You are on page 1of 52

GOVERNMENT

OF

MAHARASHTRA

P.W. CIRCLE , GADCHIROLI


P.W. DIVISION NO. 1, GADCHIROLI

UNDER I.A.P. BUDGET 12 -13

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part


1 Km 0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

Estimated Cost Rs.

1500000.00

ESTIMATE
DIVISION

SUB-DIVISION

PUBLIC WORKS DIVISION NO.I ,


GADCHIROLI
PUBLIC WORKS SUB-DIVISION NO.1,
GADCHIROLI

SANCTIONED ESTIMATE NO:


FUND HEAD

MAJOR HEAD

MINOR HEAD

SERVICE HEAD

DEPARTMENTAL HEAD

Estimate is framed in the office of the Executive Engineer, Public Works Division
No. I , Gadchiroli for the probable expenses that will be incurred on
Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in
Gadchiroli Taluka & Dist. Gadchiroli.
AMOUNT: Rs.

1500000.00

Administrative Approval under No.:

Date:

Technically Sanctioned under No.:

Date:

Estimate Prepared by:

S. G. Allewar (A.E.II)

Estimate checked by:


General Description
Attached Seperatly

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

GENERAL REPORT
Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in
Gadchiroli Taluka & Dist. Gadchiroli.
Amount of Estimate:Authority :-

Rs.

1500000.00

This work is proposed in IAP budget Progrmme 2012-13 for Rs. 15.00 Lakhs.
vide letter of Shri. Marotrao S. Kowase, M.P. Gadchiroli - Chimur no.
M.P.L.A.D. / G.D. / 1558/2012/ Dt. 21/04/12

Introduction & necessity:-

Nagari village is situated on S.H. - 275 i.e. Bejorpalli Parsewada


Aheri Chamroshi Gadchiroli Armori Wadsa Balagath Road about 1.20 Km
away. The existing earthen road is constructed under E.G.S. but no metelling of
this road in constructed in any programme. Mohazai village is situated on R/S
of S.H. - 275. Due to existing earthen road the people of Nagari Village found it
very difficult to go agriculture field & main road during rainy season.
Also there are agriculture field on both side of road, due to
construction of this road the farmers also get facility for transporting of
agriculture goods during rainy season and the road will be all weather.
Hence this estimate is framed.
Provisions:-

1
2
3
4
5

In order to gain above objectives following provisions are made in estimate;


For Road Work
Excavation of Catch water drain with its utilisation.
Providing Eartwork in embankment required as per standard cross section.
Blanketing as an admixture of Soft Murum & Sand 50 % respectively for full width.
80 mm metalling in 1 coat 200 mm loose of 3.30 mt. width.
40 mm metalling in 1 coats 100 mm loose of 3.00 mt. width.

1
2
3
4
5

Construction of Conc. Dhaba Drain at location of crossing. 2 Nos.


Rubble soling below face wall .
C.Conc. 1:4:8, 0.10 m thik below Bottom slab.
C.Conc. In M-15, 0.10 m thick.
Face wall in M-15
RCC slab in M-20 C. Conc.

Rate & Specifications:The rates are adopted as per current CSR 2012-2013 w.e.f. 01-09-2011. The standard
specifications of Govt. of Maharashtra will be followed for execution of these items.

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

GENERAL ABSTARCT

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1


Km 0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

1 Work Cost

Rs.

1499746.00

Rs.

1499746.00

Total Rs.

1499746.00

Say Rs.

1500000.00

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in
Gadchiroli Taluka & Dist. Gadchiroli.
ABSTRACT SHEET
Sr.
No.

Item of Work

Quantity

Rate
in Rs.

Unit

Amount
in Rs.

356.00

105.50

Cum.

37558.00

356.00

12.00

Cum.

4272.00

1280.44

155.85

Cum. 199557.00

385.04

695.75

Cum. 267892.00

175.02

723.35

Cum. 126601.00

738.73

456.85

Cum. 337489.00

694.98

455.95

Cum. 316876.00

a) Road Work
1 Excavation for catch / side water gutter in all sort of soils, soft
murum etc. to the specified section including stacking the
excavated stuff in regular bund and disposing off unsuitable or
excess stuff upto a lead of 50 m and spreading as directed
Engineer-in-charge.
(C.S.R. It No 13 / Page No. 224 )
2 Laying, watering and compacting the embankment formed of
materials obtained from the road cutting, breaking clods,
dressing to 3% camber design superelevation curve &
prescribed section for embankment within a lead of 50 m, after
laying them in layers of 20cm to 30cm. with static roller etc.
complete.
(C.S.R. It No ( 27 - 28 ) /Page No. 227 )
3 Providing earthwork in embankment with approved materials
obtained from departmental land or other sources including all
lifts, laying in layers of 20 cm. to 30 cm. thickness breaking
clods, dressing to the required lines, curves, grade and
section, watering and compacting with power roller complete. (
Including Royalty Charges )
(C.S.R. It No 27 Page No. 227 )
4 Supplying trap /granite /quartzite / gneiss stone metal of
required size by bringing the boulders at the road side
breaking them to required gradation including conveying the
boulders and stacking the broken metal etc. complete. (Prior
approval of sample stack of broken metal by the Ex.Engineer
is necessary, the date of approval will form part of the
measurements)
b) By Breaking boulder (Hand broken)
CSR Item No. 31(bi)/228
For 80mm Metal
For 40mm Metal
5 Supplying soft murum at the road side, including conveying
and stacking complete.
CSR Item No. 33/229
6 Supplying sand at the road side, including conveying and
stacking complete.
CSR Item No. 34/229

Sr.
Item of Work
Quantity
No.
7 Spreading gravel/sand/soft murum/ available murum over
rubble soling/ W.B.M. surface blanketing berms etc. complete.

Rate
in Rs.

Unit

Amount
in Rs.

1433.71

16.80

Cum.

24086.00

385.04

27.60

Cum.

10627.00

175.02

24.00

Cum.

4200.00

1925.22

8.40

Sqm.

16172.00

1925.22

13.80

Sqm.

26568.00

1750.20

14.40

Sqm.

25203.00

13 Compacting the hard murum side widths layerwise on each


side with static roller including necessary artificial watering
complete .
CSR Item No. 44/230

5250.60

3.60

Sqm.

18902.00

(b) DHABA DRAINS


14 Excavation for foundation in earth, soils of all types, sand,
gravel soft murum etc. including shoring and strutting as
necessary and disposing off excavated stuff within lead of 100
m as directed etc. complete
Lift upto 1.5 meter
CSR Item No. 1/184

11.09

149.85

Cum.

1662.00

15 Providing rubble filling of trap / granite / quartzite / gneiss


stones in foundation including hand packing filling gravel /
sand in the voids etc. complete.
CSR Item No. 1/216

1.96

672.40

Cum.

1318.00

16 Providing and laying in situ cement concrete of 1:4:8


proportion with trap / granite / quartzite / gneiss metal in
foundation including necessary compacting and curing
complete. (Including plywood/ steel formwork) The C.M. 1:3
plaster is considered for rendering uneven and honeycombed
surface only. Newly laid concrete shall be covered by gunny
bag, plastic, tarpaulin etc. (Wooden centering/formwork will
not be allowed).
CSR Item No. 2/216

1.31

3213.25

Cum.

4209.00

CSR Item No. 37/229


8 Spreading 80 mm metal including sectioning complete.
CSR Item No. 38/229
9 Spreading 40 mm metal including sectioning complete.
CSR Item No. 39/229
10 Compacting the hard murum / kankar of all width (200 mm.
loose) with Static roller including necessary artificial watering
complete.
CSR Item No. 43/230
11 Compacting the sub grade/gravel/ oversize metal (200 mm
loose) layers of all width with static roller including necessary,
labour, materials and artificial watering complete.
CSR Item No. 40/230
12 Compacting the sub grade/gravel/ size metal (100 mm loose)
layers of all width with static roller including necessary, labour,
materials and artificial watering complete.
CSR Item No. 42/230

Sr.
No.

Item of Work

Quantity

Rate
in Rs.

Unit

Amount
in Rs.

4.54

5325.55

Cum.

24178.00

18 Providing and laying in situ M-15 / 1:2:4 cement concrete of


trap / granite / quartzite / gneiss metal for levelling coures
below R.C.C raft and in foundation including necessary
plywood/steel formwork, steel centering, compaction by
vibrating finishing, curing etc. complete. The C.M. 1:3 plaster
is considered for rendering uneven and honeycombed surface
only. Newly laid concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering/formwork will not be
allowed).
CSR Item No. 14/190

1.17

4922.45

Cum.

5759.00

19 Providing and fixing A.C./ UPVC pipes of 100 mm diameter


and of required length for relieving water pressure, stone filter
as directed complete.(For vent holes in raft).
CSR Item No. 16/191

2.23

135.50

Rmt

302.00

20 Providing and casting in situ cement concrete of M-20 grade


of trap / granite /quartzite /gneiss metal for R.C.C slabs and
landings as per detailed design and drawings including steel
centering, plywood /steel formwork, steel props, compaction,
finishing uneven and honeycombed surface with C.M. 1:3 of
sufficient minimum thickness to give a smooth and even
surface or roughening the surface if special finish is to be
provided with fan hook box of 2 mm thick M.S.Sheet
rectangular size 180 mm x 100 mm with required depth, with
holes or notches, as required, bottom and top lids of 1.6 mm
thick M.S.Sheet
CSR Item No. 43/203

2.93

6774.85

Cum

19850.00

MT

26236.00

17 Providing and laying in situ cement concrete of M-15 / 1:2:4


with trap / granite / quartzite / gneiss metal in face wall
including plywood/ steel formwork and steel centering,
compaction by vibrator, finishing uneven and honeycombed
surface with C.M.1:3 of sufficient minimum thickness to give
smooth and even surface, filling joints with bitumen, curing
etc. complete. (Excluding cost of reinforcement.) The C.M. 1:3
plaster is considered for rendering uneven and honeycombed
surface only. Newly laid concrete shall be covered by gunny
bag, plastic, tarpaulin etc. (Wooden centering/formwork will
not be allowed).
CSR Item No. 3/216

21 Providing and cutting, bending, hooking, laying, in position and


tying bar reinforcement as per detailed drawing for R.C.C.
works etc. complete.
CSR Item No. 35/200

0.411 63834.20

Sr.
Item of Work
Quantity
No.
22 Providing selected murum (having PI < 6 ) filling including
laying in layers of 15 cm to 20 cm watering and compacting
etc. complete.
CSR Item No. 10/219

0.65

Rate
in Rs.

Unit

Amount
in Rs.

353.05

Cum.

229.00

Total

Rs.

1499746.00

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

MEASUREMENT SHEET
Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in
Gadchiroli Taluka & Dist. Gadchiroli.
Sr.

Item of Work

Nos.

L.

B.

D.

Quantity

Unit

No.
a) Road Work
1 Excavation for catch / side water gutter in all sort of soils, soft murum etc. to the specified section

including stacking the excavated stuff in regular bund and disposing off unsuitable or excess stuff upto
a lead of 50 m and spreading as directed Engineer-in-charge.
(C.S.R. It No 13 / Page No. 224 )

75% of Total Length

439.50

0.90

0.45

356.00
356.00

Cum.

2 Laying, watering and compacting the embankment formed of materials obtained from the road cutting,

breaking clods, dressing to 3% camber design superelevation curve & prescribed section for
embankment within a lead of 50 m, after laying them in layers of 20cm to 30cm. with static roller etc.
complete.
(C.S.R. It No ( 27 - 28 ) /Page No. 227 )

As per Quantity of item no. 3

356.00
356.00

Cum.

3 Providing earthwork in embankment with approved materials obtained from departmental land or other

sources including all lifts, laying in layers of 20 cm. to 30 cm. thickness breaking clods, dressing to the
required lines, curves, grade and section, watering and compacting with power roller complete. (
Including Royalty Charges )
(C.S.R. It No 27 Page No. 227 )
As per Std X- Section
Deduct As per existing X- Section
Less Qty obtained from Drain

1
1

583.40 (9.0+10.80)/2 0.45


583.40 (5.0+6.00)/2 0.30

2599.05 Cum.
-962.61
-356.00
1280.44 Cum.

Nett Qty.

4 Supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the
road side breaking them to required gradation including conveying the boulders and stacking the
broken metal etc. complete. (Prior approval of sample stack of broken metal by the Ex.Engineer is
necessary, the date of approval will form part of the measurements)
b) By Breaking boulder (Hand broken)
CSR Item No. 31(bi)/228
80mm Metal
583.40
1
583.40
3.30
0.20 385.04 Cum.

CSR Item No. 31(bii)/228


40mm Metal

583.40

3.00

Total

385.04

Cum.

0.10

175.02

Cum.

Total

175.02

Cum.

Sr.

Item of Work

Nos.

L.

B.

D.

Quantity

Unit

192.52
280.03
135.64
72.200
58.340
738.73

Cum.
Cum.
Cum.
Cum.
Cum.
Cum.

192.52
280.03
135.64
72.200
14.590
694.98

Cum.
Cum.
Cum.
Cum.
Cum.
Cum.

No.
5 Supplying soft murum at the road side, including conveying and stacking complete.
CSR Item No. 33/229
Murum Blanketing for Formation of Road
3.30 3.30
For Blanketing
3.30
3.30
1X1/2
For filling side of 80mm
2.55
2.25
2X1/2
For side berms
2.40
2.25
2X1/2
Murum for 80mm
(1/2)X (3/8)
385.04 Cum.
Murum for 40mm
(1/3)
175.02 Cum.

