DCR # : 230 DCR Date : Thursday, February 02, 2012 Recording Date : 3-Feb-12
To Supervision Consultant :
Temp
15
Wind
Rain Dust
Humidity
High
Dry Moder Humid
Clear
Overca st
Still
Moder
MACHINERY USED
Augering Machine Size No. On Site Hrs Hydraulic Placing Boom Bar bending Machine Bar cutting Machine Elect. Wood Saw Bull Dozer Compressor Concrete Pump Mobile Crane Tower Crane Dewatering pump
6-Wheel
Dumpers
Excavator
Bob cat
Generator
Grader
Half Lorry
Hoist
Jack hammer Size No. On Site Hrs Wheel Loader Size No. On Site Hrs
Plate Compactor
Roller Compactor
Total Station
Tractor
Trailer
Vibrator
Welding Machine
1
8
4
8
JCB
22
DISTRIBUTION
KEO(A/E)
Projacs(CM)
Owner
1 of 6
Total 74
Total 23
Total 28
Total 28
Total 25
Total 20
Total 4
Grand Total - Direct Man Power MATERIAL DELIVERED TO THE SITE Quantity Unit
221 Origin/Manufacturer
Sr. No:
Description
SITE SAFETY
We have inspected the works, working area, procedures and practices and have found the following items are satisfactory with regard to safety precautions
Electrical(Temp Light, Temp. Power, Generators, etc.) Access (Ladder tied-off, walk ways clear, etc.) Temporary works (scaffolding, shoring, hoists, rubbish chutes, etc.)
Equipment (excavator, tower & mobile cranes, loaders lifts, etc.) PPE (All personnel provided with personal protective equipment compliant to safety standards and codes. and informed of emergency management procedures) Warnings at hazard areas (pits, holes, tripping hazards, stair Provisions for first aid stocked landing, floor and roof edges, etc.)
2 of 6
DCR Date:
Start Date
Finish Date
Remarks
Basement-02(-7.00)
Basement-01(-3.50)
Finishes
Finishes
29-Jan-12 14-Jan-12
75% 34%
3 of 6
Remarks
Finishes
Finishes
4 of 6
Remarks
Finishes
Finishes
5 of 6
Remarks
Remarks
Finishes
Finishes
6 of 6