PROJECT15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECTBASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM BASIC DESIGN DOCUMENTS BATCH 1

DOCUMENT TITLE

DMCI COMMENTS

DMCI EXPLANATION

RESPONSE OF CNEEC

CUC RESPONSE

DMCI RESPONSE

DMCI COMMENT REV.B

DMCI/CUC/CNEEC/CHPI RESPONSE

I&C 73 I&C Design Description


DMCI

DMCI

STANDARD: Should include relevant standard applicable to I&C in accordance to various national and international standard as the basis for derivation of selection criteria and implementation. Not mentioned Systems in I&C Description Document: Sootblower System Sewage Water Treatment Chlorinating Plant CCR should include the following: -Annunciator for critical alarms -Emergency Trip Pushbuttons -GPS -Drum Level Monitoring CCTV -Large LCD monitor - Verify configuration/equipment based on basic design statements and compare with MTD requirements. Drum level CCTV refer to dwg. No. F253C-K05 at drum level diagram.

Accept, and revised.

Accepted p. 5. [2.2.7] From REV A. Common Control System will be controlled and monitored by DCS. Please clarify the "cluase"- adopt local control mode.

Standard used were reflected to Revision B. CNEEC/CHPI explained that the 2.2.7 refers to local control (conventional Push button wil bel used) since the system is manageable and small number of I/O no need by PLC and does not refer to Common System.

Accept. Description will be modified, the three systems' description will be added. This project includes: . Annunciator for critical alarms . Emergency Trip Pushbuttons . GPS . Drum Level Monitoring CCTV Above information will be submit detailed drawing in detailed design stage. This project doesn't includes: Large LCD monitor (not including in MTD)

(Must be reflect in F253C-K03)

DMCI

.Should be reflect in drawing F253C-K3

- CCTV

Annunciator Alarms and signals should be provided aside from drum level alarm indication.

CNEEC/CHPI will provide a panel mounted Annunciator for process alarms, and the signals will be provided during detail design.

Annunciator Alarms and signals should be provided aside from drum level alarm indication.

CNEEC/CHPI will provide a panel mounted Annunciator for process alarms, and the signals will be provided during detail design.

DMCI

Specify and quantify all the equipments intended for DCS and other relevant facilities such as: -Number of Operator Work Station -Number of printers -Large LCD for process monitoring -Drum level monitoring indicator and CCTV

This project doesn't includes: Large LCD monitor (not including in MTD) Regarding Number of Operator Work StationNumber of printersrefer to F253C-K03. Drum level monitoring indicator's quantity is 2 sets and CCTV's quantity is 1 set.

*REJECTED NOTE:Please Indicate the Number of Operator Work Station Number of printers etc. in I&C design description.

With new comment (see p. 6[3.2]. F253C-K01 should conform to F253C-K03 and the number of Operator stations, EWS, Printer and other equipment should be stated.

CNNEC/CHPI will modify the description and for revision

DMCI

Should state the contro systeml of the following; -Sootblower System ( MTD p.13 [4.2.2]) -Sewage Water Treatment ( MTD p.19 [4.6.3]) -Chlorinating Plant ( MTD p.19 [4.6.2])

Accept. Description will be modified, the three systems' description will be added. The relevant P&I drawing will be submit in the detailed design stage.

Accepted

The descriptions are incorporated in Rev. B. Chlorinator System, Sootblower system will be in PLC Control System, while Sewage Treatmennt System wiil adapt the conventional control since the I/O are very minimal.

REVISED with new comment see p 6[4] : Include in this specification the following: ELECTRICAL CONTROL SYSTEM COMMON CONTROL SYSTEM SEWAGE TREATMENT SYSTEM BOILER CONTROL SYSTEM TURBINE CONTROL SYSTEM The Boiler Control system and the Turbine Control System must be provided by OEM. FSSS- BMS is part of FSSS including FSS Fuel Safety System must comply with NFPA8502. FSS include Emergency Trip (Master Fuel Trip MFT/Oil Fuel Trip OFT), oil fuel system leakage test. Additional features and function of DEH must be: -self diagnotic on every module -risk reduction design -speed control -load control -overspeed protection trip No features included in bypass system. TBC not mentioned in I and C Description Document. TBCTurbine Bypass Control System; for HP Bypass System to guarantee the safe operation set Instruments should have at least with 10% spare quantity to anticipate damages during commisioning period. Temperature transmitter should recommended for a long distance., TC tapping to avoid ambienterrors and reduce the use of compensating cables. Or the use fo marshalling cabinet for TC with prescribe terminal blocks. Should provide Marshalling cabinet to all signal instruments to avoid congestion of wiring coming-in to DCS Cabinet with proper wire management and seggregation of signal (Analog to digital signals) For clarification: Does TC are included in section 11.2 p.10? Description of Electrical Control System, Common control System, Boiler and Turine Control System will be included to Section 6. Boiler Control System will be in DCS and Turbine Control System will be provided by Original Equipment Manufacturer migrated to DCS.

DMCI

Accept. The CPU and module of FSSS & ETS is triplicate redundancy.

Accepted

DMCI confirms/Accepts, FSSS was asured to comply with necessary Protection as Per CNEEC/CHPI. And it was included in Rev. B.

I&C Design Description

DMCI

According to MTD, steam turbine's DEH will adopt WOODWARD505 brand of American.

Accepted

DMCI confirms/Accepts, FSSS was asured to comply with necessary Protection as Per CNEEC/CHPI

DMCI

accepted, the description will be modified This opinion is out of basic design scope, which will be decided during equipment purchasing. Temperature transmitter is not included in this project. The control cabinet is not far from the local instrument so the TC will directly connect to DCS. There in no marshalling cabinet in this project. The signal cable and control cable will be directly connected to DCS. Item 11.2 is the description of pressure gauge, which has nothing to do with TC. Regarding TC, please refer to item 11.1 in the document F253C-K01. UPSF253CD04.UPSDCSETSDEH30KVA 1.5There are two power resources for UPS, which are from auxiliary power(F253C-D04). UPS load: DCS, ETS, DEH, boiler's local ignition, electrical relay protection screen, important instruments, etc. The capacity is about 30kVA(1.5 hours). Please provide the detail information as soon as possible. After calculation, it meets the requirement. Cable tray comply with GB standard. The material is hot dip galvanized steel.The cable tray for power cable is ladder type, the cable tray for control cable and instrumentation cable is channel type. 1. Please refer to I/O list for details (F253C-K25) 2. The description will be modified and added. 3. Accept, CNEEC will submit. 4. The instrument grounding and power source grounding of DCS system are separate. During construction design stage, the specific information will be provided. DEH adopted woodward505 (brand of america) and ETS adopted GE PLC. CNEEC will try best to let ETS and DCS hardware integrated. There is no item 4.4.1 in design description, please clarify further. 110V The direct current system is 110V and the specification has been modified. Accepted Accepted The description of 12.1.3 is different from 7.5 of F253C-D01, it should be unified.

Accepted Accepted Accepted

No revised description made. How the system works works?

CHPI will provide TBC description and the function during (start-up, turbine trip, etc.) CNEEC will decide according to the required no. of instruments spare. DMCI accepts/comfirms the no TT will be used, TC I/O card and RTD I/O card will be provide by DCS and directly connected to DCS

DMCI

DMCI

DMCI

* REJECTED NOTE: Need Marshalling cab. to avoid congestion of wiring coming-in to DCS Cabinet. Accepted

refer to DOR p 13 [15.5 (15.5.5)]

CNEEC/CHPI reply no need for the marshalling cabinet since there is minimal I/Os in the project. DMCI agreed. DMCI refers to TC compensating cable which is found in DOR. CNEEC will provide the TC compensating cables.

DMCI

DMCI

UPS Power source should be at auxiliary source and with at emergency source incase of auxiliary failure.

Accepted

As per Description UPS will adapt back-up power source.

DMCI

The capacity of the air receiver should able to support the required air supply for all on-line devices when the compressor unit is in stnadby mode more than five (5) minutes. Cable tray should comply with the standard requirement in accordance to NEMA standard or equivalent. - List of critical and regulatory I/Os should be identified. -List of Emergency Trip (critical) for Emergency pushbutton should be included in this document. -List of annunciator alarms to be display at CCR LCD -Grounding system for DCS system should be in seperate; Instrumenbts grounding system Power grounding system In order to minimize the spare typeDEHETS and DCS be advised to use the same hardware. The description of 12.1.2 and 4.4.1 are Inconsistent, it should be unified. There are no 220VDC in the DC System.The source from battery is only 52 cells of GFM-400 batteries, as specified in DC System Schematic (F253C-D13) 220VDC should not be in the DC System. Should comply with the 110VDC Include the following system in the basic design description: - Waste Water Treatment - Electrochlorination Plant - Fuel Oil System - Sootblower System - Limestone Handling System - Furnace Safeguard and Supervisory System - Control Fluid System - Turbine Bypass Control System Include the following System and their controls and automation on this document: - Waste Water Treatment - Electrochlorination Plant - Control Fluid System - Fuel Oil System - Sootblower System - Limestone Handling System Large LCDs aside from LCDs on operator consoles should also be provided for monitoring of important parameters (Drum level, pressures, vacuum..etc.). It serves as an instant access on the values when LCDs on the operator console are used to monitor other process and system. Section 9.3, Turbine trip should also include the ff: Vacuum Low, EH oil pressure low, Bearing Metal Temperature High, and Emergency trip button The LCD of drum water level CCTV are not shown in the drawing. Recommended that two local operator stations be required at the coal handling control system.