583.40
3.30
0.20
583.40 (2.55+2.25)/2 0.20
583.40 (2.40+2.25)/2 0.10

Total
6 Supplying sand at the road side, including conveying and stacking complete.
CSR Item No. 34/229
For Blanketing
3.30
For filling side of 80mm
2.55
For side berm
2.40
Murum for 80mm (1/2)X (3/8)
385.04
Murum for 40mm
(1/12)
175.02

3.30
2.25
2.25
Cum.
Cum.

1X1/2
2X1/2
2X1/2

583.40
3.30
0.20
583.40 (2.55+2.25)/2 0.20
583.40 (2.40+2.25)/2 0.10

Total

7 Spreading gravel/sand/soft murum/ available murum over rubble soling/ W.B.M. surface blanketing
berms etc. complete.
CSR Item No. 37/229
Quantity vide Item No. 3
Quantity vide Item No. 4
Total Qty.

738.73 Cum.
694.98 Cum.
1433.71 Cum.

8 Spreading 80 mm metal including sectioning complete.


CSR Item No. 38/229
Quantity vide Item No. 2

385.04 Cum.

9 Spreading 40 mm metal including sectioning complete.


CSR Item No. 39/229
Quantity vide Item No. 2

175.02 Cum.

10 Compacting the hard murum / kankar of all width (200 mm. loose) with Static roller including necessary
artificial watering complete.
CSR Item No. 43/230
Compaction of Murum Formation layer

583.40

583.40

3.30

--1925.22 Sqm.
Total 1925.22 Sqm.

11 Compacting the sub grade/gravel/ oversize metal (200 mm loose) layers of all width with static roller
including necessary, labour, materials and artificial watering complete.
CSR Item No. 40/230
80mm Metal

583.40

583.40

3.30

--1925.22 Sqm.
Total 1925.22 Sqm.

12 Compacting the sub grade/gravel/ size metal (100 mm loose) layers of all width with static roller
including necessary, labour, materials and artificial watering complete.
CSR Item No. 42/230
40mm Metal

583.40

583.40

3.00

--1750.20 Sqm.
Total 1750.20 Sqm.

Sr.

Item of Work

Nos.

L.

B.

D.

Quantity

Unit

No.
13 Compacting the hard murum side widths layerwise on each side with static roller including necessary
artificial watering complete .
CSR Item No. 44/230
For filling side of 80mm
2
583.40
2.25
--2625.30 Sqm.
For side berm
2
583.40
2.25
--2625.30 Sqm.
Total 5250.60 Sqm.

(b) DHABA DRAINS


14 Excavation for foundation in earth, soils of all types, sand, gravel soft murum etc. including
shoring and strutting as necessary and disposing off excavated stuff within lead of 100 m as directed
etc. complete
Lift upto 1.5 meter
CSR Item No. 1/184
For Dhaba Drain
1
9.00
1.45
0.85
11.09 Cum.
Total
11.09 Cum.
15 Providing rubble filling of trap / granite / quartzite / gneiss stones in foundation including hand packing
filling gravel / sand in the voids etc. complete.
CSR Item No. 1/216
1

For Dhaba Drain

9.00

1.45

0.15

1.96

Cum.

Total

1.96

Cum.

16 Providing and laying in situ cement concrete of 1:4:8 proportion with trap / granite / quartzite / gneiss
metal in foundation including necessary compacting and curing complete. (Including plywood/ steel
formwork) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only.
Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork
will not be allowed).
CSR Item No. 2/216
1

For Dhaba Drain

9.00

1.45

0.10

1.31

Cum.

Total

1.31

Cum.

17 Providing and laying in situ cement concrete of M-15 / 1:2:4 with trap / granite / quartzite / gneiss metal
in face wall including plywood/ steel formwork and steel centering, compaction by vibrator, finishing
uneven and honeycombed surface with C.M.1:3 of sufficient minimum thickness to give smooth and
even surface, filling joints with bitumen, curing etc. complete. (Excluding cost of reinforcement.) The
C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid
concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be
allowed).
CSR Item No. 3/216
For Dhaba Drain

Inscribing Pillars

(0.20+0.35)/2

2
4

1
1

9.00
0.25

0.28
0.25

0.90
0.30

4.46
0.08

Cum.

Total

4.54

Cum.

Sr.

Item of Work

Nos.

L.

B.

D.

Quantity

Unit

No.
18 Providing and laying in situ M-15 / 1:2:4 cement concrete of trap / granite / quartzite / gneiss metal for
levelling coures below R.C.C raft and in foundation including necessary plywood/steel formwork, steel
centering, compaction by vibrating finishing, curing etc. complete. The C.M. 1:3 plaster is considered
for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny
bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed).
CSR Item No. 14/190
1

For Dhaba Drain

9.00

1.30

0.10

1.17

Cum.

Total

1.17

Cum.

19 Providing and fixing A.C./ UPVC pipes of 100 mm diameter and of required length for relieving water
pressure, stone filter as directed complete.(For vent holes in raft).
CSR Item No. 16/191
2

9.00

0.90
2

0.28

TOTAL QTY.

2.23

Rmt

2.23

Rmt

20 Providing and casting in situ cement concrete of M-20 grade of trap / granite /quartzite /gneiss metal
for R.C.C slabs and landings as per detailed design and drawings including steel centering, plywood
/steel formwork, steel props, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of
sufficient minimum thickness to give a smooth and even surface or roughening the surface if special
finish is to be provided with fan hook box of 2 mm thick M.S.Sheet rectangular size 180 mm x 100 mm
with required depth, with holes or notches, as required, bottom and top lids of 1.6 mm thick M.S.Sheet
CSR Item No. 43/203
Slab over Drain

9.00

1.30

0.25

2.93

Cum

Total

2.93

Cum

21 Providing and cutting, bending, hooking, laying, in position and tying bar reinforcement as per detailed
drawing for R.C.C. works etc. complete.
CSR Item No. 35/200
For Bottom Slab @ 60 Kg/ Cum
1.17
@
0.060
0.070 MT
For Pier Sur. Reinf. @ 40 Kg/ Cum

4.54

0.030

0.136

For Top Slab @ 70 Kg/ Cum

2.93

0.070

0.205

TOTAL QTY.

0.411

MT

22 Providing selected murum (having PI < 6 ) filling including laying in layers of 15 cm to 20 cm watering
and compacting etc. complete.
CSR Item No. 10/219
Side of Excavation
2
1
9.00
0.08
0.90
0.65
Cum.
Total

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

0.65

Cum.

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in
Gadchiroli Taluka & Dist. Gadchiroli.
RATE ANALYSIS
Sr.
No.
1

Item of Work

Rate/Unit

Excavation for catch / side water gutter in all sort of soils, soft
murum etc. to the specified section including stacking the
excavated stuff in regular bund and disposing off unsuitable or
excess stuff upto a lead of 50 m and spreading as directed
(C.S.R. It No 13 / Page No. 224 )
Deduct 0.50 % for Insurance

Rs.
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Total = Rs.
Say = Rs.
2

Unit

88.00
-0.44
87.56
17.51
0.44
105.51
105.50

/Cum.

10.00
-0.05
9.95
1.99
0.05
11.99
12.00

/Cum.

130.00
-0.65
129.35
25.87
0.65
155.87
155.85

/Cum.

Laying, watering and compacting the embankment formed of


materials obtained from the road cutting, breaking clods, dressing
to 3% camber design superelevation curve & prescribed section
for embankment within a lead of 50 m, after laying them in layers
of 20cm to 30cm. with static roller etc. complete.
(C.S.R. It No ( 27 - 28 ) /Page No. 227 )
Rs.
Deduct 0.50 % for Insurance
Total = Rs.
Add 20 % for Naxal Special Action Plan
Add 0.50 % for Insurance
Total = Rs.
Say = Rs.

Providing earthwork in embankment with approved materials


obtained from departmental land or other sources including all
lifts, laying in layers of 20 cm. to 30 cm. thickness breaking clods,
dressing to the required lines, curves, grade and section, watering
and compacting with power roller complete. ( Including Royalty
Charges
(C.S.R. It)No 27 Page No. 227 )
Rs.
Deduct 0.50 % for Insurance
Total = Rs.
Add 20 % for Naxal Special Action Plan
Add 0.50 % for Insurance
Total = Rs.
Say = Rs.

Supplying trap /granite /quartzite / gneiss stone metal of required


size by bringing the boulders at the road side breaking them to
required gradation including conveying the boulders and stacking
the broken metal etc. complete. (Prior approval of sample stack of
broken metal by the Ex.Engineer is necessary, the date of
approval will form part of the measurements)
b) By Breaking boulder (Hand broken)
CSR Item No. 31(bi)/228

Sr.
No.

Item of Work

Rate/Unit

Rate as per Lead Statement


Deduct for Royalty Charges

For 80mm
1.00 Cum. Rs.

-70.60

Deduct Insurance Charges 0.50 %


Add for Naxal affected Area
Add Insurance Charges 0.50 %
Add for Royalty Charges

20%
1.00 Cum. Rs.

70.60

Unit

Rs.
/Cum. Rs.
Total Rs.
Rs.
Total Rs.
Rs.
Rs.
/Cum. Rs.
Total Rs.
Say
Rs.

592.00
-70.60
521.40
-2.61
518.79
103.76
2.61
70.60
695.76
695.75

/Cum.

Rs.
/Cum. Rs.
Total Rs.
Rs.
Total Rs.
Rs.
Rs.
/Cum. Rs.
Total Rs.
Say
Rs.

615.00
-70.60
544.40
-2.72
541.68
108.34
2.72
70.60
723.34
723.35

/Cum.

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

392.75
-70.60
322.15
-1.61
320.54
64.11
1.61
70.60
456.86
456.85

/Cum.

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

391.98
-70.60
321.38
-1.61
319.77
63.95
1.61
70.60
455.93
455.95

/Cum.

/Cum.

For 40mm
Rate as per Lead Statement
Deduct for Royalty Charges

1.00 Cum. Rs.

-70.60

Deduct Insurance Charges 0.50 %


Add for Naxal affected Area
Add Insurance Charges 0.50 %
Add for Royalty Charges

20%
1.00 Cum. Rs.

70.60

Supplying soft murum at the road side, including conveying and


stacking complete.
CSR Item No. 33/229
Rate as per Lead Statement
Deduct for Royalty Charges
1.00 Cum. Rs.
-70.60
/Cum.
Total
Deduct Insurance Charges 0.50 %
Total
Add for Naxal affected Area
20%
Add Insurance Charges 0.50 %
Add for Royalty Charges
1.00 Cum. Rs.
70.60
/Cum.
Total
Say
Supplying sand at the road side, including conveying and stacking
complete.
CSR Item No. 34/229
Rate as per Lead Statement
Deduct for Royalty Charges
1.00 Cum. Rs.
-70.60
/Cum.
Total
Deduct Insurance Charges 0.50 %
Total
Add for Naxal affected Area
20%
Add Insurance Charges 0.50 %
Add for Royalty Charges
1.00 Cum. Rs.
70.60
/Cum.
Total
Say

/Cum.

/Cum.

/Cum.

Sr.
Item of Work
Rate/Unit
No.
7 Spreading gravel/sand/soft murum/ available murum over rubble
soling/ W.B.M. surface blanketing berms etc. complete.
CSR Item No. 37/229
Rate as per CSR Item No 37/229
Rs.
Deduct 0.50 % for Insurance
Total = Rs.
Add 20 % for Naxal Special Action Plan
Add 0.50 % for Insurance
Rs.
Say
Rs.
8

Spreading 80 mm metal including sectioning complete.


CSR Item No. 38/229
Rate as per CSR Item No 38/229
Deduct 0.50 % for Insurance

Rs.
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Say
9

Spreading 40 mm metal including sectioning complete.


CSR Item No. 39/229
Rate as per CSR Item No 39/229
Deduct 0.50 % for Insurance

Rs.
Rs.

Rs.
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Say
10 Compacting the hard murum / kankar of all width (200 mm. loose)
with Static roller including necessary artificial watering complete.
CSR Item No. 43/230
Rate as per CSR Item No 43/230
Deduct 0.50 % for Insurance

Rs.
Rs.

Rs.
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Say
11 Compacting the sub grade/gravel/ oversize metal (200 mm loose)
layers of all width with static roller including necessary, labour,
materials and artificial watering complete.
CSR Item No. 40/230
Rate as per CSR Item No 40/230
Deduct 0.50 % for Insurance

Rs.
Rs.

Rs.
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Say
12 Compacting the sub grade/gravel/ size metal (100 mm loose)
layers of all width with static roller including necessary, labour,
materials and artificial watering complete.
CSR Item No. 42/230

Rs.
Rs.

Unit

14.00
-0.07
13.93
2.79
0.07
16.79
16.80

/Cum.

23.00
-0.12
22.88
4.58
0.12
27.58
27.60

/Cum.

20.00
-0.10
19.90
3.98
0.10
23.98
24.00

/Cum.

7.00
-0.04
6.96
1.39
0.04
8.39
8.40

/Sqm.

11.50
-0.06
11.44
2.29
0.06
13.79
13.80

/Sqm.

/Cum.

/Cum.

/Cum.

/Cum.

/Sqm.

Sr.
No.

Item of Work

Rate/Unit

Rate as per CSR Item No 42/230


Deduct 0.50 % for Insurance

Unit

Rs.

12.00
-0.06
11.94
2.39
0.06
14.39
14.40

/Sqm.

3.00
-0.02
2.98
0.60
0.02
3.60
3.60

/Sqm.

/Cum

Rs.
Rs.

125.00
-0.63
124.37
24.87
0.63
149.87
149.85

Rs
Rs
Rs
Rs
/Cum. Rs.
Total Rs.
Rs.
Total Rs.
Rs.
Rs.
/Cum. Rs.
Total Rs.
Say
Rs.

