You are on page 1of 93

ISO 9001 & 14001 CORPORATION

Tender Specification for Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers for (48x3)TR (approx.) along with associated works for MCA Building at Sector-1, Bidanasi, Cuttack.
Tender Call Notice No. Estimated Cost Time of Completion Cost of Tender Paper EMD Date of Sale Date of Downloading Date of Receipt Date of Opening M.R. No. & Date Issued to : : : : : : : : : : : M/s. 185 Dtd.29.01.2010 Rs.93.32 Lakh Ninety Days Rs.10,000.00 + VAT 1 % of the Quoted Value Dtd.02.02.10 to 10.02.10 Dtd.02.02.10 to 10.02.10 Dtd.16.02.10 upto15.00 Hrs. Dtd.17.02.10 at 16.00 Hrs.

Sir,

1.

After careful examination of the above specification together with the general conditions referred therein, we hereby offer to supply, erect, test and commission the materials covered thereon complete in all respects as per specification and general conditions at the rate quoted in attached schedule of prices of the tender.

2. 3.

Our offer shall be valid up to 180 days from the date of opening of Price Bid of the Tender. We hereby undertake to have the materials delivered / work executed within the time specified in the tender and to adhere to the quantity to be supplied at destinations to be prescribed by the owner.

4.

We hereby guarantee the technical particulars given in the tender, supported with necessary test reports from concerned authorities.

5.

We certify to have purchased a copy of the tender papers by remitting Rs._________ (Rupees _______________________________________) only by cash and this has been acknowledged by you in your Money Receipt No dated .

6.

We agree to furnish the security deposit in the manner to be decided by your competent authority. We remain.

Yours faithfully,

(Signature) (With seal) Note : This form should be duly filled in by the Tenderer and returned to the Divisional Head (Electrical), IDCO, Bhubaneswar - 751022 along with the Tender.

ORISSA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION (IDCO) IDCO TOWER JANPATH, BHUBANESWAR- 751022

(IDCO/QP/ELECT/F-05) TENDER CALL NOTICE No. BBSR / ELECT / E - 1550 / 09 - 10 / 185 Dated. 29.01.2010

1. The Divisional Head, Electrical Division, IDCO, Bhubaneswar invites Sealed Tenders from HV Airconditioning Manufacturers / Experienced HV A.C. Contractors for Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers of (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9 (P), Markat Nagar, Sector - 1, Bidanasi, Cuttack as per brief details indicated in the table below. The Tender Documents will be issued to the firms on production of following satisfactory documents only.

Documents as Original Manufacturer or as experienced AC Contractors having executed similar nature of works in a single order value not less than Rs.70.00 Lakh within last Three Years.

Copy of valid VAT Registration and Clearance Certificate. Copy of valid PAN. Copy of EPF Registration Certificate. Documents in support of having Service Facilities at Cuttack and Bhubaneswar.

2. Bids must be accompanied by Earnest Money in the shape of Demand Draft from any Nationalised Bank for an amount as mentioned in the table payable at Bhubaneswar and drawn in favour of Orissa Industrial Infrastructure Development Corporation. Bids without required amount of Earnest Money will not be taken in to consideration. 3. The Tender Document can also be downloaded within 02.02.10 to 10.02.10 from our Website at www.idco.in, in that case the cost of the Bid Document shall be submitted along with the Tender in the form of Demand Draft drawn in favour of Orissa Industrial Infrastructure Development Corporation payable at Bhubaneswar. The offer shall be considered only if the authority is satisfied about the fulfillment of eligibility criteria by the firm. IDCO shall not be responsible for any delay / difficulty / inaccessibility of the Downloading facility, incase of any discrepancy between the Tender Document Downloaded and the Master Copy available in the office, the master copy will prevail, No claim on this account will be entertained. 4. The sealed bids must be delivered to Divisional Head (Electrical), IDCO, IDCO Towers, Janpath, Bhubaneswar - 751022, Orissa office on or before 15.00 Hrs. on 16.02.10 either by Regd. Post / Speed Post. The Bids will be opened on 17.02.10 at 16.00 Hrs. in presence of the bidders or their authorized representatives, who wishes to attend. If the office happens to be eventually closed on the date of submission of the bids, the bids will be received / opened on the next working day of opening of the office at the same time and venue. However, the undersigned will not be held responsible for any postal delay. Other details can be seen in the Bidding Documents.

5. 6.

The authority reserves the right to accept or reject any or all the bids or parts without assigning any reason there of. In case of any clarification visit of site the bidders can contact Sri M.Amiya, Joint Manager (Electrical), IDCO, Bhubaneswar at Tel. No. (0674) 25411819 - Extn. 456 during office hours.

TABLE Sl. No Name of the Work Approx Value of Work and AirScroll MCA 93.32 Lakh Bid Security (in Rs.) 1 % of the Quoted Value Cost of Bid Document (in Rs.) 10,000.00 + VAT Stipulated Period of Completion Ninety Days

1.

Supply,

Erection, of system

Testing HV with for

Commissioning Conditioning with

Chillers for (48x3)TR (approx.) along associated works

Building at Plot No. 9 (P), Markat Nagar, Sector-1, Bidanasi, Cuttack. Sd/Divisional Head (Electrical) Memo No. 186 / Dtd.29.01.2010 Copy submitted to Chief General Manager (Civil), IDCO, Bhubaneswar for kind information. Sd/Divisional Head (Electrical) Memo No. 187 / Dtd.29.01.2010 Copy to DGM (MIS), IDCO, Bhubaneswar for information and necessary action. The copy of Tender Notice and Bid Document contained in the Soft Copy enclosed may be included in our Website.

Sd/Divisional Head (Electrical) Memo No. 188 / Dtd.29.01.2010 Copy to Manager (PR) for favour of kind information and necessary action as due. The enclosed short form of the Tender Notice may be published in News Papers as per norms. Tender Notice may be published on or before 02.02.2010. Sd/Divisional Head (Electrical) Memo No. 189 / Dtd.29.01.2010 Copy to IDCO Notice Board for wide circulation. Sd/-. Divisional Head (Electrical) Memo No. 190 / Dtd.29.01.2010 Copy to Divisional Head, Cuttack Division, IDCO, Cuttack for information. Sd/Divisional Head (Electrical)

COMMERCIAL TERMS & CONDITIONS The Bidder shall tabulate the commercial terms and conditions of the tender in the following. Additional sheets may be attached, if required. 1.0 2.0 3.0 4.0 Bidders Complete Company Name Bidders Proposal Number Bidders Proposal Date Name and Designation of the Officer of the Bidder to whom all references shall be made for expeditious technical co-ordination 5.0 a) Bidders Proposal Validity Is the Bidders Proposal validity as per Owners Specification acceptable? b) If not, specify the terms of Validity of Bidders Proposal (in months) from the Date of Opening of Price Bid 6.0 a) Delivery and Completion Is the term of Delivery / Completion Period as per Owners Specification Acceptable? b) If not, specify the Terms of Delivery / Completion Period (in months) from the date of issue of Letter of Intent i) Supply of Material (Delivery) Testing and Commissioning of : : : : (Yes / No) : : (Yes / No) : : : :

ii) Installation,

works complete in all respect. (Completion) c) Whether the Delivery / Completion Period is Guaranteed under Penalty / Liquidated Damage as per GCC? 7.0 a) Terms of Payment Are Terms of Payment as per Owners : (Yes / No) : (Yes / No)

Specification Acceptable? b) 8.0 If not, specify the Terms of Payment Whether EMD Deposited? If so, give reference. If not, give reasons. : : (Yes / No) : :

9.0

Whether Registered with D.G.S. & D / E.P.M. / Any other such Organisation? If so, Give Details? (Enclose Photostat Copy of the reference letter)

: (Yes / No)

10.0

Whether Photocopy of following currently valid documents furnished?

(a) (b) (c) (d) 11.0

Orissa Sales Tax Registration Certificate Orissa Sales Tax Clearance Certificate Income Tax Clearance Certificate Provident Fund Registration Certificate Conformance

: (Yes / No) : (Yes / No) : (Yes / No) : (Yes / No)

a)

Whether the materials offered are strictly in accordance with owners specification?

: (Yes / No)

b) 12.0

If not, have deviation sheets been duly filled up? Is the Performance Guarantee Period specified in GCC accepted? If not, specify the Performance Guarantee Period (in months)

: (Yes / No) : (Yes / No)

a) b) 13.0.

From the date of Commissioning at Site From the date of Despatch Whether after Sales Service facilities are

: : : (Yes / No)

available at Cuttack / Bhubaneswar a) If Yes, give Address and Details

b) 14.0.

If No, location Nearest Service Centre Whether Tenderer is a Manufacturer of Approved make of Materials? : (Yes / No)

GUIDELINES ON BANK GUARANTEE The following points are required to be noted by the party while submitting any Bank Guarantee. 1. Non-judicial stamp papers on which Bank Guarantee is typed must be purchased in the name of the issuing Bank. 2. 3. The Bank Guarantee must be executed on non-judicial stamp paper of the value applicable in the State, where the Bank Guarantee has been executed. The Bank Guarantee must be furnished in the given proforma by any Nationalised Bank and made operable at Bhubaneswar only. 4. The Bank Guarantee must be executed within six months from the date of purchase of nonjudicial stamp papers. 5. 6. The Bank Guarantee should never be typed on both sides of the non-judicial stamp papers. The Bank Officer executing the Bank Guarantee must furnish the number and date of power of Attorney / Delegation of Authority by which, he has been authorised to issue the Bank Guarantee. 7. 8. 9. The person executing the Bank Guarantee must write his full name and designation. The person, executing the Bank Guarantee, must sign in all pages of Bank Guarantee. All cuttings / additions / over writings in inks must be authenticated by the person executing the Bank Guarantee by his signature and seal of the Bank. 10. 11. 12. 13. 14. Execution of Bank Guarantee must be witnessed by two persons. Witnesses must mention their full name and address. Three months time must be given to file claim or suit from the date of expiry of the Bank Guarantee. The Act, under which issuing Bank is constituted, should be correctly given. If EMD is deposited in shape of Bank Guarantee, it should be valid, operative and irrecoverable till 60 (sixty days) after the validity of offer. 15. All dates should be carefully and correctly put in the Bank Guarantee.

SECTION - 1 (Formats & Deviations) FORMAT FOR BANK GUARANTEE AS EMD

Dated Bank Guarantee No. Ref. No.

To M/s. Orissa Industrial Infrastructure Development Corporation, IDCO, IDCO Towers, Janpath, Bhubaneswar - 751022, Dist. Khurda (Orissa) Dear Sirs, In consideration of Orissa Industrial Infrastructure Development Corporation, having its Registered Office at IDCO Towers, Janpath, Bhubaneswar (hereinafter called the Owner which expression shall unless repugnant to the subject or context include its successors and assigns) having issued Notice Inviting Tender for Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers for (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9 (P), Markat Nagar, Sector-1, Bidanasi, Cuttack and M/s. Registered Head Office at having its

(hereinafter called the Tenderer) who

wished to participate in the said tender for Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers for (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9 (P), Markat Nagar, Sector-1, Bidanasi, Cuttack and the owner, as a special favour, have agreed to accept an irrevocable and unconditional Bank Bid Guarantee executed by any Nationalised Bank operable at its Bhubaneswar Branch only for an amount of Rs. valid up to

on behalf of the tenderer in lieu of Cash Deposit required to be made by the Tenderer, as a condition precedent for participation in the said tender. We the (Bank & Address) incorporated under law and having our

Registered Head Office at

and one of our branches at

(Bhubaneswar Branch Address) do hereby unconditionally and irrevocably guarantee and undertake to pay to the Owner immediately on demand at our Bhubaneswar Branch without any demur reservation, protest, contest and recourse to the extent of the said sum of Rs. (Rupees ) only.

Any such claim/ demand made by the said Owner on us shall be conclusive and binding on us irrespective of any dispute or differences raised by the tenderer. This guarantee shall be irrevocable and shall remain valid up to . If any further extension of this guarantee is

required, the same shall be extended to such required period on receiving instruction from the Tenderer on whose behalf this guarantee is issued.

We, the said Bank, lastly undertake not to revoke this guarantee during its currency except with the previous consent of the Owner in writing and agree that any change in the constitution of the said tenderer or the said Bank shall not discharge our liability here under. I witness where of, the Bank, through its authorised offices has set its hand and stamp on this day of 2010 at .

Witness :

Signature

(Signature)

Name :

Name : Designation with Bank Stamp.

Official Address : Attorney as per power of

Attorney No.

Date. Note : The stamp papers of Rupees forty only shall be purchased in the name of Bid Guarantee issuing Bank.

DEVIATION SHEET: PART - A

If the proposal has got any deviation from the Technical Specification, the Bidder shall tabulate these deviations clause by clause in this Schedule. Additional sheets may be attached, if required. Clause No. Deviations

DEVIATION SHEET : PART - B

If the proposal has got any deviation from the tendering conditions and the General Conditions of Contract, the Bidder shall tabulate these deviations clause by clause in this Schedule. Additional sheets may be attached, if required. Clause No. Deviations

DEVIATION SHEET (IN PRICE): PART - C

Against each and every deviation from the Technical Specification as enumerated in Deviation Sheet: Part - A, the amount by which the Bid Price will thereby be increased or decreased shall be intimated clause by clause in this Schedule. In case the amount is not mentioned in the Schedule against any of the deviations mentioned in Deviation Sheet: Part - A, it will be taken for granted that the same does not involve any change in the Bid Price. Additional sheets may be attached, if required. Clause No. Deviation if any Amount by which the Bid Price will change Increase (Rs.) Decrease (Rs.)

INSTRUCTION FOR THE TENDERER General Instructions: The work put to tender pertains to Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers for (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9 (P), Markat Nagar, Sector-1, Bidanasi, Cuttack. The tenderer shall ensure to follow the instructions given hereunder failing which the tenders shall be liable for rejection. Scope of Proposal: The scope of proposal shall be in accordance with the enclosed technical specification covering Design, supply of materials at site, labour for erection, testing and commissioning of Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers for (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9(P), Markat Nagar, Sector-1, Bidanasi, Cuttack on turnkey basis complete in all respect, obtaining clearance and final handing over to IDCO authorities. Submission of Tender: Tenderers are advised to fill up the prices only in the prescribed format given by IDCO. The tender shall be submitted in two parts, each part being sealed in separate envelope. Part I will cover the Technical Bid with required drawings; general conditions special conditions, deviations if any and EMD. Sales Tax Clearance Certificate, PAN, VAT Registration Certificate, Past Experience. Part II will cover only the Price Bid, Each envelope shall be duly sealed and super-scribed with Techno-Commercial Bid and Price Bid respectively. All the two envelopes shall be put inside another envelope, super-scribed with Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers for (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9(P), Markat Nagar, Sector -1, Bidanasi, Cuttack and sealed properly. The Techno-Commercial Bid and EMD in Part I shall be opened on the due date of opening mentioned in tender call notice. Tenderers may be called to participate in techno-commercial discussions/ negotiations for finalisation of technical bid. The price bid shall be opened after finalisation of technical bid. Telegraphic tenders will not be accepted. Receipt and Opening of Tender: Tenders as described above shall be received in the Office of the Divisional Head (Electrical), IDCO, IDCO Towers, Janpath, Bhubaneswar - 751022 and shall be opened on the scheduled date and time. Telegraphic Tenders will not be Accepted. Prices: The tenderer shall ensure that all prices are filled in the price schedule both in words and figures. No overwriting shall be allowed. The tenderer shall countersign all scoring and cancellation. In case of illegibility, the interpretation and decision of the Engineer-in-charge of the work shall be final.

All entry shall be in English language only. The price should be inclusive of all taxes, duties and transit insurance and FOR destination. Please note that this office will not issue any concessional form for sales tax. The Purchaser shall not issue any Way Bill. In case if on check, there are differences between the rate given by the bidder in words and figures or in the amounts worked out by him, the following procedure shall be followed. When there is difference between a rate in figure and in words, the rate that corresponds to the amount worked out by the bidder shall be taken as correct. When the bidder has not worked out the amount of an item or it does neither correspond with the rate written in figures nor in words, then rate quoted by the bidder in words shall be taken as correct. When the rate quoted by the bidder in figures and in words tallies but the amount is not worked out correctly, the rates quoted by the bidder shall be taken as correct and not the amount. Sales Tax and Income Tax Clearance: The tenderer shall furnish valid current Sales Tax Clearance Certificates, Sales Tax Registration Number (TIN / SRIN) and ITCC / PAN along with EMD contained in the envelope. Tenders not accompanied with these documents shall be liable for rejection at the discretion of the purchaser. Nature of Contract: The work put to tender as described scope of proposal being a job contract in nature shall be treated as Indivisible works contract. Therefore this contract shall be subject to Orissa Sales Tax on works contract. Validity: The Tenderers shall keep the tender valid for a period of 180 (One Hundred Eighty) days from the date of Opening of Price Bid. Reservation of Right: The owner reserves the right to accept any bid or reject any or all bids or cancel or withdraw invitation for bid without assigning any reason for such decision. Such decision, by the owner shall not be subject to question by any bidder and the owner shall bear no liability whatsoever consequent upon such a decision. Clarifications on Tender Specifications: The tenderer should seek for the clarifications with regard to the specification, if any, before submission of the tenders. No correspondence on this account will be entertained after submission of tender.

GENERAL TERMS AND CONDITIONS OF CONTRACT FOR TURNKEY CONTRACT Definition of Terms: In construing this contract and the scope of work, the following words will have same meaning herein assigned to them unless there is something in the subject or context in consistent with such construction. Owner: The Owner shall mean the Orissa Industrial Infrastructure Development Corporation (IDCO) (A Government of Orissa Undertaking) and shall include its legal representatives, successors and assignees. Contractor: The Contractor shall mean the firm whose tender has been accepted by the owner and shall include its legal representatives, successors and assignees. Engineer In Charge: The Engineer-in-charge shall mean the Divisional Head (Electrical) IDCO, Electrical Division, First Floor, IDCO Towers, Janpath, Bhubaneswar or his authorised representative. Consulting Engineer: The Consulting Engineer shall mean the Divisional Head (Electrical), IDCO, IDCO Towers, Janpath, Bhubaneswar or his authorised representative. Consignee: The Consignee shall mean the person authorised by the Consulting Engineer / Engineer-incharge to receive the materials, supervise and take measurement of the work. Site: The Site shall mean, the actual place of the proposed Project as detailed in the specification or other place where work has to be executed under this contract. Specification: The Specification shall mean collectively all terms stipulated in the contract known as General Conditions, Technical Specification and such amendments as may be made in the Agreement pertaining to method and manner of performing the work with respect of quantities & qualities of materials and workmanship to be furnished under the contract. Contract: The Contract shall mean and include the following documents: (a) Invitation to Tender (b) Instructions to Tenderer (c) General Terms and Conditions of Contract

(d) Technical Specification (e) Contract Agreement (f) Contractors tender proposal including clarification letters (g) Letter of Intend (h) Work order (i) Agreement Commissioning: The Commissioning shall mean the first authorised operation of the equipment / installation after completion of erection, testing, initial adjustments, statutory approvals etc. Approved: The Approved shall mean the written approval of the Consulting Engineer / Engr-in-charge. Months: Months shall mean the calendar month. Performance Test: The Performance Test shall mean all the tests as prescribed in the specification / ISS to be carried out by the contractor before taking over the installation by the owner. Final Acceptance: The Final Acceptance shall mean the owners written acceptance of the works performed under the contract after successful completion of Performance & Guarantee Test and Commissioning. Contractor to Inform Himself Fully: The contractor shall be deemed to have carefully examined the General Conditions, Specifications, Schedules and Drawings and also to have satisfied himself as to the nature and type of work to be executed and where necessary of the site conditions and other relevant matters and details. Any information thus had or otherwise obtained from the owner / consulting engineer or the inspector shall not in any way relieve the contractor from his responsibility for supplying the plant and equipment or material and executing the work in terms of the specification including all details and incidental works and supply of all accessories or apparatus which may not have been specifically mentioned in the specification or drawings but otherwise necessary for ensuring complete erection and safe and sufficient working of the plant and equipment or installation. Deviation: The contractor must get the sample materials, which are under scope of supply of contractor, approved by the Client and Engineer-in-charge before procurement otherwise the same shall be liable for rejection.

In case the tenderer wish to deviate in any way from the General Conditions of contract or the Technical Specifications, he should draw specific attention to such departure in his tender. All such deviations shall be clearly mentioned in the Deviation Sheet giving the corresponding reference clause Number. Terms such as See covering letter or Tender printed General Terms and Condition are not acceptable, unless such deviations are submitted with the tender, it will be understood and agreed that the Tenderers proposal is based on strict conformance to purchasers specification in all respects. Price: i. The unit rates quoted for design, engineering manufacturing supply at site, storage, handling installation, testing and commissioning shall be inclusive of all taxes, duties, royalties and all other taxes applicable such as sales tax on work contract and income tax etc. ii. The prices are to be quoted on the lump-sum price based on item rates as indicated in the specification. THE TENDERER
SHALL QUOTE FIRM PRICES FOR THE COMPLETE SCOPE OF WORK.

