Professional Documents
Culture Documents
AGENDA
Regional Signicance
Energy Corridor Land Use and Demographics
Energy Corridor Growth
Energy Corridor Land Deals
Energy Corridor Trafc Solutions
West Houston Community Vision
ACRP discussion on what's going on
Regional
Signicance
TheWoodlands
FM 1960
IAH
Greenspoint
The Energy Corridor
Brookhollow
Uptown
CBD
Hobby
Sugar Land
Clear Lake
Male 87,347
Female 90,279
Avg. age 35 years old
Avg. household income - $89,694
70% married households
40% household with children
7% Associates degree
31% Bachelors degree
10% Masters degree
18.9
0.6
Class C
4.1
Class B
Class A
14.2
75% of existing Ofce square footage is Class A
Over 3 million square feet is under construction or proposed
22.1
3.1
0.2
Planned
18.9
Under Construction
Existing
2012
2012
20.3
2.6
2.4
2.9
3.5
Office/Mixed Use
Industrial/ Warehouse
Retail
2012
2030
6,986
986
1,186
1,834
1,808
2012
2030
78,206
21,025
25,441
Population
Employment
2012
2030
Key Findings
Key Findings
TMC West
Park 10
State Hwy 6
IH 10 Corridor
Memorial Drive
Eldridge Parkway
Enclave Parkway
Ashford Place
Woodbranch
Trammell Crow
BP Communica'ons Center
Lincoln Properties
240,000 square feet
Transwestern
350,000 square feet
Eldridge at Enclave
On Buffalo Bayou Terry Hershey Park
Energy Tower 3
Woodbranch 1 and 2
*On an interstate highway the minimum clearance is 19 feet. This would also work for the light rail vehicles as the current METRO red line requires 17 feet. Commuter rail requires 262 as shown in the diagram, however the clearance of Highway 6 over I 10 is only 172. If the bridge was lowered to a 192 clearance then the approach ramps could be 1752 shorter, however both Big Room Road and Berstein Perwien Street underpasses would have to be further lowered. The steel beams would be approximately 5 feet thick. For the ramps, 4% grades would be the maximum.
Elevation
I 10 Eastbound
I 10 Westbound
Plaza
Plan
~ 5752 @ 4% slope
Feeder
Feeder
~ 5752 @ 4% slope
SOV 80%
Reserve
Access
Drive
Connect
With
Us