395.00
162.80
18.23
576.03
-91.78
484.25
-2.42
481.83
96.37
2.42
91.78
672.40
672.40

/Cum

Total = Rs.
Add 20 % for Naxal Special Action Plan
Add 0.50 % for Insurance
Say
13 Compacting the hard murum side widths layerwise on each side
with static roller including necessary artificial watering complete .
CSR Item No. 44/230
Rate as per CSR Item No 44/230
Deduct 0.50 % for Insurance

Rs.
Rs.

Rs.
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Say
14 Excavation for foundation in earth, soils of all types, sand, gravel
soft murum etc. including shoring and strutting as necessary and
disposing off excavated stuff within lead of 100 m as directed etc.
complete
Lift upto 1.5 meter
CSR Item No. 1/184
Rate as per CSR Item No 1/184
Deduct 0.50 % for Insurance

Rs.
Rs.

Rs
Total = Rs.

Add 20 % for Naxal Special Action Plan


Add 0.50 % for Insurance
Say
15 Providing rubble filling of trap / granite / quartzite / gneiss stones
in foundation including hand packing filling gravel / sand in the
voids etc. complete.
CSR Item No. 1/216
Rate as per CSR Item No 1/216
Add Tranptn of Metal
1.00 Cum Rs
162.80
/Cum
Sand
0.30 Cum Rs
60.78
/Cum
Deduct for Royalty Charges

1.30 Cum. Rs.

-70.60

Deduct Insurance Charges 0.50 %


Add for Naxal affected Area
Add Insurance Charges 0.50 %
Add for Royalty Charges

20%
1.30 Cum. Rs.

70.60

/Sqm.

/Sqm.

/Cum

/Cum

Sr.
Item of Work
Rate/Unit
No.
16 Providing and laying in situ cement concrete of 1:4:8 proportion
with trap / granite / quartzite / gneiss metal in foundation including
necessary compacting and curing complete. (Including plywood/
steel formwork) The C.M. 1:3 plaster is considered for rendering
uneven and honeycombed surface only. Newly laid concrete shall
be covered by gunny bag, plastic, tarpaulin etc. (Wooden
centering/formwork will not be allowed).
CSR Item No. 2/216
Rate as per CSR Item No 2/216
Rs
Add Tranptn Charges
HB Metal
0.90 Cum Rs
148.00
/Cum Rs
Sand
0.450 Cum Rs
60.78
/Cum Rs
Cement
3.40 Bag Rs
4.48
/Bag Rs
Rs
Deduct for Royalty Charges
1.35 Cum. Rs.
-70.60
/Cum. Rs.
Total Rs.
Deduct Insurance Charges 0.50 %
Rs.
Total Rs.
Add for Naxal affected Area
20%
Rs.
Add Insurance Charges 0.50 %
Rs.
Add for Royalty Charges
1.35 Cum. Rs.
70.60
/Cum. Rs.
Total Rs.
Say
Rs.
17 Providing and laying in situ cement concrete of M-15 / 1:2:4 with
trap / granite / quartzite / gneiss metal in face wall including
plywood/ steel formwork and steel centering, compaction by
vibrator, finishing uneven and honeycombed surface with C.M.1:3
of sufficient minimum thickness to give smooth and even surface,
filling joints with bitumen, curing etc. complete. (Excluding cost of
reinforcement.) The C.M. 1:3 plaster is considered for rendering
uneven and honeycombed surface only. Newly laid concrete shall
be covered by gunny bag, plastic, tarpaulin etc. (Wooden
centering/formwork will not be allowed).
CSR Item No. 3/216
Rate as per CSR Item No 3/216
Rs
Add Tranptn Charges
CB Metal
0.85 Cum Rs
926.70
/Cum Rs
Sand
0.425 Cum Rs
60.78
/Cum Rs
Cement
6.27 Bag Rs
4.48
/Bag Rs
Rs
Deduct for Royalty Charges
1.28 Cum. Rs.
-70.60
/Cum. Rs.
Total Rs.
Deduct Insurance Charges 0.50 %
Rs.
Total Rs.
Add for Naxal affected Area
20%
Rs.
Add Insurance Charges 0.50 %
Rs.
Add for Royalty Charges
1.28 Cum. Rs.
70.60
/Cum. Rs.
Total Rs.
Say
Rs.

Unit

2520.00

/Cum

133.20
27.35
15.23
2695.78
-95.31
2600.47
-13.00
2587.47
517.49
13.00
95.31
3213.27
3213.25

/Cum

3615.00

/Cum

787.70
25.83
28.09
4456.62
-90.02
4366.60
-21.83
4344.77
868.95
21.83
90.02
5325.57
5325.55

/Cum

Sr.
Item of Work
Rate/Unit
No.
18 Providing and laying in situ M-15 / 1:2:4 cement concrete of trap /
granite / quartzite / gneiss metal for levelling coures below R.C.C
raft and in foundation including necessary plywood/steel
formwork, steel centering, compaction by vibrating finishing,
curing etc. complete. The C.M. 1:3 plaster is considered for
rendering uneven and honeycombed surface only. Newly laid
concrete shall be covered by gunny bag, plastic, tarpaulin etc.
(Wooden centering/formwork will not be allowed).
CSR Item No. 14/190
Rate as per CSR Item No 14/190
Add Diff. in cost of Cement
(6.27-4.40)=1.87
Add Tranptn Charges
CB Metal
0.85 Cum Rs
Sand
0.425 Cum Rs
Cement
6.27 Bag Rs
Deduct for Royalty Charges

1.275 Cum. Rs.

Rs
Rs
Rs
Rs
/Cum. Rs.
Total Rs.
Rs.
Total Rs.
Rs.
Rs.
/Cum. Rs.
Total Rs.
Say
Rs.

787.70
25.83
28.09
4120.42
-90.02
4030.40
-20.15
4010.25
802.05
20.15
90.02
4922.47
4922.45

Rs

/Rmt

Rs.
Rs.

113.00
-0.57
112.43
22.49
0.57
135.49
135.50

Rs

4820.00

/Cum

Rs
Rs
Rs
Rs

787.70
25.83
31.81
5665.34

926.70
60.78
4.48

/Cum
/Cum
/Bag

20%
1.275 Cum. Rs.

2830.00
448.80

/Bag

Deduct Insurance Charges 0.50 %


Add for Naxal affected Area
Add Insurance Charges 0.50 %
Add for Royalty Charges

Rs
Rs

240.00

-70.60

70.60

Unit

19 Providing and fixing A.C./ UPVC pipes of 100 mm diameter and of


required length for relieving water pressure, stone filter as
directed complete.(For vent holes in raft).
CSR Item No. 16/191
Rate as per CSR Item No 16/191
Deduct 0.50 % for Insurance

Total = Rs.
Add 20 % for Naxal Special Action Plan
Add 0.50 % for Insurance
Say
20 Providing and casting in situ cement concrete of M-20 grade of
trap / granite /quartzite /gneiss metal for R.C.C slabs and landings
as per detailed design and drawings including steel centering,
plywood /steel formwork, steel props, compaction, finishing
uneven and honeycombed surface with C.M. 1:3 of sufficient
minimum thickness to give a smooth and even surface or
roughening the surface if special finish is to be provided with fan
hook box of 2 mm thick M.S.Sheet rectangular size 180 mm x 100
mm with required depth, with holes or notches, as required,
bottom and top lids of 1.6 mm thick M.S.Sheet
CSR Item No. 43/203
Rate as per CSR Item No 43/203
Add Tranptn Charges
CB Metal
0.85 Cum Rs
926.70
/Cum
Sand
0.425 Cum Rs
60.78
/Cum
Cement
7.10 Bag Rs
4.48
/Bag

/Cum

/Cum

/Rmt

Sr.
No.

Item of Work
Deduct for Royalty Charges

Rate/Unit
1.275 Cum. Rs.

-70.60

Deduct Insurance Charges 0.50 %


Add for Naxal affected Area
Add Insurance Charges 0.50 %
Add for Royalty Charges

20%
1.275 Cum. Rs.

70.60

Unit

/Cum. Rs.
Total Rs.
Rs.
Total Rs.
Rs.
Rs.
/Cum. Rs.
Total Rs.
Say
Rs.

21 Providing and cutting, bending, hooking, laying, in position and


tying bar reinforcement as per detailed drawing for R.C.C. works
etc. complete.
CSR Item No. 35/200
Rate as per CSR Item No 35/200
Add Tranptn Charges
Steel
1.000 MT
Rs
89.55
/MT

-90.02
5575.32
-27.88
5547.44
1109.49
27.88
90.02
6774.83
6774.85

/Cum

Rs

53150.00

/MT

Rs
Rs

89.55
53239.55
-266.20
52973.35
10594.67
266.20
63834.22
63834.20

/MT

Deduct 0.50 % for Insurance


Total = Rs.
Add 20 % for Naxal Special Action Plan
Add 0.50 % for Insurance
Say

Rs
Rs.

22 Providing selected murum (having PI < 6 ) filling including laying


in layers of 15 cm to 20 cm watering and compacting etc.
complete.
CSR Item No. 10/219
Rate as per CSR Item No 10/219
Rs
Add Diff. in cost of Murum(140.00-130.00)
1.00 Cum. Rs.
10.00
/Cum. Rs
Add Transportation Charges
Murum
0.50 Cum Rs
121.55
/Cum Rs
Sand
0.50 Cum Rs
60.78
/Cum Rs
Rs
Deduct for Royalty Charges
1.000 Cum. Rs.
-70.60
/Cum. Rs.
Total Rs.
Deduct Insurance Charges 0.50 %
Rs.
Total Rs.
Add for Naxal affected Area
20%
Rs.
Add Insurance Charges 0.50 %
Rs.
Add for Royalty Charges
1.000 Cum. Rs.
70.60
/Cum. Rs.
Total Rs.
Say
Rs.

225.00
-10.00
60.78
30.39
306.17
-70.60
235.57
-1.18
234.39
46.88
1.18
70.60
353.05
353.05

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

/Cum

/Cum

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km


0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

LEAD STATEMENT (For Road Work)


Sr.
No.

Material

Source of supply

Lead in
Km.

Lead
Charges

H. Br.metal
80 mm

Dongargaon quarry

17.50

280.00

279.00

33.00

592.00

/Cum.

40 mm

Dongargaon quarry

17.50

280.00

302.00

33.00

615.00

/Cum.

Sand

Kathani River

10.50

172.98

190.00

29.00

391.98

/Cum.

Murum

17.00

233.75

130.00

29.00

392.75

/Cum.

C.B. Metal

From Nandori Metal


crusher quarry

136.00

1058.70

---

---

1058.70

/Cum.

Rubble

Dongargaon quarry

17.50

308.00

308.00

/Cum.

Madia Tukum Quarry

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Supply Loading/
Net
Chrges Unloading Charges

Unit

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km


0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

LEAD STATEMENT (For C.Conc. Work )


Sr.
No.

Material

Source of supply

Lead in
Km.

Lead
Charges

Deduct 5
km Lead
charges

Net
Charges

Unit

Dongargaon quarry

17.50

280.00

132.00

148.00

/Cum.

H. Br.metal
80 mm &
40 mm
Rubble

Dongargaon quarry

17.50

308.00

145.20

162.80

/Cum.

Sand

Kathani River

10.50

172.98

112.20

60.78

/Cum.

Murum

Madia Tukum Quarry

17.00

233.75

112.20

121.55

/Cum.

C.B. Metal

From Nandori Metal


crusher quarry

136.00

1058.70

132.00

926.70

/Cum.

Cement

Gadchiroli Market

13.00

208.35

118.80

89.55
4.48

/MT
/Bag

Steel

Gadchiroli Market

13.00

208.35

118.80

89.55

/MT

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km


0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.
TYPE CROSS SECTION OF ROAD (VR Std.)

Proposed 80mm metaling layer


40mm metaling 1 coat of 0.075m compacted
Side Berm 0.075 m compacted
Murum Sand blanketing

7.50
2.25

3.00
3.30
9
Av Banking Ht. in M
10.8

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

2.250

0.45

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000


to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

Type Cross Section of RCC DHABA DRAIN

1.30
0.90

0.20

0.20

RCC Slab in M-20


C. Conc.

0.25

Surface Reinforcement 10 mm Dia


30 Cm C/C. form of Closed Stirrups.

1: 6

0.90
Weep Hole 100 mm Dia UPVC Pipe
1.25
0.60
0.35
0.10

1:4:8 C. Conc.

