Desarenador.
Hp = 6.826 m.
Le = 11.5 m.
La determinacin de las caracteristicas hidraulicas y geometricas del canal desarenador se basa en las condiciones de
su funcionamiento:
A. Primera Condicion : canal desarenador cerrado y obra de toma abierta.
Para esta condicion, el tramo del desarenador frente a las compuertas de toma, funciona como un tanque de
sedimentacion, su geometria debera permitir velocidades bajas del agua, para dar oportunidad a que los acarreos se
depositen esn este sitio.
B. Segunda condicion: Canal desarenador y obra de toma cerrado.
Cuando los sedimentos se hayan acumulado frente a las tomas, sus compuertas deberan cerrarse y abrirse las del
desarenador para desalojar los materiales acumulados.
Para lograrlo, es necesario que se establezca un regimen rapido con una velocidad de arrastre suficiente que no
ocasione erosion a lo largo del canal de descarga del desarenador.
C. Calculo del desarenador.
C.1. Velocidad de arrastre ( Vc )
Utilizando la ecuacionde Rubey:
Vc
Donde:
2 rs r
36 2
6
g d 2 2
3 r
rd
r d
r
r
Reemplazando:
Vc = 0.091 m/s
Vc = 0.135 m/s
Vc = 0.135 m/s
Se tiene:
A = Q / Vc
A = 27.08 m
Luego:
ad = A / Ld
ad = 0.931 m.
ad = 0.930 m.
.
C.3. Calculo de la pendiente del desarenador (Sd).
Sd
Donde:
Se tiene:
n 2 g 10 / 9
q2/9
Se asume:
Sd = 2.000 %
C F D = Sd x Lcd + C F R.
C F D = 90.808 m.s.n.m
Muro de Contencion
92.000 m.s.n.m
Cauce
Natural
Sd = 2.00%
Toma
90.808 m.s.n.m
Lcd = 15.41 m.
0.98
Lo = 17.300 m.
8. Tomas.
El calculo hidraulico comprende el dimensionamiento del orificio y conducto de salida y determinacion del gasto
maximo que puede pasar por las compuertas en epocas de maximas avenidas. Ademas se diseara la transicion
que une el canal de captacion a la salida dde la toma con el canal de aduccion.
1. Toma.
A) Compuerta de toma.
El diseo de las compuertas se realizara para el nivel nivel de operacin.
Se comprueba si el caudal puede conducir el caudal que ingresa en epoca de maxima avenida.
El frente de captacion esta formado po 4 ventanas de 1.80 m. de ancho por 1.80m.
V = 1.00 m/s
Escogemos dimensiones de compuertas segn manual de ARMCO ( dimension para modelo 5 - 00)
Se escoge:
72'' x 72''
a = 72''
b = 72''
a = 1.8 m.
b = 1.8 m.
Acomp = 3.34 m
Luego:
Ec. De continuidad:
Q
V
Adiseo = 3.66 m
# Compuertas:
# Compuertas = 1.095
Verificamos con la velocidad:
Q
A
# Compuertas = 1.000
V = 1.10 m/s
aumentar # de compuertas
4.951115
Ho=3.46m
Nivel de operacin.
P = 2.00 m.
Yn = 0.51 m.
h1 = 1.02 m.
Y2 = 0.608 m.
a = 0.20 m.
Y1 = 0.124 m.
0.98 m.
L1 = 0.32 m.
L2 = 2.419 m.
C. Verificacion de Funcionamiento.
Funciona:
Vertedero:
Orificio:
D. Formula a emplear.
Q Cd a b
Donde:
Cd
a
b
h
(2 g h)
= Coef. De descarga.
= altura del orificio de toma.
= ancho del orificio de toma.
= Carga hidraulica del orificio de toma.
h1 = 1.02 m.
h1 / a = 5.11
> 1.4
Y1 = 0.124 m.
h' = h1 - Y1
h' = 0.897 m.
d. Calculo de h'
Q Cd a b
(2 g h)
Q = 0.93 m/s
f. Calculo del tirante Y2
V12 = 2 g h
Y2
Y1
= 17.60 m/seg
Y12
2V12Y1
g
Reemplazando:
Y2 = 0.608 m.
g. Calculo del tirante normalen canal de la ventana de captacion (Yn)
Q = 0.93 m/s
0.001
0.015
b = 1.8 m.