The prices are to be quoted for the work complete in all respects in strict accordance with the specifications. Should the Tenderer wish to propose alternatives the same should be clearly mentioned in the deviation. Any action on the part of the Tenderer to revise the price/ prices/ and/ or to change the structure of price / prices at his own instance after opening of the tender may result in rejection of the tender. Terms of Payment: Subject to any deduction which the owner may be authorised to make under the contract, the contractor shall on the certificate of the engineer or his authorised representatives whose certificate will be final regarding evidence of materials at site and completion or erection etc. be entitled to payments generally as follows; 70% of the contract price shall be paid after supply of materials, verification and

acceptance of materials at site in good condition by the Consignee / Engineer - in -charge and presentation of bills, subject to acceptance of your Security Deposit B.G. and execution of agreement. 20% shall be paid after completion of erection and testing of the work. Balance 10% shall be paid on completion of satisfactory Commissioning, Performance

Test and after final acceptance by the Engineer-in-charge, subject to you submission of Performance B.G. and acceptance thereof. Contract Price: The lump sum price quoted by the contractor in his bid with additions and deletion as may be agreed before signing of the contract for the entire scope of the work viz. Supply and erection of equipment concerned under the specification and documents shall be treated as the contract price. Change of Quantity: The owner reserves the right to vary the quantities of items or groups of items to be ordered as specified in the accompanying Technical Specifications as may be necessary during the execution of the contract.

Taxes: i. The contractor shall include all taxes, duties, royalty of whatever nature, entry tax; other local taxes etc. if any in the quoted price. ii. Sales tax or any other tax on materials required for the work and also tax on works contract shall be payable by the contractor. Owner will not entertain any such claim whatsoever on this account. iii. Not with standing anything contained elsewhere in the contractor the owner shall deduct at source from the payment due to the contract, the taxes as required under Orissa Sales Tax Act and Income Tax Act, 1961 or as amended from time to time, or any other statute. The owner shall pay the amount so deducted to the Sales Tax and Income Tax authorities as per the law. This is for the contractor to deal with the Sales tax Authority directly in respect to any claim or refund relating to the above tax owner shall not be liable or responsible for any type of payment for reimbursement in this regard. iv. The supplier / contractor should furnish his valid STCC with OVAT Registration Number.

Liquidated Damage for Delay in Completion: If the contractor fails in the due performance of the contract to supply/ erection/ testing / commissioning the equipment within the time fixed by the owner or any extension thereof, he shall be liable at the discretion of the Engineer to liquidated damage amounting to 0.5% (HALF PERCENT) of the Contract Price per Week. The contractors liability for delay shall not in any case exceed 5% (FIVE
PERCENT)

of the total contract price. If the contractor shall fail to supply the equipment or any part

thereof within a reasonable period after the expiry of the appointed time of extended time as may be provided for in the contract the provisions in clause " Negligence " shall become operative, in addition to the liability of Liquidated Damage as above. Despatch Instructions: The materials that will be required to be despatched under this contract, shall be despatched to the work site in the name of the Consignee with a copy addressed to MCA Building at Plot No. 9 (P), Markat Nagar, Sector-1, Bidanasi, Cuttack. The contractor shall have to intimate the probable date of arrival of materials at site to the Engineer. Inspection and Tests: The corporation shall inspect, examine and test the equipment material through its representative at the manufacture/ suppliers works during or after the manufacture of goods prior to despatch on receipt of a clear notice of minimum two weeks in advance to the reckoned from the date of receipt by the purchase. The supplier/ contractor shall provide all facilities as may be required to carry out the tests in accordance with approved standards free of cost.

Negligence: If the contractor neglects to execute the work with due diligence and expedition of refuse or neglects to comply with any reasonable orders given to him in writing by the Engineer in connection with the work, or contravene the provisions of the contract, the purchaser may give notice in writing to the contractor calling upon him to make good the failure, neglect or contravention complained of. Should the contractor fail to comply with such notice within a period, in the case of failure, neglect or contravention capable of being made good within that time or otherwise within such time as may in the opinion of the purchaser be reasonably necessary for making it good, then and in such case the purchaser shall have the option and be at liberty to take the work wholly or in part, out of the contractors hand and may carry on the work envisaged in the contract at a price with any other materials, tools, tackle or labour for the purpose of completing the works or part thereof. In such event the purchaser shall without being responsible to the contractor for fair wear and tear of the same be entitled to seize and take possession and have free use of all materials, tools tackle or other things which may be on the site, for use at any time in connection with the work to the exclusion of any right of the contractor over the same and the purchaser shall be entitled to apply and balance sum which may otherwise be then due on the contract by him to the contractor or such part thereof as may be necessary. If the cost of executing the work as aforesaid shall exceed the balance due to the contractor fails to make good the deficit, the said materials, tools tackle, construction plant or other things, the property of the contractor as may not have been used up in the completion of the works, may be sold by the purchaser and the proceeds applied towards the payment of such sale. Any outstanding balance existing after crediting the proceeds of such sale shall be paid by the contractor on the certificate of the Engineer, but when all expenses, cost and charges incurred in the completion of the work are paid by the contractor, all such materials, tools tackle, construction plant or other things not used up in the completion of the works and remaining unsold shall be removed by the contractors. If the proceeds of the above sale of the contractors materials tools and tackle, construction plant etc. are insufficient to cover the executing the aforesaid work, the balance remaining after crediting the proceeds of such sale shall be recoverable from the contractor by encasing the Bank Guarantee available/ any other money payable by the purchase or by action of law. Notwithstanding anything contained above, the purchaser may determine the contract due to any breach of failure of the contract, without notice before determining the contract as above, if in the opinion of the purchaser, the default or defaults committed by the contractor is/ are curable and can be cured by the contractor if an opportunity is given to him, then the owner may issue a notice in writing calling upon the contractor or default within such time as may be specified in the notice. If the cost of executing the work as aforesaid shall exceed the balance due to the contractor fails to make good the deficit, the said materials, tools, tackle, construction plant or other things, the property of the contractor as may not have been used up in the completion of the work, may be sold by the purchaser and the proceeds applied towards the payment of such sale. Any outstanding balance existing after crediting the proceeds of such sale shall be paid by the contractor on the certificate of the Engineer, but when all expenses, costs and charges incurred in the completion of the work are paid by the contractor, all such materials, tools, tackle, construction plant or other things not used up in the completion of the works and remaining unsold shall be removed by the contractor.

If the proceeds of the above sale of the contractor's materials, tools, tackle, construction plant etc. are insufficient to cover executing the aforesaid work, the balance remaining after crediting the proceeds of such sale shall be recoverable from he contractor by encasing the bank Guarantee available/ any other money payable by purchaser or by action of law. Notwithstanding anything contained above, the purchaser may determine the contract due to any breach of failure of the contract, without notice before determining the contract as above, if in the opinion of the purchaser, the default or defaults committed by the contractor is / are curable and can be cured by the contractor if an opportunity is given to him, then the owner may issue a notice in writing upon the contractor to cure the default within such time as may be due in the event of termination, the security deposit will be forfeited without reference to the contractor and if no amount is available towards security deposit, an identical amount is recoverable from the contractor. Power to Vary or Omit Work: No alternation, amendments, omissions, additions or variations of the work herein after referred to as variations, under the contract shall be made by the contract except as directed in writing by the Engineer, but the engineer shall have full power, subject to the provision hereinafter contained from time to time during the execution of the contract by notice in writing, to instruct t the contractor shall carry out such variations and be bound by the same conditions as far as applicable, as through the said clarifications occurred in the contract, if any suggested variations would , in the opinion of the contractor, if carried our, percent him from fulfilling any of his obligations or guarantees under the contract, he shall notify the Engineer thereof within 10 days in writing and the Engineer conforms his instructions, the contractors obligations and guarantees shall be modified to such as extent as may be justified. In the absence of any such notification, the contractor shall be bound to carry out the suggested variations without any additional financial implication to purchaser and it will amount to an absolute waiver of any claim whatsoever. Settlement of Dispute: Except as otherwise specifically provided in the contract all dispute concerning questions of facts arising under the contract shall be decided by the Engineer subject to a written appeal by the contractor to the Engineer, whose decision shall be final to the parties hereto. Any dispute or difference including those considered as such by only one of the parties arising out of or in connection with the contract shall be to the extent possible settled amicably between the parties. If amicable settlement cannot be reached them unresolved dispute issue may be settled by arbitration as provided subsequently. Termination of Contract: Notwithstanding anything contained elsewhere in this contract, if at any time during the terms of this contract, the plans of the Government of India and of the State Government change for any reason, the purchaser shall have the right to terminate the contractor by notice to the contractor by a registered letter. In respect of such changes the materials those are complete as ready for transportation within thirty- (30)-days after such notice, purchaser agrees to accept delivery thereof at the contract price and terms. In the case of the reminder of the undelivered materials, the purchaser may elect

i. To have any part thereof complete and take delivery thereof at the contract price and ii. To cancel the reside (if any) and pay to the contractor a prorate amount of the contract price based upon the state of completion to be certified by him. The contractor shall deliver all such materials in process of manufacture to the purchaser and shall return to the purchase any funds remaining to the purchaser's credit. The purchaser shall not make any payment for any material not yet in process of manufacture on the date of notice of cancellation is received. Deductions from Contract Price: All costs, damages or expenses which the purchaser may have paid, for which under the contract the contractor is liable, may be deducted by the purchaser from any money due or becoming due by him to the contractor under the contract, or may be recovered by action of law or other wise from the contract. Further all legal and statutory deductions will be made and the contractor is not entitled to any reimbursement or claim whatsoever other than only a tax deduction certificate. In the event of recovery to the necessary extent becoming impossible owing to insufficiency of the performance bond and withheld amounts, the balance due to the purchase, may be recovered in any way the purchaser may deem fit. Earnest Money: i. ii. a) The tenderer shall be required to deposit Earnest Money as indicated in the NIT. The Bid Guarantee offered shall be in one of the following alternative forms: A crossed Bank Draft / Bankers cheque in favour of IDCO, Bhubaneswar payable at Bhubaneswar. b) An irrevocable Bank Guarantee of any Nationalised schedule Bank
AT BHUBANESWAR ONLY OPERABLE AT ITS

BRANCH

in favour of IDCO, as per the proforma.

iii. iv.

The Bank Guarantee should be kept valid up to 8 (Eight) Months from the date of Opening of Tender as per Tender Specification. Earnest Money shall be forfeited in case of withdrawal/ modification of an offer within the validity period as required in the NIT / Tender Specification after opening of tender. EMD shall be forfeited in case of non-acceptance of LOI / WO within stipulated period.

v.

In case of tenders not accepted, the earnest money shall be refunded within 30 days of the accord of order/ contract to the successful tenderer.

vi.

Bids not accompanied by the required Bid Guarantee in accordance with the clause above, or if the Bid Guarantee is of in adequate value of the tender will not be entertained and shall be returned unopened.

vii.

Bidders are to attend the techno-commercial discussion whenever called by the owner. In case the bidder fails to attend the techno-commercial discussion, the same will be treated as violation of tender condition and the EMD may be forfeited with rejection of the offer.

Security Deposit: The successful Tenderers shall be required to submit security deposit for faithful execution of the contract at the rate of 10% (TEN
PERCENT) OF THE CONTRACT VALUE

in shape of Bank Guarantee

from any Nationalised Bank operable at its branch at Bhubaneswar only VALID UP TO ONE MONTH AFTER
THE COMPLETION OF CONTRACT PERIOD.

In the event of default on the part of the contractor in the

faithful execution of contract the security deposit shall be forfeited by an order of the purchaser. The forfeited of security deposit shall be without prejudice to any other rights arising or accruing to the purchaser under relevant provision of contract link L.D Negligence, termination etc. Performance Bond: The contractor shall furnish a performance bond as a guarantee for due performance during the guarantee period by way of a Bank Guarantee from any nationalised bank operable by its branch at Bhubaneswar to be kept valid for 12 months after completion of contract in all respects equal to an amount at a rate 10% (TEN PERCENT) of the total contract price for faithful filling the terms of guarantee for a period of 12 MONTHS
AFTER SUCCESSFUL COMPLETION OF WORK.

If during the contract period the

bid amount gets reduced on account of any recoveries of otherwise the contractor shall furnish a bond covering the short fall to bring it to 10% of the contract value. Extension of Time: The application for extension of time is to be given to the owner through the Engineer and the owner may authorise the extension of time after considering the due merits. Whenever the owner grants extension of time the same shall be on the existing terms and conditions of the contract and without financial liability to the owner. The contractor in any case shall have no claim whatsoever for any of compensation on account of any delay attributable to any one. Erection of the Materials: The contractor shall be responsible for complete installation of the equipment materials required under the scope of contract. The contractor shall provide all equipment, tools, scaffolding and minor civil works required for safe transportation and erection. All the materials and/ or equipment after receipt at site shall be checked and verified against shipping documents and all claims against loss or damage in transit shall be intimated to the owner. All insurance charges such as transit insurance, storage insurance and handling insurance charges shall be borne by he contractor. The materials and / or equipments shall remain under the custody of the contractor until the owner takes up the plant / installation as a whole after completion of the work. The contractor shall take adequate steps to ensure safety of such materials and/ or equipment. Necessary stores receipt certificates shall be issued to the owner after the stores are checked and certified. No materials and/ or equipment pertaining to the contract shall be removed from site without the consent in writing of the owner. The contractor shall be responsible for obtaining the correct reference lines for purchases of fixing the alignment of various equipment and / or materials.

Regulation of Local Authorities and Status: The contractor shall comply with the rules and regulations of local authorities during the performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the payment made there under in respect of any employee of workmen employed or engaged by his subcontractor. Manufacture's Supervision: The contractor may be required to work under the supervision of the manufacture's Engineer, where the contractor is not the manufacture. However, this will not relieve the contractor of his responsibility of the correctness of quality of workmanship shall be responsible for the correctness of the positions, levels and dimensions of the works according to the drawing, notwithstanding that he may have been assisted by the Engineer in setting out the same. Taking Over: Upon successful completion of all the tests to be performed at site on equipment and/ or materials and systems supplied and erected by the contractor the Engineer shall issue to the contractor a taking over certificate as a proof of the final acceptance of the equipment system. Such certificate shall not relieve the contract of any of his obligation which otherwise survive by terms and condition of the contract issuance of such certificate. Engineer's Decision: In respect of all materials, which are left to the decision of the Engineer, the Engineer shall if so required to do so by the contractor given in writing a decision thereon to the contract. All decisions of the Engineer shall be binding on the contractor. Completion Certificate and Final Certificate: When the contractor fulfils his obligation under the contract he shall be eligible to apply for completion certificate in respect of the work by submitting the completion documents along with such application for completion certificate. The owner of his representative shall normally issue to the contractor the completion certificate within one month after receiving an application there of from the contractor after verifying from the completion documents and satisfying that the work has been completed in accordance with and as set out in the construction and erection drawings, and the contract documents. The contractor, after obtaining the completion certificate is eligible to present the final bill for the work executed by him under terms of the contract. Completion Certificate: Within one month of the completion of work in all respects, the contractor shall be furnished with a certificate by the owner or his representative of such completion but no completion certificate shall be given nor shall the work by deemed to have been executed until all scaffolding, surplus materials and rubbish are cleared off the site completely nor until the work shall have been measured by the Engineer, whose measurement shall be binding and conclusive, the binding and conclusive, the work will not be considered as complete and taken over by the owner until the temporary works and staff colonies etc. constructed are removed and work site cleared to the satisfaction of the owner.

If the contractor shall fail to comply with the requirement of this clause on or before the date fixed for the completion of the work, the Engineer may at the expense of the contract remove such scaffolding, surplus materials and rubbish and dispose off the same as the things fit and clean off such dirt as aforesaid, and the contractor shall forth will pay the amount of all expenses so incurred and shall have no claim in respect of any such scaffolding or surplus materials as aforesaid except for any sum actually realized by the sale thereof. Completion Certificate shall be in 3 parts as follows: (a) (b) (c) Physical/ Mechanical completion work. Satisfactory completion of commissioning of equipment with load. Satisfactory completion of guarantee. The contractor shall clearly indicate the three dates separately for completion documents / to form the completion documents.

i) ii) iii) iv) v) vi) vii) viii) ix)

The technical documents according to which the work was carried out. Three sets of construction drawings showing therein the modification corrections made during the course of executing and signed by the Engineer. Completion certificate for embedded and Covered-up works. Certificates of final levels as set out for various works. Certificates of tests performed for various works. Materials appropriation statement for the materials issued by the owner for the works and list of surplus materials returned to the owners store duly supported necessary documents. Physical/Mechanical completion work. Satisfactory completion of commissioning of equipment with load. Satisfactory completion of guarantee.

Miscellaneous: Entire Agreement: These General Conditions together with the specifications, tender drawing and guaranteed technical particulars, tender data with subsequent agreed modification thereof shall constitute the entire Agreement between the parties in respect of the subject matter thereof. No variation of modification of the contract of modification of the contract of waiver of any of the terms and conditions thereof shall be deemed valid unless in writing and signed by the parties hereto. General Conditions of Contract, the tender specification and other contract/tender documents are to be taken as mutually explanatory to one another. However, in case of conflict between these documents, the technical specification, special conditions of the contract and general condition of the contract shall have precedence in that order. Endorsement of Terms: The failure of either party to endorse at any time of the provisions of the contract of any rights in respect there to or to exercise an option herein provided shall in no way be construed to be a waiver of such provisions, rights of options or in any way to effect the validity of the contractor. The exercise by either party of any of his herein shall not preclude of prejudice either party from exercising the same of any other it may have hereunder.

Contract Labour Regulation and Abolition: The contractor shall be responsible for following all statutory obligations under Contract Labour (Regulation & Abolition) Act, 1970, E.S.I and Provident Funds Acts as applicable for their labour and staff engaged in executing this work. The contractor will also keep purchaser indemnified against all claims and disputes arising out of death or injury to their workmen and staff. It will be necessary for the contractor to ensure that their workmen follow proper safety measures to avoid accident/ damage/ loss to life and property. Their workmen when working at any height must use approved safety belts. Charges for above are deemed included in the quoted rates and accepted amount. The bidder shall furnish the photocopy of their valid registration with Provident Fund Department. Recovery of Damage: Nothing contained in the conditions or in any other part of this contract, in case of any damage, it shall be construed as the purchaser preventing the contractor from committing the damage and the purchaser shall be entitled to recover the amount required for the repair/ replacement/ rectification of the damage as a consequence of the breach of any of the terms of the contract by the contractor. Completeness of Equipment / Installation: The equipment / installation shall be complete in every respect with all mountings fixtures and standard accessories which are normally even though not specifically detailed in the specification. The contractor shall be eligible for any extra payment in respect of such mounting, fittings and fixtures and accessories which are needed for safe operation of the equipment/installations as required by applicable codes though they may not have been included in the contract. The various equipment and / or materials supplied this contract shall be subject to the purchaser/owners approval. Time Schedule: Time is the essence of the contract and the contractor shall be responsible for performance his works in accordance with the specified construction schedule. The offer should clearly indicate monthly/ quarterly schedule of deliveries, date of commencement and completion of supply erection testing and commissioning against that indicated in the NIT/construction schedule. If any time the contractor failing behind schedule he shall take necessary action to make good for such delays by increasing his work to comply with the schedule and shall communicate such actions in writing to the Engineer satisfying that the action will compensate delay. The contractor shall however not be responsible for provision of additional labour and / or materials or supply of any other services to the contractor except for the co-ordination of works. The entire scope of work shall be completed within Ninety Days from the date of issue of Work Order / LOI. Safety Regulations: Without prejudice to the general obligations under the statutes the contractor shall ensure the safety of all the workmen, materials & equipment either belonging to him or to others working at site.

Subletting of Contract: The contractor shall not without the consent in writing of the purchaser, which shall not be unreasonably withhold, assign or sublet his contract of any substantial part thereof other than for raw materials, for minor details, or for any part of the works of which the markers are named in the contract, provided that any such consent shall not relieve the contractor from any obligation, duty or responsibility under the contract. For components/equipment procured for the purpose of the contract, after obtaining the written approval of the owner, the contractors purchase specifications and inquiries shall call for quality plans to be submitted by the suppliers along with their proposals. The quality plans called for from the vendors shall set out during the various stages of manufacture and installations, the quality practices and procedures followed by the vendors quality control organisation, the relevant reference documents/standards used, acceptance level, inspection of documentation raised, etc. Such quality plans of the successful vendors shall be discussed and finalised in consultation with the Engineers and shall from a part of the purchase order/ contract between the contractor and the vendor. Within 3 weeks of the release of the same purchase order /contracts for such bought out items/ components a copy of the same without price details but together with detailed purchase specifications, quality and delivery conditions shall be furnished to the Engineer by the contractor. Force Majeure: Any delays in or failure of the performance of either parties thereof shall not constitute default here or give rise to any claims for damages, if any, to the extent such delays or failure of performance caused by occurrences such as acts of God or the public enemy, expropriation or confiscation of facilities by Government authority, compliance with any order or request of any Government authorities, act of war, rebellion, sabotage, fire, floods explosions, riots or illegal strikes, provided always that such occurrences result in impossibility or performances of the contract. Only events of force majeure, which impedes the execution of the contract at the time of its occurrence, shall be taken into cognizance. Language and Measurement System: All documents pertaining to the contract including specifications schedules, notices, correspondence operating and maintenance instructions drawings or any other writing shall be in English Language. All measurements, location marking and drawings shall be in Metric Units. Materials and Workmanship: All materials used in the manufacture of these equipments shall be selected from the best available for the purpose, considering strength, durability and best engineering practice. Liberal factors of safety shall be used through out the design and especially in the design of all parts subject to alternation stresses or shocks. All the work shall be performed and completed in a thorough workmanship like manner and shall follow the best modern practice in the manufacture of high-grade equipment notwithstanding any omissions in the specification. Castings shall be free blow holes, flaws, cracks of other defects and shall be smooth, close grained and of true forms and dimensions. No plugged or filled up holes or other defects will ordinarily be allowed. Such castings are liable to be rejected.