0.10

Rubble Filling

0.15

1.45

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

LEAD STATEMENT
LEAD
Metal
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
10.50
11.00
11.50
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00

68.00
75.00
82.00
89.50
96.50
103.50
110.50
118.00
125.00
132.00
138.50
145.00
152.00
158.50
165.00
171.50
178.00
185.00
191.50
198.00
203.50
209.00
215.00
220.50
226.00
231.50
237.00
243.00
248.50
254.00
259.00
264.50
269.50
275.00
280.00
285.00
290.50
295.50
301.00
306.00

Rubble

Murum

Sand

Cement

Steel

Bricks

Bit.Mix

74.80

57.80

57.80

61.20

61.20

68.00

61.20

82.50

63.75

63.75

67.50

67.50

75.00

67.50

90.20

69.70

69.70

73.80

73.80

82.00

73.80

98.45

76.08

76.08

80.55

80.55

89.50

80.55

106.15

82.03

82.03

86.85

86.85

96.50

86.85

113.85

87.98

87.98

93.15

93.15

103.50

93.15

121.55

93.93

93.93

99.45

99.45

110.50

99.45

129.80

100.30

100.30

106.20

106.20

118.00

106.20

137.50

106.25

106.25

112.50

112.50

125.00

112.50

145.20

112.20

112.20

118.80

118.80

132.00

118.80

152.35

117.73

117.73

124.65

124.65

138.50

124.65

159.50

123.25

123.25

130.50

130.50

145.00

130.50

167.20

129.20

129.20

136.80

136.80

152.00

136.80

174.35

134.73

134.73

142.65

142.65

158.50

142.65

181.50

140.25

140.25

148.50

148.50

165.00

148.50

188.65

145.78

145.78

154.35

154.35

171.50

154.35

195.80

151.30

151.30

160.20

160.20

178.00

160.20

203.50

157.25

157.25

166.50

166.50

185.00

166.50

210.65

162.78

162.78

172.35

172.35

191.50

172.35

217.80

168.30

168.30

178.20

178.20

198.00

178.20

223.85

172.98

172.98

183.15

183.15

203.50

183.15

229.90

177.65

177.65

188.10

188.10

209.00

188.10

236.50

182.75

182.75

193.50

193.50

215.00

193.50

242.55

187.43

187.43

198.45

198.45

220.50

198.45

248.60

192.10

192.10

203.40

203.40

226.00

203.40

254.65

196.78

196.78

208.35

208.35

231.50

208.35

260.70

201.45

201.45

213.30

213.30

237.00

213.30

267.30

206.55

206.55

218.70

218.70

243.00

218.70

273.35

211.23

211.23

223.65

223.65

248.50

223.65

279.40

215.90

215.90

228.60

228.60

254.00

228.60

284.90

220.15

220.15

233.10

233.10

259.00

233.10

290.95

224.83

224.83

238.05

238.05

264.50

238.05

296.45

229.08

229.08

242.55

242.55

269.50

242.55

302.50

233.75

233.75

247.50

247.50

275.00

247.50

308.00

238.00

238.00

252.00

252.00

280.00

252.00

313.50

242.25

242.25

256.50

256.50

285.00

256.50

319.55

246.93

246.93

261.45

261.45

290.50

261.45

325.05

251.18

251.18

265.95

265.95

295.50

265.95

331.10

255.85

255.85

270.90

270.90

301.00

270.90

336.60

260.10

260.10

275.40

275.40

306.00

275.40

20.50
21.00
21.50
22.00
22.50
23.00
23.50
24.00
24.50
25.00
25.50
26.00
26.50
27.00
27.50
28.00
28.50
29.00
29.50
30.00
30.50
31.00
31.50
32.00
32.50
33.00
33.50
34.00
34.50
35.00
35.50
36.00
36.50
37.00
37.50
38.00
38.50
39.00
39.50
40.00
40.50
41.00
41.50
42.00
42.50
43.00
43.50

311.00
315.50
320.50
325.00
330.00
335.00
339.50
344.50
349.00
354.00
358.50
363.00
367.00
371.50
376.00
380.50
385.00
389.00
393.50
398.00
401.78
405.55
409.33
413.10
416.88
420.65
424.43
428.20
431.98
435.75
439.53
443.30
447.08
450.85
454.63
458.40
462.18
465.95
469.73
473.50
477.28
481.05
484.83
488.60
492.38
496.15
499.93

342.10

264.35

264.35

279.90

279.90

311.00

279.90

347.05

268.18

268.18

283.95

283.95

315.50

283.95

352.55

272.43

272.43

288.45

288.45

320.50

288.45

357.50

276.25

276.25

292.50

292.50

325.00

292.50

363.00

280.50

280.50

297.00

297.00

330.00

297.00

368.50

284.75

284.75

301.50

301.50

335.00

301.50

373.45

288.58

288.58

305.55

305.55

339.50

305.55

378.95

292.83

292.83

310.05

310.05

344.50

310.05

383.90

296.65

296.65

314.10

314.10

349.00

314.10

389.40

300.90

300.90

318.60

318.60

354.00

318.60

394.35

304.73

304.73

322.65

322.65

358.50

322.65

399.30

308.55

308.55

326.70

326.70

363.00

326.70

403.70

311.95

311.95

330.30

330.30

367.00

330.30

408.65

315.78

315.78

334.35

334.35

371.50

334.35

413.60

319.60

319.60

338.40

338.40

376.00

338.40

418.55

323.43

323.43

342.45

342.45

380.50

342.45

423.50

327.25

327.25

346.50

346.50

385.00

346.50

427.90

330.65

330.65

350.10

350.10

389.00

350.10

432.85

334.48

334.48

354.15

354.15

393.50

354.15

437.80
441.96
446.11
450.26
454.41
458.57
462.72
466.87
471.02
475.18
479.33
483.48
487.63
491.79
495.94
500.09
504.24
508.40
512.55
516.70
520.85
525.01
529.16
533.31
537.46
541.62
545.77
549.92

338.30
341.51
344.72
347.93
351.14
354.35
357.55
360.77
363.97
367.18
370.39
373.60
376.81
380.02
383.22
386.44
389.64
392.85
396.06
399.27
402.48
405.69
408.89
412.11
415.31
418.52
421.73
424.94

338.30
341.51
344.72
347.93
351.14
354.35
357.55
360.77
363.97
367.18
370.39
373.60
376.81
380.02
383.22
386.44
389.64
392.85
396.06
399.27
402.48
405.69
408.89
412.11
415.31
418.52
421.73
424.94

358.20
361.60
365.00
368.40
371.79
375.19
378.59
381.99
385.38
388.78
392.18
395.58
398.97
402.37
405.77
409.17
412.56
415.96
419.36
422.76
426.15
429.55
432.95
436.35
439.74
443.14
446.54
449.94

358.20
361.60
365.00
368.40
371.79
375.19
378.59
381.99
385.38
388.78
392.18
395.58
398.97
402.37
405.77
409.17
412.56
415.96
419.36
422.76
426.15
429.55
432.95
436.35
439.74
443.14
446.54
449.94

398.00
401.78
405.55
409.33
413.10
416.88
420.65
424.43
428.20
431.98
435.75
439.53
443.30
447.08
450.85
454.63
458.40
462.18
465.95
469.73
473.50
477.28
481.05
484.83
488.60
492.38
496.15
499.93

358.20
361.60
365.00
368.40
371.79
375.19
378.59
381.99
385.38
388.78
392.18
395.58
398.97
402.37
405.77
409.17
412.56
415.96
419.36
422.76
426.15
429.55
432.95
436.35
439.74
443.14
446.54
449.94

44.00
44.50
45.00
45.50
46.00
46.50
47.00
47.50
48.00
48.50
49.00
49.50
50.00
50.50
51.00
51.50
52.00
52.50
53.00
53.50
54.00
54.50
55.00
55.50
56.00
56.50
57.00
57.50
58.00
58.50
59.00
59.50
60.00
60.50
61.00
61.50
62.00
62.50
63.00
63.50
64.00
64.50
65.00
65.50
66.00
66.50
67.00
67.50
68.00
68.50
69.00
69.50

503.70
507.48
511.25
515.03
518.80
522.58
526.35
530.13
533.90
537.68
541.45
545.23
549.00
552.78
556.55
560.33
564.10
567.88
571.65
575.43
579.20
582.98
586.75
590.53
594.30
598.08
601.85
605.63
609.40
613.18
616.95
620.73
624.50
627.48
630.45
633.43
636.40
639.38
642.35
645.33
648.30
651.28
654.25
657.23
660.20
663.18
666.15
669.13
672.10
675.08
678.05
681.03

554.07
558.23
562.38
566.53
570.68
574.84
578.99
583.14
587.29
591.45
595.60
599.75
603.90
608.06
612.21
616.36
620.51
624.67
628.82
632.97
637.12
641.28
645.43
649.58
653.73
657.89
662.04
666.19
670.34
674.50
678.65
682.80
686.95
690.23
693.50
696.77
700.04
703.32
706.59
709.86
713.13
716.41
719.68
722.95
726.22
729.50
732.77
736.04
739.31
742.59
745.86
749.13

428.15
431.36
434.56
437.78
440.98
444.19
447.40
450.61
453.82
457.03
460.23
463.45
466.65
469.86
473.07
476.28
479.49
482.70
485.90
489.12
492.32
495.53
498.74
501.95
505.16
508.37
511.57
514.79
517.99
521.20
524.41
527.62
530.83
533.36
535.88
538.42
540.94
543.47
546.00
548.53
551.06
553.59
556.11
558.65
561.17
563.70
566.23
568.76
571.29
573.82
576.34
578.88

428.15
431.36
434.56
437.78
440.98
444.19
447.40
450.61
453.82
457.03
460.23
463.45
466.65
469.86
473.07
476.28
479.49
482.70
485.90
489.12
492.32
495.53
498.74
501.95
505.16
508.37
511.57
514.79
517.99
521.20
524.41
527.62
530.83
533.36
535.88
538.42
540.94
543.47
546.00
548.53
551.06
553.59
556.11
558.65
561.17
563.70
566.23
568.76
571.29
573.82
576.34
578.88

453.33
456.73
460.13
463.53
466.92
470.32
473.72
477.12
480.51
483.91
487.31
490.71
494.10
497.50
500.90
504.30
507.69
511.09
514.49
517.89
521.28
524.68
528.08
531.48
534.87
538.27
541.67
545.07
548.46
551.86
555.26
558.66
562.05
564.73
567.41
570.09
572.76
575.44
578.12
580.80
583.47
586.15
588.83
591.51
594.18
596.86
599.54
602.22
604.89
607.57
610.25
612.93

453.33
456.73
460.13
463.53
466.92
470.32
473.72
477.12
480.51
483.91
487.31
490.71
494.10
497.50
500.90
504.30
507.69
511.09
514.49
517.89
521.28
524.68
528.08
531.48
534.87
538.27
541.67
545.07
548.46
551.86
555.26
558.66
562.05
564.73
567.41
570.09
572.76
575.44
578.12
580.80
583.47
586.15
588.83
591.51
594.18
596.86
599.54
602.22
604.89
607.57
610.25
612.93

503.70
507.48
511.25
515.03
518.80
522.58
526.35
530.13
533.90
537.68
541.45
545.23
549.00
552.78
556.55
560.33
564.10
567.88
571.65
575.43
579.20
582.98
586.75
590.53
594.30
598.08
601.85
605.63
609.40
613.18
616.95
620.73
624.50
627.48
630.45
633.43
636.40
639.38
642.35
645.33
648.30
651.28
654.25
657.23
660.20
663.18
666.15
669.13
672.10
675.08
678.05
681.03

453.33
456.73
460.13
463.53
466.92
470.32
473.72
477.12
480.51
483.91
487.31
490.71
494.10
497.50
500.90
504.30
507.69
511.09
514.49
517.89
521.28
524.68
528.08
531.48
534.87
538.27
541.67
545.07
548.46
551.86
555.26
558.66
562.05
564.73
567.41
570.09
572.76
575.44
578.12
580.80
583.47
586.15
588.83
591.51
594.18
596.86
599.54
602.22
604.89
607.57
610.25
612.93

70.00
70.50
71.00
71.50
72.00
72.50
73.00
73.50
74.00
74.50
75.00
75.50
76.00
76.50
77.00
77.50
78.00
78.50
79.00
79.50
80.00
80.50
81.00
81.50
82.00
82.50
83.00
83.50
84.00
84.50
85.00
85.50
86.00
86.50
87.00
87.50
88.00
88.50
89.00
89.50
90.00
90.50
91.00
91.50
92.00
92.50
93.00
93.50
94.00
94.50
95.00
95.50

684.00
686.98
689.95
692.93
695.90
698.88
701.85
704.83
707.80
710.78
713.75
716.73
719.70
722.68
725.65
728.63
731.60
734.58
737.55
740.53
743.50
746.48
749.45
752.43
755.40
758.38
761.35
764.33
767.30
770.28
773.25
776.23
779.20
782.18
785.15
788.13
791.10
794.08
797.05
800.03
803.00
805.98
808.95
811.93
814.90
817.88
820.85
823.83
826.80
829.78
832.75
835.73

752.40
755.68
758.95
762.22
765.49
768.77
772.04
775.31
778.58
781.86
785.13
788.40
791.67
794.95
798.22
801.49
804.76
808.04
811.31
814.58
817.85
821.13
824.40
827.67
830.94
834.22
837.49
840.76
844.03
847.31
850.58
853.85
857.12
860.40
863.67
866.94
870.21
873.49
876.76
880.03
883.30
886.58
889.85
893.12
896.39
899.67
902.94
906.21
909.48
912.76
916.03
919.30

581.40
583.93
586.46
588.99
591.52
594.05
596.57
599.11
601.63
604.16
606.69
609.22
611.75
614.28
616.80
619.34
621.86
624.39
626.92
629.45
631.98
634.51
637.03
639.57
642.09
644.62
647.15
649.68
652.21
654.74
657.26
659.80
662.32
664.85
667.38
669.91
672.44
674.97
677.49
680.03
682.55
685.08
687.61
690.14
692.67
695.20
697.72
700.26
702.78
705.31
707.84
710.37

581.40
583.93
586.46
588.99
591.52
594.05
596.57
599.11
601.63
604.16
606.69
609.22
611.75
614.28
616.80
619.34
621.86
624.39
626.92
629.45
631.98
634.51
637.03
639.57
642.09
644.62
647.15
649.68
652.21
654.74
657.26
659.80
662.32
664.85
667.38
669.91
672.44
674.97
677.49
680.03
682.55
685.08
687.61
690.14
692.67
695.20
697.72
700.26
702.78
705.31
707.84
710.37

615.60
618.28
620.96
623.64
626.31
628.99
631.67
634.35
637.02
639.70
642.38
645.06
647.73
650.41
653.09
655.77
658.44
661.12
663.80
666.48
669.15
671.83
674.51
677.19
679.86
682.54
685.22
687.90
690.57
693.25
695.93
698.61
701.28
703.96
706.64
709.32
711.99
714.67
717.35
720.03
722.70
725.38
728.06
730.74
733.41
736.09
738.77
741.45
744.12
746.80
749.48
752.16