Qn
AR 2 / 3
0.5
s
0.442 =
( 1.83 Yn )
5/3
/ ( 1.829 + 2 Yn) 2 / 3
Iterando:
Yn
y = 0.442
0.5090
0.5091
0.5091
0.5092
0.5092
0.5093
0.5093
0.5094
0.4418
0.4419
0.4419
0.4420
0.4421
0.4422
0.4422
0.4423
Como Y2 > Yn.
0.322580645
2.419462643
LCc = L1 + L2
2.742043289
Yn = 0.51 m.
(orificio ahogado)
Qn
AR 2 / 3
0.5
s
1.767 =
Iterando:
Yn
y = 1.767
0.4070
0.4071
0.4071
0.4072
0.4072
0.4073
0.4073
0.4074
1.7653
1.7657
1.7661
1.7665
1.7669
1.7672
1.7676
1.7680
Yn = 0.41 m.
a = 0.20 m. (asumido)
b = 1.8 m.
Cd = 0.61
h = H - Y1
= 4.35750
Q Cd a b
(2 g h)
Q = 2.05 m/s
Y2
Y1
= 85.49 m/seg
Y12
2V12Y1
g
Reemplazando:
Y2 = 1.409 m.
c. Calculo del tirante normalen canal de la ventana de captacion (Yn)
Q = 2.05 m/s
0.001
0.015
b = 1.8 m.
Qn
AR 2 / 3
s 0.5
5/3
2/3
0.974 =
Iterando:
Yn
y = 0.974
0.9012
0.9013
0.9013
0.9014
0.9014
0.9015
0.9015
0.9016
0.9734
0.9735
0.9735
0.9736
0.9737
0.9738
0.9738
0.9739
Yn = 0.90 m.
(orificio sumergido)
0.322580645
6.427248127
LCc = L1 + L2
LCc = 6.75 m.
Qn
AR 2 / 3
s 0.5
3.895549029
58.4
/3
8.4
2/3
Iterando:
Yn
y = 3.896
0.6600
0.6601
0.6601
0.6602
0.6602
0.6603
0.6603
0.6604
3.8130
3.8135
3.8140
3.8145
3.8150
3.8155
3.8160
3.8165
Yn = 0.66 m.
Conclusion:
En epocas de maximas avenidas teniendo las cuatro compuertas abiertas a 0.33 m pasa un caudal de
Q = 8.21 m/s que puede ser conducido por el canal de aduccion y conduccion.
f. Calculo de la abertura de las compuertas para conducir el caudal de diseo en epocas de maximas avenidas.
Q
Cd b
2gh
Q = 0.93 m/s
4.3575
a = 0.09 m.
Q = 3.73 m/s
a = 0.36 m.
Q = 1.86 m/s
a = 0.18 m.
Yn = 0.90 m.
Y2 = 1.41 m.
Tirante en nivel de operaciones:
Yn = 0.51 m.
Y2 = 0.61 m.
2.00 m
1.83 m
0.902 m.
0.509 m.
1.83 m
2
Transicion de salida:
a
t
T
Lt
Longitud de transicion.
LT
Donde:
(T t )
( 2 tg a )
a : angulo de inclinacion.
T : ancho de la toma.
t : ancho canal rectangular
Para
a
T =
t =
12.50
8.400 m.
2.500 m.
Remplazando :
Lt
13.307 m.
Lt
13.500 m.
Asumimos :
2400
0.6
2.15
4.3
1900
1000
1450
Donde:
0.402684103
1000
Reemplazando y tabulando:
pto.
h'
Lx
Sp
1
2
3
4
5
6
0.00
1.00
1.00
0.70
0.70
2.10
0.00
1.00
2.00
3.57
13.77
15.57
1350
1648.657948
1447.315897
981.2088754
-1072.480052
-734.8957452
7
8
9
10
11
12
13
2.10
1.80
1.80
1.80
2.80
2.80
0.00
16.97
17.64
22.12
28.89
30.98
31.50
34.28
-1016.774618
-1301.673792
-2203.686184
-3566.771874
-3487.576762
-3592.274629
-5552.005533
Diagrama de subpresiones
L (x) m.
