This document is tecnimont's property,and cannot be used by others for ony purpose, without prior written consent GENERAL EXCAVATION (m 3) (Code M02A) LIMITED SECTION EXCAVATION (m 3) (Code M02B) ELEVATED CONCRETE CONCRETE u 0 FOUNDATION tO I I PTS I NGE .,.._ ..1:: ......... :a I I I I I I I I I I I l ol x l LEAN CONCRETE "' --"' l!f!:'l General excavation (Paving sub-bose) - Section excavation VEl =o1xb1xh1 ... .... ... "'"'Z .., ...
l a2 x b2 l I( a x b VGE=axbxh VE2=o2xb2xh2 VE3=o3xb3xh3
Ill = C".. ..1:: I I I I I I I I I I
I( PSG '\7 ,.,., = LEAN CONCRETE 0 < .. F II c n m :a , - a
I 0 a
o< "Til
mo
en" cen ::tl m
m z -i "'D"'DI--1 ==""
c.o 1 z: en o ...:.. 9:0 0
N m "0 " U! " 0 c: c: c:"
uc "0 "' c: 0 0 ,:..c -ea. "- a., 0 0 Ci. _rn "i Co; 0 Ul .Ui c: () " l!!a. ,., Ul c: - 0 "" c "0 "N "0 N
0 "0 a.:; c: 0 g
o e E a. c. 0 () N " c: .... ., Ul i3 - t:! 0" ;;- co 0."0 0 0 "-u 0 " E .B c: c: " "() Eo " () c: 0 - Uo 00 - N Ul N G>:.= ::J:,J 0:> TM 930.1/04E CIVIL WORKS METHODS OF MEASUREMENT 41 F 62 CIVIL DEPT. PTS/NGE GENERAL EXCAVATION (m 3 ) (Code M02A) r----, I I I I I I r-.....J L---, I I L---""'7'-----J a x b r--, I I I I I I I I L------...J OS ANNEX 3 The excavation volume VE , is to be calculated as follows, regardless of the actual volume of the excavation executed: The volume of the concrete items and other obstacles ore not to be deducted from the V[. Where: "a" and "b" ore the dimensions shown in the drawings issued for construction and "h" is the required excavation CIVIL WORKS METHODS OF MEASUREMENT TM 930.1/04E PAGE 42 dQ1F 62 Pagina CIVIL DEPT. DS " .0 0 c c c "' o:::: u c "0 ;o c 0 0 >.,'C t"-
"-:o 0 0
fl) '3: Cui 0" g_ c u :0 .!"- >- ., c - 0 -2.00m
c .s:::::. "0 -4.00m
0 ., :.C>. >-.0
"'0
"
:0 0 a_:; c 0 g Q):g
0 E a_ co UN " c >- " ., :.0 - t:'
" co O."Q 0 5..g 0 " E Be c :0 "' u Eo :0 u c 0 - "B 0 0 N U> N Q):,.=
0:> ANNEX 4 LIMITED SECTION EXCAVATION (m 3 ) (Code AA02B) DIRECT FOUNDATION WITH SUB-BASE IMPROVMENT PTS/NGE/PSG l l ELEV. OF BOTTOM OF EXCAVATION a x b 'r The excavation volume of each individual foundation, is to be calculated as follows, in according to pertinent codes, regardless of the actual volume of the excavation executed: A = ax b VE1=Axhl (Code up to 2.00m) (Code from 2.01m to 4.00m) V[3=Axh3 (Code above 4.00m) where: A= surface area of the bottom of foundation excavation according to the dimensions shown in the drawings issued for construction h= excavation depth between PTS/NGL/PSG and bottom of excavation elevation shown in the drawings issued for construction EXAMPLE: Foundation with dimensions 4.00mx3.00m and h= 4.50m V 1 = ( 4.00x3.00)x2.00 = 24.00m 3 ( with code up to 2.00m) V 2 = ( 4.00x3.00)x2.00 = 24.00m 3 ( with code from 2.01 m to 4.00m) V 1 = (4.00x3.00)x0.50 = 6.0Qm3 ( with code about 4.00m) c ~ " 0 E- " ., g Q; -o:S 0 f/1 'E.>. 1--" CIVIL WORKS METHODS OF MEASUREMENT TM 930.1 /04E PAGE 43 Od.IF 62 Pagina CIVIL DEPT. DS LIMITED SECTION EXCAVATION (Code AA028) EXCAVATION FOR SINGLE FOUNDATION .s:::. BOTTOM ELEVATION OF LEAN CONCRETE LEAN CONCRETE a I b L The excavation volume VE of each individual foundation, is to be calculated as follows, regardless of the actual volume. of the excavation executed: A = a X b VE=Axh D a A = Surface area of the foundation according to the dimensions shown in the drawings issued for construction h = Excavation depth between PTS/NGL/PSG and leon concrete bottom elevation shown in the drawings issued for construction ., .0 0 c: c: c:.,
...... CIVIL WORKS METHODS OF MEASUREMENT TM 930 .1/04E PAGE 44 Od.,F 62 Pagina CIVIL DEPT. OS ANNEX 6 EXCAVATION OF UNDERGROUND PIPING SYSTEM - SEWERS (m 3 ) (Code AA02B) "' ..r:::; I .F I ..r:::; Underground piping consist of all in-line materials as: pipes, fitting, valves, in-line instruments, special parts, ecc. 0 1 -0 1 a -0 1 b =Elevation of ground (NGE/PTS) -BOE 2 -BOE 3 =Eievation of bottom excavation according to the drawings issued for construction DN =Nominal pipe diameter -h 2 = Excavation height I =Distance between two pipes of the bundles of pipes according to the construction drawings K =Value (in em) to be added to the nominal diameter (DN) of pipes in order to evaluate the excavation width, regardless of the actual execution DN 35 em DN :> 35 em to 60 em DN :> 60 em to 150 em DN :> 150 em value of K = 35 em value of K = 40 em value of K = 45 em value of K = 60 em L 1 -L 2 etc.= Distance between two sections (A to Al - Al to A2 etc.) measured on the axis where is changing the steady gradient of the ground 0 BOE 1 -BO 2 -BOE 3 "V 0000 K l ON l1 l ON l1 l ON l1 l ON lK "' "' "' "' "' "' "' "' Wl The excavation volume V E is determined as follows: V E= A x L + A 1 x L 1 etc. Where: A = W or w 1 x h h = 0 1 - BOE 1 A 1 = W or w 1 x h 1 = 0 10 - BOE 2 etc.