You are on page 1of 4

PROJECT CHARTER Design and fabrication of fully autonomous stair climbing robot with precise object manipulation from

different altitude in a multi-robot environment


A robotics project submitted to Dr Ali Ahsan

Written by: Umer Farooq (E08-116 A) Date: 22nd November 2011 Presented by: Centre for Advanced Studies in Engineering

1. PROJECT CHARTER PURPOSE


The project charter defines the scope, objectives, and overall approach for the work to be completed. It is a critical element for initiating, planning, executing, controlling, and assessing the project. It should be the single point of reference on the project for project goals and objectives, scope, organization, estimates, work plan, and budget. In addition, it serves as a contract between the Project Team and the Project Sponsors, stating what will be delivered according to the budget, time constraints, risks, resources, and standards agreed upon for the project.

2. PROJECT OVERVIEW
Development of a stair climbing robot with object manipulation capabilities will be a great tool to be used in places where pick and place is very common. The robot will have the capability to pick objects from different altitudes and place them at some other altitudes. The object climbing capability allows climbing up stairs or small obstacles in the path. However, the project is aimed for participation in ABU ROBOCON 2012 which will hold in HongKong next year. The robot has to communicate with other robots as well. In the theme, this robot will climb up a stair, pick up buns placed at different altitudes and place them in the basket present at a different altitude. So this competition provides a much better learning experience and much better testing platform.

3. GOALS AND OBJECTIVES


Goals Objectives The project will provide improved Develop a system for climbing up the stairs and precise object manipulation. by January 2012.
The project aims for improved and Develop object manipulation capabilities in fast stair climbing capability. the structure by February 2012. The project will provide multi Develop a tuned Velocity controller robot communication in a multi algorithm by February 2012. robot environment. Develop a precise algorithm for pick and The project will provide us an place of objects by March 2012. opportunity to participate in ABU ROBOCON 2012 Complete all the tasks by March 2012

4. ACTIVITIES AND DURATION

Activity Research Phase

Comments Design of the mechanical structure, selecting and experimenting with the electronic products and selecting the best approach st Manufacturing of 1 January 2012 to Design of the mechanical structure takes Mechanical Structure 28th February 2012 time. Hence almost 50 days are required for completion of the complete robot structure Testing And iteration 20th February to 2nd This is the largest phase of the project. It week of May 2012 not only involves testing but also achieving the required tasks. This phase passes through lots of iteration in the robotic design and hence it enters the manufacturing phase again. This process is repeated throughout.

Date 30th November 2011 to 30th December 2011

5. Project Team

Name
Mr. Mansoor Shaukat

Designation
Assistant Professor/ Director CRG

Duty Assigned
Project Manager/Supervisor Team Leader of the student body / Programming of the Software Hardware and Electronics

Umer Farooq Sajid Abbas Ayaz Ahmad Raja Jawad Ali

President CRG General Secretary CRG

Student/ Member CRG Programming of the Software Student/Member CRG Hardware and Electronics

The Project Manager, Mr. Mansoor Shaukat is hereby authorized to interface with management as required, negotiate for resources, delegate responsibilities within the framework of the project, and to communicate with all contractors and management, as required, to ensure successful and timely completion of the project. The Project Manager is responsible for developing the project plan, monitoring the schedule, cost, and scope of the project during implementation, and maintaining control over the project by measuring performance and taking corrective action.

6. Project Plan
A completed project plan will be developed and submitted to the Project Sponsor for approval by 5th December 2011. Upon approval of the project plan resources will be assigned to the project and work will commence within 5 days. Once the project commences, work on the project will be performed according to the schedule provided in the approved project plan. The Project Manager will obtain approval from the Project Sponsor for any schedule changes which impact the project completion milestone.

7. APPROVALS
Prepared by __________________________________
Project Manager

Approved by __________________________________
Project Sponsor

__________________________________
Executive Sponsor

__________________________________
Client Sponsor