615.60
618.28
620.96
623.64
626.31
628.99
631.67
634.35
637.02
639.70
642.38
645.06
647.73
650.41
653.09
655.77
658.44
661.12
663.80
666.48
669.15
671.83
674.51
677.19
679.86
682.54
685.22
687.90
690.57
693.25
695.93
698.61
701.28
703.96
706.64
709.32
711.99
714.67
717.35
720.03
722.70
725.38
728.06
730.74
733.41
736.09
738.77
741.45
744.12
746.80
749.48
752.16

684.00
686.98
689.95
692.93
695.90
698.88
701.85
704.83
707.80
710.78
713.75
716.73
719.70
722.68
725.65
728.63
731.60
734.58
737.55
740.53
743.50
746.48
749.45
752.43
755.40
758.38
761.35
764.33
767.30
770.28
773.25
776.23
779.20
782.18
785.15
788.13
791.10
794.08
797.05
800.03
803.00
805.98
808.95
811.93
814.90
817.88
820.85
823.83
826.80
829.78
832.75
835.73

615.60
618.28
620.96
623.64
626.31
628.99
631.67
634.35
637.02
639.70
642.38
645.06
647.73
650.41
653.09
655.77
658.44
661.12
663.80
666.48
669.15
671.83
674.51
677.19
679.86
682.54
685.22
687.90
690.57
693.25
695.93
698.61
701.28
703.96
706.64
709.32
711.99
714.67
717.35
720.03
722.70
725.38
728.06
730.74
733.41
736.09
738.77
741.45
744.12
746.80
749.48
752.16

96.00
96.50
97.00
97.50
98.00
98.50
99.00
99.50
100.00
100.50
101.00
101.50
102.00
102.50
103.00
103.50
104.00
104.50
105.00
105.50
106.00
106.50
107.00
107.50
108.00
108.50
109.00
109.50
110.00
110.50
111.00
111.50
112.00
112.50
113.00
113.50
114.00
114.50
115.00
115.50
116.00
116.50
117.00
117.50
118.00
118.50
119.00
119.50
120.00
120.50
121.00
121.50

838.70
841.68
844.65
847.63
850.60
853.58
856.55
859.53
862.50
865.23
867.95
870.68
873.40
876.13
878.85
881.58
884.30
887.03
889.75
892.48
895.20
897.93
900.65
903.38
906.10
908.83
911.55
914.28
917.00
919.73
922.45
925.18
927.90
930.63
933.35
936.08
938.80
941.53
944.25
946.98
949.70
952.43
955.15
957.88
960.60
963.33
966.05
968.78
971.50
974.23
976.95
979.68

922.57
925.85
929.12
932.39
935.66
938.94
942.21
945.48
948.75
951.75
954.75
957.75
960.74
963.74
966.74
969.74
972.73
975.73
978.73
981.73
984.72
987.72
990.72
993.72
996.71
999.71
1002.71
1005.71
1008.70
1011.70
1014.70
1017.70
1020.69
1023.69
1026.69
1029.69
1032.68
1035.68
1038.68
1041.68
1044.67
1047.67
1050.67
1053.67
1056.66
1059.66
1062.66
1065.66
1068.65
1071.65
1074.65
1077.65

712.90
715.43
717.95
720.49
723.01
725.54
728.07
730.60
733.13
735.45
737.76
740.08
742.39
744.71
747.02
749.34
751.66
753.98
756.29
758.61
760.92
763.24
765.55
767.87
770.19
772.51
774.82
777.14
779.45
781.77
784.08
786.40
788.72
791.04
793.35
795.67
797.98
800.30
802.61
804.93
807.25
809.57
811.88
814.20
816.51
818.83
821.14
823.46
825.78
828.10
830.41
832.73

712.90
715.43
717.95
720.49
723.01
725.54
728.07
730.60
733.13
735.45
737.76
740.08
742.39
744.71
747.02
749.34
751.66
753.98
756.29
758.61
760.92
763.24
765.55
767.87
770.19
772.51
774.82
777.14
779.45
781.77
784.08
786.40
788.72
791.04
793.35
795.67
797.98
800.30
802.61
804.93
807.25
809.57
811.88
814.20
816.51
818.83
821.14
823.46
825.78
828.10
830.41
832.73

754.83
757.51
760.19
762.87
765.54
768.22
770.90
773.58
776.25
778.71
781.16
783.61
786.06
788.52
790.97
793.42
795.87
798.33
800.78
803.23
805.68
808.14
810.59
813.04
815.49
817.95
820.40
822.85
825.30
827.76
830.21
832.66
835.11
837.57
840.02
842.47
844.92
847.38
849.83
852.28
854.73
857.19
859.64
862.09
864.54
867.00
869.45
871.90
874.35
876.81
879.26
881.71

754.83
757.51
760.19
762.87
765.54
768.22
770.90
773.58
776.25
778.71
781.16
783.61
786.06
788.52
790.97
793.42
795.87
798.33
800.78
803.23
805.68
808.14
810.59
813.04
815.49
817.95
820.40
822.85
825.30
827.76
830.21
832.66
835.11
837.57
840.02
842.47
844.92
847.38
849.83
852.28
854.73
857.19
859.64
862.09
864.54
867.00
869.45
871.90
874.35
876.81
879.26
881.71

838.70
841.68
844.65
847.63
850.60
853.58
856.55
859.53
862.50
865.23
867.95
870.68
873.40
876.13
878.85
881.58
884.30
887.03
889.75
892.48
895.20
897.93
900.65
903.38
906.10
908.83
911.55
914.28
917.00
919.73
922.45
925.18
927.90
930.63
933.35
936.08
938.80
941.53
944.25
946.98
949.70
952.43
955.15
957.88
960.60
963.33
966.05
968.78
971.50
974.23
976.95
979.68

754.83
757.51
760.19
762.87
765.54
768.22
770.90
773.58
776.25
778.71
781.16
783.61
786.06
788.52
790.97
793.42
795.87
798.33
800.78
803.23
805.68
808.14
810.59
813.04
815.49
817.95
820.40
822.85
825.30
827.76
830.21
832.66
835.11
837.57
840.02
842.47
844.92
847.38
849.83
852.28
854.73
857.19
859.64
862.09
864.54
867.00
869.45
871.90
874.35
876.81
879.26
881.71

122.00
122.50
123.00
123.50
124.00
124.50
125.00
125.50
126.00
126.50
127.00
127.50
128.00
128.50
129.00
129.50
130.00
130.50
131.00
131.50
132.00
132.50
133.00
133.50
134.00
134.50
135.00
135.50
136.00
136.50
137.00
137.50
138.00
138.50
139.00
139.50
140.00
140.50
141.00
141.50
142.00
142.50
143.00
143.50
144.00
144.50
145.00
145.50
146.00
146.50
147.00
147.50

982.40
985.13
987.85
990.58
993.30
996.03
998.75
1001.48
1004.20
1006.93
1009.65
1012.38
1015.10
1017.83
1020.55
1023.28
1026.00
1028.73
1031.45
1034.18
1036.90
1039.63
1042.35
1045.08
1047.80
1050.53
1053.25
1055.98
1058.70
1061.43
1064.15
1066.88
1069.60
1072.33
1075.05
1077.78
1080.50
1083.23
1085.95
1088.68
1091.40
1094.13
1096.85
1099.58
1102.30
1105.03
1107.75
1110.48
1113.20
1115.93
1118.65
1121.38

1080.64
1083.64
1086.64
1089.64
1092.63
1095.63
1098.63
1101.63
1104.62
1107.62
1110.62
1113.62
1116.61
1119.61
1122.61
1125.61
1128.60
1131.60
1134.60
1137.60
1140.59
1143.59
1146.59
1149.59
1152.58
1155.58
1158.58
1161.58
1164.57
1167.57
1170.57
1173.57
1176.56
1179.56
1182.56
1185.56
1188.55
1191.55
1194.55
1197.55
1200.54
1203.54
1206.54
1209.54
1212.53
1215.53
1218.53
1221.53
1224.52
1227.52
1230.52
1233.52

835.04
837.36
839.67
841.99
844.31
846.63
848.94
851.26
853.57
855.89
858.20
860.52
862.84
865.16
867.47
869.79
872.10
874.42
876.73
879.05
881.37
883.69
886.00
888.32
890.63
892.95
895.26
897.58
899.90
902.22
904.53
906.85
909.16
911.48
913.79
916.11
918.43
920.75
923.06
925.38
927.69
930.01
932.32
934.64
936.96
939.28
941.59
943.91
946.22
948.54
950.85
953.17

835.04
837.36
839.67
841.99
844.31
846.63
848.94
851.26
853.57
855.89
858.20
860.52
862.84
865.16
867.47
869.79
872.10
874.42
876.73
879.05
881.37
883.69
886.00
888.32
890.63
892.95
895.26
897.58
899.90
902.22
904.53
906.85
909.16
911.48
913.79
916.11
918.43
920.75
923.06
925.38
927.69
930.01
932.32
934.64
936.96
939.28
941.59
943.91
946.22
948.54
950.85
953.17

884.16
886.62
889.07
891.52
893.97
896.43
898.88
901.33
903.78
906.24
908.69
911.14
913.59
916.05
918.50
920.95
923.40
925.86
928.31
930.76
933.21
935.67
938.12
940.57
943.02
945.48
947.93
950.38
952.83
955.29
957.74
960.19
962.64
965.10
967.55
970.00
972.45
974.91
977.36
979.81
982.26
984.72
987.17
989.62
992.07
994.53
996.98
999.43
1001.88
1004.34
1006.79
1009.24

884.16
886.62
889.07
891.52
893.97
896.43
898.88
901.33
903.78
906.24
908.69
911.14
913.59
916.05
918.50
920.95
923.40
925.86
928.31
930.76
933.21
935.67
938.12
940.57
943.02
945.48
947.93
950.38
952.83
955.29
957.74
960.19
962.64
965.10
967.55
970.00
972.45
974.91
977.36
979.81
982.26
984.72
987.17
989.62
992.07
994.53
996.98
999.43
1001.88
1004.34
1006.79
1009.24

982.40
985.13
987.85
990.58
993.30
996.03
998.75
1001.48
1004.20
1006.93
1009.65
1012.38
1015.10
1017.83
1020.55
1023.28
1026.00
1028.73
1031.45
1034.18
1036.90
1039.63
1042.35
1045.08
1047.80
1050.53
1053.25
1055.98
1058.70
1061.43
1064.15
1066.88
1069.60
1072.33
1075.05
1077.78
1080.50
1083.23
1085.95
1088.68
1091.40
1094.13
1096.85
1099.58
1102.30
1105.03
1107.75
1110.48
1113.20
1115.93
1118.65
1121.38

884.16
886.62
889.07
891.52
893.97
896.43
898.88
901.33
903.78
906.24
908.69
911.14
913.59
916.05
918.50
920.95
923.40
925.86
928.31
930.76
933.21
935.67
938.12
940.57
943.02
945.48
947.93
950.38
952.83
955.29
957.74
960.19
962.64
965.10
967.55
970.00
972.45
974.91
977.36
979.81
982.26
984.72
987.17
989.62
992.07
994.53
996.98
999.43
1001.88
1004.34
1006.79
1009.24

148.00
148.50
149.00
149.50
150.00
150.50
151.00
151.50
152.00
152.50
153.00

1124.10
1126.83
1129.55
1132.28
1135.00
1137.73
1140.45
1143.18
1145.90
1148.63
1151.35

1236.51
1239.51
1242.51
1245.51
1248.50
1251.50
1254.50
1257.50
1260.49
1263.49
1266.49

955.49
957.81
960.12
962.44
964.75
967.07
969.38
971.70
974.02
976.34
978.65

955.49
957.81
960.12
962.44
964.75
967.07
969.38
971.70
974.02
976.34
978.65

1011.69
1014.15
1016.60
1019.05
1021.50
1023.96
1026.41
1028.86
1031.31
1033.77
1036.22

1011.69
1014.15
1016.60
1019.05
1021.50
1023.96
1026.41
1028.86
1031.31
1033.77
1036.22

1124.10
1126.83
1129.55
1132.28
1135.00
1137.73
1140.45
1143.18
1145.90
1148.63
1151.35

1011.69
1014.15
1016.60
1019.05
1021.50
1023.96
1026.41
1028.86
1031.31
1033.77
1036.22