However, the contractor may rectify minor casting defects be welding or other method in accordance with the standard manufacturing practice provided such rectification does not affect the strength of the casting or impair the efficient working of the plant and proper approval of the purchaser is obtained for the same. Facility to the Contractor: The purchase/ owner will at his own discretion and convenience and for the duration of the execution of the work make available near the site land for construction of contractors field office, godowns, workshop and assembly year required for the execution of the contract. The contractor shall at his own cost construct all these temporary buildings and provide suitable water/ electricity and sanitary arrangement after obtaining approval from the Engineer. On completion of the works undertaken by the contractor he shall remove all temporary works erected by him and have the site cleared as directed by the Engineer. If the contractor fails to comply with these requirements, the Engineer at the expense of the contractor will remove such surplus and rubbish materials and dispose off the same as he deems fit and get the site cleared as aforesaid and the contractor shall forthwith pay the amount of all expense so incurred and shall have no claim in respect of any such surplus materials disposed of as aforesaid. But the purchaser/ owner reserves the right to ask the contractor at any time during the pendency of the contract to caveat the land by giving 7 days notice on security reasons or national interest or otherwise a token rent of Rs. 100/- per month per hectare a part thereof shall be charged for the land so occupied. Electricity and drinking water at normal charges will be supplied at one point. The cost of distribution if any shall be borne by the contractor. Modification Prior to the Date of Tender Opening: The purchase/ owner reserves the right revise or amend the tender specifications prior to the date notified for opening of the tender and also the right to postpone the date for presentation and opening of tender without assigning any reason, whatsoever. Clarification Desired by the Tenderer: (a) The tenderer, before submission of the tender, should seek for any clarification with regard to the specifications. No correspondence on this account will be entertained once the tenderer has submitted the tender. (b) The contractor will be responsible for any loss theft, destruction and deterioration of quality of any materials when it is in the storage under the custody of the contractor. A custodian certificate is to be issued by the firm to the owner. The purchaser reserves the right to inspect the materials under the custody of the contractor from time to time. The contractor will indemnify the owner for any loss arising due to any reason whatsoever of the materials during storage under the custody of the contractor. (c) The contractor will make good of the loss at his own cost and arrangement without waiting for settlement of claim from insurance of any other Agencies. Jurisdiction of Court: Dispute / Litigation if any, arising out of this contract deemed to have been entered into at Bhubaneswar shall be under the jurisdiction of Orissa High Court.

TERMS AND CONDITIONS


Subject : Supply, Erection, Testing and Commissioning of HV Air-Conditioning system with Scroll Chillers of (48x3)TR (approx.) along with associated works for MCA Building at Plot No. 9 (P), Markat Nagar, Sector - 1, Bidanasi, Cuttack, Orissa. It is proposed to supply, install, test and commission Air-conditioning system of 144 TR capacity i.e. 4 x 48 TR (Nominal) Scroll Air-Cooled chilling machine (one as standby) shall be installed as per Bill of Quantities given in the Tender Document at the above premises. The Air-conditioning System shall comprise of : 4 nos. 48 TR Air-Cooled Scroll Water Chilling Machines, Chilled Water Pump Sets, Double Skinned Air Handling Units, Fan Coil Units, Piping and Valves, G.I Ducting, Powder Coated Aluminum Grills / Diffusers, Insulation, Electrical Works, etc. SHOP DRAWINGS:. On the award of the work, the Contractor shall immediately proceed with the preparation of detailed working drawings showing the detail of the equipment that are to be installed and the ancillary works that are to be carried out. Three sets of all such working drawings dully signed by the head of the planning and design department shall be submitted to the Owner / Consultant / Architect for approval to ensure that the works will be carried out in accordance with the specifications and drawings, including such changes as may have been mutually agreed upon. All the drawings shall be received by the Owner / Consultant / Architect for approval within 02 (two) weeks of the award of work. The approval of the drawings by the Owner / Consultant / Architect shall in no way relieve the Contractor form his obligations to provide a complete and satisfactory plant installation, testing and commissioning as per intent and purpose as laid down in the specifications. Any omissions and / or errors shall be made good or rectified whether or not the drawings are approved. Contractor shall obtain written approval for samples (like grills / diffusers) and other materials before placing the order. Contractor shall guarantee the specified inside conditions at specified outside conditions. Prior to the completion of the work, the contractor shall furnish to the employer four (04) sets of a comprehensive manual, describing all components furnishing a list of spare parts and setting forth in details the instructions for the operation and maintenance of the plant. The Contractor shall also fix in the plant room, neatly typed and framed, instructions in details, for the starting and running of the plant. The following shop drawings shall be prepared by the AC contractor for approval; a) b) c) d) e) f) AC Plant room layout plans with sectional drawings. Schematic chilled water piping drawings. Duct layout plans of all floors including AHU rooms Electrical panel, sub panels, power & control wiring drawings. Foundation details of all equipments. Any other shop drawings necessary for the project.

AS BUILT DRAWINGS At the completion of work and before issuance of certificate of virtual completion the contractor shall submit 04 (four) sets to the Engineer-in-charge, layout drawing drawn at appropriate scale indicating the complete HVAC system as installed.

INSTRUCTION / MAINTENANCE MANUAL: The Contractor shall prepare and produce instruction, operation and maintenance manuals in English for use, operation and the maintenance of the supplied equipment and installations, and submit to the Owner 04 (four) copies at the time of handing over. The manual shall generally consist of the following: a) b) c) d) e) f) g) h) i) Description of the Project. Operating Instructions. Maintenance Instructions including Procedures for Preventive Maintenance. Manufacturers Catalogues. Spare Parts List. Trouble Shooting Charts. Drawings. Type and Routine Test Certificates of Major Items. One (1) set of Reproducible As Built Drawings.

PERFORMANCE BOUND CONTRACT: The contract will be a performance bound contract and therefore the Bidder shall make their independent check for Heat Load, selection of equipments etc. The drawings enclosed with the tender documents shall be only tentative layout plans and for guidance purpose only. The detailed shop drawings shall be prepared and submitted for approval to the Owner / Consultant / Architect. The contractor shall guarantee the specified inside condition at specified outside condition considering the fresh air as detailed in the basis of design of the tender documents. The contractor shall guarantee that the capacity of various components as well as the whole system shall be within 3% of the specified capacity. GUARANTEE: The contractor shall guarantee the complete AC system for a period of 12 months from the date of handing over the plant after successful initial testing & one major seasonal test i.e. either summer or monsoon to the department. The Tenderer shall guarantee the AC system to maintain space conditions as specified. They shall also guarantee that the performance of the various equipments individually or jointly shall be within 3% of the specified ratings when working under operating conditions for the complete installation. During guarantee period loss of refrigerant and oil, if any shall be borne by the air-conditioning contractor. De-scaling, if required during the guarantee period, shall be done by air-conditioning contractor free of cost if certified by owner. REPAIRS / REPLACEMENT OF PARTS DURING GUARANTEE: Any defects or other faults which may appear within defect liability / guarantee period of twelve months from the date of handing over the plant in a satisfactory working conditions to the Client (except for normal wear and tear) arising in the plant from material or workmanship not in accordance with the contract specification will be rectified by the contractors free of cost and nothing shall be paid extra on any account.

TESTING: All testing instruments, velocity meter, digital thermometer, psychomotor, measuring steel tapes, tools, scaffolding and ladders etc. that may be required for taking measurements shall be arranged by air-conditioning contractor at his own cost. All types of routine and other tests shall be carried out at the works of the Contractor or the manufacturers of the components. The Client shall be free to witness any or all tests, if they so desired. The Contractor has to inform to the Client before dispatch of any material / equipment. On the completion of the installation the Contractor shall arrange to carry out various initial tests as detailed below, in the presence of Owner / Consultant / Architect and to the entire satisfaction of the Owner / Consultant / Architect. Any defect or short-coming found during the tests shall be speedily rectified or made good by the Contractor at his own expenses. The initial tests shall include, but, not be limited to the following : a) To operate and check proper functioning of all electrically operated components viz. Compressor motor, pumps, fan of air handling units etc. as well as other electrical motors. b) To test and check the proper functioning of electrical gears, safety and other controls to ensure their proper functioning. c) d) e) To check the air distribution system and to provide designed air flow in all areas by adjusting the grills, diffusers and dampers for air-conditioning. To check and balance / adjust the water in the water circuit for smooth and noiseless flow. To check the systems against leaks in different circuits, alignment of motor, V belt adjustments, control setting and all such other tests which are essential for smooth functioning of the plant. f) g) Contractor shall have to submit the capacity test of all equipment at site. On the satisfactory completion of all Initial tests and one major seasonal test i.e. either summer or monsoon the plant shall be considered Virtually Complete for the purpose of taking over by the Client. h) In addition to the Initial test the Contractor shall also give summer and monsoon tests of the plant, each of (3) three days duration, and each one during the full specified outside conditions (when the ambient conditions are close to the specified ambient conditions). The first running test may be taken on the completion of the initial test, provided the ambient temperature and humidity are near their peak. Inside condition as per the contract, performance of each equipment, Airflow etc. shall be as per the requirement of the contract during these tests. It is clarified that guarantee period shall start after successful completion of one major seasonal test whichever season falls earlier & inside design conditions in areas to be airconditioned temperature in the working area if any.

OPERATION OF PLANT: The tenderer shall arrange to operate the plant for a period of Fifteen Days from the date of commissioning of plant and successful completion of initial test free of cost. TRAINING OF PERSONAL: The contractor shall impart training to the minimum three technical staffs appointed by the Client free of cost during erection and commissioning of the plant.

WEEKLY PROGRESS REPORT: A weekly progress report of site as shall be submitted in writing to the Owner / Consultant / Architect. INSPECTION AND TESTING: All major equipments such as water chilling units, cooling coils of air-handlers, air handlers, electrical panels etc. may be got inspected and tested before dispatch if desired by the client at the manufacturers work. The AC Contractor shall intimate the Client in minimum 10 days advance about the date of readiness of equipment for inspection and testing at a date to be mutually agreed upon by the client and the AC Contractor. The inspection of equipments / materials at site. The manufacturer of these equipments must have a facility of testing the equipments at the test bed on full load at their works. All the test readings mutually taken shall be recorded and evaluated with the technical data furnished by the AC Contractor. STORAGE OF MATERIALS / EQUIPMENTS: Plant room / Air handling unit room, if ready can be used for storage of materials / equipment brought to site by the contractors. Watch and ward of the same shall be the contractors responsibility. In case the plant room space is not readily available, it shall be contractors responsibility to make his own temporary structure at site with approved location from the client at his own cost. POWER AND WATER SUPPLY: Water and electricity for erection purpose shall be provided by the client at one point on chargeable basis. In case of non availability of the same the AC contractor shall make his own arrangement for water and power required for erection purposes at their own cost without any delay in progress of work. However water and power required for testing and commissioning shall be provided by the client. INSURANCE: The contractor shall be responsible for the storage and safe custody of all equipment / materials brought to site from time to time till the plant is taken over by the department. The contractor may provide adequate and comprehensive insurance coverage for storage and execution. The contractor shall be responsible for all the injury or damage to persons, buildings, structures, property etc., which may arise form any act of omission on part of the contractor or his servants or sub contractors or his employee etc. The contractor shall indemnify and keep indemnified the owner and hold him harmless in all respects of and any expenditure liability, loss, claims or proceeding arising from any such injury or damage to persons or property as aforesaid. The contractor may undertake all risk policy including earthquake risk with an insurance company approved by the owner in the joint names of owner and contractor at his own expense. All technical data to be filled by the bidders and shall be accepted in metric system only. Any bidder submitting the technical data in any other unit would render his bid liable for rejection. The technical data should be typed in capitals only.

DESIGN PARAMETERS: Given below are some design parameters which should be followed in addition to those given in various sections of technical specifications enclosed. a) Temperature of chilled water entering the chiller C b) Temperature of chilled water leaving the chiller C c) Fouling factor of chiller (MKS) d) Air Inlet temperature to condenser C AIRHANDLERS: a) b) c) d) e) f) Maximum Face velocity across cooling coil MPM Maximum face velocity across all types of filter MPM Maximum water pressure drop across the coil in Mt. Maximum water velocity through coil in MPS Fan outlet velocity (maxm.) MPS Fan Speed (maxm.) of air handing unit RPM : : : : : : 152.0 152.0 4.6 2.5 12.0 1000 : 12.22 : : : 6.67 0.0001 43.3

FAN COIL UNITS: a) b) c) d) e) Maximum Face velocity across cooling coil MPM Maximum face velocity across prefilters MPM Maximum water pressure drop across the coil in Mt. Maximum water velocity through coil in MPS Fan outlet velocity (maxm.) MPS : : : : : 152.0 152.0 4.6 2.5 12.0

DUCTING WORK: a) b) c) d) e) Method of Duct Design Maximum air velocity in supply duct MPM Maximum air velocity in return duct MPM Friction loss in duct (maxm.) MM Wg in 100 Mt run. Maximum Velocity at supply air grill outlet MPM : : : : : Equal Friction Method 460.0 305.0 8.33 150.00

PIPING WORK: a) b) Friction loss (maxm.) Mt / 30 Mt length Flow velocity (maxm.) Mt / Sec. : : 1.60 2.50

INSULATION: Maximum temperature rise in the supply air duct from air handlers outlet to farthest outlet in C : 1.10

STANDARD SPECIFICATION SCOPE OF WORK: The complete scope of work shall cover supply, erection, testing and commissioning of the entire HVAC system as detailed under specification and schedule of quantities. BASIS OF DESIGN: The entire system shall be based and designed on climatological data available as given under Basis of Design and Scheme.

TERMS AND DEFINATIONS: The followings terms have been used in the tender specifications, drawings etc. ISI : Bureau of Indian Standards.

ASHRAE : American Society of Heating Refrigeration & Air-conditioning Engineers, USA. ASME ASA B.S. CMH : American Society of Mechanical Engineers. : American Standard Association. : British Standards. : Cubic Meter per Hour.

US GPM : US Gallons per minute. IGPM RPM : Imperial Gallons per Minute. : Revolutions per Minute.

BTU / Hr. : British Thermal Unit per Hour. Kcal / Hr. : Kilo Calories per Hour. HZ H.P. Kg /Cm2 SAG SAD SAF FD VCD RAD FAD RH DB WB MV DP : Hertz. : Horse Power : Kilo Gram per Square Centimeter. : Supply Air Grills. : Supply Air Diffuser. : Supply Air Filters. : Fire Damper. : Volume Control Damper. : Return Air Damper. : Fresh Air Damper. : Relative Humidity. : Dry Bulb Temperature. : Wet Bulb Temperature. : Mechanical Ventilation. : Drain Point.

The codes, regulation as detailed below shall be followed in this contract :1. Safety code for Air-conditioning (revised) amendment 1 2. 3. 4. 5. 6. Safety code foe Mechanical Refrigeration Testing of Refrigeration Compressors Air-cooled Heat Exchangers (amendment 1) Packaged Air-conditioner (amendment 1991) Hermetic Compressors IS 660 : 1963 (reaffirmed 1991) IS 5111 : 1993 IS 10470 : 1983 (reaffirmed 1991) IS 8148 : 1976 (reaffirmed 1991) IS 10617 : Part I, II & III 1983 (reaffirmed 1991) 7. Suppliers Data Sheet for clean air equipment (laminar flow) 8. 9. Thermostats for use in refrigeration etc. Code of practice for design and construction of flue chimneys 10. 11. 12. Metal Duct Work Steel for general structural purpose Piping Work IS 655 : 1963 (reaffirmed 1991) IS 2062 : 1992 IS 1239 Part I & II 1990 / 1992 IS & BS : 3601 13. 14. Welding Refrigeration IS : 3589 As per ASHRAE / ISI Air-conditioning and Refrigeration Air-conditioning institute Standards. 15. 16. 17. Hot Dip Zinc Coated Steel Tubes Gate Valves for Water lines Copper Alloy Gate Globe Check Valve for water lines 18. 19. 20. 21. 22. 23. 24. Butterfly Valve Steel Pipe flanges Gaskets Mild steel tubes and fittings Dual plate Check Valve for Water Lines Colour code for the identification of pipe lines Specific requirements for the direct switching of the individual motors. 25. PVC insulated (HD) Electric Cables for working voltage up Including 1100 Volts. 26. HRC Cartridge fuse links upto 650 Volts. IS 2208 : 1976 IS : 1554 ( Part I) IS 13095 : 1991 IS : 6392 IS 638 : 1979 (reaffirmed 1993) IS 1239 Part I & II AP : 194 IS 2379 : 1963 IS 4064 ( Part II) 1978 IS 4736 : 1968 IS 778 : 1980 IS 778 : 1980 IS 11338 : 1965 (reaffirmed 1991) IS 11338 : 1965 (reaffirmed 1991) IS 12357 : 1998 IS 659 : 1964 (reaffirmed 1991)

27. 28. 29. 30. 31.

Starter Inspection and testing of installation Galvanized steel wire for fencing Three phase induction motors PVC insulated (heavy duty) cables for working voltage up to 1.1. KV and up to 11 KV Grade respectively.

IS 8554 ( Part I) 1979 IS 732 ( Part III) 1979 IS 277 : 1977 IS : 325 IS 1554 : 1981 Part I & II

32. 33. 34. 35. 36.

Code for practice for electrical wiring installations. Code for practice for earthing Horizontal centrifugal pumps Centrifugal fans (1 . Division) Wrought aluminum and aluminum alloy sheet and strip for general engineering purposes.
st

IS 732 : 1989 IS 3043 : 1966 IS : 1620 IS 894 : 1987 (reaffirmed 1991) IS : 737

37.

Mild steel tubes, tubular and other wrought steel fittings.

IS : 1239

38. 39.

Bourden tube pressure and vacuum gauges. Glossary of terms used in refrigeration and airconditioning.

IS : 3624 IS : 3615

40.

Code for practice for standard for selection of standard worm and helical gears.

IS : 7403

41. 42.

Three phase induction motors. Specification for single phase small A/C and universal motors

IS : 325 IS : 996

43. 44. 45. 46.

Specifications for flame proof motors Circuit breaker A.C Contactors for A.C for voltage upto 1100 V. Low voltage switch gear and control gear assemblies.

IS : 2148 IS 2516 : 1980 Part I & II IS 2959 : 1975 IS 8623 : 1993 Part I & II

47.

Code of practice for selection of starters for AC induction motors

IS 3914

48. 49.

Specification for cables glands Code for selection, installation and maintenance of switch gear and control gear.

IS 4821 IS 10118 : 1982 Part I to IV

50. 51.

Conduits for electrical installations Permissible limits of noise level for rotating electrical machines.

IS 9537 : 1981 Part I to IV IS 12065 : 1987

52.

Code of practice for installation and maintenance of motors

IS 3106 : 1966

53. 54.

Bourden tube pressure and vacuum gauges Code of practice for selection of standard worm and helical gear boxes.

IS : 3624 IS : 7403

55.

Mild tubes, tubulars and other wrought steel fittings.

IS : 1239

56.

Electrically welded steel pipes for water, gas and sewage.

IS : 3589

57.

Gun metal gate, globe and check valves for general purposes.

IS : 778

NOISE AND VIBRATION CONTROLS: The air conditioning contractor must take all necessary precautions to have minimum noise generation and its transmission. Minimum vibration as permitted by IS relevant code shall be ensured. A few points for guidance only are given below: a) Double fire retardant flexible connections shall be provided from air discharge to outlet of airhandler to the duct. b) Vibration isolation pads of suitable thickness commensurate to loading for isolation of vibration shall be provided under all pumps, air handlers fans etc. in consultation with manufacturer for proper selection of vibration isolators. c) Vibration isolation springs of suitable size to suit the weight of Air Cooled chilling machine if recommended by the manufacturer for elimination of vibrations shall be provided as suitable for type and model of Air Cooled chilling unit. d) The floor supported piping shall be mounted on pipe supports with 7.5mm ribbed neoprene pads between the base plate of the pipes and the floors. e) f) In case of ducts, conduits, pipes and tubes the annular space between construction and penetrating element shall be sealed suitably. All ducts starting from air handling unit shall be provided with acoustic lining as indicated in the tender drawings. g) The air-conditioning contractor shall take all other precautions or shall make his own arrangements even if not specified in the tender documents for eliminating high noise levels and shall minimize vibrations in all mechanical equipments without any additional cost.

INDIGENOUS SCROLL AIRCOOLED CHILLERS: The specification under this section covers the supply, installation, testing and commissioning of the INDIGENOUS AIRCOOLED CHILLERS conforming to these specifications and in accordance with the requirements of the schedule of equipment.