Accepted Accepted DMCI accepts/comfirms.

DMCI

DMCI

Accepted

Grounding System Philosophy (Separation of IE and PE) IEEE 1050-2004 Clause 5.2

The Grounding Philosophy of DCS are varied depending on its Manufacture. CNNC/CHPI will check with the DCS Manufacturer about the Grounding System prescribe for DCS.

CUC CUC SMC

DMCI/CUC accepts/confirm, CNEEC/CHPI assures that the ETS and DCS will be hardwired integrated properly. The description was already changed, see the revision B of I&C Description. CNEEC/CHPI revised the description. See Rev. B. CNEEC/CHPI revised the description. See Rev. B.

SMC

SMC:

CNEEC revised the description. Please see drawing version B Description of Turbine Bypass Control System will be added

SMC:

Please see drawing version B Waste Water Treatment will adopt local control mode Electrochlorination PlantSootblower System will adopt PLC control Control Fluid SystemFuel Oil SystemLimestone Handling System will control in DCS. DMCI confirms. CNEEC/CHPI will supply drum level TV and plant and main buliding TV, but no large LCD. Turbine trip Include Bearing Metal Temperature High, and Emergency trip button, but Vacuum Low, EH oil pressure low just for alarm. Accept, and revised drawing F253C-K05. Accepted, and revised drawing. Accepted Accepted .Should reflect in the drawing the control engr. Station of each respective BOP control. As mentioned in F253C-KO1 that PLC will be controlled at local control, the console Should show. . Each wires should identify accroding to type (F.O/UTP/HARDWIRED) Accepted Common Control system should have a separate DCS Cabinet. Ash Handling System- Fly Ash and ESP should have separate Control System. (TURBINE AND BOILER Control System will be must be a propriatary bvy OEM) BOILER Control Cabinet not included. This project is 15MW unit, so the IO points of compressed air system, oil pump house's ignition oil system(oil unloading pump controlled locally, and oil supply pump controlled in DCS) and bottom ash handling system are a few. They will be controlled in boiler and steam turbine's DCS cabinet, so will not pls show the system in drawing be shown separately. Electrolysis chlorination system will be controlled by PLC, and this part has been modified. CNEEC/CHPI replies that the parameters will be provided and to be checked to the Turbine manufacturer. CNEEC/CHPI will revise the drawing. CNEEC/CHPI revised the drawing and was included in Rev.B. Common Control System has small number of I/Os and it will be connected to Boiler and Turbine DCS Control Cabinet. Boiler Control panel refers to Drum Level Monitor (TV) not for Boiler DCS Cabinet. The Boiler DCS Cabinet is counted in DCS Cabinet.

SMC:

SMC:

74 75

Central Control Room And Electronic Control Room Lay-out Drawing Configuration Diagram of Control System

CUC:

CUC:

DMCI

DMCI

CUC:

Some systems are missing, it at least includes air compressor system, limestone convey system, diesel oil pump system, electrolysis chlorination systembottom ash handling system.

CNNEC/CHPI will revise the drawing, and show this system in drawing F253C-K03.

SMC:

Include the ff. systems: - Electro-chlorination Plant - Fuel Oil system - Limestone Handling System - Waste Water Treatment

CNEEC/CHPI revised the drawing. Please see drawing version B Electrochlorination Plant will adopt PLC control Waste Water Treatment will adopt local control Fuel oil systemLimestone Handling System will control in DCS.

76

Boiler Combustion System P&I Diagram

DMCI

Note #1:Field Instrument: Needs Isolating Valve Of All Field Instrument Which Is Pressure,Level,Pressure Diff.Flow Transmitter And P.S Pressure Switch For Safety Purposes, For Replacement Of Instrument Or Re-Calibration Online.

Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

Accepted For VFD AO change ZT to ST since VFD generates Frequency/Speed not Valve Position. 1CH001CFD01MTR (VALVE POSITION) ZT 1CH001CFD02MTR (VALVE POSITION) ZT 1CH001CFD03MTR (VALVE POSITION) ZT

CNEEC/CHPI will provide a details in hook-up drawing, and also provide instrument valve and instrument pipe list.

DMCI

CNEEC/CHPI will revise the drawing.

76

Boiler Combustion System P&I Diagram

DMCI

Note#2: Thermocouple: Indicate And Enumerate The Quantity/Number Of Every Primary Element Or Te. Noter #3:ESP Hopper; Flag Reference Of Esp Hopper Should Show The Break/Continuation Process And The System. Note #4; Slide Damper: Needs Dcs Signal For Slide Damper Di And Do And Reference; Details Of Slide Damper; How Slide Damper Works. Note# 4 Analyzer Symbol: Needs Detailed Reference Of Analyzer And Correct Symbol Because Of Inconsistency Symbol P&Id (At) Note#6 Coal Feeder 1,2 & 3: Coal Feeders 1,2 And 3 Are Vfd Motors. It Is Necessary To Put Zt Valve Positioner. Please Advice Information For This Process Flow Diagram And Other Control Parameters For Coal Feeder. Note #7 & 8 Cyclone stop Valve and Cola gate Valve; Need To Designate The Flag Reference And Drawing No. NOTE #9; Need To Designate The Drawing No. NOTE #10 : Need A Detailed Information Of This Valve And How It Works ...Manual Operated Or Actuated? Note #11 What will the control to be used? : Give Detailed Information Of This Valve And How It Works. The Symbol Has No Information For Control Or Actuator To Be Used. Note #12 Motorized 4 to 20 Ma Feedback(Zt Symbols) Please Advice For Zt-Valve Position 4-20 Ma Transmitter Signal Suggested the temperature instrument of TE0107 change to pressure instrument PT0117. Clarify the equipment Loop Seen Fan Note #1 ;Fast Acting Valve: Need fast acting valve feedwater or steam system.(Pneumatic valve)

The instrument serial number is continuous, so the quantity can be counted, which will be reflected in the equipment list during construction design stage. Regarding primary element's quantity, Please refer to legend F253C-A02. Here are double element. Accept, and revised. The inlet valve of ESP is normal open. It can be operated only when failure happens. It is manually operated. It is in the legend , Please refer to F253C-A03. AT is Analyzer transmitter. Here is O2 Analyzer transmitter. The coal feeder's speed varies which is controlled by VFD. The coal consumption 20.8t/h at BMCR condition. The max. output of coal feeder is 12t/h. On the Normal condition three sets coal feeder operation. Here the three ash discharge exits for emergency, which will be specified in the drawings. Accepted, and revised drawing. During commissioning, they will be set in a best position and will not be operated. The damper of fans' outlet is normal open. It can be operated only when failure happens. This valve position's feedback signal is 4~20mA. Revert air temperature is high and TE0107 is used to calculate the temperature compensation of revert air.

Accepted Accepted Accepted Accepted Accepted Accepted Accepted Accepted Accepted Accepted

CNEEC/CHPI replies that to enumerate the instrument in sequence number will make the drawing crowded that is to limit the space in drawing sheet. And the detail was in Instrument List which will be provided during detail design. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI repliest that the inlet valve of ESP is normal open. It can be operated only when failure happens. It is manually operated. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI Will change ZT to ST, and revise the drawing. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI replies that the damper of sealing air duct is normally open in a fixed opening required for boiler's operation. CNEEC/CHPI replies that the damper of fans' outlet is normal open. It can be operated manually only when failure happens. CNEEC/CHPI replies that the ZT refers to MOV feedback (4-20mA), please see the I&C Legends CUC accepts the reply of CNEEC/CHPI that the revert air temperature is high and TE0107 is used to calculate the temperature compensation of revert air. CNEEC/CHPI changed the description of LOOP SEEN FAN to HP FLUIDIZED AIR FAN. See Rev.B. F253C-J02 and will be modif ied in F253C-K04 P&ID.