Timber

Tiles(Floor) Mang. Tiles

AC/GI Sheet RCC Pipe bulk Bitn Pack Bitun

47.60

54.40

61.20

51.00

9.08

3.13

1.60

52.50

60.00

67.50

56.25

18.15

6.25

3.20

57.40

65.60

73.80

61.50

27.23

9.38

4.80

62.65

71.60

80.55

67.13

36.30

12.50

6.40

67.55

77.20

86.85

72.38

45.38

15.63

8.00

72.45

82.80

93.15

77.63

54.45

18.75

9.60

77.35

88.40

99.45

82.88

63.53

21.88

11.20

82.60

94.40

106.20

88.50

72.60

25.00

12.80

87.50

100.00

112.50

93.75

81.68

28.13

14.40

92.40

105.60

118.80

99.00

90.75

31.25

16.00

96.95

110.80

124.65

103.88

99.83

34.38

17.60

101.50

116.00

130.50

108.75

108.90

37.50

19.20

106.40

121.60

136.80

114.00

117.98

40.63

20.80

110.95

126.80

142.65

118.88

127.05

43.75

22.40

115.50

132.00

148.50

123.75

136.13

46.88

24.00

120.05

137.20

154.35

128.63

145.20

50.00

25.60

124.60

142.40

160.20

133.50

154.28

53.13

27.20

129.50

148.00

166.50

138.75

163.35

56.25

28.80

134.05

153.20

172.35

143.63

172.43

59.38

30.40

138.60

158.40

178.20

148.50

181.50

62.50

32.00

142.45

162.80

183.15

152.63

190.58

65.63

33.60

146.30

167.20

188.10

156.75

199.65

68.75

35.20

150.50

172.00

193.50

161.25

208.73

71.88

36.80

154.35

176.40

198.45

165.38

217.80

75.00

38.40

158.20

180.80

203.40

169.50

226.88

78.13

40.00

162.05

185.20

208.35

173.63

235.95

81.25

41.60

165.90

189.60

213.30

177.75

245.03

84.38

43.20

170.10

194.40

218.70

182.25

254.10

87.50

44.80

173.95

198.80

223.65

186.38

263.18

90.63

46.40

177.80

203.20

228.60

190.50

272.25

93.75

48.00

181.30

207.20

233.10

194.25

278.63

96.88

49.60

185.15

211.60

238.05

198.38

285.00

100.00

51.20

188.65

215.60

242.55

202.13

291.38

103.13

52.80

192.50

220.00

247.50

206.25

297.75

106.25

54.40

196.00

224.00

252.00

210.00

304.13

109.38

56.00

199.50

228.00

256.50

213.75

310.50

112.50

57.60

203.35

232.40

261.45

217.88

316.88

115.63

59.20

206.85

236.40

265.95

221.63

323.25

118.75

60.80

210.70

240.80

270.90

225.75

329.63

121.88

62.40

214.20

244.80

275.40

229.50

336.00

125.00

64.00

217.70

248.80

279.90

233.25

342.38

128.13

65.60

220.85

252.40

283.95

236.63

348.75

131.25

67.20

224.35

256.40

288.45

240.38

355.13

134.38

68.80

227.50

260.00

292.50

243.75

361.50

137.50

70.40

231.00

264.00

297.00

247.50

367.88

140.63

72.00

234.50

268.00

301.50

251.25

374.25

143.75

73.60

237.65

271.60

305.55

254.63

380.63

146.88

75.20

241.15

275.60

310.05

258.38

387.00

150.00

76.80

244.30

279.20

314.10

261.75

393.38

153.13

78.40

247.80

283.20

318.60

265.50

399.75

156.25

80.00

250.95

286.80

322.65

268.88

406.13

159.38

81.60

254.10

290.40

326.70

272.25

412.50

162.50

83.20

256.90

293.60

330.30

275.25

418.88

165.63

84.80

260.05

297.20

334.35

278.63

425.25

168.75

86.40

263.20

300.80

338.40

282.00

431.63

171.88

88.00

266.35

304.40

342.45

285.38

438.00

175.00

89.60

269.50

308.00

346.50

288.75

444.38

178.13

91.20

272.30

311.20

350.10

291.75

450.75

181.25

92.80

275.45

314.80

354.15

295.13

457.13

184.38

94.40

278.60
281.25
283.89
286.53
289.17
291.82
294.46
297.10
299.74
302.39
305.03
307.67
310.31
312.96
315.60
318.24
320.88
323.53
326.17
328.81
331.45
334.10
336.74
339.38
342.02
344.67
347.31
349.95

318.40
321.42
324.44
327.46
330.48
333.50
336.52
339.54
342.56
345.58
348.60
351.62
354.64
357.66
360.68
363.70
366.72
369.74
372.76
375.78
378.80
381.82
384.84
387.86
390.88
393.90
396.92
399.94

358.20
361.60
365.00
368.40
371.79
375.19
378.59
381.99
385.38
388.78
392.18
395.58
398.97
402.37
405.77
409.17
412.56
415.96
419.36
422.76
426.15
429.55
432.95
436.35
439.74
443.14
446.54
449.94

298.50
301.34
304.16
307.00
309.83
312.66
315.49
318.32
321.15
323.99
326.81
329.65
332.48
335.31
338.14
340.97
343.80
346.64
349.46
352.30
355.13
357.96
360.79
363.62
366.45
369.29
372.11
374.95

463.50
469.88
476.25
482.63
489.00
495.38
501.75
508.13
514.50
520.88
527.25
533.63
540.00
546.38
552.75
559.13
565.50
571.88
578.25
584.63
591.00
597.38
603.75
610.13
616.50
622.88
629.25
635.63

187.50
190.63
193.75
196.88
200.00
203.13
206.25
209.38
212.50
215.63
218.75
221.88
225.00
228.13
231.25
234.38
237.50
240.63
243.75
246.88
250.00
253.13
256.25
259.38
262.50
265.63
268.75
271.88

96.00
97.60
99.20
100.80
102.40
104.00
105.60
107.20
108.80
110.40
112.00
113.60
115.20
116.80
118.40
120.00
121.60
123.20
124.80
126.40
128.00
129.60
131.20
132.80
134.40
136.00
137.60
139.20

352.59
355.24
357.88
360.52
363.16
365.81
368.45
371.09
373.73
376.38
379.02
381.66
384.30
386.95
389.59
392.23
394.87
397.52
400.16
402.80
405.44
408.09
410.73
413.37
416.01
418.66
421.30
423.94
426.58
429.23
431.87
434.51
437.15
439.24
441.32
443.40
445.48
447.57
449.65
451.73
453.81
455.90
457.98
460.06
462.14
464.23
466.31
468.39
470.47
472.56
474.64
476.72

402.96
405.98
409.00
412.02
415.04
418.06
421.08
424.10
427.12
430.14
433.16
436.18
439.20
442.22
445.24
448.26
451.28
454.30
457.32
460.34
463.36
466.38
469.40
472.42
475.44
478.46
481.48
484.50
487.52
490.54
493.56
496.58
499.60
501.98
504.36
506.74
509.12
511.50
513.88
516.26
518.64
521.02
523.40
525.78
528.16
530.54
532.92
535.30
537.68
540.06
542.44
544.82

453.33
456.73
460.13
463.53
466.92
470.32
473.72
477.12
480.51
483.91
487.31
490.71
494.10
497.50
500.90
504.30
507.69
511.09
514.49
517.89
521.28
524.68
528.08
531.48
534.87
538.27
541.67
545.07
548.46
551.86
555.26
558.66
562.05
564.73
567.41
570.09
572.76
575.44
578.12
580.80
583.47
586.15
588.83
591.51
594.18
596.86
599.54
602.22
604.89
607.57
610.25
612.93

377.78
380.61
383.44
386.27
389.10
391.94
394.76
397.60
400.43
403.26
406.09
408.92
411.75
414.59
417.41
420.25
423.08
425.91
428.74
431.57
434.40
437.24
440.06
442.90
445.73
448.56
451.39
454.22
457.05
459.89
462.71
465.55
468.38
470.61
472.84
475.07
477.30
479.54
481.76
484.00
486.23
488.46
490.69
492.92
495.15
497.39
499.61
501.85
504.08
506.31
508.54
510.77

642.00
648.38
654.75
661.13
667.50
673.88
680.25
686.63
693.00
699.38
705.75
712.13
718.50
723.90
729.30
734.70
740.10
745.50
750.90
756.30
761.70
767.10
772.50
777.90
783.30
788.70
794.10
799.50
804.90
810.30
815.70
821.10
826.50
831.90
837.30
842.70
848.10
853.50
858.90
864.30
869.70
875.10
880.50
885.90
891.30
896.70
902.10
907.50
912.90
918.30
923.70
929.10

275.00
278.13
281.25
284.38
287.50
290.63
293.75
296.88
300.00
303.13
306.25
309.38
312.50
315.63
318.75
321.88
325.00
328.13
331.25
334.38
337.50
340.63
343.75
346.88
350.00
353.13
356.25
359.38
362.50
365.63
368.75
371.88
375.00
378.13
381.25
384.38
387.50
390.63
393.75
396.88
400.00
403.13
406.25
409.38
412.50
415.63
418.75
421.88
425.00
428.13
431.25
434.38

140.80
142.40
144.00
145.60
147.20
148.80
150.40
152.00
153.60
155.20
156.80
158.40
160.00
161.60
163.20
164.80
166.40
168.00
169.60
171.20
172.80
174.40
176.00
177.60
179.20
180.80
182.40
184.00
185.60
187.20
188.80
190.40
192.00
193.60
195.20
196.80
198.40
200.00
201.60
203.20
204.80
206.40
208.00
209.60
211.20
212.80
214.40
216.00
217.60
219.20
220.80
222.40

478.80
480.89
482.97
485.05
487.13
489.22
491.30
493.38
495.46
497.55
499.63
501.71
503.79
505.88
507.96
510.04
512.12
514.21
516.29
518.37
520.45
522.54
524.62
526.70
528.78
530.87
532.95
535.03
537.11
539.20
541.28
543.36
545.44
547.53
549.61
551.69
553.77
555.86
557.94
560.02
562.10
564.19
566.27
568.35
570.43
572.52
574.60
576.68
578.76
580.85
582.93
585.01

547.20
549.58
551.96
554.34
556.72
559.10
561.48
563.86
566.24
568.62
571.00
573.38
575.76
578.14
580.52
582.90
585.28
587.66
590.04
592.42
594.80
597.18
599.56
601.94
604.32
606.70
609.08
611.46
613.84
616.22
618.60
620.98
623.36
625.74
628.12
630.50
632.88
635.26
637.64
640.02
642.40
644.78
647.16
649.54
651.92
654.30
656.68
659.06
661.44
663.82
666.20
668.58

615.60
618.28
620.96
623.64
626.31
628.99
631.67
634.35
637.02
639.70
642.38
645.06
647.73
650.41
653.09
655.77
658.44
661.12
663.80
666.48
669.15
671.83
674.51
677.19
679.86
682.54
685.22
687.90
690.57
693.25
695.93
698.61
701.28
703.96
706.64
709.32
711.99
714.67
717.35
720.03
722.70
725.38
728.06
730.74
733.41
736.09
738.77
741.45
744.12
746.80
749.48
752.16

513.00
515.24
517.46
519.70
521.93
524.16
526.39
528.62
530.85
533.09
535.31
537.55
539.78
542.01
544.24
546.47
548.70
550.94
553.16
555.40
557.63
559.86
562.09
564.32
566.55
568.79
571.01
573.25
575.48
577.71
579.94
582.17
584.40
586.64
588.86
591.10
593.33
595.56
597.79
600.02
602.25
604.49
606.71
608.95
611.18
613.41
615.64
617.87
620.10
622.34
624.56
626.80

934.50
939.90
945.30
950.70
956.10
961.50
966.90
972.30
977.70
983.10
988.50
993.90
999.30
1004.70
1010.10
1015.50
1020.90
1026.30
1031.70
1037.10
1042.50
1047.90
1053.30
1058.70
1064.10
1069.50
1074.90
1080.30
1085.70
1091.10
1096.50
1101.90
1107.30
1112.70
1118.10
1123.50
1128.90
1134.30
1139.70
1145.10
1150.50
1155.90
1161.30
1166.70
1172.10
1177.50
1182.90
1188.30
1193.70
1199.10
1204.50
1209.90

437.50
440.63
443.75
446.88
450.00
453.13
456.25
459.38
462.50
465.63
468.75
471.88
475.00
478.13
481.25
484.38
487.50
490.63
493.75
496.88
500.00
503.13
506.25
509.38
512.50
515.63
518.75
521.88
525.00
528.13
531.25
534.38
537.50
540.63
543.75
546.88
550.00
553.13
556.25
559.38
562.50
565.63
568.75
571.88
575.00
578.13
581.25
584.38
587.50
590.63
593.75
596.88

224.00
225.60
227.20
228.80
230.40
232.00
233.60
235.20
236.80
238.40
240.00
241.60
243.20
244.80
246.40
248.00
249.60
251.20
252.80
254.40
256.00
257.60
259.20
260.80
262.40
264.00
265.60
267.20
268.80
270.40
272.00
273.60
275.20
276.80
278.40
280.00
281.60
283.20
284.80
286.40
288.00
289.60
291.20
292.80
294.40
296.00
297.60
299.20
300.80
302.40
304.00
305.60

587.09
589.18
591.26
593.34
595.42
597.51
599.59
601.67
603.75
605.66
607.57
609.48
611.38
613.29
615.20
617.11
619.01
620.92
622.83
624.74
626.64
628.55
630.46
632.37
634.27
636.18
638.09
640.00
641.90
643.81
645.72
647.63
649.53
651.44
653.35
655.26
657.16
659.07
660.98
662.89
664.79
666.70
668.61
670.52
672.42
674.33
676.24
678.15
680.05
681.96
683.87
685.78

670.96
673.34
675.72
678.10
680.48
682.86
685.24
687.62
690.00
692.18
694.36
696.54
698.72
700.90
703.08
705.26
707.44
709.62
711.80
713.98
716.16
718.34
720.52
722.70
724.88
727.06
729.24
731.42
733.60
735.78
737.96
740.14
742.32
744.50
746.68
748.86
751.04
753.22
755.40
757.58
759.76
761.94
764.12
766.30
768.48
770.66
772.84
775.02
777.20
779.38
781.56
783.74

754.83
757.51
760.19
762.87
765.54
768.22
770.90
773.58
776.25
778.71
781.16
783.61
786.06
788.52
790.97
793.42
795.87
798.33
800.78
803.23
805.68
808.14
810.59
813.04
815.49
817.95
820.40
822.85
825.30
827.76
830.21
832.66
835.11
837.57
840.02
842.47
844.92
847.38
849.83
852.28
854.73
857.19
859.64
862.09
864.54
867.00
869.45
871.90
874.35
876.81
879.26
881.71

629.03
631.26
633.49
635.72
637.95
640.19
642.41
644.65
646.88
648.92
650.96
653.01
655.05
657.10
659.14
661.19
663.23
665.27
667.31
669.36
671.40
673.45
675.49
677.54
679.58
681.62
683.66
685.71
687.75
689.80
691.84
693.89
695.93
697.97
700.01
702.06
704.10
706.15
708.19
710.24
712.28
714.32
716.36
718.41
720.45
722.50
724.54
726.59
728.63
730.67
732.71
734.76