-4000
-3000
Sp
-2000
-1000
35
30
25
2000
20
1000
15
10
0
0
em in
4 Sp
3gc
Sp = 2203.686184
g c = 2400
e = 1.22 m.
Se asumio e = 0.90 (aceptable)
K= 1
10 5 m / s
43.739
2.7
I=H / L
Ancho cimentacion =
Para una altura de =
0.061729806
29.082
2
0.003590452
P1
Sv
Sh
W
Fh
P2
Ea
Sp
Fh
Ea
Wa
Sp
Sh
Sv
Ve
Me
=
=
=
=
=
=
=
=
Fuerza hidrosttica
Empuje activo del suelo en suelo friccionante
Peso de la estructura
Sub - Presion
Componente horizontal de la fuerza sismica
Componente vertical de la fuerza sismica
Empuje del agua sobre la estructuraocacionado por aceleracion sismica
Es el momento producido por esta fuerza.
2.00
1.45
2.9
Tn/m
Tn/m
Tn
Vh = P /3 =
0.667
P1 = ( Pc H1) + (Pa H)
P2 = (Pf H2 ) + (P' Ka H2 ) + P1
Donde :
Pf
P'
=
=
1000.00 Kg/m
Peso especifico del suelo sumergido =
P' = (Ps - 1) =
H2
&
=
=
Ps
Pa
=
=
1.00 Tn/m
Segn tabla N SM
1.45
Ka
Pc
H1
=
=
37
4.58
1.25
2.00
Tn/m
0.24858362
Remplazando tenemos:
P1
P2
Tn/m
1.00
Tn/m
Tn/m
2400
0.70
Ea
2.04
Tn/m
Ya = H2 (2P1 + P2) / [ 3 (P1 + P2) ]
Ya = 0.595 m.
0.595 m.
2.9
Tn/m.
Ec = 0.5 (P + P1) H1
Donde,
P=
Pa H
Entonces :
Ec
2.618
Yc
( 2 H2 + H1 ) / 2
1.350 m.
0.71
1.19
0.16
A9 A10
1.14
A11
A12
A13
A5
A6
A7 A8
A4
0.32
0.32
0.27
0.39
1.90
0.30
0.40
2.50
0.71
1.19
0.16
A9 A10
1.14
A11
A12
A13
A5
A6
A7 A8
A4
0.32
0.32
0.27
0.39
1.90
0.30
0.40
2.50
A2
0.40
0.42
A3
3.42
2.50
A1
5.92
ancho (m)
Alto (m)
Area (m)
x (m)
y (m)
Ax
Ay
A1
A2
A3
A4
A5
A6
A7
A8
A9
5.92
3.42
2.50
1.90
0.30
0.40
0.40
0.39
0.71
0.90
2.50
2.50
1.14
0.98
0.71
0.39
0.42
0.32
5.33
8.55
3.13
2.17
0.29
0.28
0.16
0.08
0.11
2.96
1.71
4.25
0.95
2.05
2.40
2.80
3.14
0.47
0.45
2.27
1.73
3.97
3.89
3.76
3.60
3.53
4.65
15.77
14.62
13.29
2.06
0.60
0.68
0.44
0.26
0.05
2.40
19.41
5.42
8.60
1.14
1.07
0.56
0.29
0.53
A10
A11
A12
A13
1.19
0.30
0.40
0.40
TOTAL :
0.32
0.16
0.27
0.32
0.19
0.02
0.05
0.06
15.10
1.11
2.00
2.33
2.73
X
Y
2.365598847
2.000696983
W =
36.24696
Sp = c Pa H L / 2
Donde :
c =
H=
L =
0.2
2
5.92
Sp =
1.184
Xsp = 2L/3 =
f. F. Sismo.
Componente horizontal del sismo.
(fines de diseo)
Xsp = 3.95 m.
4.65
4.43
4.20
3.90
0.21
0.05
0.13
0.17
48.33131348
= 3.20 m.
= 2.71 m.