SCROLL AIRCOOLED CHILLERS: The indigenous Air-cooled Water chilling machine shall consist of multiple number of SCROLL compressors, liquid refrigerant cooled motor evaporator, air cooled condenser, factory mounted microprocessor based panel and interconnecting refrigerant piping, expansion valve controls and accessories to make it compact and efficient unit. The driving motor shall be suitable hermetic type protected against damages by means of built in protection devices and suitable for 415 +/- 10% Volts, 50Hz, Ac supply. EVAPORATOR: The shells shall be fabricated from carbon steel plate. Evaporator is to be designed, tested and stamped in accordance with ASME code for refrigerant side working pressure of 300 Psig. All tube sheets are carbon steel. Evaporator tubes are individually replaceable. Standard tubes are externally finned, internally enhanced seamless copper with lands at all tube sheets. Evaporator tubes are of 25mm diameter and condenser tubes are 19mm. Diameter. Tubes are mechanically expanded into tube sheets. All water pass arrangements are available in either flat-faced flange (150 or 300 psig waterside) or marine configuration with grooved connections (300 psig waterside). All connections may be either right or left handed. Waterside is hydrostatically tested at one and half times design working pressure, but should not be less than 225 psig. The insulation of evaporators shall be as per manufacturers standards and factory insulated only. AIRCOOLED CONDENSORS: The air-cooled condenser coils shall be fabricated out of copper tubes expanded into aluminum fins. The direct drive discharge fans with fan guards driven by total enclosed motors having class F insulation with IP- 55 protection of lower RPM motors of 915 or less shall be preferred. The integral cooler & sub cooler circuits shall form part of condenser circuits. The leak tests shall be conducted at the factory at 21 bar and pressure rated for 35 bar pressure. The system shall have atleast two independent refrigerant circuits and each circuit shall have removable core filter dryer, liquid line shut off valves, high pressure relief valves electronic expansion valves minimizing superheat in the evaporator so as to allow chiller to operate at reduced condensing temperatures. aluminum fins. The direct drive discharge fans with fan guards driven by total enclosed motors having class F insulation with IP- 55 protection of lower RPM motors of 915 or less shall be preferred. The integral cooler & sub cooler circuits shall form part of condenser circuits. The leak tests shall be conducted at the factory at 21 bar and pressure rated for 35 bar pressure. The system shall have atleast two independent refrigerant circuits and each circuit shall have removable core filter dryer, liquid line shut off valves, high pressure relief valves electronic expansion valves minimizing superheat in the evaporator so as to allow chiller to operate at reduced condensing temperatures. REFRIGERANT: The INDIGENIOUS AIRCOOLED CHILLERS shall be selected on R-22 /R-134 A refrigerant only. The water chilling unit should be fully factory charged with refrigerant and oil and spare refrigerant and oil must be sent along with the machine for topping up of as and oil if required,

REFRIGERANT CIRCUIT: A multiple orifice control system consisting of an expansion valve and a fixed orifice, maintains refrigerant flow. MAIN CONTROL PANEL: Factory mounted main control panel is to provided with all starters, phase indicating lights, voltmeter pressure cutouts, safety switches, pre wired and factory tested etc. should be weather protected with IP- 55 protection. SELECTION OF WATER CHILLING UNIT: The Water chilling unit should be selected for the duty as specified in schedule of equipment. INSTALLATION: The chilling machine shall be installed over a cement concrete platform on flooring and shall be adequately isolated as per manufacturers recommendations against transmission of vibration to the building structure. For open type units, special attention shall be paid to the alignment of the drive and driven shaft, final alignment shall be checked at the site in the presence of the contractor sing dial indicator. PAINTING: The Indigenous Air-cooled water Chilling machine shall be finished with durable enamel paint. The shop coats of paint that have become marred during shipment or erection, shall be cleared of win mineral spirit, wire bushed and spot primed over the effected areas, than be coated with enamel paint. PERFORMANCE RATING: The unit shall be selected for the lowest operating noise level. Capacity ratings, and power consumption with operating points clearly indicated, shall be submitted and verified at the time of testing and commissioning of the installation. The architects / consultant / clients representatives shall witness the capacity tests if need be at manufacturers works and all costs towards to and for air fare, lodging and boarding expenses shall be borne by the client. Power consumption shall be computed from measurements of incoming voltage and input current and energy measure meters. TESTING: a) Unit capacity in tons refrigeration, shall be computed from the temperature reading and water flow measurements. Flow measurements shall be through flow meters. Computed results shall tally with the specified capacities as furnished with tender. b) All instruments, services needed for the test required for the computation of capacities and power consumption shall be provided by the contractors themselves. All instruments shall be calibrated and contracts shall produce calibration certificate in support. c) Tenderer shall furnish detailed certificates of tests carried out on test bed in the factory. d) The total frame of air-cooled chillers should be well protected by epoxy or equivalent coating to take care of coastal installation and high sulphur contents in atmosphere to avoid corrosion.

PUMP SETS: This section deals with supply, erection, testing and commissioning of water pump sets conforming to general specification and suitable for the duty selected. The type, capacity and size of pumps shall suit the parameters given under Schedule of Equipment. The Pumps selected should have high efficiency, which should be supported by selection charts and curves. MONOBLOCK PUMPSETS: The construction of mono block pumps shall be as follows and as per ISI 1520. Duty Chilled water Impeller Shaft Bearings Base Plate Speed Motor Starter Casing Cast Iron Bronze Steel Ball Cast Iron / MS 2900 RPM TEFC DOL

The impellers of pumps shall be statically and dynamically balanced. The following accessories shall be provided with each pump and not limited to the list. a) b) c) d) e) f) Air vent Cocks. Lubrication fittings and seals. 25mm G.I. Drain piping up to the nearest drain point. Suction and Discharge shut of valves. Discharge check valves Delivery pressure gauges of 150mm diameter.

The quantities of item (c) to (f) have been separately quantified under Bill of Quantities and should not be estimated along with the pump. The installation of pumps shall be carried out by the contractor as per manufacturers recommendations. The pumps shall be mounted on concrete foundations with vibration isolators sand-witched between foundation and pumps. As far as possible, the pump sets shall be factory aligned and if necessary site alignments shall be done by experienced and trained personal. The pumps shall be installed in such a manner that maintenance could be done without causing damage to the insulation. AIR HANDLERS: SCOPE : This section deals with supply installation testing and commissioning of air handlers of various capacities as given in Bill of Quantities and confirming to the following specifications. TYPE: The horizontal or vertical type air handlers should be of double skin construction, draw through type comprising of various sections such as pre-filter section, cooling coil section, fan section etc. CAPACITY: The air handling unit capacities, maximum motor H.P, static pressure, cooling coil area, pre-filters etc. shall be according to Schedule of Equipment & Bill of Quantities.

DOUBLE SKINNED CASING: The casing shall be self supporting type, factory fabricated and assembled made of extruded anodised aluminum hollow sections to make a rigid frame structure. The frame shall be assembled using pressure die cast aluminum joints. The self supporting unit shall consist of sandwiched panel made out of 0.6mm thick pre-plasticide sheet outside and 0.6mm GI sheet inside duly factory fabricated insulated with 23 mm thick injected PU foam insulation of density of 30 Kg/CMT in between (As specified in Bill of Quantities). The insulated panels shall be bolted to main frame with neoprene rubber gaskets held captive in the framed extrusion to make it leak proof. Suitable air tight access doors / panels with pressure die cast aluminum hinges and nylon handles and locks shall be provided for access to various sections for maintenance. The entire housing shall be mounted on Extruded Aluminum channel frame work having pressure die cast aluminum jointers or the frame work shall be joined together with corner plates. Condensate Drain Pan shall be constructed of 22 gauge Stainless steel sheet with all corners welded with uniform slope from all sides leading to drain pan ensuring no stagnation of condensate water. SINGLE SKINNED CASING: The casing shall be self supporting type, factory fabricated & assembled made of extruded anodised aluminum hollow sections to make a rigid frame structure. The frame shall be assembled using pressure die cast aluminum joints. The self supporting unit shall consist of 18 G pre-plasticide / precoated GI sheet body factory fabricated. The AHU casing shall be insulated with with 23 mm thick injected PU foam insulation of density of 30 Kg/CMT from inside. The casing shall be bolted to main frame with neoprene rubber gaskets held captive in the framed extrusion to make it leak proof. Suitable air tight access doors / panels with pressure die cast aluminum hinges & nylon handles and locks shall be provided for access to various sections for maintenance. The Entire housing shall be mounted on Extruded Aluminum channel frame work having pressure die cast aluminum jointers or the frame work shall be joined together with corner plates Condensate. Drain Pan shall be constructed of 22 gauge polished stainless steel sheet with all corners welded with uniform slope from all sides leading to drain pan ensuring no stagnation of condensate water. Drain Pan shall be insulated with 10 mm thick nitrile foam. MOTOR AND DRIVE: The fan motors shall be 415 10% volts, 50 5 % HZ, 3 phase TEFC SQ. Cage induction motor. The motor shall be specially designed for quiet operation & motor speed shall not exceed 1440 RPM. Drive to fan shall be provided through belt drive arrangement. Belts shall be of the resistant type only. FAN OF DOUBLE/ SINGLE SKINNED AIRHANDLING UNITS: The casing shall have heavy gauge GI construction forward curved DIDW fan statically and dynamically balanced mounted on EN8 solid shaft or C 40 carbon steel. The supply air DIDW fan shall be forward curved. The fan impeller shall be supported to housing with angle iron frame and pillow block heavy duty ball bearing. The fan shall be selected for a fan speed not exceeding 1000 RPM. and fan outlet velocity shall be below 10.2 meter / sec. The fan housing with TEFC Sq. Cage motor shall be mounted on a common adjustable base frame on vibration isolators in case the impeller diameter is exceeding 450 mm and rubber turret mounts vibration isolators for fan diameter up to 450mm diameter. The fan motor shall be installed inside the housing of air handling unit to keep low noise level. The assembly for fan and motor shall be of aluminum extruded section only.

COOLING COILS: The cooling coil shall be made of aluminum fins and copper tubes of dia.12.5mm or 16mm OD. The minimum no. of fins / cm for cooling coils shall be 4.7. The bonding of aluminum fins with copper should be done hydraulically. The tube thickness shall be 24 G and fin thickness shall be 36 G. The cooling coil should be tested for leaks at a hydraulic pressure of at least 21 Kg / sq.cm. for a minimum period of 3 hours at works. The velocity across face should be limited to 152 metre / minute. In case of chilled water coils the design should be such to limit water velocity to maximum of 2.5 m / sec. FILTERS: Each unit shall be provided with a factory assembled filter section containing washable synthetic tube air filters having extruded aluminum frame having filtration capacity of 10 micron particle size with an efficiency of 90%. Filters shall fit so as to prevent by pass. Holding frames shall be provided for installing a number of filter cells in banks. These cells shall be held within the frames by sliding the cells between guiding channels. Face velocity across filters shall not exceed 152 MPM. ACCESSORIES: The following accessories must be provided with each air handlers. a) Auto air vents with globe valve at highest point in the chilled water pipe in all AHU rooms without any additional cost. b) Borden type pressure gauge conforming to IS 3624 with gun metal globe valves shall be provided at the inlet and outlet of coils (as per Schedule of Quantities). c) V form Thermometers with metal guards shall be provided at inlet and outlet of water of cooling coil (as per Schedule of Quantities). d) Balancing valves at coil outlet and butterfly valve and Y-Strainer at coil inlet (as per Schedule of Quantities). TESTING: The testing of AHU shall be done as per the procedure indicated in Specification. FAN COIL UNITS: This section deals with supply, erection and commissioning of fan coil units conforming to general specifications and suitable for duty selected as indicated in Schedule of Equipment. The horizontal type of fan coil units shall be complete with centrifugal blowers of aluminum construction, 3 speed permanent split-capacitor type fan motor, cooling coil, sandwiched insulated drain pan, ball valve sets etc. The outer casing of Fan Coil Unit shall be of 18G cold roll sheet of suitable size to accommodate all piping and controls. The drain pan shall be in double skin construction made of 22G SS sheet duly insulated and of sufficient size to accommodate all controls, valves, copper connection ensuring no stagnation of condensate water. The cooling coil shall be 4 row deep having at least 4.7 fins / cm. The fins configuration of Sigma flow or plain fin shall be acceptable. The OD of copper tube shall be 10 mm minimum and wall thickness of 0.5 mm. The fan shall be centrifugal, forward curved driven by 3 speed permanent split capacitor type fan motor. The Fan Coil Units shall be provided with the following accessories given below.

a) b) c) d) e) f)

Double fire retardant Canvass Connection. 12 mm thick cleanable aluminum filters with aluminum frame. Strainer with ball valve at inlet & ball valve at outlet. Balancing valve in return chilled water line. Copper connections between chilled water lines, controls etc. Electrical wiring between motors.

It may be noted that all accessories specified above shall be provided along with the Fan Coil Unit and shall be included in the price of Fan Coil Unit. Each Fan Coil Unit shall be tested at factory and complete in all respects. The sound level of the unit should not exceed 40 dB. The test certificate shall be furnished with each Coil Unit. It is necessary to design the fan coil unit in a way to have silent operation. The Fan Coil Unit shall be powder coated both internally and externally.

DESIGN PARAMETERS OF FAN COIL UNITS: The design parameters of Fan Coil Units are given below: FAN COIL UNIT - CEILING SUSPENDED: a) Capacity b) Air quantity CMH c) Fan Static pressure d) Face area of cooling Coil (SMT) minimum e) No. of fins / cm f) No. of rows deep g) Motor HP (Single Phase) h) 22 G SS Insulated tray i) Type of painting TESTING: The fan coil units shall be tested as per Performa Test Readings. 1.0TR 680 1.5 TR 1020 2.0 TR 1360 2.5 TR 1700 3.0 TR 2040

------------------------- 10MM------------------------0.129 0.17 0.23 0.293 0.325

---------------------------- 4.70 ------------------------3 3 4 4 4

----------------- To suit the requirement ----------------------------------------------YES ------------------------------------------------------Powder coated finish only-------------

THERMAL / ACOUSTIC INSULATION: This section deals with supply and fixing of thermal / acoustic insulation of ducts, pipes etc. as per the specification given in this section. MATERIAL OF INSULATION: The insulation material of the following kind shall be used for cold insulation.

a) RESIN BONDED FIBRE GLASS WOOL: The Thermal conductivity values in W/m.K of fiberglass shall confirm to following: Mean Temperature C For Duct Insulation 25C 50C For Duct Lining 25C 50C 48 48 0.030 0.033 24 24 0.033 0.039 Density In Kg / Cmt Thermal Conductivity W/m.k

b) Expanded Polystyrene The density of expanded polystyrene shall not be less than 20 kg per cubic meter and the thermal conductivity shall not exceed 0.031 Kcal./ hr.m C at 10 C mean temperature. The sample of insulation material shall be submitted for approval to the Engineer in Charge and the sample shall be tested for thermal conductivity values by the contractor at his own expense. Adhesive used for setting the insulation shall be non-flammable, vapour proof, CPRX compound. INSULATION ON SHEET METAL DUCTING The thickness of insulation used on ducting shall be as detailed below: Conditioned space a) Supply Air Duct Insulated with factory Pre-laminated 25mm thick Fibre Glass as shown in the tender drawing. b) Return Air Insulated with factory Pre-laminated 25mm thick Fibre Glass as shown in the tender drawing. c) Fresh Air Duct Insulated with factory Pre-laminated 25mm thick Fibre Glass as shown in the tender drawing. d) Plenums Lined internally with 25mm thick fiberglass rigid board as shown in the tender drawing. e) FCU Collars Lined internally with 12 mm thick fiberglass rigid board as shown in the tender drawing. The application of insulation should be carried out in workman like manner as detailed below. INSULATION OF DUCTING WITH ALUMINUM FACED FIBERGLASS: a) Duct surface to be cleaned thoroughly b) To apply two coats of CRPX compound. c) To fix factory pre-laminated aluminum faced fibre glass insulation of density 24 Kg/cmt of specified thickness. d) Fix self-adhesive aluminum tape of 50 mm width on all longitudinal / transverse joints. e) Finally fix PVC straps of 25mm width at every 300mm centre to centre. ACOUSTIC LINING OF DUCT: The material to be used for duct lining shall be 12 / 25mm thick resin bonded fibre glass rigid board having a density of 48 Kg/m and covered with 0.5 mm thick perforated aluminum sheet. The lining of initial length of the duct shall be done as shown in the tender layout drawings & shall be carried out as follows. a) Clean the duct piece thoroughly, b) Fix the board of suitable thickness inside the duct and cover with fibre glass tissue paper. c) Cover the insulation board with 0.5mm thick perforated aluminum sheet with at least 20% perforation. d) Secure the insulation board and aluminum sheet with cadmium coated bolts nuts and cup washers / steel screws. e) Finally seal the ends completely, so that no lining material is exposed.

No of Corrections

-44-

Signature of Tenderer

INSULATION OF PIPES: The chilled water pipes & condensate drain water pipes shall be insulated with 50 mm and 25 mm thick expanded polystyrene pipe section respectively. Expanded polystyrene of P quality shall be used. The application of insulation on pipes should be carried out in workman like manner as mentioned below: INSULATION OF PIPES WITH ALUMINIUM CLADDING: a) b) The pipe to be insulated should be cleaned thoroughly with steel brush for removing dirt, rust and grease. Apply a coat of Zinc chromate primer and 02 coats of cold setting adhesive CPRX compound on pipes. c) d) Fix insulation of specified thickness tightly and seal all joints with adhesive compound. Insulated surface should be wrapped with two layers of 400G polythene sheet with over lapping longitudinal and transverse joints. e) f) To apply self adhesive tape for firm holding of polythene sheet in position at interval of 500 mm. Finish the surface with 0.5 mm thick aluminum sheet fixed with the hand operated roller machine (Grooving Machine) and finally to be fixed with self tapping screws. NOTES: NO INSULATION TO BE APPLIED BEFORE LEAK TESTS. INSULATION OF VALVES AND FITTINGS IN CHILLED WATER LINE: All valves, fittings, flanges, strainers etc. in the chilled water line shall be insulated in the same manner as described above for chilled water pipes with 50 mm thick uniformly cut pieces from slabs of expanded polystyrene duly aluminum cladded. Care should be taken to ensure that no damage would be caused to the insulation when valves or strainers are operated. PUMP AND ACCESSORIES: All chilled water pumps and accessories shall be insulated with 50mm thick expanded polystyrene. EXPANSION TANK: Expansion tank shall be insulated with 50mm thick expanded polystyrene in two layers of equal thickness. The method of application of insulation shall be same as described for insulation of piping. The final finish shall be done with 0.5mm thick aluminum sheet cladding. AIR CIRCULATION SYSTEM: This section deals with supply, erection, testing and balancing of GI sheet metal duct work and air registers conforming to specifications as given below: MATERIAL FOR DUCTING: The duct shall be fabricated out of galvanised sheet, class VIII (Zinc coating 120 gm/m as per the parameters given below which are conforming to IS 655-1963).

No of Corrections

-45-

Signature of Tenderer

MAXIMUM SIDE (1) mm Up to 300 301 to 600 601 to 750 751 to 1000 1001 to 1500 1501 to 2250 2250 to above*

THICKNESS OF GI SHEET (2) mm 0.63 0.63 0.80

TYPE OF TRANSVERSE JOINT CONNECTIONS (3)


S-drive, pocket or bar Slips, on 2.5m centers S-drive, pocket or bar slips, on 2.5m centres S-drive, 25mm pocket or 25mm bar slips on 2.5m centers. Drive, 25mm pocket or 25mm bar slips, on 2.5 m centres 40 x 40 mm angle connections, or 40-mm bar slips, with 35 x 3 mm bar reinforcing on 2.5 m centres. 40x40x3mm angle connections, or 40mm bar slips, 1m maximum centres with 35 x 3 mm bar reinforcing. 50 x 50 mm angle connections, or 40mm pocket or 40 mm bar slips, 1m maximum centres with 35 x 3 mm bar reinforcing.

BRACING (4)
None None 25 x 25 x 3 mm angles, 1.2m from joint 25 x 25 x 3 mm angles, 1.2 m from joint 40 x 40 x 3 mm angles, 1.2 m from joints 40 x 40 x 3 mm diagonal angles, or 40 x 40 x 3 mm angle 60 cm from joint. 40 x 40 x 3 mm diagonal angles, or 40 x 40 x 3 mm angle 60 cm from joint.

1.00 1.25

* Ducts 2250 mm and larger require special field study for hanging and supporting methods. In addition to above the following points should be also taken into account while fabrication of ducts. All ducts of size larger than 450mm shall be cross broken. All ducts shall be supported from the ceiling / slab by means of MS rods of dia 9mm with MS angle of size 40 x 40 x 5 mm at the bottom with neoprene pad in between the duct and MS angle. The ducts shall be suspended from the ceiling with the help of dash fasteners. Provision for necessary ancillary materials required for hanging the ducts shall be arranged by the contractor. The vanes shall be provided wherever required and shall be securely fastened to prevent noise and vibration. The rubber gasket shall be installed between duct flanges in all connections and joints. All flanges and supports should be primer coated. The flexible joints shall be fitted to the delivery side of AHU fans with Fire Retardant Double canvass. The length of flexible joints should not be less than150 mm and not more than 300 mm between faces. The ducting work can be modified if deemed necessary in consultation with the AC Consultant to suit actual site conditions in the building. Box Type Dampers and Splitters These dampers shall be provided in the ducting work for proper control and balancing of air distribution. All dampers shall be louver type robust construction. These dampers shall be fitted with easily accessable operating mechanism, complete with links, levers, quadrant for proper control and setting in a desired position. The position of the handle of the damper operating mechanism shall be clearly visible and shall indicate the position of the damper in the duct. All dampers, splitters shall be fabricated out of G.S. sheet of two gauges higher than the duct piece having these fittings. Dampers shall be installed in duct at all required locations. No extra payment shall be made separately since these form part of Air Circulation System. NOTE: In case angle iron supports are not feasible to be installed for supporting the ducts due to

height constraint then the contractor shall support the ducts with M.S flats of at least double the thickness of the angle iron supports.