1215.30
1220.70
1226.10
1231.50
1236.90
1242.30
1247.70
1253.10
1258.50
1263.90
1269.30
1274.70
1280.10
1285.50
1290.90
1296.30
1301.70
1307.10
1312.50
1317.90
1323.30
1328.70
1334.10
1339.50
1344.90
1350.30
1355.70
1361.10
1366.50
1371.90
1377.30
1382.70
1388.10
1393.50
1398.90
1404.30
1409.70
1415.10
1420.50
1425.90
1431.30
1436.70
1442.10
1447.50
1452.90
1458.30
1463.70
1469.10
1474.50
1479.90
1485.30
1490.70

600.00
603.13
606.25
609.38
612.50
615.63
618.75
621.88
625.00
628.13
631.25
634.38
637.50
640.63
643.75
646.88
650.00
653.13
656.25
659.38
662.50
665.63
668.75
671.88
675.00
678.13
681.25
684.38
687.50
690.63
693.75
696.88
700.00
703.13
706.25
709.38
712.50
715.63
718.75
721.88
725.00
728.13
731.25
734.38
737.50
740.63
743.75
746.88
750.00
753.13
756.25
759.38

307.20
308.80
310.40
312.00
313.60
315.20
316.80
318.40
320.00
321.60
323.20
324.80
326.40
328.00
329.60
331.20
332.80
334.40
336.00
337.60
339.20
340.80
342.40
344.00
345.60
347.20
348.80
350.40
352.00
353.60
355.20
356.80
358.40
360.00
361.60
363.20
364.80
366.40
368.00
369.60
371.20
372.80
374.40
376.00
377.60
379.20
380.80
382.40
384.00
385.60
387.20
388.80

687.68
689.59
691.50
693.41
695.31
697.22
699.13
701.04
702.94
704.85
706.76
708.67
710.57
712.48
714.39
716.30
718.20
720.11
722.02
723.93
725.83
727.74
729.65
731.56
733.46
735.37
737.28
739.19
741.09
743.00
744.91
746.82
748.72
750.63
752.54
754.45
756.35
758.26
760.17
762.08
763.98
765.89
767.80
769.71
771.61
773.52
775.43
777.34
779.24
781.15
783.06
784.97

785.92
788.10
790.28
792.46
794.64
796.82
799.00
801.18
803.36
805.54
807.72
809.90
812.08
814.26
816.44
818.62
820.80
822.98
825.16
827.34
829.52
831.70
833.88
836.06
838.24
840.42
842.60
844.78
846.96
849.14
851.32
853.50
855.68
857.86
860.04
862.22
864.40
866.58
868.76
870.94
873.12
875.30
877.48
879.66
881.84
884.02
886.20
888.38
890.56
892.74
894.92
897.10

884.16
886.62
889.07
891.52
893.97
896.43
898.88
901.33
903.78
906.24
908.69
911.14
913.59
916.05
918.50
920.95
923.40
925.86
928.31
930.76
933.21
935.67
938.12
940.57
943.02
945.48
947.93
950.38
952.83
955.29
957.74
960.19
962.64
965.10
967.55
970.00
972.45
974.91
977.36
979.81
982.26
984.72
987.17
989.62
992.07
994.53
996.98
999.43
1001.88
1004.34
1006.79
1009.24

736.80
738.85
740.89
742.94
744.98
747.02
749.06
751.11
753.15
755.20
757.24
759.29
761.33
763.37
765.41
767.46
769.50
771.55
773.59
775.64
777.68
779.72
781.76
783.81
785.85
787.90
789.94
791.99
794.03
796.07
798.11
800.16
802.20
804.25
806.29
808.34
810.38
812.42
814.46
816.51
818.55
820.60
822.64
824.69
826.73
828.77
830.81
832.86
834.90
836.95
838.99
841.04

1496.10
1501.50
1506.90
1512.30
1517.70
1523.10
1528.50
1533.90
1539.30
1544.70
1550.10
1555.50
1560.90
1566.30
1571.70
1577.10
1582.50
1587.90
1593.30
1598.70
1604.10
1609.50
1614.90
1620.30
1625.70
1631.10
1636.50
1641.90
1647.30
1652.70
1658.10
1663.50
1668.90
1674.30
1679.70
1685.10
1690.50
1695.90
1701.30
1706.70
1712.10
1717.50
1722.90
1728.30
1733.70
1739.10
1744.50
1749.90
1755.30
1760.70
1766.10
1771.50

762.50
765.63
768.75
771.88
775.00
778.13
781.25
784.38
787.50
790.63
793.75
796.88
800.00
803.13
806.25
809.38
812.50
815.63
818.75
821.88
825.00
828.13
831.25
834.38
837.50
840.63
843.75
846.88
850.00
853.13
856.25
859.38
862.50
865.63
868.75
871.88
875.00
878.13
881.25
884.38
887.50
890.63
893.75
896.88
900.00
903.13
906.25
909.38
912.50
915.63
918.75
921.88

390.40
392.00
393.60
395.20
396.80
398.40
400.00
401.60
403.20
404.80
406.40
408.00
409.60
411.20
412.80
414.40
416.00
417.60
419.20
420.80
422.40
424.00
425.60
427.20
428.80
430.40
432.00
433.60
435.20
436.80
438.40
440.00
441.60
443.20
444.80
446.40
448.00
449.60
451.20
452.80
454.40
456.00
457.60
459.20
460.80
462.40
464.00
465.60
467.20
468.80
470.40
472.00

786.87
788.78
790.69
792.60
794.50
796.41
798.32
800.23
802.13
804.04
805.95

899.28
901.46
903.64
905.82
908.00
910.18
912.36
914.54
916.72
918.90
921.08

1011.69
1014.15
1016.60
1019.05
1021.50
1023.96
1026.41
1028.86
1031.31
1033.77
1036.22

843.08
845.12
847.16
849.21
851.25
853.30
855.34
857.39
859.43
861.47
863.51

1776.90
1782.30
1787.70
1793.10
1798.50
1803.90
1809.30
1814.70
1820.10
1825.50
1830.90

925.00
928.13
931.25
934.38
937.50
940.63
943.75
946.88
950.00
953.13
956.25

473.60
475.20
476.80
478.40
480.00
481.60
483.20
484.80
486.40
488.00
489.60

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in Gadchiroli Taluka & Dist.
Gadchiroli.

APPENDIX "A"
Sr.No.

Name of Material

Approximately Quantity
to be supplied

Unit

Rate of which the materials


will be charged to the Contractor
In Figures
In Words
5
6

H.Y.S.D. Steel

4.742
MT

Per Metric
Tonne

-----

-----

Cement 43 Grade

349
Bags

Per Bag

-----

-----

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Place of Delivery

7
All the materials mentioned are to be
procured by contractor at his own
cost and risk from open market &
proof of purchase of materials should
be submitted. All materials should be
tested from P.W. Distt. Laboratory at
his own cost. RCC Pipes should
purchase from MSSIDC only & bill
along with test result should be
submitted.

Executive Engineer
P.W. Division No. 1
Gadchiroli

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000


to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.
Quarry Chart

Dongargao
n
Crusher1.0
Km off

1 km off

220.000

Nagari Village

Mohazari Village
204/400

Proposed
Road

Kathani River

195.200

Sand
madiya
Tukum
Murum &
Brick
Quarry

0.50 Km off

192.300
98/800

MSH - 7

Gadchiroli

108/600

112/400

126/000
To Dhanora

CB Metal upto plant Site -128.50 Km


CB Metal upto Indira Chowk -123.20 Km
Chamorshi

170.600

1) Certified that the quarries shown have good and sufficeint quantity of material available in it.
2) Certified that the route shown is shortes one.

A E II

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in Gadchiroli Taluka & Dist.
Gadchiroli.
SCHEDULE "B" & "C"
Sr.
Item of Work
No.
1 Excavation for catch / side water gutter in
all sort of soils, soft murum etc. to the
specified section including stacking the
excavated stuff in regular bund and disposing
off unsuitable or excess stuff upto a lead of 50
m and spreading as directed Engineer-incharge.

Quantity

2 Laying, watering and compacting the


embankment formed of materials obtained
from the road cutting, breaking clods, dressing
to 3% camber design superelevation curve &
prescribed section for embankment within a
lead of 50 m, after laying them in layers of
20cm to 30cm. with static roller etc. complete.

356.000

12.00

Rs. Thirteen & Paise Twenty


Only.

One Cubic
Meter

3 Providing earthwork in embankment with


approved materials obtained from
departmental land or other sources including
all lifts, laying in layers of 20 cm. to 30 cm.
thickness breaking clods, dressing to the
required lines, curves, grade and section,
watering and compacting with power roller
complete.

1280.440

155.85

Rs. One Hundred Forty Two &


Paise Fifty Only.

One Cubic
Meter

356.00

Rate
In Figures
In Words
105.50 Rs. Eigthy Nine & Paise Eigthy
Five Only.

Unit
One Cubic
Meter

Amount
in Rs.
37558.00

4272.00

Specifications
Rd.9/Page No.187

Rd.13/Page No.194 &


Rd.16/Page No.195

199557.00 Rd.13/Page No.194

Sr.
Item of Work
Quantity
No.
4 Supplying trap/granite/quartzite/ gneiss
stone metal of required size by bringing
the boulders at the road side breaking them
to required gradation including conveying the
boulders and stacking the broken metal etc.
complete. (Prior approval of sample stack of
broken metal by the Ex.Engineer is necessary,
the date of approval will form part of the
measurements

In Figures

Rate
In Words

Unit

Amount
in Rs.

Specifications

b) By Breaking boulder (Hand broken)


385.040

695.75

Rs. Eigth Hundred Twenty Nine One Cubic


& Paise Eigthy Only.
Meter

267892.00 Rd.19,20,21,22/Page
No. 197 to 201

175.020

723.35

Rs. Eigth Hundred Fifty Four &


Paise Ninty Five Only.

One Cubic
Meter

126601.00 Rd.19,20,21,22/Page
No. 197 to 201

5 Supplying soft murum at the road side,


including conveying and stacking complete.

738.730

456.85

Rs. Three Hundred Eigthy Five


& Paise Eigthy Only.

One Cubic
Meter

337489.00 Rd.24/Page No.203

6 Supplying sand at the road side, including


conveying and stacking complete.

694.980

455.95

Rs. Four Hundred Forty One &


Paise Ninty Five Only.

One Cubic
Meter

316876.00 Rd.25/Page No.203

7 Spreading gravel/sand/soft murum/


available murum over rubble soling/ W.B.M.
surface blanketing berms etc. complete.

1433.710

16.80

Rs. Thirteen & Paise Twenty


Only.

One Cubic
Meter

24086.00

Rd.28/Page No.205

8 Spreading 80 mm metal including sectioning


complete.

385.040

27.60

Rs. Twenty Two & Paise


Seventy Five Only.

One Cubic
Meter

10627.00

Rd.29/Page No.205

9 Spreading 40 mm metal including sectioning


complete.

175.020

24.00

Rs. Ninteen & Paise Seventy


Five Only.

One Cubic
Meter

4200.00

Rd.29/Page No.205

80 mm Metal

40 mm Metal

Sr.
Item of Work
Quantity
Rate
No.
In Figures
In Words
Rs. Six & Paise Sixty Only.
10 Compacting the hard murum / kankar of all 1925.220
8.40
width (200 mm. loose) with Static roller
including necessary artificial watering
complete.

Unit
One Square
Meter

Amount
in Rs.
16172.00

Specifications
Rd.38/Page No.210

11 Compacting the sub grade/gravel/ oversize 1925.220


metal (200 mm loose) layers of all width
with static roller including necessary, labour,
materials and artificial watering complete.

13.80

Rs. Eleven & Paise Forty Only.

One Square
Meter

26568.00

Rd.32/Page No.205

12 Compacting the sub grade/gravel/ size


1750.200
metal (100 mm loose) layers of all width
with static roller including necessary, labour,
materials and artificial watering complete.

14.40

Rs. Eleven & Paise Forty Only.

One Square
Meter

25203.00

Rd.35/Page No.209

13 Compacting the hard murum side widths


layerwise on each side with static roller
including necessary artificial watering
complete .

5250.600

3.60

Rs. Three & Paise Sixty Only.

One Square
Meter

18902.00

Rd.40/Page No.211

14 Excavation for foundation in earth, soils of


all types, sand, gravel soft murum etc.
including shoring and strutting as necessary
and disposing off excavated stuff within lead
of 100 m as directed etc. complete

11.090

149.85

Rs. One Hundred Twenty Eigth


& Paise Twenty Only.

One Cubic
Meter

1663.00

BR.3/Page No.102

15 Providing rubble filling of trap / granite /


quartzite / gneiss stones in foundation
including hand packing filling gravel / sand in
the voids etc. complete.

1.960

672.40

Rs. Eigth Hundred Seventy & One Cubic


Paise Ninty Only.
Meter

1318.00

CD.1/Page No.159

Sr.
Item of Work
No.
16 Providing and laying in situ cement concrete
of 1:4:8 proportion with trap / granite /
quartzite / gneiss metal in foundation
including necessary compacting and curing
complete. (Including plywood/ steel formwork)
The C.M. 1:3 plaster is considered for
rendering uneven and honeycombed surface
only. Newly laid concrete shall be covered by
gunny bag, plastic, tarpaulin etc. (Wooden
centering/formwork will not be allowed).