DMCI

DMCI

DMCI

DMCI

DMCI DMCI DMCI

DMCI

DMCI

CUC:

SMC:

77

Boiler Steam & Water system P&I Diagram

DMCI

The electric valve MV0201's open & close speed can meet the requirement of boiler's operation No SPIN for Final Superheater Header Outlet MOV Boiler Drum Phosphate Dosing Tapping origin flag not found in F253C-H08[01 CHPI will revise the Drawing CHPI will revise the drawing and Dosing System P&ID will be provided during detailed design. Dosing System will be at conventional push button control. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. CNEEC/CHPI replies that it refers to LITS CNEEC/CHPI confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. CUC accepts the reply of CNEEC/CHPI CUC accepts the reply of CNEEC/CHPI

DMCI

NOTE 2. Wrong description TE0212 was wrong description of I/O List at I/O List Page 19/55. NOTE # 3: Indicate reference drawing number. reference drawing number should need indicate for easy tracing. NOTE # 4: Break process Break process/continuation are need labelled for easy tracing line from both sides of the Break. NOTE # 5: All flow transmitter should need proper isolation flow transmitter water & steam system will erect five manifold valve. NOTE # 6: P&ID symbol this is LITS or LT. - incosistent NOTE # 7: ** All instruments: Need isolating valve of all field instrument which is pressure,level, flow transmitter and P.S-pressure switch, for safety purposes and replacement of instrument or re-calibration. Suggested to main steam flow measuring position is located before temperature and pressure sensor. The manual by-pass valve for water supply control valve group (LCV0201/0202) should be designed. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

Accept. And revised. Here it should be "High temperature superheater inlet header temperature", which has been modified in the drawing. Accepted, and revised. Accepted, and revised. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. It is LITS Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted, and revised. Accepted, and revised. Accepted Accepted

Accepted Accepted Accepted Accepted Accepted Accepted

DMCI

DMCI

DMCI

DMCI

DMCI

CUC:

CUC:

SMC:

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

78 Boiler Fuel Oil system P&I Diagram

DMCI

NOTE 1.Wrong instrument loop no. 0301. Need to be changed to 0302 loop no.

Accepted, and revised.

Accepted Add Flow Totalizer Transmitter in Fuel Oil Unloading Pipe. Check the location of 1F00056 1F00062 (Return Bypass pipe) Check the orientations of Flag directions

CNEEC/CHPI revised the drawing, see Rev. B. CHPI replies that not necessary to put FIQ to the unloading pipe CHPI interchanged the valves 1F00056 and 1F00057; 1F00060 and 1F00061 CHPI replies that Flags refers to pipe ID not Pipe ID and Flow direction. Add process flow direction ( arrow)

D. M. CONSUNJI, INC. PROJECT15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECTBASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM

DOCUMENT TITLE

DMCI COMMENTS DMCI

DMCI EXPLANATION

RESPONSE OF CNEEC

CUC RESPONSE

DMCI RESPONSE

DMCI COMMENT REV.B

DMCI/CUC/CNEEC/CHPI RESPONSE

DMCI

DMCI

DMCI

DMCI

1 Boiler Fuel Oil system P&I Diagram

DMCI

CUC: CUC: CUC:

NOTE 2. Indicate DWG#/Terminal pt.# reference drawing number should need indicate for easy tracing. NOTE 3: Indicate line arrows for flow direction Please clarify pipelines and flows for easy tracking/tracing. NOTE 4: Break process Break process/continuation are need labelled for easy tracing line from both sides of the Break. NOTE # 5: ** All instruments need proper isolation Need isolating valve of all field instrument which is pressure,level, flow transmitter and P.S-pressure switch, for safety purposes and replacement of instrument or re-calibration. NOTE # 6: Break process Break process/continuation are need labelled for easy tracing line from both sides of the Break. NOTE # 7: I/O Fault alarm Need DI fault or fail alarm for retract or extend page 22/55 at I/O List (for Oil Gun and Ignitor) The temperature measuring points of oil tank top should be designed, and it shall be interlocked cooling water valves. Fire water can also be used of cooling water. Suggested to PT0301 is located before PCV0301. Please explain the purpose of SV0302 . For FT0302 - Incomplete configuration. Indicate the missing valve.(see drawing) For FT0301 - Incomplete configuration. Indicate the missing valve.(see drawing) Two (2) suction strainers should be installed in case one strainer is clogged up, the other can be used.

Accepted, and revised. Accepted, and revised. Accepted, and revised. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted, and revised. Yes, CNEEC confirm. There is power failure alarm signal. See drawing F253C-K06(Rev.B). There is a temperature measuring point on oil tank top. Accepted, and revised. When malfunction happens, the fuel oil can be cut at once. The code requires this valve. Accepted Accepted Accepted

Accepted Accepted Accepted Accepted Accepted Accepted

CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI confirm. There is power failure alarm signal. See drawing F253C-K06(Rev.B). CNEEC/CHPI confirms that there is a temperature measuring point on oil tank top.

Accepted

SMC:

SMC:

CNEEC/CHPI revised the drawing, see Rev. B. CUC accepts, the rejply of CNEEC/CHPI that when malfunction happens, the fuel oil can be cut at once. The code requires this valve. CNEEC/CHPI will adopt volume type flow measurement deviec, it install in pipe directly,and no need isolation valve CNEEC/CHPI will adopt volume type flow measurement device, it install in pipe directly,and no need isolation valve CNEEC/CHPI will provide two strainer at suction of the oil supply pump and the existing strainer will be removed. The drawing will be modified with proper instrument needed. Please see drawing version B

SMC:

Install also differential Pressure transmitter.


SMC:

Indicate drawing numbers for all connections coming from or going to other system. NOTE # 1 : ** Where is pneumatic signal for this valve? How about the instrument air for this pneumatic actuator? How actuate if theres no instrument air for this valve. The air source of pneumatic valve is from instrument air of compressed air system. When there is no air source, the pneumatic valve is closed.

79

Limestone System P&I Diagram

DMCI

Accepted 1AH0173P not found in I/O list I/O 539 not found in P&ID

DMCI accepts the reply of CNEEC/CHPI that the air source of pneumatic valve is from instrument air of compressed air system. When there is no air source, the pneumatic valve is closed. CHPI will revise the drawing. CNEEC/CHPI revised the drawing, see Rev. B. DMCI accepts the reply ,of CNEEC/CHPI that there is no DI feedback signal. Pneumatic is operated via solenoid but solenoid has no feedback signal. CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. CNEEC/CHPI revised the drawing, see Rev. B. CNEEC/CHPI revised the drawing, see Rev. B.

DMCI

DMCI

DMCI

DMCI

DMCI

NOTE # 2 : Need Temperature Indicator For safety and for monitoring to the local that the heater was high temperature. NOTE # 3 :How about Feedback Why theres no DI feedback for valve opening at (Dwg. No. f253-k23) I/O List page 25/55 HV. NOTE # 4 : ** All instruments needed proper isolation.Need isolating valve of all field instrument which is pressure,level, flow transmitter and P.S-pressure switch, for safety purposes and replacement of instrument or re-calibration. NOTE # 5 : Indicate drawing number reference drawing number should need indicate for easy tracing. NOTE # 6 : Flow arrow Indicate line arrows of each turn of line for easy reading of Flow diagram of P&ID. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

Accepted, and revised. There is no DI feedback signal. Pneumatic is operated via solenoid but solenoid has no feedback signal. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted, and revised. Accepted, and revised.

Accepted Accepted Accepted Accepted Accepted

SMC

Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC SMC SMC SMC SMC

Turbine Steam & Water System P&I 80 Diagram

DMCI

Indicate drawing numbers for all connections coming from or going to other system. Show specific connection of limestone feeding going to the furnace. (will it be directly injected inside the furnace, or through the secondary air ducts or through the pipes on the J valve) The air receiver tank should indicate if its service air or instrument air. Flow transmitter should be installed for monitoring of limestone quantity injected. On the heater, a temperature indicator and transmitter should be installed for heater control and automatic shut off if very high temperature is reached. NOTE # 1 :All Break process. All Break process/continuation are need labelled for easy tracing line from both sides of the Break.

Please see drawing version B CNEEC/CHPI comfirm limestone feeding going to the J valve. It's service air, and please see drawing version B CNEEC/CHPI will provide limestone weight conuting function in DCS. CNEEC/CHPI wrevised the drawing. Please see drawing version B Temperature indicator and RTD will be supllied , and instrument tag no.1TI4851 and 1TE4851. Accepted, and revised. Accepted No Auxiliary Steam header for Sootblower. Add Isolating Valve (MOV) at Cooler Ejectors, Gland Steam Cooler, LP Heater Instruments with ASTERISK (*) means what? CNEEC/CHPI revised the drawing. See Rev. B. CNEEC/CHPI replies, Tapping point for Sootblower steam will not be determined at this time, the tapping point will be determined by Boiler manufacturer. Details will be given during the detailed design. CNEEC/CHPI will revise the drawing and manual valve will be provided "*" means to be provided by main equipment manufacturer. CNEEC/CHPI confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. DMCI accepts the reply of CNEEC/CHPI that the refered valve is solenoid valve, which has no feedback signal. CNEEC/CHPI revised the drawing. See Rev. B. CNEEC/CHPI revised the drawing. See Rev. B. The fast acting BP valve should be secure and consider the reponse time of the valve during the operation. There haven`t fast acting requirement in MTD. If it is possible in the market, CNEEC will do the best. CNEEC/CHPI revised the drawing. See Rev. B.