No of Corrections

-46-

Signature of Tenderer

A) THE SUPPLY AND RETURN AIR GRILLS AND CEILING DIFFUSERS: The supply and return air grills and ceiling diffusers shall be made of powder coated extruded aluminum sections. The supply air grills / diffusers shall be provided with screw operated opposed blade volume control device made of extruded aluminum in black anodised finish. All grills / diffusers shall have soft continuous rubber / foam gasket between the periphery of the grills / diffusers and surface on which it has to be mounted. The colour of grills / diffuser shall be as per the approval of the Architect. B) LINEAR SUPPLY AND RETURN GRILLS: The linear continuous supply / return air grills shall be made of powder coated extruded aluminum construction with fixed horizontal bars. The thickness of fixed bar louvers shall be 5mm in front and the flange shall be 20mm wide with round edges. The register shall be suitable for concealed fixing and horizontal bars of the grills shall mechanically crimped from the back to hold them. The colour of grills shall be as per the approval of the Engineer in Charge. The volume control device made of extruded aluminum construction in black anodised finish shall be provided in supply air duct collars only. C) FRONT FIXED BAR REAR ADJUSTABLE LOUVERED GRILLS: The grills shall be made of powder coated extruded aluminum construction with front fixed horizontal bar at 0 degree inclination with one way or two way deflection with rear vertical individually adjustable louvers in black shade mounted on Nylon bushes to hold deflection setting under all conditions of velocity and pressure. The colour of grills shall be as per the approval of the Engineer in Charge. The volume control device of extruded aluminum construction in black anodised finish shall be provided in supply air duct collars. D) SQUARE / RECTANGULAR CEILING DIFFUSERS: The square / rectangular ceiling diffusers shall be made of powder coated extruded aluminum construction with flush fixed pattern. The diffusers shall have Anti-Smudge ring and spring loaded removable central core in various pattern for air flow direction. The diffusers shall be mounted by concealed screw fixing arrangement. The volume control device of extruded aluminum construction in black anodised finish shall be provided in supply air diffusers. The colour of diffuser shall be as per the approval of the Architect. E) VOLUME CONTROL DEVICE: The opposed blade volume control device shall be made of Powder Coated extruded aluminum construction in black anodised finish. Opposed blades shall be pivoted to extruded aluminum frame with Nylon bushes. Specially designed blade shall have an overlapping lip which shall ensure a tight closure.

No of Corrections

-47-

Signature of Tenderer

F) FRESH AIR INTAKE LOUVERS WITH BIRD SCREEN: The fresh air intake louvers at least 50mm deep will be made of powder coated extruded aluminum construction. Bird / insect screen will be provided with the intake louvers. The blades shall be inclined at 45 degree on a 40mm blade pitch to minimize water ingress. The lowest blade of the assembly shall be extended out slightly to facilitate disposal of rain water without falling on door / wall on which it is mounted. The intake louvers shall be provided with factory fitted aluminum construction volume control dampers in black anodised finish. PAINTING: All ducts collar / shoot behind the grills / diffuser shall be given at least two coats oil black enamel paints. TESTING: The complete duct system shall be tested for air leakage & complete air distribution system shall be balanced in accordance with air quantities indicated on the approved drawing. CONTROL SYSTEM: This section deals with supply, installation and testing, commissioning of necessary controls (automatic) and instruments conforming to these specifications and shall be in accordance with schedule of quantities. The various controls listed below shall be electrically operated and in case of low voltage controls the necessary step down transformer shall be provided with each control. All automatic controls shall be as detailed in specifications. CONTROLS FOR AIRHANDLER: Three way modulating valves: The three way modulating valves shall be provided in chilled water line to the cooling coil of Airhandlers which is actuated by a proportionating thermostat. The three-way valve shall be selected for valve authority value in the range of 40 % to 60 %. These valves shall consist of bronze metal valve body with stainless steel trim with linear flow characteristics. Modulating motor suitable for 24 volts AC supply shall be complete with 220/24 volts transformer and shall be suitable for operation with a signal of 0-10 volt DC from the proportionating thermostat. The pressure drop across valve for air-handler unit shall not exceed 5.0 PSI. The valve linkages shall be of the same make as of valves and modulating motor. THERMOSTATS: a) Snap Acting Thermostat for FCU: These shall be electrically operated fixed differential type with the sensing elements located in the return air passage. The exact mounting arrangement, profile etc. shall be derived as per location requirements.

No of Corrections

-48-

Signature of Tenderer

b) Proportionating Thermostat for AHU: For Air-handlers, three way mixing valves shall be proportionately operated based on return air temperature & is suitable to operate in the range of 14 to 30 C. INSTRUMENTS: Thermometer: The alcohol filled V-form thermometer shall have range of 50 deg.C. for airconditioning application . These shall be provided at inlet / outlet of condensers, chillers, air-handlers. Pressure Gauges : The pressure gauges shall be dial type of 150 mm dia to be installed at inlet / outlet of condensers, chillers, air-handlers and at suction and discharge sets of pump-sets. The pressure gauges shall be connected to the pipes by proper dia copper pipe with shut off cocks required for gauges protection during testing. ELECTRICAL MOTORS AND STARTERS: This section deals with supply, installation, testing and commissioning of all types of motors used for pumps, air-handlers, cooling towers etc. The motor installation, wiring and its control shall be carried out in accordance with the specifications as detailed below. MOTORS: MAKE OF MOTORS: The make of motors shall be as specified in List of Approved Make. The winding of motors shall be class F insulation and suitable for local conditions. The insulation of motors shall conform to IS : 325 / 1978. All motors shall comply with IS : 325, IEC-34.1 or BS - 2313, IEC - 72.1 for foot mounted motors. The rating of the motor shall be as indicated in the Schedule of Equipment & Bill of Quantities. The motors shall be selected on the basis of ambient temperatures and allowable maximum temperature rise. Motor above 1HP shall be three phase unless otherwise specified. All motors shall be rated for continuous duty as per IS:325. Motor shall be suitable for operation on 415 volts 10% volts, 50 5% Hz AC supply (or 230 10% volts, 50 5% Hz for single phase AC supply). Motors shall be provided with cable box to receive Aluminum conductors, PVC insulated, PVC sheathed and armoured cables. All motors shall be provided with combination of Ball and Roller Bearing. Suitable grease nipples for regreasing the bearing shall be provided. Manufacturers test certificate shall be furnished for the motors above 1 HP. MOTOR STARTERS: All starter shall conform to IS: 13947. All starter should have suitable range of voltage and frequency. All starter shall have integral stop/start push button of international colour code. Contactor shall have number of poles as required for appropriate duty. Contacts should be made of solid silver faced and shall be suitable for at least 40 contacts per hours. In event of power failure, the starter should automatically disconnect.

No of Corrections

-49-

Signature of Tenderer

All starters shall be provided with thermal over load relay. All star delta starters shall have adjustable timers. Rating of motors shall be selected to suit the application as indicated in the Schedule of Equipment. All starters shall be provided as specified in Bill of Quantities. All starter shall be compatible to the drive and driven equipment. Auxiliary contacts for interlocking purpose shall be provided in the starter. INSTALLATION OF MOTORS: The motor and drive machine shall be fixed on slide rails to facilitate belt and other adjustments. Vibration isolation arrangement shall be provided. The installation of motor shall be carried out as per IS:900. The motor with driving equipment shall be mounted on foundation and connected to each other with flexible coupling with guard in condenser and chilled water pumps. All motors after installation shall be tested at site for vibrations, heating and electrical insulation resistance by AC contractor. MOTOR CONTROL CENTRE (MV PANEL), AHU SUB-PANEL: This section deals with supply, installation, testing and commissioning of Motor Control Centre (MV panel), AHU Sub-Panels etc. and shall be manufactured by CPRI approved venders. The power / control cabling and earthing work shall be carried out as per the specification given below: SCOPE: All work shall confirm to Indian Electricity Act (amended upto date), I.S. code of practices local rules and regulations etc. Power cabling shall be carried out with approved make of cables as indicated in the List of approved make of equipment / materials and shall be of grade 1100 volts, PVC insulated and sheathed, armoured aluminum conductors cables. Control cabling shall be of approved make and shall be of grade 1100 volts, PVC insulated & sheathed, copper conductor armoured multicore cables as specified in BOQ. MOTOR CONTROL CENTRE (MV PANEL) / AHU SUB-PANEL: Motor control centre (MV Panel) floor mounted extendable type and wall mounted AHU sub-panel shall be fabricated out of 14G C.R.C.A. Sheet. These panels shall be cubical sectionalised type, totally enclosed dust & vermin proof. Gaskets shall be provided in all joints to prevent dust to reach the internals of the panels to make it completely dust proof. The degree of protections for panels shall be IP 52 for indoor applications and IP 55 for outdoor applications as per IS:2147. This panel (MV) shall be suitable for voltages upto 500 volts, three phase 50 Hz, 4 wire supply capable of functioning satisfactorily in temperature ranging up to 45 to 50 degree centigrade and rupturing capacity suitable for connected load and design should be type tested for 42 KA fault level. All joints of panels shall be welded and braced as necessary to provide a rigid support for all components. The base channel provided in the floor mounted MV panel shall be 75mm high and a clear space of 200mm between the floor and the bottom most part of the unit shall be provided. The panel shall be correctly positioned. Self- threading screws shall not be used in the construction of control panels.

No of Corrections

-50-

Signature of Tenderer

Appropriate knock-out holes of proper sizes shall be provided for incoming and outgoing cables. The facility for bottom or top entry of cables in the panels shall be provided. Necessary cables clamps shall provided for holding the cables in position. All power/control wiring inside the panel shall be colour coded and control wiring ferruled for identification purpose. All labeling shall be provided in engraved anodized aluminum strips on the front face of the panel. Each circuit breaker shall be housed in separate compartments. It shall have steel sheets on top and bottom of compartment. The steel sheet hinged door shall be interlocked with the circuit breaker on the ON position. When the breaker is on the ON position, suitable preventive measures shall be provided, such as interlocks, to prevent the breaker from being drawn out. When the breaker is in ON position steel sheet shall be provided between the tiers in the vertical section. The door of this compartment shall not form part of the draw out arrangements. BUS-BARS: The bus-bar and its connections shall be aluminum Electrolytic grade E-91 as per IS: 5082 and shall be of rectangular section. These should be suitable for full load current for phase bus-bar and neutral bus-bar shall be of half rated current capacity. The bus-bar should have provision on either side for extension. The bus-bar should be sleeved with colour coded heat shrinkable PVC sleeve. Bus-bar supports shall be of fibre glass reinforced thermosetting polyester having in built and tracking barriers to break the path of conducting dust through moulded ribs. In panels bus-bar connections shall be done by drilling holes with cadmium coated bolts and nuts. Extra cross section shall be provided to compensate drilling of the holes. Insulated aluminum strips of suitable size of full rated current capacity shall be used for interconnecting bus-bar and breaker. A horizontal / vertical wire way shall be provided for interconnecting control wiring between different vertical sections. The terminal blocks shall be used for outgoing terminals and neutral link at a suitable located place in the control panel. Separate compartments for outgoing and incoming cable shall be provided. The current transformers of all instruments shall be mounted with terminal blocks. All live parts including incoming and outgoing link / terminals should be totally shrouded by means of non hygroscopic and fire retardant material. ROTARY SWITCH / SELECTOR SWITCH / SWITCHES / HRC FUSES / STARTERS / SINGLE PHASE PREVENTERS / TOGGLE SWITCH: These shall be of approved make and conforming to relevant ISI standard. The rupturing capacity of HRC fuses should not less than 80 KA and in case of switches it should be 60 Amps maximum. CURRENT TRANSFORMER: The current transformers shall have accuracy of class I and 5P10 / 10P10 and suitable VA burden for operation of the connected meters and relays. OVERLOAD RELAYS: All the motors shall have overload relay protections conforming to relevant IS.

No of Corrections

-51-

Signature of Tenderer

TIME DELAY RELAYS: These shall be adjustable type with time delay adjustments of 0-180 or as per manufacturers standards. INDICATING LAMPS AND METERING: These shall confirm to BS37 & BS39. All meters shall be flush mounted and draw-out type. The indicating lamp shall be filament type and with very low burden and economy resistor. VOLTMETER AND AMMETERS: Motor Control Centre (MV Panel) shall have flush type voltmeter and ammeter of size 96 x 96 mm as detailed in B.O.Q. PUSH BUTTON STATIONS: These shall be suitable for panel mounting and accessible from front without opening. These shall be provided for manual starting and stopping of motors/equipments as per normal practices. The contacts shall be suitable for 6AMP current capacity. CONDUITS: These shall be preferable made of mild steel, stove enameled from inside and outside with minimum wall thickness of 1.6 mm for conduits up to dia of 25mm and 2 mm for conduits above 25 mm dia. CABLES: These shall be PVC insulated, pre-sheathed, aluminum conductor armoured cables as per IS:694 and as per list of approved make of equipment / materials. Control Cables shall be multi-core PVC-insulated PVC sheathed copper conductor and armoured cables of approved make only. LAYING OF CABLES: These shall be laid as Indian Standard code of practice. All cables shall be laid on 16GI Cadmium Plated U shaped Channel 40mm x 20mm cable trays. In case more than one cable is running, then proper space in between the two cables shall be provided to avoid loss of current carrying capacity. While cables are running on walls, proper saddles must be provided. WIRE SIZES: Single stand PVC-copper conductor wires shall be used inside the control panel for interconnecting different components. All wires shall be neatly dressed and coloured beads shall be provided for easy identification in control wiring. The minimum size of control wiring shall be 1.5sq.mm. Testing of panels as per code of practice shall be done at works by AC contractor before inspection and dispatch to site.

No of Corrections

-52-

Signature of Tenderer

DRAWINGS: Necessary drawings of all control panels and wiring of equipment etc. shall be submitted by the A.C contractor for approval of the Engineer in Charge. On final completion of job and before handing over of AC System As Built Drawings shall be submitted to the Department.

TESTING: The complete electrical installation shall be tested in accordance with relevant ISI codes in presence of Electrical Supervisor of the Department before commissioning of plant. PAINTING OF PANELS: All sheet metal enclosures shall be powder coated only after de-rusting and hot-dip phosphating degreasing etc. at works only. NOTE: Rubber mats of 1100 volts shall be laid in front of all switch boards.

SIZES OF POWER CABLING: The following size of power cabling shall be used only:

HP of Motors a) b) c) d) e) f) Up to 5 HP 5 to 7.5 HP 10 to 15 HP 20 to 25 HP 30 to 35 HP 40 to 50 HP

Cable Size 3c x 4 sq.mm aluminum conductor wire. 3c x 6sq.mm aluminum conductor wire. 2no. 3c x 6sq.mm aluminum conductor armoured cable. 2no. 3c x 16sq.mm aluminum conductor armoured cable. 2no. 3c x 35sq.mm aluminum conductor armoured cable. 2no. 3c x 35sq.mm aluminum conductor armoured cable.

CAPACITY OF RELAYS AND CONTACTS: The following capacity relays and contacts shall be used for various rating of motors: Type of Starter Contactor Overload Relay Current a) b) c) d) e) f) g) h) i) 40 HP Motor 35 HP Motor 30 HP Motor 25 HP Motor 20 HP Motor 15 HP Motor 10 HP Motor 7.5 HP Motor 5.0 HP Motor Star Delta Starter Star Delta Starter Star Delta Starter Star Delta Starter Star Delta Starter Star Delta Starter Star Delta Starter Star Delta Starter D.O.L. Starter 40 Amp. 40 Amp. 40 Amp. 32 Amp. 32 Amp. 25 Amp. 16 Amp. 16 Amp. 16 Amp. Phase Relay Range 30 - 50 Amp. 20 - 33 Amp. 20 - 33 Amp. 14 - 23 Amp. 14 - 23 Amp. 09 - 15 Amp. 06 - 10 Amp. 09 - 15 Amp. 06 - 10 Amp.

No of Corrections

-53-

Signature of Tenderer

EARTHING: The earthing of all equipments shall be carried out by G.I. strips / wires as mentioned in Bill of Quantities. All panels / three phase motors shall be earthed with two number distinct and independent G.I. strips / wires of the following sizes: 1. 2. 3. 4. Motor upto 5.5 KW Motor 7.5 to 12 KW Motor 12 to 50 KW Motor 51 to 89 KW 4 sq. mm G.I. Wire 6 sq. mm G.I. Wire 25 x 3 mm G.I. Strip 32 x 6 mm G.I. Strip

The earthing connections shall be connected to main earth station or main earth grid. The earth connections shall be connected to equipments after removal of paint, grease etc. REMOTE CONTROL CONSOLE: The control console shall be floor mounted Vertical type and shall be provided in the plant room to enable to operate various equipments and also to provide status indication. The location of the control desk should be in such a way to provide a clear view of all equipments installed in the air-conditioning plant complete without mimic diagram. The control console shall be complete with on/off push buttons stations and status lamps etc. as listed in this section. All controls and alarms shall be suitable for 230 volts. The actual number of switches and lights shall correspond to the number of units being installed and the equipment given below. The indication lights shall be of 10mm LED controlled through individual relays. Internal illumination duly interlocked with door switch shall be provided for internal maintenance of the control console panel. Equipments Illuminated Push Button On Green Off Red Identification Lights Status Green On Air-Cooled Chiller (Four Nos.) Chilled Water Pump Sets (Four Nos.) Air-handlers (Eleven Nos.) Spare indications (One Nos.) Water flow Chiller Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Status Red Off Yes Yes Yes Yes Yes Yes Status amber

The alarm hooter shall have reset buttons. The system lamp-testing arrangement shall be provided in control console. All controls shall be functionally tested. In case of fault, amber fault light should glow only. All control cabling shall be carried out with multi-core copper conductor cables only. Additional core for each equipment to be connected shall be provided as spare on each feeder. Laminated drawings shall be pasted in each panel, sub-panel, control console by the contractor.

No of Corrections

-54-

Signature of Tenderer

STANDARD SPECIFICATION ON PIPING WORK: This section deals with supply, installation, testing and commissioning of chilled water /condenser water / hot water / drain water pipes, pipe fittings and valves etc. as detailed below in specifications. All pipes, fittings and valves etc. shall conform to relevant Indian standards. WATER PIPING: The pipes, fittings and valves shall be of approved make given in the NIT. Chilled water pipes shall be "C" (Heavy) Class M.S. E.R.W Black pipes and shall conform to IS:1239 (Part 1) -1991 & IS : 3589 - 1991 with latest amendments. The wall thickness of "C" Class M.S. E.R.W. Black pipes as per IS:1239 (Part 1) shall be as follows: Sl.No. a) b) c) d) e) f) g) h) i) j) k) l) Nominal Pipe Dia in mm 25 32 40 50 65 80 100 125 150 200 250 300 Wall Thickness of Pipe in mm 4.00 4.00 4.00 4.50 4.50 4.80 5.40 5.40 5.40 6.00 6.00 6.00

Drain water / make up water pipes shall be "B" Class GI Pipe and shall Conform to IS: 4736. The pipes shall be sized for individual liquid flow and shall ensure smooth noiseless balanced circulation of fluid. All piping and their steel supports shall be thoroughly cleaned and primer coated before installation.

PIPE FITTINGS: The pipe fittings for screwed piping shall be malleable iron and for piping with welded joints shall of weldable quality. Also the fittings shall be suitable for same pressure ratings as for the piping system. All bends up to sizes 150 mm dia shall be ready made of heavy duty wrought steel of appropriate class. All bends in sizes 200 mm and above shall be fabricated from the same dia and thickness of pipe in at least four sections and having a center in radius of at least 1.5 times diameter of pipes. Fittings such as tees, reducers etc. shall be fabricated from the same pipe and its length shall be at least twice the diameter of the pipe. The dead ends shall be formed with flanged joints and shall have 6 mm thick blank between flange pair for 150 mm and over.