0.88
0.11
0.23
0.25
40.88
Sh = 0.1 W =
3.624696
Sv = 0.03 W =
1.0874088
Donde:
Aumento de presion de agua en Lb/ pie a cualquier elevacion debido alas oscilaciones
sismicas y se calcula por la siguiente formula:
Pe = C i Pa h
y=0
c=0
Pe = 0
Me = 0
2.00
2.00
1
c =
i =
Pa =
h =
0.32
90.48
6.56
lb/pie
pie
Remplazando :
Pe =
138.653
lb/ pie
Ve =
660.3432317
lb / pie
1,730.35
lb - pie
Ve =
Me =
0.982
0.785
Tn/m
Tn - m
F horz (m)
Brazo (m)
Mot (m)
Fh
-2.9
0.667
-1.9343
F vert. (m)
Brazo (m)
Mot (m)
Ea
-2.04
0.595 m.
-1.214869089
Ec
-2.618
1.350 m.
-3.5343
Sh
-3.624696
3.200134642
-11.59951524
Ve
-0.982
TOTAL
-12.16630327
-0.785
-19.06798432
Sp
1.18
3.95
4.67
Sv
1.09
3.20
3.48
W
36.25
3.20
116.00
TOTAL
38.52
M (+) =
m (-) =
116.00
-10.92
= 2.73 m.
OK!
Cae en el tercio central de toda la longitud
c. Excentrecidad (e)
e = L/2 -
Xr
= 0.07 m.
d. Estabilidad al volteo
F.S.
= suma M (+)
F.S.
10.627
e. Estabilidad al deslizamiento.
Fuerza resistente: Fr = u Fv
Fr
19.2591844
u = Coeficiente de friccion
entre el concreto y el terreno, segn el
proyecto u=
0.5
para grava.
Fr > Fh
1.2
1 =
2 =
0.738524131
0.639650439
a= 1
b = 5.590 m.
1 , se encuentra en el rango
<
OK!
1.2
h=
6 m.
cambio de seccin
altura del pilar despues del resalto
5.4605
2 m.
6.405778144
4.859061061
16 m.
ANALISIS ESTRUCTURAL
Consideramos la seccin ms crtica del pilar es decir
la parte que est expuesta al embalse del ro.
Hacemos el anlisis de la seccin por ancho unitario.
1.- Fuerza Hidrosttica.
Fh = Pa * Vol
Fh =
5543.32
Yh = h/3 =
0.667
h
0.65
5.4605
Xc =
0.65
Yc =
3.74
e
1.449
0.35
W (Kg)
2260.44
4586.82
6847.26
Total
3. Fuerza de Sismo.
Sh = 0.10 W =
Area
0.94185
1.911175
2.853025
684.726
xi
0.65
0.65
yi
5.7855
2.73025
Axi
0.6122025
1.24226375
1.85446625
Ayi
5.449073175
5.217985544
10.66705872
Sv = 0.03 W =
205.4178
0.726 Pe y
Donde:
Aumento de presin de agua en Lb/ pie a cualquier
elevacin debido alas oscilaciones ssmicas y se calcula
por la siguiente frmula:
Pe = c T Pa h
C
Cm =
c=0
Pe = 0
2.00
2.00
1.00
m
m
Me = 0
0.32
Pa =
h
=
90.48
6.56
lb/pie
pie
Pe =
Ve =
138.65
660.34
lb/ pie
lb / pie
160.84
lb - pie
0.978538512
0.022165619
Tn/m
Tn - m
Kg/m
Reemplazando :
529.34
0.466666667
1450.24
Fh
Sv
Sh
Sp
Ve
W
s/c
Fuerza (Kg)
Brazo (m)
Mto. (Kg-m)
5543.31622
205.4178
684.726
529.3367746
978.5385124
6847.26
2000
0.667
1.00
2.00
3.48
1.00
1.00
1.00
3697.391919
205.4178
1369.452
1842.014994
978.5385124
6847.26
2000
Suma Fh =
Suma Fv =
7206.58
-8317.92
Kg-m
Kg-m
M (+) =
m (-) =
8092.815225 Kg-m
8847.26 Kg-m
OK!
Cae en el tercio central de toda la longitud
Excentricidad (e)
e = L/2 -
Xr
0.265701099
Estabilidad al volteo
F.S.V, =
F.S.V. =
Estabilidad al deslizamiento.
suma M (+)
0.914725602
u = Coeficiente de friccin
entre el concreto y concreto, segnpara
el arena.
proyecto u=
0.7
4.33
OK.
263.68
93.00
423.96
93.50
292.27
93.09
292.27
88.00