DMCI

DMCI

DMCI

DMCI

NOTE # 2: ** All instruments need proper isolation. Need isolating valve of all field instrument which is pressure,level, flow transmitter and P.S-pressure switch, for safety purposes and replacement of instrument or re-calibration NOTE # 3 :Rear cyclone spray water solenoid valve open feedback How about feedback of valve opening @ I/O List page 29/55. NOTE # 4 : Flow arrows Should indicate Flow arrows on each turn line of process. For easy reading of diagram. NOTE # 5: Reference from bottom ash and to bottom ash cooler. Indicate reference drawing number for easy tracing if where terminates. ***Bypass valve should fast acting. Suggested that the FT0401/FE0401 should be located behind the LP Heater. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. This valve is solenoid valve, which has no feedback signal. Accepted, and revised. Accepted, and revised. There haven`t fast acting requirement in MTD. If it is possible in the market, CNEEC will do the best. Accepted, and revised.

Accepted Accepted Accepted Accepted Accepted Accepted

DMCI CUC:

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

Indicate drawing numbers for all connections coming from or going to other system.

CNEEC/CHPI revised the drawing. Please see drawing version B

D. M. CONSUNJI, INC. PROJECT15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECTBASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM

DOCUMENT TITLE SMC SMC

DMCI COMMENTS

DMCI EXPLANATION

RESPONSE OF CNEEC

CUC RESPONSE

DMCI RESPONSE

DMCI COMMENT REV.B

DMCI/CUC/CNEEC/CHPI RESPONSE

show instrumentations for normal and emergency drains for monitoring and controlling. Vent air fans should be renamed to gland steam exhauster fans. NOTE # 1: T/C Please enumerrate and label or indicate marking for each T/C at condenseer for easy tracing. NOTE # 2 : TURBINE SUPERVISORY INSTRUMENT. TURBINE SUPERVISORY INSTRUMENT is parallel to DCS to monitor to the DCS HMI not only to TSI. NOTE # 3 : Digital Electro-hydraulic Control System. Digital Electro-hydraulic Control System is parallel to the DCS. NOTE # 4 : Reference DWG. No. Indicate reference DWG. No. to trace where designate this process NOTE # 5 : all Break process ll Break process/continuation are need labelled for easy tracing line of every break line process. NOTE # 6 : Flow arrow line should indicate to the process flow diagram Indicate flow arrow of each turn of line process for easy tracing and reading of PFD. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency. The instrument serial number is continuous, so the quantity can be counted, which will be reflected in the equipment list during construction design stage. For example, the TE0518 TE0523, it means there are six sets meters, number should be TE0518, TE0519, TE0520, TE0521, TE0522, TE0523. Accepted, and revised. There already have three signal connected to DCS. This signal will not be connected to DCS, to DEH only. . Accepted, and revised. Accepted and refer to F253C-J06 for specific cooling water system drawing Accepted, and revised. Accepted Heater not found in I/o List

CNEEC/CHPI will supply additional drawing for Turbine Drain System CNEEC/CHPI replies, vent air fan is named by manufacturer. CNEEC/CHPI will revise the I/O list

81

Turbine Lube System and Turbine Proper Instrument System P&I Diagram

DMCI

DMCI

Accepted Accepted Accepted Accepted Accepted

DMCI

DMCI

DMCI

DMCI

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC SMC SMC SMC SMC

Indicate drawing numbers for all connections coming from or going to other system. indicate supply and return lines for easy tracing of system flow. Use arrow for flow. oil/air separator should be provided to prevent oil from exhausting in the atmosphere. There are two auxiliary oil pumps, identify which is the turning gear oil pump from the drawing and label such. Indicate equipment label for Main Oil Pump NOTE # 1: Level transmitter not Level switch This is level transmitter not a level switch the P&ID Symbol is inconsistent and this is 4-20mA signal to the I/O List page 39/55. NOTE # 2 : ** All instruments need proper isolation. Need isolating valve of all field instrument which is pressure,level transmitter and P.S-pressure switch, for safety purposes and replacement of instrument or re-calibration. NOTE # 3: Wrong loop number Wrong loop number for position switch motorized valve (MV604) . NOTE # 4 : Indicate line arrows for flow direction Please clarify pipelines and flows for easy tracking/tracing. NOTE # 5 : the symbol is inconsistent LITS change to LT symbol . Inconsistent symbol NOTE # 6 : Break process Shall need reference DWG. No. for easy tracing of connection of process. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, please see drawing version B CNEEC/CHPI accepts, and revise. CNEEC/CHPI comfirms to provide oil/air separator. CNEEC/CHPI revised the drawing. Please see drawing version B Turning gear oil pump is already shown. CNEEC/CHPI accepts, and revise

82 Feed Water System P&I Diagram

DMCI

LITS is floating-ball liquid level meter. It can send 4~20mA signal and alarm signal to DCS. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted, and revised. Accepted, and revised. It is LITS Accepted, and revised.

Accepted

DMCI

Accepted Accepted Accepted Accepted Accepted

DMCI

DMCI

DMCI

DMCI

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC SMC

83

Closed Cycle Cooling Water System P&I Diagram

DMCI

DMCI

DMCI

DMCI

DMCI

Indicate drawing numbers for all connections coming from or going to other system. Indicate equipment label for Motor-driven boiler feed pumps 1, 2, and 3. NOTE # 1 : **All flow transmitter should need proper isolation. Need isolating valve of all field instrument which is pressure,level, flow transmitter. for safety purposes and replacement of instrument or re-calibration. NOTE # 2 : Flow indicator. Shall indicate Flow indicator for easy reading of P&ID. NOTE # 3 : indicate the Reference DWG. No. Shall indicate the Reference DWG. No. if where the designation. NOTE # 4 : where terminate this break process line. Break process/continuation are need labelled for easy tracing line from both sides of the Break. NOTE # 5 : Process flow Shall indicate the process flow arrow for easy tracing. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, Please see drawing version B CNEEC/CHPI accepted, and revised. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. This flow indicator is used to observe whether there is water, not to measure the flow. Accepted, and revised. This is not break process line but dash dot line. And have been revised. Accepted, and revised. Accepted Accepted Accepted Accepted Accepted

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

84

Water Supply System P&I Diagram

DMCI

DMCI

DMCI

CUC: SMC

Indicate drawing numbers for all connections coming from or going to other system. NOTE # 1 :Process flow Shall indicate the process flow arrow for easy tracing. NOTE # 2 : **All flow transmitter should need proper isolation. Need isolating valve of all field instrument which is pressure transmitter and PI. for safety purposes and replacement of instrument or re-calibration. NOTE # 3 : **How about the control of this motorized DCS or PLC. is this local control for operator only ? If not shall indicate PLC control or DCS signal. Recommended monitor & control signal of water system for fire protection into DCS. Indicate drawing numbers for all connections coming from or going to other system. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, Please see drawing version B Accepted, and revised. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Fire fighting and outlet valves are motorized, which are controlled by fire alarm panel. The fire fighting pump will be operated on the fire alarm panel. Accepted CNEEC/CHPI revised the drawing, Please see drawing version B CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted Accepted Accepted

SMC

SMC

Provide backwashing valves for the condenser as stipulated in the MTD and include instrumentations. NOTE # 1 : Flow indicator shall need to show the name of P&ID name. Shall indicate Flow indicator to the instrument of P&ID and the P&ID is not consistent to the symbol the other symbol can't identify to the Process and instrument diagram. The flow indicator is just used to observe the water flow situation inside the pipe, which is a mechanical part, not belong to instrument. Accepted

Refer to Mechanical part Item 27 (SMC comment)

85

Circulation Cooling Water System P & I Diagram

DMCI

D. M. CONSUNJI, INC. PROJECT15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECTBASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM

DOCUMENT TITLE

DMCI COMMENTS DMCI

DMCI EXPLANATION

RESPONSE OF CNEEC

CUC RESPONSE

DMCI RESPONSE

DMCI COMMENT REV.B

DMCI/CUC/CNEEC/CHPI RESPONSE

DMCI

NOTE # 2: indicate flow arrow for direction of process. shall indicate the flow arrow of the process for easy tracing of process flow. NOTE # 3: shall indicate reference drawing. Shall indicate reference drawing no. if where designate the process connection. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

Accepted, and revised. Accepted, and revised.

Accepted Accepted

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

Indicate drawing numbers for all connections coming from or going to other system. Accepted Instruments should be provided with isolating valves for maintenance purposes.