No of Corrections

-55-

Signature of Tenderer

FLANGES: All flanges shall be of mild steel as per IS : 6392 / 71 (with latest amendments) and shall be slip on type welded to the pipes. Flanged thickness shall be to suit Class II pressure. 3mm thick gasket shall be used in between the flanges. Flanged pair shall be used on all such equipments which are required to be isolated or removed for service for example condenser / chilled water pumps, chilling m/c, AHU etc. VALVES (BUTTERFLY VALVES): Butterfly valves shall be ISI marked of PN 1.0 rating as per IS 13095 preferably with fixed linear design to suit duty and flanges as per IS 6392 Table "E". Valves of sizes 32mm and above diameter shall be made of cast iron close end body, cast iron epoxy coated disc, Nitrile Seat and SS 410 Stem with tefflon bush. Valves up to 150mm NB shall be with detachable hand lever operation whereas valves above 150 mm NB shall have warm gear operation. These valves shall be installed in condenser / chilled water lines, make up / drain water piping lines. All valves shall be supplied with factory test reports and the manufacturer must have test facilities at their works. NON-RETURN VALVE (DUCT PLATE CHECK VALVES: The dual plate check valves shall be used for horizontal / vertical run of pipes and shall conform to PN 1.0 rating .The valve design shall confirm to API 594 and tested as per ANSI SERIES. The valves shall have cast iron body, and SS 410 plates, SS 410 Shaft and Nitrile Seat. All valves shall be supplied with factory test reports and the manufacturer must have test facilities at their works. Y-STRAINER: The Y-strainer shall be fabricated out of MS `C class pipe two size higher than that of strainer pipe size. Flanges as per BS 10 shall be provided at inlet and outlet of connections. The body shall be pressure tested at 10 Kg/Sq. cm and shall be hot dip galvanized. Permanent magnet shall be provided in the body of the strainer to arrest MS particles. Filter element shall be of nonmagnetic 20 gauge SS sheet with 3 mm perforation. Strainer shall be provided at inlet of each AHU and chilled water pumps. BALANCING VALVES: The balancing control and shut off valves with built in pressure drop measuring facility shall be provided in return water lines for air-handling units, chillers, condensers as given in the tender drawings. The valves of sizes 32 mm to 65mm dia. shall be of gun metal / cast iron construction with screwed ends angular design digital hand wheel with locking facility. Whereas valves of sizes 75mm and above shall be of cast iron construction with internal parts of SS 410 and EPDM / nitrile seat with flanged ends. The test cocks should be long enough to protrude out of valve insulation. The valves shall be designed for PN 1.0 and tested for the seat at 1.1 times the design pressure and 1.5 times the design pressure for the shell. All valves shall be supplied with test certificates and the manufacturer must have test facilities at their works. SUPPORTS FOR PIPES: In plant room pipe shall not be supported from ceiling and shall have steel supports of adequate strength firmly fixed to the floor only.

No of Corrections

-56-

Signature of Tenderer

LAYOUT AND SIZING OF PIPE LINES: The sizes and layout given in the drawings / bill of quantities are for guidance purpose only. The AC Contractor shall prepare and submit detailed drawings after the award of contract to the Engineer in Charge for his approval. No work at site shall be started before final approval of drawings if given. The drawings shall indicate sizes of pipes, quantity of water flow in each length of pipe. All details of fittings, location of all valves, air vents, pipe supports etc. shall be clearly indicated in the drawings. INSTALLATION OF CHILLED / DRAIN / MAKE UP WATER PIPING: a) All pipes shall be securely supported or suspended on stands, hangers, clamps etc. as required. The Air-conditioning contractor shall design all brackets, saddles, anchors, clamps etc. and shall be responsible for structural adequacy. b) All pipe supports shall be of steel, coated with two coats of anti-corrosive paint and finally finished with paint. c) The pipe spacing shall be as follows : Dia of Pipe Up to 25mm 30 mm to 50 mm 65 mm to 75 mm 100 mm to 125 mm 150 mm 200 mm & above Spacing between supports 1.5 mt 2.0 mt 2.5 mt 3.0 mt 3.5 mt 4.0 mt

d) The vertical rises shall run parallel to walls and should be straight to wall duly checked with plumb line. e) In case pipes with/ without insulation while passing through the wall / slab, shall be provided with sleeve 50mm higher in size than the pipe with / without insulation. f) Wherever insulated pipes are running, it should be supported in such a way that no undue pressure is exerted on the insulated pipe. g) The expansion-joints or expansion-loops shall be provided to take care of the expansion and contraction in pipes due to temperature rises. TESTING OF PIPE SYSTEM: (a) All tools, tackles, labours etc. shall be arranged by AC Contractor. (b) All pipes shall be tested hydraulically at 3 times the maximum operating pressure for a period of 24 hours. The test pressure should not be less than 10 Kg/sq. cm at any times. All leaks occurring during testing shall be rectified to the satisfaction of the Engineer in Charge. After repairs of leak it shall be tested again at the same pressure. (c) In case piping is tested in parts, these sections shall be securely sealed and capped during testing. (d) The AC Contractor should ensure that there should be minimum vibration / noise in the chilled water / condenser water circuit due to water turbulence.

No of Corrections

-57-

Signature of Tenderer

AUTO AIR-VENTS: AUTO Air vents for purging of air trapped in piping system shall be provided at the highest point shall be provided and no additional price shall be paid.

PRESSURE GAUGES / THERMOMETERS: PRESSURE GAUGES: Burden type pressure gauges of 100mm dia of suitable range shall be provided at the following locations: a) Chiller / Cooling coils of AHU - Inlets and outlets. b) All pumps - Suction and discharge c) All pressure gauges shall be complete with globe valves and confirming to IS:3624. INDUSTRIAL TYPE THERMOMETER: Direct reading V form type thermometer alcohol filled of suitable range / length shall be provided at the following locations: a) Chiller / Cooling coil Inlets and outlets in separate wells. STANDARD SPECIFICATION OF FIRE DAMPERS: This section deals with supply, erection and commissioning of fire dampers and box type dampers, conforming to general specification and suitable for duty selected, indicated in Schedule of Equipment and Bill of Quantities.

MOTORISED COMBINED SMOKE AND FIRE DAMPERS-SPRING RETURN TYPE: a) All supply air Ducts in AHU room crossing shall be provided with approved make fire and smoke dampers of at least 90 minutes fire rating certified by CBRI, Roorkee as per UL555:1973. b) The fire damper blades and outer frame shall be formed of 1.6 mm galvanised steel sheet. The damper blade shall be pivoted on both ends using chrome plated spindles in self lubricating bushes. Stop seals shall be provided on top and bottom of the damper housing made of 16G Galvanised steel sheet. For preventing smoke leakage side seals will be provided. In normal operating conditions damper blade shall be held in open position with the help of a 24 V operated electric actuators thereby providing maximum air passage without creating any noise or chatter. c) The damper shall be actuated through electric actuator. The actuator shall be energised with the help of a signal from smoke detector installed in AHU Room / R.A. Duct. The fire damper shall close due to temp. rise in S.A. Ducts through the electric temp. sensor which is factory set at 165 F . d) Each motorized smoke cum fire damper shall have its own panel which will incorporate necessary circuit required to step down voltage available from UPS or emergency power supply to show status of the damper (open or close), to allow remote testing of damper, indication in event of damper closure due to signal from smoke sensor / temperature sensor and reset button. Additional terminal will be provided to have audio cum video signal in Central Control Room.

No of Corrections

-58-

Signature of Tenderer

e) f)

Damper actuator shall be such that it should close the damper in the event of power failure automatically and open in the same in case of Power being restored. The fire Damper shall be mounted in fire rated wall with a duct sleeve 600 MM long. The sleeve shall be factory fitted on fire damper. The joints at sleeve end shall be slip on type. Minimum thickness of GI Sheet shall be 18G.

g)

Damper actuator shall be such that it should close the damper in the event of power failure automatically and open in the same in case of Power being restored.

h) Hinged access doors of suitable size complete with air tight gastkets shall be provided in all fire dampers and plenums. MODE OF MEASUREMENT: The following measurement code shall apply to the Contract: SHEET METAL WORK: DUCTING: a) The final finished sheet area in sq. mt shall be measured only. b) Vanes, splitters, flanges, access doors etc. shall not be separately measured. These shall be treated as part of duct work. c) Bends, Elbows, Transformation, pieces etc. shall be measured along the centre line and measured as per duct work. d) Canvas connections, Duct Supports, Stiffening members, frames etc. shall not be measured separately and shall form part of duct work. GRILLS / DIFFUSERS / FIRE DAMPERS: All Grills / Diffusers / Fire Damper areas will be measured in terms of effective area (Neck Area). Any Extruded aluminum grill / diffusers having an area less than 0.1 sq.mt shall be accounted as 0.1 sq.mt. BOX DAMPERS: a) No separate measurement of box dampers shall be done since they form part of duct. b) Fresh air dampers shall be measured as effective areas only. No separate measurements for bird screen inlet / outlet louvers shall be done. PIPING WORK: a) The length of piping accessories and fittings shall be measured along its centre line in meters and no measurements for bends, elbows, tees etc. shall be made. All such fittings / accessories shall be treated as part of the piping work. b) Flanges shall not be measured, as they form part of piping work. c) For thermometer wells and pressure gauge sockets no measurement shall be done separately. d) All kinds of supports, hangers etc shall be part of piping work and no extra measurements shall be done. e) No additional price for installation of purge and descaling valves as required at site shall be paid.

No of Corrections

-59-

Signature of Tenderer

INSULATION: Insulation of Duct: This shall be measured on the basis of bare duct surface area i.e. the area of duct insulation and area of duct shall be same. Insulation of Chilled Water / Drain Water. i) Insulation of pipes shall be measured in terms of linear length of pipe for each size. ii) For insulation of bends, elbows, tees etc. it shall be measured along with the center line of insulation and shall be measured in meters. iii) Insulation of valves shall be separately accounted as per bill of quantities. Insulation of chiller / Expansion Tank / Suction Line: The insulation of the above equipments shall be deemed to form part of equipment and no separate measurements for insulation of such items will be accounted for payment. Acoustic Lining of Duct and Plenum This shall be measured on the basis of bare duct surface area i.e. the area of duct lining and area of duct shall be same. ELECTRICAL CABLING WORK: a) All power cables / controls cables shall be measured on linear basis in meters. b) No extra price shall be paid on account of end termination of cables which includes thimble, gland etc. STRUCTURAL SUPPORTS: No extra price shall be paid on account of structural supports required for piping, ducting and cabling work. PAINTING WORK: This section deals with painting of various equipment / material supplied under this contract. It gives basic guidance for painting as specified below : Application: The original colour of all equipments like water chilling machines, air-handling units, cooling tower etc. which if got damaged during transportation or during installation shall be painted in original shade with the two coat of paint to give a final finish. a) All condenser water / chilled water pipes shall be painted as per standard code of practice and arrows shall be marked to indicate direction of flow of water. COLOUR SCHEME FOR THE EQUIPMENTS / MATERIALS: i) ii) iii) iv) v) vi) vii) Chilling Machine Pump-sets Chilled Water Pipes Direction of flow of water Electrical Panels / Subpanel / Remote Control Console Cable Trays Supports for Ducts As Per Manufacturers Standard Battle ship Gray Light Blue Black Arrows Light Gray Powder Coated Cadmium Plated Silver

Any change in the above colour scheme can be done with the approval of the Engineer-in-Charge.

No of Corrections

-60-

Signature of Tenderer

Sl. No.

AHU No.

AHU / GF / 01, FF / 01 2F / 01, 3F/01 GF/FF/ 2F/3 Floor

Air-conditioned Areas on Floor

AHU / GF / 02, FF / 02 2F / 02, 3F/02, 5F/01 & 02 GF/FF/ 2F/3 Floor

AHU / 4F / 02

AHU / 4F / 01

4 Floor

4 Floor

2 3 4

Space Served Location of AHU Air Quantity CFM and No. of Fans 6800 & One

Please Refer the Drawing Enclosed with the Tender Please Refer the Drawing Enclosed with the Tender 7650 & One 4250 & One 3400 & One

5 6

Fan Static Pressure mm Face Area of Cooling Coil SMT

40 0.74

40 0.83

40 0.46

40 0.37

7 8 9

No. of Fins / CM No. of Rows Deep All AHUs without Face and bypass Dampers

5.2 6 Yes

5.2 6 Yes

5.2 6 Yes

5.2 6 Yes

10 11

Motor HP Type of Unit

3 Ceiling Suspended Unit

3 Ceiling Suspended Unit 23

2 Ceiling Suspended Unit 23

2 Ceiling Suspended Unit 23

12

Double Skinned AHUs with 23 / 43 mm Insulation

23

13

Materials of Drain Pan

Polished S. Steel, 22G

Polished S. Steel, 22G 0.6mm Pre Plasticized Sheet 0.6mm GSS Sheet Yes

Polished S. Steel, 22G 0.6mm Pre Plasticized Sheet 0.6mm GSS Sheet Yes

Polished S. Steel, 22G 0.6mm Pre Plasticized Sheet 0.6mm GSS Sheet Yes

14

Materials of Outer Sheet

0.6mm Pre Plasticized Sheet

15

Materials of Inner Sheet

0.6mm GSS Sheet

16

Pre Filters

Yes

No of Corrections

-61-

Signature of Tenderer

LIST OF PREFERRED MAKES OF EQUIPMENTS / MATERIALS: 01. Scroll Type Air Cooled Chilling M/C with Microprocessor Based Control Panel 02. 03. Monoblock Pumps Air Handlers Unit (Double Skinned) (Ceiling Suspended) 04. Cooling Coil Kirloskar / Beacon /Mather-Platt Suvidha Savier / Caryaire / Blue Star Zeco / Waves/ Edge Tech Blue Star / Carriyaire/ Zeco./ Caryaire. / Waves/ EdgeTech 05. 06. 07. 08. AHU Fans Imported Fire Damper Actuator Fire and Smoke Damper Spring Type Three Phase Motors Comferi / Nikotra /Krugger Belimo / Siemens Caryaire / Ravi-Star / Tanus Crompton greaves / Siemens/Kirloskar / ABB / Bharat Bijlee 09. 10. 11.a. 11.b. Y-strainer Water Piping Water duty Butterfly Valve Water duty Check Valve (Dual Plate type) 12 13. 14. 15. Balancing Valves Globe Valve Pressure Gauges Industrial type Thermometer (Mercury filled V form) 16. Glass Wool Blankets (Factory Laminated Aluminum) 17. Expanded Polystyrene (P Quality) Styrene Packaging / Toshiba Mettur Beardsell 18. 19. 20. 21. a) Fibre Glass Rigid Board Extruded Aluminum Grills / Diffusers GSS Sheet Controls Three Way Modulating Valve and Modulating Motor b) Thermostat Honeywell / Johnson / Steffa / Siemens / Anergy Honeywell / Johnson / Steffa / Danfoss Anergy 22. 23. Paints Tar felt / CPRX Compound ICI / Asian /Johnson & Nicholson Shalimar tar product U.P.Twiga / Owen corning Caryaire / Ravistar / Tanus Opella Sail / Tata / Bhusan Steel U.P.Twiga / Owen Corning Advance / Castle Sant / Leader Feibig / H-Guru / Emarald Emerald / Japsin Emerald / Rapidcool /Sant Jindal-Hissar / Tata / BST Advance / Audco / Castle Advance / Audco / Castle Blue Star / Voltas / Carrier Climaventa

No of Corrections

-62-

Signature of Tenderer

24.

Power Cable

- ICC / CCI / Gloster / Grandlay / Universal / INCAB / Polycab / Havells

25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39.

Control Cable M.C.C.B. Voltmeter / Ammeter Switches HRC Fuse and Fittings Current Transformer Contactors Starter Overload Relays Indicating Lights (LED Type) Selector / Toggle Switch Change Over Switch Time Delay Device Single Phase Device Make of Electrical Panel / Sub-Panels / Remote Control

- Gloster / Grandlay / National / Havells - L&T / GE / Siemens - A.E. / IMP. - L&T / Siemens / GE - L&T / Siemens / GE - A.E. / Kappa - L&T / Siemens / BCH./ GE - L&T / Siemens / BCH./ GE - L&T / Siemens / BCH./GE - Siemens / L&T Kaycee / L&T Elecon / L&T Siemens / L&T/ BCH L&T / Minilec Power Tech, Bhubaneswar / Technocrat, Cuttack / ESS, Cuttack / Utkal Electrical Industries, Bhubaneswar

40. 41. 42. 43.

Vibration Isolation Spring / Pad Pre Filters Purging Valves Fan Coil Units (Ceiling Suspended)

Dunlop / Resistoflex Anfilco / Thermodyne Anergy / Rapidcool High Tech / Blue Star Zeco / Waves/ Edge Tech

NOTE: ALL MAKES SHALL CONFORM TO STANDARD SPECIFICATIONS OF EACH ITEMS AS ENCLOSED WTH THE TENDER DOCUMENTS. BASIS OF DESIGN: Outside Design Conditions Summer / Monsoon Inside Design Conditions Summer / Monsoon Exposed Roof: DBT C 43.3 / 35.0 / 7.2 DBT C 22 1 WBT C 23.9 / 28.3 /5.0 RH Around 60 %

All exposed roof / terraces shall be provided with under deck insulation with 50 mm thick expanded polystyrene or equivalent material by the Department through their own agency.

Make up Water Requirement :

Soft water in expansion tank shall be provided by the Client.

No of Corrections

-63-

Signature of Tenderer

POWER SUPPLY:

Stabilised three phase four wire AC supply i.e. 415 Volts 10 % and 50 Hz 5 % shall be made available in the plant room and in each air handling unit rooms and single power supply within two meters from each Fan coil unit by the client through their own agencies.

PARAMETERS FOR AIR-CONDITIONED AREAS: Sl. No. Floor and Area Name GROUND FLOOR 1 2 Office - 01 Office - 02, Entrance Lobby 3 Court Room - 01, Lobby 4 Court Room - 02, Lobby 5 6 7 8 Office - 03 Member Room - I Member Room - II Member Room - IIII TOTAL FIRST FLOOR 1 2 Office - 01 Offices - II & III, Corridor 3 4 5 Offices - IV Officer - I Officer- II & III (2 Nos.) 6 Officer - IV TOTAL SECOND FLOOR 1 2 Officer - I Offices - II & III, Corridor 3 4 Offices - IV Officer - I 142 12 15 15 25 2 5.0 0.3 1ACPH 1ACPH AC AC AC AC 26 142 15 15 4 25 0.6 5.0 1ACPH 1ACPH AC AC AC AC 142 12 13 Each 12 345 15 2 0.3 1ACPH AC AC 15 15 15 25 2 2 5.0 0.3 0.3 1ACPH 1ACPH 1ACPH AC AC AC AC AC AC 24 142 15 15 4 25 0.6 5.0 1ACPH 1ACPH AC AC AC AC 14 19 15 20 337 15 15 15 15 2 4 4 4 0.3 0.3 0.3 0.3 1ACPH 1ACPH 1ACPH 1ACPH NAC NAC NAC NAC AC AC AC AC 70 156 6 0.4 1ACPH NAC AC 81 15 6 0.4 1ACPH NAC AC 27 91 15 15 5 10 0.75 0.4 1ACPH 1ACPH NAC NAC AC AC Area SMT Light Load W/SMT Occu pancy Equipme nt Load KW ACPH or CFM PER Floor Below Floor Above

No of Corrections

-64-

Signature of Tenderer

Sl. No. 5

Floor and Area Name Officer - II & III (2 Nos.)

Area SMT 13 Each 12 39 386

Light Load W/SMT 15

Occu pancy 2

Equipme nt Load KW 0.3

ACPH or CFM PER 1ACPH

Floor Below AC

Floor Above AC

6 7

Officer - IV Committee Room TOTAL THIRD FLOOR

15 15

2 8

0.3 0.3

1ACPH 1ACPH

AC AC

AC AC

Officer - I

26

15

0.6

1ACPH

AC

P Insulated

Offices - II & III, Corridor

142

15

25

5.0

1ACPH

AC

P Insulated

3 4 5

Offices - IV Officer - I Officer - II & III (2 Nos.)

142 12 13 Each 12 39 386

15 15 15

25 2 2

5.0 0.3 0.3

1ACPH 1ACPH 1ACPH

AC AC AC

AC AC AC

6 7

Officer - IV Committee Room TOTAL FOURTH FLOOR

15 15

2 8

0.3 0.3

1ACPH 1ACPH

AC AC

AC AC

1 2

Committee Room Room - 1 & 2 (2 Nos.)

47 20 Each 25 25 54 35 77 283

15 15

8 4

0.3 0.3

1ACPH 1ACPH

AC AC

AC AC

3 4 5 6 7

House Keeping Offices Spare Room - I Spare Room - II Corridor & Lobby TOTAL FIFTH FLOOR

15 15 15 15 15

4 4 8 6 10

NIL 0.6 1.0 0.3 NIL

1ACPH 1ACPH 1ACPH 1ACPH 1ACPH

AC AC AC AC AC

AC AC AC AC AC

1 2 3

Canteen - I Canteen - II Lobby & Corridor TOTAL GRAND TOTAL

110 110 65 285 2022

15 15 15

50 50 8

2 2 NIL

1ACPH 1ACPH 1ACPH

AC AC AC

Insulated Insulated Insulated

No of Corrections

-65-

Signature of Tenderer

REFRIGERATION LOAD: Based on the above parameters the total air-conditioning load works out is 124 TR approx with diversity of 0.9 approx.. SCHEME FOR AIR-CONDITIONING SYSTEM: It is proposed to provide 04 No. Scroll Air Cooled Chilling machine each of 44 /48 TR (Nominal) capacity with multiple Scroll compressors, microprocessor based control panel to cater to the above refrigeration load.(one as stand by). The air-cooled chilling m/c shall work in conjunction with 4 Nos. chilled water pump sets (one as stand by), 32 Nos. fan coil units with automatic controls, 12 Nos. double skinned air handling units (ceiling suspended), MS C class chilled water piping duly insulated and aluminum cladded with fittings and valves, powder coated extruded aluminum grills / diffusers, GSS ducting, duct lining, duct insulation, electrical work shall comprise of main panel, sub-panels for AHUs, power and control cabling with earthing etc. The conditioned air shall be fed with the help of GSS ducting and diffused through aluminum extruded grills/ diffusers. The return air shall be collected through false ceiling to be provided by client through their own agencies. The Air Cooled water chilling units shall be installed on terrace. The Chilled water pump sets, main electrical panel etc. shall be installed in the AC plant room to be constructed by client on terrace near the chillers as shown in the drawing enclosed. The chilled water shall be fed to various air-handling units with the help of insulated chilled water pipes shall run through vertical shafts etc as shown in the drawings enclosed. Inside design conditions in winter seasons shall not be maintained, since no hot water generator is being installed ASSOCIATED CIVIL / ELECTRICAL AND OTHER WORKS TO BE PROVIDED FREE OF COST TO THE AC CONTRACTOR BY THE CLIENT (THROUGH THEIR OWN AGENCIES): a) Housing of equipment such as plant room for housing pumps and main MCC panel on terrace only. b) Any kind of foundation or supporting structure work for chilling machines, pump sets and MCC panel etc. c) Stablised main incoming power supply in the AC plant room and near each ceiling suspended AHU panel i.e. 415 volts 10 %, 50 Hz 5 % A.C. supply. Single power supply within 2 meters from each fan coil unit. d) e) f) g) h) i) j) Drain points in near each air-handling unit and in plant room and near expansion tank. Any kind of false ceiling work or return air boxing work. Frame work for fixing grills / diffusers. Fire signal from potential free contact from fire panel to be wired to each AHU room. Under-deck insulation of all exposed roof and terraces. Soft and filtered water connection in Expansion tank. No winter heating package, hot water generator.

