Major Projects of BTCL

Sl No
1

Ongoing projects included in Annual Development Program (ADB) Name of project Project Implementation Period & Major Component Cost of the Project (In Lakh Taka)
Telecommunication Network Development Project (TNDP) Period : 1 July, 2009 30 June, 2013 Cost : GOB : 11350.72 BDT P.A : 50935.53 BDT -----------------------------Total : 62286.25 BDT 1. NGN (IMS) based Telecommunication System & Access Gateway 2. International Gateway Exchange (IGW) 3. National Transmission Backbone-SDH OFC Network, SDH M/W link 4. Access Facilities- FTTX, 5. Wireless Access-WLL 6. ADSL & DSLAM 7. 24*7 National Operation Center (NOC) 1. Transmission equipment : STM16 & STM1 Mux 2. a) OFC Network from Upazila to Union (10060KM) b) OFC Network Accessories 3. Balancing equipment (M/W, SDH Link, Sever ports etc.)

Present Status
JICA (Japan) funded project at start up phase, Procurement process is going on.

Optical Fibre Cable Network development in 1000 Union Parishad (1006 Union Parishad)

Period : 1 January 2012 June 2014 Total Cost : 71897.09 BDT GOB (Equity) : 71897.09 BDT Local Currency : 49088.29 BDT Foreign Currency : 22818.15 BDT ----------------------------------Total Cost : 69430.31 BDT

This Pro-people project was approved on 24.01.2012 and now at start up phase The aim is to build up a nationwide modern and high capacity ICT infrastructure to materializing vision 2021.

Future projects planned for Annual Development Program (ADB)


3 Optical Fiber cable Network development at Upazila level (290 Upazilla) Period : 1 November, 2011 October , 2014 Local Currency : 58149.65 BDT ForeignCurrency: 11280.66 BDT 1. Transmission equipment : STM-64 & STM-16 Mux 2. a) OFC Network from Upazila to District (48 core): 8220 km b) OFC Network Accessories Pro-people project, waiting for Govt. approval

/var/www/apps/conversion/current/tmp/scratch_3/108922492.doc

Optical Fibre Cable Network development in 1000 Union Parishad (2nd Phase)

Period : 1 July, 2012 30 June, 2016 Foreign : 16901.31 Local: 91053.82 ----------------Total Cost :107955.13 BDT GOB

1. Transmission equipment : STM16 & STM1 Mux 2. a) OFC Network from Upazila to Union : 11500 km b) OFC Network Accessories

This future project is aimed to provide optical connectivity to difficult places to fulfill the vision 2021: Digital Bangladesh goal of the government. Motto is Reach the unreachable.

Installation of Wireless Broadband network for Digital Bangladesh

Period : 1 January, 2010 31 December, 2014 Foreign : 40623.97 Local : 14292.67 Total Cost : 54916.64 BDT

1. ASN gateways related equipments 2. AAA server with other CSN network equipment for central side at Dhaka 3. BTS at all metropolitan cities, District HQ, Upajilla and growth centers 4. NMS & IN 5. CPE about 10,000 set 6. Transmission equipment to connect all BTS with ASN 7. Optical fiber -300 km 1. Construction of NGN Platforms 2. OFC Network - 3500 km 3. International Trunk Exchange 4. Interface for existing BTCLs Exchanges 5. Broadband -FTTX 6. ADSL (100,000 subscriber) 7. Centralized billing system

BTCL proposed LTE instead of Wimax. Negotiation going on with EDCF (Korea) for financing. Aim is to provide blanket coverage for broadband access. 3G will provide broadband accessibility to mobile devices (mobile hand set or Tablet), while LTE is for broadband access for PCs or Laptops. Foreign funding is being sought. *Make tele-access affordable for all citizens *Extension of high quality tele-density * Extending of infrastructure of ICT related services

Installation of NGN (IMS) Based Telecommunication Network for Digital Bangladesh (NTN)

Period : 1 January, 2010 30 June, 2015 Total Cost :172538.85 BDT. (GoB)

Ongoing BTCL funded Projects


7 ILDTS Policy-2007 Compliance Project . Period : 1 Oct, 2008 30 June, 2012 Total Cost :17959.93 BDT 1. Installation of IGW with NGN facility 2. Installation of ICX at Dhaka, Chittagong, Sylhet, Khulna & Bogra 3. Upgrading BTCLs existing IIG 4. Central Billing System 6. Computerized Accounting System

IIG has been completed. Installation of ICX is going on.

/var/www/apps/conversion/current/tmp/scratch_3/108922492.doc

Replacement of old Digital Telephone System of Dhaka city (171000 line )

Period : 1 Sep, 2009 Aug, 2012 Total Cost :19663.19 BDT

1. NGN based Switching with IN & MGW, MGC, Access gateway 2. PSDN, AAA, NMS 3. LAN Switch /Router/Firewall/IP equipment 4. Tandem/Media gateway including STP exchange 5. XDSL 6. Optical Fiber

This Project is only for Dhaka city and at Startup phase