CNEEC/CHPI revised the drawing, see drawing version B

86

Sewage Water Treatment System P&I

DMCI

SMC

Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

Indicate drawing numbers for all connections coming from or going to other system. NOTE # 1 : Air Compressor system included two compressor and three air receiver. NOTE # 1 : Base in the MTD the air compressor system included two air compressor and three sufficient volume air receivers with filter,dryers etc. but in the P&ID should not indicate the third air receiver please revise this drawing (4.7 compressed air Page 20/90). NOTE # 2: how about switch position ZS symbol for feedback? Shall be need indicate to the P&ID drawing ZS at motorize for feedback. NOTE # 3: Why no secondary filter for air receiver if the other air receiver have own secondary filter? NOTE # 4: **Inconsistent symbol can't identify to the P&ID. Drain trap symbol is inconsistent symbol to the P&ID can't identify. NOTE # 5 : **all Pressure instrument shall be needed isolating. Need isolating valve of all field instrument which is pressure transmitter for safety purposes and replacement of instrument or re-calibration. NOTE # 6:no reference drawing for easy tracing. shall indicate Drawing number for easy tracing. NOTE # 7 :why three air compressor indicate in this drawing but base in MTD theres only two compressor. The MTD reference have only two compressor. is it the third compressor is for spare incase of emergency or back-up?. Instruments should be provided with isolating valves for maintenance purposes. According to the contract and the actual air consumption, the compressed air system process has been optimized. For this project, 3 air compressors(2 operation & 1 standby) and 2 air receivers will be used, and per capacity of air compressor is 13m3/min(9.8m3/min in MTD). 2 operation & 1 standby is better than 1 operation & 1 standby and 2 air receivers can meet the requirement of system. Accepted, and revised. This compressed air is service air for maintenace, it is not instrument air. It use for the compressed air tools, so there no need. Accepted, and revised. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted, and revised. According to the contract and the actual air consumption, the compressed air system process has been optimized. For this project, 3 air compressors(2 operation & 1 standby) and 2 air receivers will be used, and per capacity of air compressor is 13m3/min(9.8m3/min in MTD). 2 operation & 1 standby is better than 1 operation & 1 standby and 2 air receivers can meet the requirement of system.

CNEEC/CHPI revised the drawing, see drawing version B

87 Compress Air System P&I Diagram

DMCI

Accepted

DMCI

Accepted Accepted Accepted Accepted Accepted

DMCI

DMCI

DMCI

DMCI

Compress Air System P&I Diagram

DMCI

Accepted

SMC

Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency. Indicate drawing numbers for all connections coming from or going to other system. it only shows two (2) air tank receivers, MTD stipulated that three (3) air tanks will be supplied and installed.

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. CNEEC/CHPI revised the drawing, see drawing version B

SMC

SMC

/ Pending and will be discuss with Mechanical group Two air receivers will be used as service air while the third air receiver will be used as instrument air. There are no pressure transmitters and level on ash vessels. Why? How does it work? CNEEC has already considered this pressure transmitter, which will be supplied with jet pump. It will be Accepted specified in future information. Add TI at fly ash silo air heater How is the control of the valve dischanrge of at fly ash silo? Instruments should be provided with isolating valves for maintenance purposes. CNNEC/CHPI will add local TI at fly ash silo air heater CNEEC/CHPI will revise the drawing with pneumatic three-way valve controlled by PLC at discharge of Fly Ash Silo.

88

Fly Ash Handling System P&I Diagram

CUC:

SMC

Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

89

Bottom Ash Handling System P&I Diagram

DMCI

DMCI

DMCI

Indicate drawing numbers for all connections coming from or going to other system. NOTE # 1: No local remote at I/O List page 54/55. how about the local/remote control of ash cooler? NOTE # 2: Wrong tapping of level transmitter. The level transmitter should tap at the top of bottom ash silo because the material of silo is noncombustible coal not water the transmitter is ultrasonic or laser type. NOTE # 3: Hardwired pushbutton motorize. Is this a local control only by operator? or shall need PLC control? Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, see drawing version B It is shown in I/O list Accepted, and revised. Only local operation Accepted Accepted Accepted

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

Indicate drawing numbers for all connections coming from or going to other system. Alarms and interlocks should be provided for monitoring. Accident Bottom Ash should be re-translated. Use appropriate English translation. Vibrating motors should be installed to loosen the slags inside the tank for easy discharge. Proposal adding the measurement instrument of water flow and electric conductivity at the demineralized water pipe that send to main building . Advised to set TE1701 to primary RO inlet manifold. Please describe control relationship of between demineralized water pump and deaerated water tank level . Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, see drawing version B CNEEC/CHPI confirm and changed.(it was changed to Emergency Bottom ash see reply of CHPI/CNEEC comments in Bottom Ash system) CNEEC/CHPI confirm and provide Vibrating motors Accepted, and revised. Accepted, and revised. The water level of deaerator tank will be controlled by tank's inlet makeup water regulating valve according to the water level. Accepted Accepted so the capacity of demineralized water pump will be considered at startup and normal Accepted Accepted CNEEC/CHPI confirm demineralized water pump operation requirement at startup and normal running condition.

SMC

SMC

90

Boiler Make-up Water Treatment System P&I Diagram

CUC: CUC: CUC:

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

Indicate drawing numbers for all connections coming from or going to other system. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, see drawing version B

91

Boiler Make-up Water Treatment Dosing and Auxilliary System P&I Diagram

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

92

Indicate drawing numbers for all connections coming from or going to other system. Recommended adding CUC: Regenaration System for Boiler Make-up Water Treatment P&I Diagram interlock between the pumps (M1751, M1752) and liquid level ( LI1751,LI1752). Instruments should be provided with isolating valves for maintenance purposes.
SMC

SMC

CNEEC/CHPI revised the drawing, see drawing version B Accepted, this will be shown in schematic diagram of electrical local control cabinet Accepted

Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

93 Water and Steam Sampling System P&I

DMCI DMCI

DMCI

DMCI SMC

Indicate drawing numbers for all connections coming from or going to other system. NOTE # 1: Wrong I/O Designation please check at I/O List page 55/55. NOTE # 3 : indicate DWG. No. For easy tracing. NOTE # 2 : ** all Pressure indicator and flow switch shall be need isolating valve. Need isolating valve of all field instrument which is pressure indicator, flow switch, for safety purposes and replacement of instrument or re-calibration. NOTE # 4: indicate Process flow arrow direction. reconcile tagging/designation of instrumentations with I/O lists submitted. Instruments should be provided with isolating valves for maintenance purposes. Include Legends and Symbols for easy reference. Use standard symbols for all the drawings for consistency.

CNEEC/CHPI revised the drawing, see drawing version B It have been revised. Accepted, and revised. Yes, CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing. Accepted, and revised. Accepted Accepted Accepted Accepted CNEEC/CHPI revised the drawing, see drawing version B

SMC

CNEEC confirm. The isolating valves will be reflected in instrument valve list and hook up drawing.

SMC

Indicate drawing numbers for all connections coming from or going to other system. The number of PLC station should be same as the F253C-K03. The SV0301 and SV0302 are solenoid valves in drawing F253C-K06, but the signals of IO list are for motor valve. Please confirm which one is correct. Please add the signals of CEMS. Nos. 1128-1136, reconcile designation with drawing no. F253C-K21. Clarify what is Loop Seen Fan. Identify which are Critical and Regulatory Signals Refer to Item 2.3 of Basic Design Report. Please provide wind pressure calculation for a height of 7meters(as specified at Turbine Hall) and 23meters(as specified at Coal Bunker Bay). Wind pressure varies with height, so please provide such pressure for 7m and 23m. Please provide Basic Design drawings and calculations for Civil/Structural works. Your submittal does not have a copy of Civil/Structural drawings to review and comment. Accepted, and revised. SV0301SV0302 are solenoid valves. CNEEC have been revised. CEMS and DSC will adopt communication. There is no hardwired signal connected to DCS Accepted Accepted the communication signals also can be indicated in drawing

CNEEC/CHPI revised the drawing, see drawing version B

94 95 96 97

Cable Routing Drawing in Main Building CUC: Water Treatment Control Room Lay-out Ash Handling Control Room Lay-out Drawing DCS I/O List
CUC:

CUC: SMC

CHPI will revise the drawing, the communication between CEMS and DCS will be shown in drawing F253C-03, CNEEC/CHPI revised the drawing, see drawing version B CNEEC/CHPI changed the description of LOOP SEEN FAN to HP FLUIDIZED AIR FAN. See Rev.B. F253C-J02 and will be modif ied in F253C-K04 P&ID.and I/O list will be modified. The requested Signals (critcal and regulatory) was already sent to CNEEC, snd CNEEC will provide a copy to DMCI

SMC

DMCI

Architecture and Structure 98 Architecture and Structure Design Description


DMCI

7m wk=10.81.251.063=1.063(kN/m) 23m wk=10.81.681.063=1.429(kN/m) Accept DMCI's comment, will revise. 1m2.4 That is vertical rung ladder and access to level -2.00m of the TG building. The following reply for the question on the drawings: The width of apron is 1m. Normally the width of gate's ramp is 2.4m. These data above,which will be decided during construction design, is unnecessary to show. DMCI Accept DMCI comment, and revised drawing according requirement. We want to remind DMCI, if this modification is taken, the door of Men's toilet is right pointing to the hole for hanging and hoisting. 50mm Accept DMCI comment. The elevation of outdoor platform(staircase landings) lower 50mm. 50mm Accept DMCI comment. The elevation of outdoor platform(staircase landings) lower 50mm. 1323 Accept DMCI comment., and revised drawing. It is staircase rest platform between +13.000m and +23.000m Accept DMCI's comment, and revised. CNEECDMCI DMCI First of all, CNEEC provides the general layout drawing, detail drawing should be designed by DMCI according to Philippines standard and the type of window should be determined in detail drawing. Therefore type of window will be chosen, designed and provided by DMCI. Accept DMCI's comment, and revised. Accept DMCI's comment, and revised. Accept DMCI's comment, and revised. Accept DMCI's comment, and revised. Accept DMCI's comment, and revised. Accept DMCI's comment, and revised. The auxiliary chemical equipment is an open shed. Will provide more in formation on the drawing, Please refer to drawing F253C-T12(Rev.B) 150mm The building is steel structure and the concrete hollow blocks of 150mm for wall's thickness is accepted

Accepted

DMCI

Accepted

99

0.000 M Plan of TG Building

DMCI

What is the means of access to the level of underground facilities in the TG building? Drawing does not show or call out any means of access to level -2.00 of the TG building.