No of Corrections

-66-

Signature of Tenderer

The capacity / rating of various equipments in this contract are given for guidance only. The AC contractor shall check in detail the design / selection of equipment. The AC contractor shall be finally responsible for maintaining the desired inside conditions with the equipments selected and offered by him and shall not deprive him of the responsibility if selection of equipment is not thoroughly checked. In case of shortfall the AC contractor shall replace / modify equipment for achieving desired parameter without any extra cost to owner / employer. The contractor would be bound to replace the equipment / equipments selected by him if design condition is not achieved by the AC System offered and installed by him. SCROLL TYPE AIR COOLED CHILLING MACHINE WITH MICROPROCESSOR BASED CONTROL PANEL) COMRESSOR: a) b) c) d) e) f) g) h) i) j) k) Capacity in TR at Operating Conditions Type of Compressor Refrigerant Air entering Temperature to Air-cooled Condenser. Compressor Motor KW Type of Motor No. of Machines No. of Compressor per Machine IKW / TR of Chiller including Condenser Fans Microprocessor Based Control Panel Test Bed facilities at works for computing the capacity of chilling machine at full load and part load AIR COOLED CONDENSER: a) b) c) d) e) f) g) Entering Air Temperature Number of Fans Material of Coils Total Air Quantity CMH RPM of each Fan Maximum No. of Fins / CM No. of Rows Minimum EVAPORATOR: a) b) c) d) f) Type of Chiller Water Flow LPM Entering Water Temperature C. Leaving Water Temperature C. Pressure Drop Max. Mt. Actual Capacity of Air Cooled Chiller at operating condition DX 380 12.22 6.67 4.5 41 TR Approx 43.3 C As Per Standard Copper tubes aluminum finned As Per Standard 915 5.5 3/4 48 / 44 TR (Nominal) Scroll (Hermetic ) R-22 / R-134A / R-410A 43.3 C To suit the above duty. Refrigerant cooled Four Nos(One as stand by). Minimum Three 1.40 Yes Yes

No of Corrections

-67-

Signature of Tenderer

CHILLED WATER PUMP SETS: a) b) c) d) e) f) g) No. of Pump Sets Stand by Capacity of each Pump LPM Net Operating Head Mts. RPM Motor HP Type of Motor 4 Nos. 1 No. 380 27.43 2900 5.0 T.E.F.C. Sq. Cage Induction Motor h) i) j) Type of Starter (To be included in Electrical works) Type of Impeller Type of Pump MISCELLANEOUS: a) b) c) d) e) Water Pipes ( Chilled Water Pipe) Class (Chilled Water Pipe) Refrigerant Piping Drain Water Pipes Class (Drain Water Pipe) G.S.S. DUCTING: a) b) c) d) Class of Galvanising Code of Fabrication Material of Hangers Quality of Sheet WOOL BLANKETS / RIGID BOARD: a) b) c) d) a) b) c) For External Thermal Insulation of Duct Density For Acoustic Lining of Duct Density Material for Pipe Insulation Density Insulation of Pipes and Valves As per BOQ. 24 Kg / m As per BOQ. 48 Kg / m Expanded Polystyrene 20 Kg / m As per BOQ VIII ISS-655 (revised) MS Lock forming quality MS Heavy Class As per Manufacturer GI Medium DOL Bronze Monoblock

No of Corrections

-68-

Signature of Tenderer

TECHNICAL DATA (TO BE FILLED BY THE BIDDER IN METRIC SYSTEM ONLY) AIR COOLED CHILLING MACHINE SCROLL TYPE COMPRESSOR: a) b) c) d) e) f) Manufacturer Name Model No. Type of Compressor Hermetic / Semi Hermetic No. of Compressor per Machine Nominal Capacity of Each Machine TR Nominal Capacity of Each Compressor TR Operating Conditions: g) h) i) J) K) l) m) n) Air inlet to Condenser Degree Centigrade Saturated Suction Temperature Degree Centigrade Standard Discharge Temperature Degree Centigrade Max. RPM Mode of Start Refrigerant Quantity of Refrigerant Used Power Consumption 1KW/TR Full Load 100% 75% 50% 25% o) p) q) r) s) Type of Capacity Control Range of Capacity Variation Safety Devices and Controls Monitoring Devices Type of Bearings

MOTOR (COMPRESSOR) a) b) c) d) e) f) g) h) i) Make of Motor Type oF Motor Motor KW Class of Insulation R.P.M. Type of starter Electrical characteristics Voltage/Frequency Fluctuation permissible Method of starting

No of Corrections

-69-

Signature of Tenderer

J) K) l) m)

Full load current (Amp) Starting current (Amp) Locked rotor current (Amp) Over load/ under load Voltage/single phase protection provided

AIR-COOLED CONDENSER: a) b) c) d) e) f) g) h) i) J) K) l) m) Manufacturer Name Model No. of Condenser Tube Dia OD (MM) No. of fins / cm Number of tubes Length of tube (MM) Area of air-cooled condenser No. of rows deep Material of tube Material of fins Heat rejection capacity K cal / hr. No of Circuits

CHILLER: a) b) c) d) e) f) g) h) i) j) k) l) m) n) Manufacturer Name Model Type of chiller Tube materials Tube thickness (MM) Number of tubes No. of Circuits Tube dia O.D. (MM) Water Flow LPM Water Temperature out degree centigrade Water Temperature in degree centigrade Pressure drop Mt of water Heat rejection Kcal /Hr. Fouling factor MKS

No of Corrections

-70-

Signature of Tenderer

OVERALL SIZE OF WATER CHILLING MACHINE: a) b) c) d) Overall dimension MM Type of vibration isolator Operating Wt. Kg. Servicing Clearance MM

AIR COOLED CHILLING MACHINE SCROLL TYPE: a) b) Operating Condition Actual capacity of water Chilling machine at above operating condition c) d) Power consumption at above operating condition Total Electrical Load per Machine

CHILLED WATER PUMP SETS: a) b) c) d) e) f) g) h) i) j) k) l) m) n) Make Type Model Discharge (LPM) Head (Mt) Brake Horse Power Horse power of motor Make/Type of motor Type of starter Impeller Diameter (MM) & Material Material of Bearing / Seal Type of Bearing Speed (RPM) Material of Shaft

CONTROLS MAKES: a) b) c) d) e) Flow switch Three Way Valve Propertionating Thermostat Pressure gauge Thermometers

PIPES: a) b) Make Class

No of Corrections

-71-

Signature of Tenderer

c) i ii iii iv v vi vii vii viii ix

Wall Thickness mm Nominal Pipe Dia in mm 25 32 40 50 65 80 100 125 150 200

Wall Thickness of Pipe in mm

VALVES: a) b) c) d) e) f) g) Check Valve make Butterfly Valve make Balancing Valve make Ball Valve make Y-strainer make Material /Gauge / perforation of basket in Pot / Y-Strainer Globe Valve make

GRILLS / DFFUSERS / DAMPERS: Please indicate make/material/gauge of the following: Make a) b) c) d) Duct Dampers Grills / Diffusers Fire Dampers Smoke and Temperature Sensor Material

DUCT INSULATION: a) b) c) d) Manufactures Name Materials Density Kg. per Cmt. Thermal Conductivity Kcal/Hr. Deg. C.

DUCT LINING: a) b) c) Manufactures Name Materials Density Kg. per Cmt.

No of Corrections

-72-

Signature of Tenderer

PIPE INSULATION: a) b) c) d) Manufactures Name Materials Density Kg. per Cmt. Thermal Conductivity Kcal/Hr. Deg. C.

ELECTRICAL ACCESSORIES : Please indicate makes of the following: a) b) c) d) e) f) g) h) i) j) k) l) m) n) o) Panel Manufacture`s name MCCB / FSU HRC Fuses Rotary Switch Starter`s DOL / Star Delta Contractor Indicating Lights Push Buttons Control Cables Power Cables Ammeters Voltmeters Single Phase Preventers Current Transformer Bus-bar / Grade

CEILING SUSPENDED FAN COIL UNITS: 1.0TR a) b) c) d) Make Cooling Coil Area SMT No. of Rows Motor Wattage Watts 1.5TR 2.0TR 2.5TR

PERFORMANCE TEST READINGS: The Test Readings shall be recorded on hourly basis during the summer / onsoon seasons after satisfactory commissioning of AC System at site as per the Performa indicated below. OUTSIDE DESIGN CONDITIONS: a) b) c) Season Dry bulb temp. C Wet bulb temp. C

No of Corrections

-73-

Signature of Tenderer

INSIDE DESIGN CONDITIONS IN EACH AREA: a) Dry bulb temp. C b) Wet bulb temp. C c) Realitive Humidity % COMPRESSOR: a) Suction temp. Deg. C b) Suction pressure Kg/cm c) Discharge temp. C d) Discharge pressure Kg/cm e) R.P.M. of compressor

COMPRESSOR MOTOR RATING AT VARIOUS LOADS: a) Motor current - AMPs b) Voltage - AMPs c) AC Load Status EVAPORATOR: a) Water flow rate LPM b) Entering water temp. C c) Leaving water temp. C d) Pressure drop through evaporator Kg/cm (PSI) CAPACITY TEST FOR CHILLING MACHINE ON: TR of M/C 100 % Load ---------Current Drawn by M/C --------------

AIR HANDLERS: a) b) c) d) e) f) Air quantity CFM Air velocity ft/min. Entering air temperature DB/WB C Leaving air temperature DB/WB C Entering water temp. C Leaving water temp. C

g) Entering water pressure Kg/cm h) Leaving water pressure Kg/cm MOTOR DRIVE FOR AIR HANDLERS: a) Actual voltage / current

No of Corrections

-74-

Signature of Tenderer

CHILLED WATER PUMP: a) Flow rate LPM b) Suction pressure Kg/cm c) Discharge pressure Kg/cm d) Actual voltage / current :

All electrical panels / cables / starters / single phase preventer etc. shall be tested as per standard code of practice. TECHNICAL SPECIFICATION FOR THE DISTRIBUTION BOARDS TO BE FABRICATED: A. A.1 CODES AND STANDARDS: The Distribution Boards shall be designed, manufactured and tested in accordance with the latest Indian Standard (IS) and (IEC) except where modified and / or supplemented by this specification. A.2 The electrical installation shall meet the requirements of Indian Electricity Rules as amended up to date and relevant IS code of practice. In addition, other rules and regulations applicable to the work shall be followed. B B.1 B.2 B.3 SPECIFIC REQUIREMENT: The enclosure of outdoor type Distribution Boards shall be conforming to a degree of protection IP-55 and that of Indoor type Distribution Boards IP-43. The minimum thickness of sheet metal used shall be 2mm and CRCA sheets. The Distribution boards shall be fully compartmentalized with metal / insulating partition between compartments. The working height shall be limited within 400mm to 1800mm from the floor level. All the doors and covers shall be gasketed. B.4 A full height vertical cable alley with cable supports shall be provided in each section to facilitate wiring. The chamber shall be liberally sized to accommodate all cables and shall have removable cover at the front for access. The minimum width of cable alley shall be 300mm. B.5 B.6 Four (4) nos. lifting lugs shall be provided in each section, 2 (two) nos. on either end of the section. Necessary shrouding arrangement shall be provided over the cable terminations located in cable trey in order to carry out maintenance in a compartment with the busbar and adjacent circuit live. B.7 The minimum clearance in air between phases and between phases and earth for the entire run horizontal and vertical busbars shall be 25mm.All connections from the busbars up to the ACB / MCCB / MCB / Fuses shall be fully shrouded to be minimize the risk of phase to phase and phase to earth shorts. C C.1 BUSBAR AND BUS TAPS: The Distribution Boards shall be provided with phase busbars and neutral busbars. In addition, continues earth bus shall be provided in each board. All busbar compartments shall be completely enclosed.

No of Corrections

-75-

Signature of Tenderer

C.2

Horizontal and vertical busbars and connections shall be of high conductivity copper / copper alloy / aluminum / aluminum alloy. The maximum temperature rise of bus bars and bus connections when carrying 100% of the rated current along the full run, will be limited to 55 C with silver plated joints and 40C with all other types of joints over an outside ambient temperature of 50C.

C.3

All bus connections shall be provided with anti-oxide grease. Adequate contact pressure shall be ensured by means of two-bolt connection with plane and spring washers and locknuts.

C.4 C.5

Bimetallic connectors shall be provided for connection between dissimilar metals. Busbars and Bus connections shall be fully insulated for working voltage. Insulating heat shrinkable sleeves shall be provided for all busbars. All joints and tap-off points shall be shrouded.

C.6

Bus insulators shall be non-hygroscopic, flame retardant, track resistant, high strength, sheet molded or equivalent polyester fiberglass molded type .Separate supports shall be provided for each phase and neutral busbar.

C.7

The cross section of the bus bars shall be uniform throughout the length of the assembly. The size of neutral busbar shall be same that the phase busbar. All busbar and bus connections shall be supported and braced to with stand the stresses due to maximum short circuit current and also to take care any thermal expansion. The current density of copper busbar shall not be more than 1.6 Amp / sqmm. The current density of aluminum busbar shall not be more than 1.25Amp / sqmm.

C.8

Busbars shall be colour coded for easy identification and so located that the sequence R-Y-B shall be from left to right, top-to-bottom or front to rear when viewed from the front of the Assembly.

C.9

Bolted disconnecting links shall be provided for all incoming and outgoing feeders for isolation of neutral, if necessary.

D. D.1

CONTROL , INDICATION AND METERING: Each breaker cubicle shall be equipped with the following. a) One(1) Spring-return breaker control TRIP-NEUTRAL-CLOSE switch with pistol grip handle for TRIP & CLOSE operation wired as per control philosophy. b) Three(3) indicating lamps on the front of the compartment. Breaker open and Mechanism charged -- -- -- -- GREEN Breaker closed -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- RED Breaker tripped / trip circuit faculty -- -- -- -- -- -- AMBER

D.2

The following indication will be considered for MCCB /SDF operated outgoing feeders. Off -- -- -- -- -- -- -- -ON -- -- -- -- -- -- -- -GREEN RED

D.3 D.4 D.5

Voltmeters and Ammeters with corresponding selector switches as per SLD shall be provided. Detail scheme of connections for control, interlock and protection requirements of individual circuits shall be developed and submitted for approval. Push button shall be heavy duty, oil tight, push to actuate type with integral escutcheon plate marked with its function.

No of Corrections

-76-

Signature of Tenderer

D.6 D.7

Each push-button shall have minimum 2NO + 2NC contacts rated 10A at 240V A.C. Selector switches shall be stay-put rotary type with escutcheon plates marked to indicate the function and position, and shall be lockable in each position. Selector switch contact shall be rated for 10A at 240V A.C .Selector switches shall be provided with minimum three (3) contact blocks of 1 NO + 1NC each.

D.8

Indicating lamps will be clustered type LED. The body shall be made polycarbonate Unbreakable Lens.

D.9 D.10 E. E.1

Current Transformers shall be cast resin type; Accuracy class shall be 0.2 for metering and 5P20 for relaying. Voltage Transformers shall be cast resin type. Accuracy class shall be of 0.2. INTERNAL WIRING: All equipments shall be fully wired to ensure proper functioning of control, Protection and interlocking schemes

E.2

Fuse / MCBs and Links shall be provided to permit individual circuit isolation from bus wires without disturbing other circuits .All spare contacts of the devices shall be wired up to the terminal blocks.

E.3

Internal wiring shall be done with flexible, 1100 volt grade PVC insulated multistranded copper conductor wires of following sizes. a) Control and Current Circuit -- -- -- -- -- b) Voltage circuit -- -- -- -- -- -- -- -- --- -- -c) MCB up to 10Amp rating -- -- -- -- -- -From 16Amp to 25Amp rating- -- -- -- -- -- Up to 32 Amp rating -- -- - --- - --- -- -- -- -Up to 40Amp rating -- - --- --- -- -- -- -- -- -Up to 63Amp rating -- -- -- -- -- -- -- -- -- -- Up to 80Amp rating -- -- -- -- -- -- -- -- -- -- Up to 100Amp rating -- -- -- - --- -- -- -- -- -2.5 sqmm 1.5 sqmm 2.5 sqmm 4.0 sqmm 6.0 sqmm 10.0 sqmm 16.0 sqmm 25.0 sqmm 35.0 sqmm

E.4

The wires shall be colour coded for easy identification. Each shall be identified, at both ends with permanent markers such as ferrules bearing wire numbers as per the wiring diagrams.

E.5

Wire termination shall be made with crimping type connection and insulating sleeves. Wire shall not be spliced between terminals.

F F.1

TERMINAL BLOCKS: Terminal blocks shall be 1100volts grade self insulated stud type10sqmm minimum with marking strips. Terminals for C.T secondary leads shall have provision for shorting.

F.2 F.3

No more than two wires shall be connected to any terminal. Spare terminals equal in number to 20% active terminals shall be provided. Terminal blocks shall be located to allow easy access. Wiring shall be so arranged that individual wires of an external cable can be connected to consecutive terminals.

No of Corrections

-77-

Signature of Tenderer

F.4

Terminal blocks with in the panels shall be mounted on vertical support brackets. The support bracket shall be tack welded to the interior sheet steel mounting plates of the cabinet. Support brackets shall not be welded directly to the walls of the enclosure. The terminal blocks shall be attached to the support brackets with round head machine screws.

F.5 F.6

Terminal blocks shall generally be mounted vertically with adequate spacing (not less than 100mm) between adjacent rows. The bottom of the terminal blocks shall be at least 200mm above the incoming cable grand plate.

G. G.1 G.2

CABLES TERMINATIONS: Boards shall be designed for cable entry from Bottom / Top as per as the actual site condition. Sufficient space shall be provided for ease of termination and connection All provisions and accessories shall be furnished for termination and connection of cables, including removable gland plates, cables supports, crimping type lugs, brass compression glands with tapered washers (Power cable only) and terminal blocks.

G.3 G.4

Gland plates shall be minimum 3mm thick CRCA. The gland plate and supporting arrangement for cables shall be of non-magnetic material to minimize flow of eddy current. Sufficient space shall be provided between the lower most power cable termination and gland plate for easy cable termination.

H. H.1

GROUND BUS: A 25x6 / 40x6 / 50x6 mm Aluminum / Galvanized iron ground bus, rated to carry maximum fault current, will be provided which will extend the full length of the assembly.

H.2 H.3 I. I.1

The ground bus shall be provided with the two-bolt drilling with G.I blots and nuts at each end and shall be suitable to receive G.I flats up to 50x6mm. All hinged doors shall be earthed through flexible copper braid NAME PLATE: Name plates of approved design shall be provided on cubicle, at the top of the assembly and on each instrument and device mounted on or inside the cubicle.

I.2 I.3

The material of the name plate shall be anodized aluminum / lamicoid or approved equal 3mm thick, with block letter on white background. Caution Notice (Danger Board) on suitable metal plate shall be affixed at the back of each vertical panel.

J. J.1 J.2

TROPICAL PROTECTION: All equipment, accessories and wiring shall have fungus protection, involving special treatment of insulation and metal against fungus, insects and corrosion. Screens of corrosion resistant material shall be provided on ventilating louvers to prevent entry of insects.

No of Corrections

-78-

Signature of Tenderer

K. K.1 K.2

PAINTING: All surfaces will be sand blasted, pickled and grounded as required to produce a smooth, clean surface free of scale, grease & rust. All assemblies shall be finished in light gray (1S-5 shade 631) or any other approved shade with two coats of synthetic enamel paint. Painting process shall be of powder coating type.

L L.1 L.2

TESTS All equipments as per as SLD shall be completely assembled, wired, adjusted and tested at the factory as per the relevant standards. The following routine tests shall include but not necessarily be limited to the following:a) Operation under simulated service condition to ensure accuracy of wiring, Correctness of control schemes and proper functioning of the equipment. b) All wiring and current carrying part shall be given appropriate High Voltage Test. (for 415V Panels, 2.5 KV for 1 minute) c) d) Insulation resistance test with 500 volt insulation megger. Continuity Test.

N. N.1

GENERAL The distribution boards with ACBs / MCCBs of rating 400 Amp and the boards to be installed at Moisture prone locations, Space heaters controlled by the Thermostats and individual MCBs shall be provided.