Quantity

17 Providing and laying in situ cement concrete


of M-15 / 1:2:4 with trap / granite / quartzite
/ gneiss metal in face wall including
plywood/ steel formwork and steel centering,
compaction by vibrator, finishing uneven and
honeycombed surface with C.M.1:3 of
sufficient minimum thickness to give smooth
and even surface, filling joints with bitumen,
curing etc. complete. (Excluding cost of
reinforcement.) The C.M. 1:3 plaster is
considered for rendering uneven and
honeycombed surface only. Newly laid
concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden
centering/formwork will not be allowed).

4.540

1.310

Rate
In Figures
In Words
3213.25 Rs. Three Thousand One
Hundred Fifty Nine & Paise Nil
Only.

Unit
One Cubic
Meter

One Cubic
5325.55 Rs. Four Thousand Seven
Hundred Eigthy Nine & Paise Nil Meter
Only.

Amount
in Rs.
4209.00

24178.00

Specifications
CD.3/Page No.160

CD.3/Page No.160 / I.S.


456 (2000)

Sr.
Item of Work
No.
18 Providing and laying in situ M-15 / 1:2:4
cement concrete of trap / granite / quartzite
/ gneiss metal for levelling coures below
R.C.C raft and in foundation including
necessary plywood/steel formwork, steel
centering, compaction by vibrating finishing,
curing etc. complete. The C.M. 1:3 plaster is
considered for rendering uneven and
honeycombed surface only. Newly laid
concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden
centering/formwork will not be allowed).

Quantity

19 Providing and fixing A.C./ UPVC pipes of 100


mm diameter and of required length for
relieving water pressure, stone filter as
directed complete. (For weep holes in raft).

2.230

135.50

20 Providing and laying in situ Cement concrete


of M - 20 grade of trap / granite / quartzite /
gneiss metal for R.C.C Work in solid / deck
slab including plywood/steel formwork, steel
centering, compaction by vibrating finishing
uneven and honeycombed surface with
C.M.1:3 of sufficient minimum thickness to
give a smooth and even surface or
roughening the surface if special finish is to be
provided, curing and finishing in cement
plaster (Excluding reinforcement, including
cover block) The C.M. 1:3 plaster is
considered for rendering uneven and
honeycombed surface only. Newly laid
concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering /
formwork will not be allowed).

2.930

6774.85 Rs. Six Thousand One Hundred One Cubic


Six & Paise Ten Only.
Meter

1.170

Rate
In Figures
In Words
4922.45 Rs. Four Thousand Four
Hundred Twenty Five & Paise
Thirty Only.

Unit
One Cubic
Meter

Rs. One Hundred Twenty Three One


& Paise Forty Only.
Running
Meter

Amount
in Rs.
5759.00

302.00

19850.00

Specifications
BR.5/Page No.105

As directed by Engineer
in-charge.

BR.38/Page
No.135/I.S.456 (2000)

Sr.
No.

Item of Work

Quantity

Rate
In Words

In Figures

21 Providing and cutting, bending, hooking,


laying, in position and tying bar reinforcement
as per detailed drawing for R.C.C. works etc.
complete.

0.411

Unit

Amount
in Rs.

63834.20 Rs. Fifty Three Thousand Three One Metric


Hundred Thirty One & Paise
Tonne.
Thirty Only.

Specifications

26236.00

BR.35/Page No. 134

229.00

CD.14/Page No.167

H.Y.S.D. Steel bars.


22 Providing selected murum (having PI < 6 )
filling including laying in layers of 15 cm to 20
cm watering and compacting etc. complete.

0.650

353.05

Rs. Three Hundred Thirty One & One Cubic


Paise Ten Only.
Meter

Total

Prepared by me

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Rs.

1499747.00

Executive Engineer
P.W. Division No. 1
Gadchiroli

Statement showing Labour Component & Material Required for Work

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.
Sr.
No.

Item of Work

Labour
Rate

Unit

1 Excavation for catch / side water gutter in all sort of soils, soft murum etc. to 356.000
the specified section including stacking the excavated stuff in regular bund

75.00

/Cum

26700.00

2 Watering and compacting the embankment formed of materials obtained from


the road cutting, laying them in layers of 20cm to 30cm thickness breaking

356.000

4.00

/Cum

1424.00

3 Providing earthwork in embankment with approved materials obtained from 1280.440


departmental land or other sources including all lifts, laying in layers of 20 cm.

50.00

/Cum

64022.00

4 Supplying trap/granite/quartzite/ gneiss stone metal of required size by


bringing the boulders at the road side breaking them to required gradation
385.040
For 80mm Metal

203.00

/Cum

78163.00

385.04

175.020

222.00

/Cum

38854.00

175.02

5 Supplying soft murum at the road side, including conveying and stacking 738.730
complete.

55.00

/Cum

40630.00

738.73

6 Supplying sand at the road side, including conveying and stacking complete.

694.980

61.00

/Cum

42394.00

694.98

7 Spreading gravel/sand/soft murum/ available murum over rubble soling/ 1433.710


W.B.M. surface blanketing berms etc. complete.

11.00

/Cum

15771.00

8 Spreading 80 mm metal including sectioning complete.

385.040

19.00

/Cum

7316.00

9 Spreading 40 mm metal including sectioning complete.

175.020

16.50

/Cum

2888.00

For 40mm Metal

Quantity

Labour
Amount

HB Metal CB Metal

Sand

Material
Murum Cement

Steel

Bitumen
Upto Site Upto Plant
0
0

Sr.
No.

Item of Work

Labour
Rate

Unit

10 Compacting the hard murum / kankar for all widths (200 mm. loose) with 1925.22
static roller including necessary artificial watering complete.

1.00

/Sqm.

1925.00

11 Compacting the sub grade/gravel/ oversize metal (200 mm loose) layers for all 1925.22
widths with static roller including necessary, labour, materials and artificial

2.00

/Sqm.

3850.00

12 Compacting the sub grade/gravel/ size metal (100 mm loose) layers for all 1750.20
widths with static roller including necessary, labour, materials and artificial
watering complete.
13 Compacting the hard murum side widths layerwise on each side with static 5250.60
roller including necessary artificial watering complete .

2.00

/Sqm.

3500.00

1.00

/Sqm.

5251.00

11.09

107.00

/Cum

1187.00

15 Providing rubble filling of trap / granite / quartzite / gneiss stones in foundation


including hand packing filling gravel / sand in the voids etc. complete.

1.960

78.00

/Cum

153.00

1.960

16 Providing and laying in situ cement concrete of 1:4:8 proportion with trap /
granite / quartzite / gneiss metal in foundation including necessary compacting

1.310

408.00

/Cum

534.00

1.18

0.59

4.454

17 Providing and laying in situ cement concrete of M-15 / 1:2:4 with trap / granite
/ quartzite / gneiss metal in face wall including plywood/ steel formwork and

4.540

427.00

/Cum

1939.00

3.86

1.93

28.47

18 Providing and laying in situ M-15 / 1:2:4 cement concrete of trap / granite /
quartzite / gneiss metal for levelling coures below R.C.C raft and in foundation

1.170

340.00

/Cum

398.00

0.99

0.50

7.34

19 Providing and fixing A.C./ UPVC pipes of 100 mm diameter and of required
length for relieving water pressure, stone filter as directed complete.(For weep

2.230

10.00

/Rmt.

22.00

20 Providing and laying in situ Cement concrete of M - 20 grade of trap / granite /


quartzite / gneiss metal for R.C.C Work in solid / deck slab including

2.930

2939.00

2.49

1.25

20.803

14 Excavation for foundation in earth, soils of all types, sand, gravel soft murum
etc. including shoring and strutting as necessary and disposing off excavated
Lift upto 1.50m.

Quantity

1003.00 /Cum

Labour
Amount

HB Metal CB Metal

Sand

Material
Murum Cement

Steel

Bitumen

Sr.
No.

Item of Work

Quantity

Labour
Rate

Unit

Labour
Amount

HB Metal CB Metal

Sand

Material
Murum Cement

Steel

Bitumen

21 Providing and cutting, bending, hooking, laying, in position and tying


mild/H.Y.S.D.steel bars for reinforcement as per detailed drawing for R.C.C.

0.411

2787.00

/MT

1145.00

0.411

22 Providing selected murum (having PI < 6 ) filling including laying in layers of


15 cm to 20 cm watering and compacting etc. complete.

0.650

40.00

/Cum

26.00

0.65

562.02
562.00
Cum.

8.52
9.00
Cum.

699.24
699.00
Cum.

0.41
0.411
MT

0.00
0.000
MT

0.00
0.000
MT

Rs. 341031.00

Material
HB Metal
CB Metal
Sand
Murum
Cement
Steel
Bitumen Site
Bitumen Plant

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

562.00
9.00
699.00
739.00
61.00
0.411
0.000
0.000

Cum.
Cum.
Cum.
Cum.
Bag
MT
MT
MT

739.38
61.06
739.00
61.00
Cum. Bag
Total
562.00
9.00
699.00
739.00
61.00
0.41
0.000
0.000

Cum.
Cum.
Cum.
Cum.
Bag
MT
MT
MT

Executive Engineer
P.W. Division No. 1
Gadchiroli

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

Sr.
No.
1
1
2
3

Statement showing Km. Running of Vehicle to brought material Required on site for work.
Particulars of Machineris
Quantity Output
Total
Diesel Required Mobile Oil Required Grease Required
LDO Required
in Cum.
Days
Standard Consptn. Standard Consptn. Standard Consptn. Standard Consptn.
2
3
4
5
6
7
8
Concrete Mixer
9.95
100.00
0.10
35.00
3.48
1.00
0.10
1.00
0.10
------Cum
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
Vibrator
9.95
100.00
0.10
15.00
1.49
0.50
0.10
0.00
0.00
------Cum
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
Blanketing
1925.22
Sqm.
a) Roller
288.78
100.00
2.89
83.00
239.69
2.65
7.70
2.65
7.70
------Cum.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
b) Tanker
288.78
100.00
2.89
66.50
192.04
1.65
4.80
0.85
2.50
------Sqm.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
80mm Metalling
1925.22
Sqm.
a) Roller
288.78
100.00
2.89
83.00
239.69
2.65
7.70
2.65
7.70
------Cum.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
b) Tanker
288.78
100.00
2.89
66.50
192.04
1.65
4.80
0.85
2.50
------Sqm.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
40mm Metalling
1750.20
Sqm.
a) Roller
131.27
100.00
1.31
83.00
108.95
2.65
3.50
2.65
3.50
------Cum.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
b) Tanker
131.27
100.00
1.31
66.50
87.29
1.65
2.20
0.85
1.20
------Sqm.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
Side Berm
5250.60
Sqm.
a) Roller
787.59
100.00
7.88
83.00
653.70
2.65
20.90
2.65
20.90
------Cum.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.
b) Tanker
787.59
100.00
7.88
66.50
523.75
1.65
13.00
0.85
6.70
------Sqm.
Cum.
Lit/day
Lit.
Lit/day
Lit.
Kg/day
Kg.

Sr.
No.
1

Particulars of Machineris
2

7 Transportation of material

Quantity
in Cum.
3

Output
4

Total
Days

Diesel Required Mobile Oil Required Grease Required


LDO Required
Standard Consptn. Standard Consptn. Standard Consptn. Standard Consptn.
5
6
7
8

5288.50

3.00

1763.00

400.00

13.22

500.00

10.58

Km.

Km/Lit.

Lit.
4005.12

Km/Lit.

Lit.
78.02

Km/Kg.

Kg.
63.38

0.0

Kg.

Litre

TOTAL

Litre

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Litre

----

Executive Engineer
P.W. Division No. 1
Gadchiroli

----

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km


0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.
1) Cost of P.O.L. Component
Material
a) Diesel
b) Mobile Oil
c) Grease
d) LDO

2) Labour Component

Quantity
4005.12
78.02
63.38
0.00

Unit
Litre
Litre
Kg.
Litre

Unit
/Litre
/Litre
/Kg.
/Litre
Total Rs.

Amount
175024.00
8582.00
6338.00
0.00
189944.00

Total Rs.

189944.00

Total Rs.
Add 20 % for Gadchiroli District = Rs.
Total Rs.

341031.00
68206.00
409237.00

Total Rs.

900566.00

Rs.
Rs.
Rs.
Rs.

Rate
43.70
110.00
100.00
35.00

3) Material Component
Total Cost of work
Deduct cost of 1 & 2

Rs. 1499747.00
Rs. -599181.00
Rs.
900566.00

Components

Total Cost of Work

Rs. 1499747.00

Labour Component

Rs.

409237.00

27.29 %

Material Component

Rs.

900566.00

60.05 %

POL Component

Rs.

189944.00

12.67 %

Rs. 1499747.00

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

100.01

Executive Engineer
P.W. Division No.I
Gadchiroli

Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to


0/600 in Gadchiroli Taluka & Dist. Gadchiroli.
Statement showing Km. Running of Vehicle to brought material Required on site for work.
Sr.
Material
No.
1
2
1 HB Metal

Quantity
in Cum.
3
562.00

Qty in One No of Trip Km./Trip To & Fro Km. Total Km. Remark
Trip
4
5
6
7
8
9
6.00
94.00
17.50
17.50
1645.00

Cum.

Cum/trip

2 CB Metal

9.00
Cum.

6.00
Cum/trip

2.00

136.00

136.00

272.00

3 Sand

699.00

6.00

117.00

10.50

10.50

1228.50

Cum.

Cum/trip

4 Murum

739.00
Cum.

6.00
Cum/trip

123.00

17.00

17.00

2091.00

5 Cement

61.00

250.00

1.00

13.00

26.00

26.00

Bag

Bag/tyrip

0.411
MT

10.00
MT/Trip

1.00

13.00

26.00

26.00

6 Steel

TOTAL

5288.50

Assistant Engineer Gr. 1


P.W. Sub-Division No. 1,
Gadchiroli

Executive Engineer
P.W. Division No. 1
Gadchiroli