Accepted

100 7.000 M Plan Drawing of TG Building

DMCI

Provide separate entrances for men's and women's toilets; and use western type water closets. Traditionally, toilets in the Philippines have separate entrances Level of landings in exterior stairs should be lower than the interior floor level. Level of landing outside should be lower to prevent wind-driven rain water from creeping into the interior. See comments on F253C-T03 re: landings of exterior stair Where does the stairs at level +23.000 lead down to? Drawing is not clear where the stairs near axis-1 and axis-B leads down to. Slope the roof of the TG hall down to exterior wall side with the gutter and downspouts possibly on the exterior. Sloping the roof to one side avoids interior gutter which is prone to overflowing and possible leaking in case of extra heavy rain. Identify which openings are for louvers and which are for windows. Drawings shows only rectangles, presumably openings for windows and louvers.

Accepted

DMCI

Accepted Accepted Accepted

101

4.000 M,13.000M, 23.000M Plan of TG Building

DMCI

DMCI

102

Section 1-1 of TG Building

DMCI

Accepted

103

DMCI Elevation View for Steam Side Of TG Building

104 105 106

D Elevation View for Fixed Side Of TG BuildingMCI

See comments on dwg F253C-T05 & T06 Walls to be 150 mm thick concrete hollow blocks with cement plaster finish on both faces. Drawing shows extra-thick walls. Please verify. Provide additional window to the toilets Toilets dont have sufficient natural ventilation Move the lavatory inside the men's room Lavatory near the entrance door blocks the passageway Use western type water closet. Traditionally, water closets in the Philippines are Western type. Fire escape should be located at the other end of the hallway along axis-A. Fire escape is needed at the other end of the long corridor Is the auxiliary chemical equipment room an open shed or an enclosed room? Drawing shows only 4 columns around the tanks. Please provide more information on the drawing.

Accepted

Plan Drawing of Underground Facilities of Plan Drawing of Fly Ash Handling System Control room and Air Compressor House Plan Drawing of Chemical Water 107 Treament Room

DMCI

Accepted Accepted Accepted Accepted Accepted

DMCI

DMCI

DMCI

DMCI

108 109 110 111

Section and Elevation of Chemical Water Plan Drawing of Auxiliary Chemical Equipment Room Layout of Coal Handling Building Plan Drawing of Diesel Generator House

DMCI

DMCI

Show concrete columns and thickness of walls at 150 mm + cement plaster finish on both faces.

10 Ventilation and Air Conditioning 112 Ventilation and Air Conditioning Design 113 Section Drawing of Ventilation in Main Plan Drawing of Ventilation and Air Conditioning in Main Building How much heat is dissipated at electronic equipment control room, central control rom and chemical sampling room and what air change on each room Heat dissipation should be considered in the design of airconditioning 24kW24kW5kW>5/. Heat dissipated at electronic equipment control room, central control rom and chemical sampling room are 24kW,24kW, and 5kW. air change on each room is more than 5 times per hour. Heat dissipation has been considered in the design of airconditioning. 500.3mm. The filter of each airconditioning unit is 0.3mm. Highly corrosive & sandy area will be considered in choosing filters. 50%~60% The relative humidity of the aircon rooms is 50%~60%. The data meet with DL/T 5035-2004 standard. AC For semirara project, the central AC system is not considered, and the cabinet AC is adopted. There is filters on the inlet of AC. The AC equipment will be submitted in the detail design stage.

114

DMCI

DMCI

How many microns are the filters of airconditioning units Highly corrosive & sandy area must be considered in choosing filters What are the relative humidity of the rooms Did this satisfy the 40-60% relative humidity as per Ashrae Standard?

DMCI

DMCI

Is there a contaminant removal in the design for outdoor air? No equipment specified

Accepted
4

D. M. CONSUNJI, INC. PROJECT15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECTBASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM

DOCUMENT TITLE

DMCI COMMENTS

DMCI EXPLANATION

RESPONSE OF CNEEC

CUC RESPONSE

DMCI RESPONSE

DMCI COMMENT REV.B

DMCI/CUC/CNEEC/CHPI RESPONSE

115 116

Layout of Dust Collection at Coal Bunker Layout of Ventilation and Air Conditioning in Chemical Water Room

DMCI

Why no exhaust fan for the rest room, office and toilet (Ground floor) Where is the exhaust fan for control room

DMCI

DMCI

At elevation 3.6m provide exhaust fan and aircon on each room if needed

Accept DMCI's comment, and revised. The exhaust fan is not needed for DM water control room. And there is aircon. 3.6m The aircon is not needed to for 3.6m rooms. Exhaust fans is installed in Laboratory warehouse, and VENTILATING CABINETS are installed in Water analysis room and Coal analysis room. Other rooms will not set exhaust fans, and natural ventilating wil be adopted. 28~32 According MTD, the sea water temperature 28 ~ 32 C, which will reflect in the data. 60HZ We select pumps and other mechanical rotating equipment in accordance with 60Hz, and when ordering, this requirement also will be emphasized to manufacturers . The coal waste water has been reused after treatment, it is used for flushing trestle. The water for flushing ash silo, deaerator & coal bunker bay house and STG house has been changed into using blowdown lowering temperature pond to drain. Please provide the basis of design temperature. Accepted

Accepted exhaust fan is need to have air change in the room

Toilet must have exhaust fan/ office must have window type aircon

11 Hydraulic 117 Hydraulic Part Design Description


CUC:

Please provide the design temperature of sea water. Please pay attention to the power frequency, which is 60Hz. Pump impeller or the electromotor should be designed to adapt the frequency. Chapter 1.4: The effluent water treated by the coal sewage disposal house should be reused for ground flushing in the turbine hall, deaerator & coal bunker and ash silo. The flushing drainage should be collected to the coal sewage disposal house for treatment. Please verify and update. Chapter 2: Please provide the following drawings: *Elevation drawing of sea water supply system *General arrangement of seawater intake station plan view *General arrangement of seawater intake station sectional view Please provide the calculation description of the seawater direct flow supply pump head. Please check the capacity of existing seawater intake channel. Chapter 3: Please provide the following drawings: *General arrangement of comprehensive water pump shelter plan view *General arrangement of comprehensive water pump shelter sectional view Chapter 5 The water quality of drainage should meet the requirement of local standard.

CUC:

CUC:

Please provide the modified water balance drawing.

CUC:

Accepted, and have added.

Accepted, pls revise the drawing

CUC: CUC:

Accepted, and revised. CNEEC already check. The capacity of existing seawater intake channel meets the design requirements.

Accepted Please provide the detail description.

Hydraulic Part Design Description

CUC:

Accepted, and have added.

Accepted, pls revise the drawing

CUC:

The waste water treatment system meets the requirements of MTD.

Please provide the detail description.

118

General Layout of Hydraulic Architectural The ground flushing water for the turbine hall, deaerator & coal bunker, ash silo should use the effluent water treated by the coal sewage disposal house. Please verify and update. The coal waste water has been reused after treatment, it is used for flushing trestle. The water for flushing ash silo, deaerator & coal bunker bay house and STG house has been changed into using blowdown lowering temperature pond to drain. The coal waste water has been reused after treatment, it is used for flushing trestle. The water for flushing ash silo, deaerator & coal bunker bay house and STG house has been changed into using blowdown lowering temperature pond to drain. The water for flushing ash silo, deaerator & coal bunker bay house and STG house has been changed into using blowdown lowering temperature pond to drain. During construction design, details of plant drain pipes will be shown The coal waste water has been reused after treatment, it is used for flushing trestle. The water for flushing ash silo, deaerator & coal bunker bay house and STG house has been changed into using blowdown lowering temperature pond to drain. This already meets the requirements of design. Please provide the modified water balance drawing and flow diagram of wter supply system.

119

Flow Diagram of Water Supply System

CUC:

120 Water Balance Drawing

CUC:

The ground flushing water for the turbine hall, deaerator & coal bunker, ash silo should use the effluent water treated by the coal sewage disposal house. Please verify and update.

Please provide the modified water balance drawing and flow diagram of wter supply system.