N.2 N.3 N.4

The space heaters may be provided in each cubicle. Each cubicle shall be provided with a convenient 2/3 pin 5amp plug socket with switch and a lamp holder with door switch to get the light inside the cubicle during maintenance work. The switch gears and other components inside the distribution boards shall be of approved makes only.

N.5 N.6

G.A drawing shall be prepared by the distribution board manufacturer and get it approved by the Consultant/Owner. G.A drawing shall be prepared for size of the boards to accommodate at site. The board manufacture must visit the site, take the measurement of the space available at site before preparing the G.A drawing.

N.7

G.A drawing shall be incorporated with the type & size of the busbars, wires, arrangement of the switchgears, spacing for the cable termination etc.

BRIEF NOTES FOR THE DISTRIBUTION BOARDS TO BE FABRICATED. A. 1. 2. 3. 4. 5. BODY & PAINTING :Shall be of 2mm thick CRCA sheet steel. Suitable size ventilation louvers with fine wire mesh shall be provided to prevent entry of insects. Both inner and outer surface shall be powder coated. Boards shall be fully compartmentalized. All doors shall be properly gasketed. Outdoor type boards shall be of double door type.

No of Corrections

-79-

Signature of Tenderer

B. 1. 2.

BUSBARS WIRINGS AND ARRANGEMENT OF EQUIPMENTS:Busbar shall be of high conductivity aluminum/copper as mentioned in SLD. Size of Busbars if not specified in SLD may be selected considering the following current density For Copper ----------For Aluminum -------1.5 Amp/sqmm, 1.25Amp/sqmm

3.

1100 volt grade PVC insulated single core, multistranded copper conductor wires of different colors (Red, Yellow, Blue, Black & Green) & following sizes shall be used. for current rating up to 10A -- --- -- -- -up to 20A-- -- -- -- -- -- -- -- -- -- -- -- -- -up to 32A -- -- -- -- -- -- -- -- ---- -- -- -- -up to 40A -- - -- -- -- -- -- -- -- -- -- -- -- -- up to 80A -- - - - - - -- -- -- -- -- -- -- -- -- -- 2.5sqmm 4.0sqmm 6.0sqmm 10.0sqmm 25.0sqmm

up to 63A -- -- -- -- -- -- -- -- -- -- -- -- -- -- - 16.0sqmm

up to 100A-- - --- -- -- -- -- -- -- -- --- --- -- -- 35.0sqmm 4. 5. Proper nomenclaturing for the DB, Incomer, out goings shall be made as per SLD. The type & rating of switchgears shall be as per as approved makes /as approved by the consultant. 6. 7. The meters shall be digital type and the indicating lamps shall be LED type. Adequate space must be provided in-between the gland plate and bottom of the switch gear for easy termination of the cables as per SLD. 8. 9. 10. 11. 12. 13. Adequate clearance must be provided in-between phase-phase conductor and phase-earth conductor. The busbar shall be fully insulated with heart shrinkable PVC sleeves. Each MCCB,s shall be provided with suitable spreader links and rotary operating handle for interlocking with the door. Ferrules may be provided on each wire for easy identification. Each cubicle maybe provided with a 2/3pin 5Amp plug socket and switch and lamp holder with its control door switch. A continuous earth busbar capable of carrying full short circuit current may be provided at the bottom of the board with the provision for bolting of main earthing conductors from the electrodes. 14. Cable alley of 300mm wide along with the cable supports may be provided for clamping the cables inside the board and for easy termination. 15 16. Wires shall be wired up to the suitable terminal blocks for easy termination. Current Transformer shall be cast resin type `Secondary of the CTs shall be wired up to terminal block with shorting arrangement. 17. Each hinged doors shall be suitably earthed with copper braid or insulated copper wire (2.5sqmm) of green colour.

No of Corrections

-80-

Signature of Tenderer

18.

Before delivery, the distribution boards must be tested with the following routing tests a) b) c) d) Sl. No. High Voltage Test. Continuity Test Insulation Resistance Test Functional Test. AHU No. AHU / GF / 01, FF / 01 2F / 01, 3F/01 AHU / GF / 02, FF / 02 2F / 02, 3F/02, 5F/01 & 02 AHU / 4F / 02 AHU / 4F / 01

1 2 3

Make of AHU Maximum Capacity CMH Material / Gauge of Casing and Drain Pan

4 5

Over all Size L x B x H mt. Type of AHU, Vertical / Horizontal / Ceiling Suspended

6 7

Overall Weight in Kg. Capacity of Air-handler at Rated Coil Face Velocity CMH

Make of Fan COOLING COIL:

1 2 3 4 5 6 7 8

Make Material of Tube / Fins No. of Fins / Cm No. of Rows Deep Dia of Tubes (MM) Face Area (SMT) Cooling Capacity (Kcal / hr) Entering / Leaving Temperature WB in Deg.C

9. 10 11

Apparatus Dew Point Deg.C Chilled Water Flow Rate LPM Face Velocity MPS FILTER SECTION:

1 2 3 4

Make of Filter Type of Filters Air Velocity through Filter FPM Efficiency of Filter %

No of Corrections

-81-

Signature of Tenderer

FAN AND FAN MOTOR: 1 2 3 4 5 6 7 8 9 10 11 12 Make of Fan Type of Fan No. of Fans Width and Dia of Fans (MM) Type of Blade Air Quantity CMH Static Pressure in Wg. Make of Motor Brake Horse Power in HP Horse Power of Motor in HP Motor RPM Fan Speed

No of Corrections

-82-

Signature of Tenderer

BOQ FOR HV AC WORKS OF MCA BUILDING AT CUTTACK Sl. No. 1. Description Scroll Air-Cooled Water Chilling Machine with Micro-Processor Based Control Panel: Supply, installation, testing and Unit Quantity Rate (in Rs.) Amount (in Rs.)

commissioning of Scroll Air-Cooled Water Chilling Machines of 48/44TR (Nominal) with Scroll Compressor at below mentioned operating conditions with R22/R-134a/R407A refrigerant, semihermatic / hermetically sealed compressor, driven by suitable KW sq. Cage induction motor complete with Air-Cooled condenser with copper tube and aluminum finned, insulated chiller, flow switch at piller outlet, refrigerant piping, refrigerant and oil (First Charge), Microprocessor based control panel, incoming switchgear, starter vibration isolator and other accessories etc. all mounted on M.S. frame. The compressor shall be suitable for 415 volts 10%, 50Hz 5%, three phase A.C. supply. Entering Air Temperature - 43.30 C Chiller CHW IN - 12.22 C 6.67 C

CHW OUT -

The chilling machine as described above shall be in line with the technical standard No. and 04 specifications and Schedule of Equipment. 2. Supply, installation, testing

commissioning of Monoblock chilled water centrifugal pump sets with bronze impeller for chilled water recirculation complete with TEFC Squirrel Cage induction motor with class "F" insulation, base plate, vibration insulators, mechanical seal etc. conforming to technical specification and as per following parameters. The chilled water pumps shall include thermal insulation and cladding. Capacity of Each Pump LPM Pump Head (Mt) Pump Motor HP 380 27.43 5.0 No. 04

No of Corrections

-83-

Signature of Tenderer

Sl. No. 3.

Description Double Skinned Ceiling Suspended Air Handling Units : Supply, installation, testing and commissioning of factory fabricated Double Skinned Chilled Water Air-handling unit ceiling suspended type fabricated out of extruded aluminum section with 0.6mm preplasticized Galvanised steel sheet outside and 0.6mm.plan Galvanised steel sheet inside, with blower in blower section and blower motor TEFC type suitable for

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

operation on 415 volts 10%, 50Hz 5% AC supply, 6 Row cooling coil made of aluminum finned copper tube with coil section, pre-filter section with non woven synthetic media of 10 micron particle size with an efficiency of 90%, polish stainless steel drain pan made out of 22G sheet duly completed with motor and belt drive package etc. without face and bypass dampers. The AHU panels shall be insulated with 23mm. thick and 36 Kg/m density PU foam. The motor and blower assembly shall be mounted on aluminum extructed section only. The complete AHU shall conform to standard specification. The face velocity, the capacity of Air-handlers shall be as follows. AHU / GF / 01, FF / 01, 2F/ 01, 3F/01 (6800 CMH, 35 mm St. Pr., 6 Row CC/ 3 HP) AHU / GF/ 02,FF/ 02,2F/ 02,3F/02.5F/01 &02 (7,650 CMH, 35 mm St. Pr., 6 Row CC/3 HP) AHU / 4F/02, 4,250 CMH, 35 mm St. Pr., 6 Row CC/2 HP) AHU / 4F/01 3,400 CMH, 35 mm St. Pr., 6 Row CC/2 HP) No. 01 No. 01 No. 06 No. 04

No of Corrections

-84-

Signature of Tenderer

Sl. No. 4. Supply,

Description installation, testing and

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

commissioning of GI powder coated fan coil units complete with fan, 3 speed motor, 4 row deep cooling coil, aluminum filters with filter box, double sandwiched insulated tray, ball valve with strainer, balancing valve, copper connection, rotary switch, supporting arrangement, electric wiring etc. The fan shall be selected for 10 mm. static pressure. The complete fan coil shall be as follows: i ii iii iv 5. 1.0 TR (680 CMH ) 1.5 TR (1,020 CMH ) 2.0 TR (1,360 CMH ) 2.5 TR (1,700 CMH ) Supply, Installation, testing and No. No. No. No. 01 11 01 19

commissioning of

three way motorised

valves with modulating motor in cooling coil of air handling units of following sizes; a. b. 6. 25 mm dia 32 mm dia Supply, installation, testing and No. No. 02 10

commissioning of the following as per technical standard specification. a. Proportional handler 7. Supply, installation, testing and No. 32 cooling Thermostat at air No. 12

commissioning of automatic control for Fan Coil Units consisting of three way motorised valves with modulating motor and

thermostat. 8.a Fire Dampers : Supply, installation and testing of Duct / Wall mounted GI Fire Dampers actuated with the help of excluding actuator. b. Damper Actuator : Supply, installation and testing of Motorised Spring Return Actuator for devices upto 0.8 sq. meter with control panel and temperature sensor. No. 12 24 V Smt. 04

electric actuator and as per specifications

No of Corrections

-85-

Signature of Tenderer

Sl. No. 9.

Description Supply, installation, testing and

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

commissioning of bare chilled / condenser water piping of M.S 'Heavy' Class complete with fittings like elbows, tees, reducers, bends, MS flanges, supports, welding etc. duly painted but excluding valves as required conforming to IS:1239 / 3589 and technical specification. a. b. c. d. e. f. g. h. i. 10. 25 mm dia pipe 32 mm dia pipe 40 mm dia pipe 50 mm dia pipe 65 mm dia pipe 80 mm dia pipe 100 mm dia pipe 125 mm dia pipe 150 mm dia pipe Supply, installation, testing and Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. 220 210 420 120 40 90 10 105 30

commissioning of butterfly valves in position conforming to standard specification. a. 11. 80 mm dia Supply, installation, testing and No. 12

commissioning of globe valves in position conforming to standard specification. a. b. c. 12. 25 mm dia 32 mm dia 40 mm dia Supply, position installation, conforming testing to and standard No. No. No. 02 02 10

commissioning of Duel plate check valves in specification. a. 13. 80 mm dia Supply, installation, testing and No. 04

commissioning of balancing valves with flow measuring port in position conforming to standard specification.

No of Corrections

-86-

Signature of Tenderer

Sl. No. a. b. c. d. e. f. 6)

Description 25 mm dia 32 mm dia 40 mm dia 50 mm dia 65 mm dia 80 mm dia Supply, installation, testing and

Unit No. No. No. No. No. No.

Quantity 02 02 10 02 02 04

Rate (in Rs.)

Amount (in Rs.)

commissioning of Y-Strainer of the following sizes conforming to standard specification. a. b. c. d. e. f. 14. 25 mm dia 32 mm dia 40 mm dia 50 mm dia 65 mm dia 80 mm dia Supply, installation, testing and No. No. No. No. No. No. No. 02 02 10 02 02 04 16

commissioning of alcohol filled 'V' form thermometer of approved make conforming to technical specifications. 15. Supply, installation, of testing gauge and of No. 16

commissioning

pressure

approved make of dia 150 mm conforming to technical specifications. 16. Supply, installation, testing and

commissioning of auto air vent valve of following sizes; a. 17. 10 mm dia auto air vent valve Supply, installation, testing and No. 20

commissioning of condensate drain water piping of GI 'Medium' class complete with fittings like elbows, tees, reducers, bends, MS flanges, supports, welding, painting etc. as required conforming to standard

specifications and of following sizes. a. b. 25 mm dia pipe 32 mm dia pipe Rmt. Rmt. 220 40

No of Corrections

-87-

Signature of Tenderer

Sl. No. 18. Supply, insulated commissioning with

Description installation, of testing tank and duly

Unit No.

Quantity 01

Rate (in Rs.)

Amount (in Rs.)

expansion

50 mm thick expanded

polystyrene and made out of 3 mm thick MS Sheet duly Epoxy coated from Outside and Inside or HDPE Tank of size 0.60 mt x 0.60 mt x 0.60 mt complete with aluminum cladding of 14 G with all accessories and fitting for chilled water only. 19. Supply, fabrication, installation and testing of G.S.S. sheet metal ducting complete with Splitter Damper, vanes as required and as per specifications and as per approved shop drawings. G.S.S. Ducting ( Rectangular Duct ) a. b. c. 20. 24 G 22 G 20 G Supply, installation and testing of Powder coated Aluminum extruded grills / diffusers as per specification and of following sizes: a. Double louvered supply / return air registers (Grills) with front louvers fixed horizontal and rear louvers vertical adjustable. b. Supply / return square ceiling air terminals (diffusers). c. Volume Control Dampers to be provided in supply air registers / terminals. d. Supplying and fixing of Fresh air intake louvers with bird screen dampers (Aluminum extruded only). e. Fixed sizes; a. b. c. 100 mm 150 mm 200 mm Rmt. Rmt. Rmt. 160 20 20 bar linear air register of following Smt. 4 Smt. 15 Smt. 8 Smt. 02 Smt. Smt. Smt. 360 300 30

No of Corrections

-88-

Signature of Tenderer

Sl. No. 21.

Description Supplying and fixing of external thermal with all

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

insulation on ducts with Aluminum faced fiber glass of density 24 Kg/m self adhesive aluminum

longitudinal / transverse joints sealed with tape of width 50 mm and finally fix 19 mm PVC straps as required and as per standard specifications. a. 22. 25 mm thick fibre glass Supplying and fixing of acoustic lining of duct with fiber glass rigid board of density 48 Kg/m sealed in fiber glass tissue paper and covered with 0.5 mm thick perforated aluminum sheet and conforming to standard specification. a. b. 23. 12 mm thick fiber glass rigid board. 25 mm thick fiber glass rigid board. Supply and installation of Insulation on chilled water piping with pre-moulded pipe section of 50mm thick expanded polystyrene duly aluminum cladded and shall be as per standard specification. a. b. c. d. e. f. g. h. i. 24. 25 mm dia pipe 32 mm dia pipe 40 mm dia pipe 50 mm dia pipe 65 mm dia pipe 80 mm dia pipe 100 mm dia pipe 125 mm dia pipe 150 mm dia pipe Supply and installation of Insulation on valves with 50mm thick expanded polystyrene duly aluminum cladded and shall be as per standard specification. A. a. Butterfly Valves 80 mm dia No. 12 Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. Rmt. 220 210 420 120 40 90 10 105 15 Smt. Smt. 140 25 Smt. Smt. 270

No of Corrections

-89-

Signature of Tenderer

Sl. No. B. a. b. c. C. a. D. a. b. c. d. e. f. E) a. b. c. d. e. f. 25.

Description Globe Valves 25 mm dia 32 mm dia 40 mm dia Check Valves 80 mm dia Balancing Valves 25 mm dia 32 mm dia 40 mm dia 50 mm dia 65 mm dia 80 mm dia Y- Strainer 25 mm dia 32 mm dia 40 mm dia 50 mm dia 65 mm dia 80 mm dia Supply and Insulation of condensate drain water piping with 25 mm thick pre-moulded expanded polystyrene pipe section duly aluminum cladded and shall be as per standard specification.

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

No. No. No.

02 02 10

No.

04

No. No. No. No. No. No.

02 02 10 02 02 04

No. No. No. No. No. No.

02 02 10 02 02 04

a. b. 26. i.

25 mm dia pipe 32 mm dia pipe MOTOR CONTROL CENTRE 48/ 44 TR (NOM Air - Cooled Screw Chilling Machine (3W+1S)

Rmt. Rmt.

220 40

ii.

5.0 HP CHW Pumps (3W+1S)

No of Corrections

-90-

Signature of Tenderer

Sl. No. Supply,

Description installation, testing and

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

commissioning of Cubical type sectionalised floor standing double enclosure Electrical Panel made of 2 mm thick C.R.C.A. sheet of 31 MVA fault capacity at 415 V complete with 4 strips, 630 A capacity Copper Bus-Bar of size 60 x 10 mm Electrolytic grade, cable alley, switchgears of following capacity and as per specifications. A. INCOMER : 630 A TPN MCCB with overload, short ckt., earth fault protection release, with 144 mm (0 -630 A) ammeter with 3 CT and selector switch, 144 mm (0 - 500 V) Voltmeter with selector switch, phase indication light with protection fuse, on / off / trip in indicating light with protection fuse - 01 Set. B. i. OUTGOINGS 4 Nos. Air-Cooled Chilling M/C of 48/44TR Nominal Capacity. 250 A TP MCCB with operating handle,

overload and short circuit protection with 144 mm (0 -250 A) ammeter with three CT and Selector switch, on / off / trip indication light with protection fuses - 04 Sets. ii. 4 Nos. Chilled Water Pump Sets of 5.0 HP 40 A TP MCB with 16 A DOL starter, overload relay start/stop push buttons, ammeter (040A) with three CT, on / off / trip indication lights with protection fuse, single phase preventer - 04 Sets Controls and interlocking accessories as required. LOT 27. SUB-PANELS FOR AIR HANDLING UNITS: Supply, installation, testing and commissioning of Cubical wall mounted type switch board as detailed below and conforming to the specifications.

No of Corrections

-91-

Signature of Tenderer

Sl. No. i.

Description For AHU For UP To 5.0 HP Fan Motor : 40 A TP MCB with 16 A DOL starter, overload relay start/stop push buttons, ammeter (040A) with three CT, on / off / trip indication lights with protection fuse, single phase preventer - 1Set (Controls and interlocking accessories as required LOT)

Unit No.

Quantity 12

Rate (in Rs.)

Amount (in Rs.)

28.

REMOTE CONTROL CONSOLE: Supply, installation, testing and commissioning of flour mounted desk type control console with mimic diagram comprising of Start / stop push buttons, status indication i.e. on / off / trip for 04 Nos. Air -cooled Chilling M/c, 04 nos. Chilled Water Pump, 11 Nos. AHU, 5 Nos. spare etc. as per specification.(Common faults for each chiller such as flow switch with associated relays hooter, fault accept and reset arrangements shall be as per specification).

No.

01

29.

POWER CABLING Supply, laying, testing and commissioning of power and control cabling as per Standard specification including end termination as required.

A.

Power

Cabling

XLPE

insulated,

PVC

sheathed, Armoured Aluminum Conductor of 1.1 KV grade on existing cable trays. a. For Air - Cooled Chilling M/C 3.5C x 120 Sq. mm b. For Chilled Water Pumps 3.0C x 10 Sq. mm c. For Air Handling Units 3.0C x 4 Sq. mm B. Control Cabling PVC insulated, PVC Rmt. 120 Rmt. 65 Rmt. 120

sheathed, Armoured Copper Conductor of 1.1KV grade on existing cable trays. i. 5.0C x 1.5 Sq. mm Rmt. 450

No of Corrections

-92-

Signature of Tenderer

Sl. No. 30.

Description Supply and installation of ladder type 16 G ms cadmium plated 'U' shaped channel 40mm x 20mm cable tray of following sizes,

Unit

Quantity

Rate (in Rs.)

Amount (in Rs.)

i. ii. iii. 31. i.

100 mm width 300 mm width 600 mm width Earthing Strip / Wires. Supply and laying of 4 mm dia. Copper wire. or in recess for loop earthing as required.

Rmt. Rmt. Rmt.

80 120 40

Rmt.

120

ii.

Supply and laying of 6 mm dia. Copper wire. or in recess for loop earthing as required.

Rmt.

30

iii.

Supply and laying of 32 x 6 mm Copper strip or in recess for loop earthing as required.

Rmt.

60

32.

Supply and laying of Rubber Mat of size 1000 mm and 12 mm thick.

Smt.

33.

Supply and Fixing of Shock Treatment Chart duly mounted on a Wooden Frame with Glass as required in two languages (English and Oriya)

No.

34.

Supply and Fixing of Carbon Dioxide Fire Extinguishers of 4.5 Kg. each mounted on Wall Hooks as per IS 2878 / 1976.

No.

35.

Supply,

Installation,

Testing

and

No.

Commissioning of Earthing complete with 3 mtr. x 50 mm dia GI Perforated Earth Electrode complete with Inspection Chamber and Cover complete as per Site Engineers Instruction and Technical Specification. Total : (Rupees.)

No of Corrections

-93-

Signature of Tenderer

You might also like