CUC

The boiler blow down should be reused, which is of good quality. Please verify and update. The discharge of oil sewage disposal house ,chemical water treatment house should be collected to the drain-pipe, those should be shown in the drawing. The effluent water treated by the coal sewage disposal house should be reused for ground flushing in the turbine hall, deaerator & coal bunker and ash silo. The flushing drainage should be collected to the coal sewage disposal house for treatment. Please verify and update. The water quality of drainage should meet the requirement of local standard. Standard Plant Identification numbering system Must Include SPIN as agreed. Request that in the drawings, each equipment should have its equipment name as its label Each equipment must be properly labeled instead of just indicating legend number. Please indicate SMC drawing number SMC - XX YYYY Where XX = Discipline GE General ME Mechanical EE Electrical CA Control & Instrumentation CE Civil AR Architectural YYYY = Drawing Sequence No. Please see spelling and grammar editing in pdf file, if any

Please provide the modified water balance drawing and flow diagram of wter supply system. Please show the flow direction in the water balance drawing as domestic wastewater.

CUC

121

Layout of Seawater Direct Flow Supply Flow Diagram of Coal Water Treatment Facility Flow Diagram of Oily Water Treatment Facility Please provide the modified water balance drawing and flow diagram of wter supply system.

122

CUC:

123

CUC:

Please provide the detail description.

General Comment (OWNER)

SMC

CNEEC reply: For the numbering system, Please refer to the new document (F253C-A04, F253C-A05

SMC

CNEEC reply: Please refer to the new drawing & document (Rev.B)

SMC

CNEEC reply: Please refer to the new drawing & document (Rev.B)

SMC

CNEEC reply: Please refer to the new drawing & document (Rev.B)

smc RESPONSE

COMMENT TYPE

REMARKS

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed Pending Closed

Closed Closed

Closed

Closed

Closed

Closed Closed Closed Closed

Closed

Closed

Closed Closed Closed Closed Closed Closed

Closed

Closed

Closed

Closed

Closed Closed

Closed Closed Closed

Closed Closed

Closed Closed

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Closed

Closed Closed Closed

Closed

smc RESPONSE Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

COMMENT TYPE

REMARKS

Closed Closed

Closed Closed Closed Closed Closed Closed Closed

Closed

Closed Closed Closed Closed Closed Closed Closed Closed Closed

Closed Closed Closed Closed PENDING Closed

Closed

Closed

smc RESPONSE Closed Closed Closed

COMMENT TYPE

REMARKS

Closed

Closed Closed Closed Closed

Closed

Closed Closed

Closed

Closed

Closed

Closed

Closed

smc RESPONSE

COMMENT TYPE

REMARKS

Closed

Closed

Closed

Closed

Closed

Closed

Pending

Closed Closed

Closed

Closed

Closed

Closed Closed Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed Closed Closed Closed

smc RESPONSE

COMMENT TYPE

REMARKS

Accepted

10

D. M. CONSUNJI, INC. PROJECT 15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECT BASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM BASIC DESIGN DOCUMENTS BATCH 1

DOCUMENT TITLE

DOCUMENT NUMBER

SMC COMMENTS

SMC EXPLANATION

COMMENT TYPE

RESPONSE OF CNEEC

REMARKS

Coal Handling 1 Coal Handling System Design Description 2 Flow Diagram of Coal Handling System 3 General Layout of Coal Handling System Section I - I (General Layout of Coal 4 Section II - II (General Layout of Coal 5 Handling System) Section III - III (General Layout of Coal 6

F253C-M01 F253C-M02 F253C-M03 F253C-M04 F253C-M05 F253C-M06 F253C-C01 F253C-C02 F253C-C03 F253C-C04 F253C-C05 F253C-C06 F253C-C07 F253C-C08 F253C-C09 F253C-C010

2 Ash Handling 7 Ash Handling System Design Description Flow Diagram of Bottom Ash Handling 8 System 9 10 11 12 13 14 15 16 BATCH 2 3 General General Design Description and Design Document List Main Equipment List Piping & Instrumentation Diagram System Flow Diagram of Fly Ash Handling System Flow Diagram of Limestone System Plan Drawing of Fly Ash and Bottom Ash Layout of Bottom Ash Handling System Layout Layout Layout Layout of of of of Bottom Ash Silo Fly Ash Handling System Fly Ash Silo Limestone Powder Silo

CNEEC should provide one standby and one operational for scrap conveyor and bucket elevator. for redundancy or continous disposal of bottom ash. CNEEC should provide only one type of ash unloader dry type is better.so that we will purchase only one type of truck for this purpose Need specs for limestone tank Truck ( Bulk Unloader). We dont have this truck locally CNEEC should provide one standby and one operational for scrap conveyor and bucket elevator. for redundancy or continous disposal of bottom ash.

17

F253C-A01

Change from "four duty three shift system" to 2 shift system. SMC adopts 2 shift system (12 hours each shift)

18 19 4

F253C-A02 F253C-A03 F253C-ZO1 F253C-ZO2 F253C-ZO3 F253C-ZO4 F253C-ZO5

MTD7.0432 According to item 7.0 of MTD, it is "four duty three shift system" but if 2 shift system is used, which will not affect the type selecting of equipment.

General Layout 20 General Layout Design Description 21 Overall of Plan 22 General Layout of Power Plant 23 Vertical Layout of Power Plant 24 Plan drawing of Pipe in the Plant Mechanical 25 Mechanical part design description

F253C-J01

All supply pump must have pressure gauge or monitor. To monitor pump efeciency All heat exchanger must have thermometer gauge or temp. monitor to in/out of the cooler. To determine the H.E. condition

26

Flow Diagram of Combustion System

F253C-J02

Yes, there are pressure gauges on every pumps' outlet. Yes, there are thermometers.

D. M. CONSUNJI, INC. PROJECT 15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECT BASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM BASIC DESIGN DOCUMENTS

DOCUMENT TITLE

DOCUMENT NUMBER

SMC COMMENTS

SMC EXPLANATION

COMMENT TYPE

RESPONSE OF CNEEC

REMARKS

27 Flow Diagram of Thermodynamic System

F253C-J03

Feedwater pumps will be reduced to two (2) units but with capacity of (38x2)=76m/hr at a pressure of 7.24mPa each. if the two working feedwater pumps will be damaged simultaneously the 3rd pump(standby) cannot cope-up the capacity of 65t/hr of steam in order to maintain the 15mw output. Its better to putv-up two (2) units w/ capacity of 76m/hr and 7.24mPa each.

CNEECMTD 4.133x55% CNEEC's design complies with relevant codes. Besides, item 4.13 of MTD requires motor pumps of 3x55%

28 Flow Diagram of Fuel Oil System 29 Flow Diagram of Closed Cycle Cooling 30 Flow Diagram of Circulating Cooling

F253C-J04 F253C-J05 F253C-J06 Air compressor to increase cap to 26Nm/min. 1-work; 1-standby; 1 diesel 2111 MTD 2-work & 1-standby is safer than 1-work & 1-standby. MTD didn't require the diesel air compressor.

31 Compressed Air System Diagram

F253C-J07

32 33 34 35 36 37 38 39 6 Chemical

Layout of 0m in Main Building Layout of Operation Floor in Main Building Layout of Each floor in Main Building Section Layout of Main building Layout of Air Compressor Room Layout of Oil Tank Area Section Drawing of Circulating Cooling Painting specification

F253C-J08 F253C-J09 F253C-J10 F253C-J11 F253C-J12 F253C-J13 F253C-J14 F253C-J15

40

Chemical Water Treatment System Design Description

F253C-H01

Pre treatment such as floucculation & sedimentation, clarification, multi-media filter, active carbon filter, & RO systems are okay. But the mixed bed is already obsolete process. This is similar to the process used in our old water treatment plant, although it is twin bed. but bothn use hazardous chemical such as caustic soda and hydrochloric acid in the regeneration process, which are very difficult to handle because they have corrosive properties and can affect surrounding structures if not handled properly. then there is a need to construct a neutralization pit which is also an additional water treatment facility(for waste water) There is a latest technology called Electronic De-Ionization System (EDI) which utilizes electric current as regeneration medium without the need of hazardous chemicals such as hydrochloric acid and caustic soda. This is very convenient to use especially in big power plants because there is no need for neutralization pit. this unit is now used by Semirara Power Plant.

The contract requires mixed bed.

D. M. CONSUNJI, INC. PROJECT 15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECT BASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

40

Chemical Water Treatment System Design Description


DOCUMENT TITLE

F253C-H01
DOCUMENT NUMBER SMC COMMENTS SMC EXPLANATION COMMENT TYPE RESPONSE OF CNEEC REMARKS

ITEM BASIC DESIGN DOCUMENTS

Amonia is not recommended in the boiler system because in the the presence of oxygen, it can attack copper alloys. Besides, it is also considered as hazardous chemical. The oxygen scavenger and corrosion inhibitor currently recommended for boiler system is DEHA (Di-Ethyl-Hydroxyl-Amine). This is less hazardous and non carcinogenic. pH ajuster and oxygen scavenger are the same. No need to use amonia dosing if we use DEHA as oxygen scavenger. 41 42 43 44 45 46 47 48 49 50 51 52 7 Equipment List of Boiler Make-up Water Flow Diagram of Boiler Make-up Water Flow Diagram of Boiler Make-up Water Flow Diagram of Regeneration System for Layout of Chemical Water Treatment Room Flow Diagram of Water and Steam Flow Diagram of Chemical Dosing System Flow Diagram of Chlorination System Layout of Equipment in Water & Steam Layout of Equipment in Chemical Dosing Layout of Equipment in Chlorination System Flow Diagram of CW Scale Inhibitor F253C-H02 F253C-H03 F253C-H04 F253C-H05 F253C-H06 F253C-H07 F253C-H08 F253C-H09 F253C-H10 F253C-H11 F253C-H12 F253C-H13 F253C-D01

PH DMCIZI-CHEM 1240 The contract requires to set ammonia dosing device and hydrazine dosing device. The ammonia dosing device is used for adjusting the pH of boiler's feed water not for remove O2.

Electrical 53 Electrical System Design Description

CNEEC should provide 34.5KV panel for standby start-up and 20MVA transformer.we have only one spare switchgear in our 34.5KV switchgear#1. in the MTD "Main Equipment List page 18/26, 3.1.10, CNEEC will provide 2 pieces 34.5KV panel and its in their scope of work.

54 Key Electrical Single Line Diagram

F253C-D02

55 Short-Circuit Current Calculation Sheet 56 57 Auxiliary Power Single Line Diagram Layout of Auxiiliary Switchgear in Main

F253C-D03 F253C-D04 F253C-D05

CNEEC should clarify if LV aux. and startup/standby transformer are rated 3150KVA or 2500KVA. in MTD"Main Equipment list" page 14/26 & 15/26 and in Basic Design "Electrical Part" page 8, the ratings are 2500KVA respectively while in Drawings F175-D01 at MTD and F253C-D02, the ratings are 31500KVA respectiively CNEEC should provide a 13.8KV switchgear and synchronizing panel for switching, isolation and synchronizing 15MW Generator, 20MVA transformer and auxilliary transformer. Synchronizing Panel of the 34.5KV switchgear #1 is very far from the control room of the 15MW generator. When tere is fault or damaged on auxilliary transformer then can be isolated from the system. CNEEC should provide Automatic Transfer Switchb (ATS) for supplying Power to 380V control MCC for DC & UPS system. in order not to overload the 200kw, 380V Diesel Engine Generator set. No need for synchronization.

This 34.5KV switchgear's design is out of CNEEC's scope. According to MTD equipment list, CNEEC can supply 2 pieces 34.5KV switchgears but the specific parameters and dimension need the owner to provide.And the owner will be responsible for layout, connecting and rehabilitation of original switchgear. Besides after site inspection, we found there were no space for these two in the 34.5KV distribution room. The final capacity will be determined during construction stage.

Accepted. And the Synchronizing function will be done by fast change-over device

It will reflect during construction design stage.

D. M. CONSUNJI, INC. PROJECT 15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECT BASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM BASIC DESIGN DOCUMENTS

DOCUMENT TITLE

DOCUMENT NUMBER

SMC COMMENTS

SMC EXPLANATION

COMMENT TYPE

RESPONSE OF CNEEC

REMARKS

58 59 60 61 62 63

General Layout of Electrical Facilities Layout of Generator Outgoing Cell and Outgoing Line Layout of Switchgear in Coal Handling House Layout of Switchgear in Water Treatment Layout of Switchgear in Ash Handling Generator-Transformer Protection Schematic

F253C-D06 F253C-D07 F253C-D08 F253C-D09 F253C-D10 F253C-D11 CNEEC should provide differential relay for Generator and Transformer separately. Generator and Transformer Differential relay are used to detect internal faults of the Generator and transformer respectively. CNEEC should provide a 13.8KV switchgear and synchronizing panel for switching, isolation and synchronizing 15MW Generator, 20MVA transformer and auxilliary transformer.Synchronizing Panel of the 34.5KV switchgear #1 is very far from the control room of the 15MW generator. When tere is fault or damaged on auxilliary transformer then can be isolated from the system.

The circuit break between generator and main transformer works only as isolation function. Generator and main transformer will be protected as a generator-transformer unit.

64

Synchronization Voltage Diagram for Generator

F253C-D12

Accepted. And the Synchronizing function will be done by fast change-over device

65 66 67 68 69 70 71 72 8 I&C 73

DC System Schematic UPS System Schematic Central Control Room and Electronic Layout of Battery Room in Main Building Layout of Control Room in Coal Handling Plan Drawing of Cable Routing in the Plan Drawing of Cable Routing in the Plant Start-Up/Stand-By Transformer Protection

F253C-D13 F253C-D14 F253C-D15 F253C-D16 F253C-D17 F253C-D18 F253C-D19 F253C-D20

Exhaust fan should be provided for the battery room. Batteries will emit acidic fumes and will corrode panel parts. Battery room should be provided with exhaust fan

Ventilation has been considered, please see F253C-N03.

I&C Design Description

F253C-K01

74 Central Control Room And Electronic F253C-K02 75 Configuration Diagram of Control System F253C-K03 76 Boiler Combustion System P&I Diagram F253C-K04 77 Boiler Steam & Water system P&I F253C-K05 78 Boiler Fuel Oil system P&I Diagram F253C-K06 79 Limestone System P&I Diagram F253C-K07 80 Turbine Steam & Water System P&I F253C-K08 81 Turbine Lube System and Turbine Proper F253C-K09 82 Feed Water System P&I Diagram F253C-K10 83 Closed Cycle Cooling Water System P&I F253C-K11 84 Water Supply System P&I Diagram F253C-K12 85 Circulation Cooling Water System P & I F253C-K13 86 Sewage Water Treatment System P&I F253C-K14 87 Compress Air System P&I Diagram F253C-K15 88 Fly Ash Handling System P&I Diagram F253C-K16 89 Bottom Ash Handling System P&I F253C-K17 90 Boiler Make-up Water Treatment System F253C-K18 91 Boiler Make-up Water Treatment Dosing F253C-K19 92 Regenaration System for Boiler Make-up Water Treatment P&I Diagram F253C-K20 93 Water and Steam Sampling System P&I F253C-K21 94 Cable Routing Drawing in Main Building F253C-K22 95 Water Treatment Control Room Lay-out F253C-K23 96 Ash Handling Control Room Lay-out Drawing F253C-K24 97 DCS I/O List F253C-K25 Architecture and Structure 98 Architecture and Structure Design F253C-T01 99 0.000 M Plan of TG Building F253C-T02

There are no 220VDC in the DC System.The source from battery is only 52 cells of GFM-400 batteries, as specified in DC System Schematic (F253C-D13)

110V The direct current system is 110V and the specification has been modified.

D. M. CONSUNJI, INC. PROJECT 15 MW SEMIRARA CFB POWER PLANT PROJECT SUBJECT BASIC DESIGN DOCUMENT LIST AND REVIEW COMMENTS DATE #

ITEM BASIC DESIGN DOCUMENTS

DOCUMENT TITLE

DOCUMENT NUMBER

SMC COMMENTS

SMC EXPLANATION

COMMENT TYPE

RESPONSE OF CNEEC

REMARKS

100 101 102 103 104 105 106 107 108 109 110 111

7.000 M Plan Drawing of TG Building 4.000 M,13.000M, 23.000M Plan of TG Section 1-1 of TG Building Elevation View for Steam Side Of TG Building Elevation View for Fixed Side Of TG Building Plan Drawing of Underground Facilities of Plan Drawing of Fly Ash Handling System Plan Drawing of Chemical Water Section and Elevation of Chemical Water Plan Drawing of Auxiliary Chemical Layout of Coal Handling Building Plan Drawing of Diesel Generator House

F253C-T03 F253C-T04 F253C-T05 F253C-T06 F253C-T07 F253C-T08 F253C-T09 F253C-T10 F253C-T11 F253C-T12 F253C-T13 F253C-T14 F253C-N01 F253C-N02 F253C-N03 F253C-N04 F253C-N05 F253C-S01 F253C-S02 F253C-S03 F253C-S04 F253C-S05 F253C-S06 F253C-S07

10 Ventilation and Air Conditioning 112 Ventilation and Air Conditioning Design 113 Section Drawing of Ventilation in Main 114 Plan Drawing of Ventilation and Air 115 Layout of Dust Collection at Coal Bunker 116 Layout of Ventilation and Air Conditioning 11 Hydraulic 117 Hydraulic Part Design Description 118 General Layout of Hydraulic Architectural 119 Flow Diagram of Water Supply System 120 Water Balance Drawing 121 Layout of Seawater Direct Flow Supply 122 Flow Diagram of Coal Water Treatment 123 Flow Diagram of Oily Water Treatment

12 Firefighting 124 Firefighting Design Description F253C-X01 125 Flow Diagram of the Main Building Fire F253C-X02 126 General Layout of Firefighting Facilities in the Plant F253C-X03