You are on page 1of 3
Hamworthy TYPICAL SUPER TRIDENT T0406028A $T8-C-ST60-C Water Systems Lid Fleets Bridge, Poole, Dorset SEWAGE TREATMENT PLANT BHI7 OJT, England INSTALLATION COPYRIGHT & DESIGN RIGHT HANORTHY WATER SYSTEWS LTD. ALL OTHER RIGHTS RESERVED: SHEET 7 OF 9 6. VENT Do not connect other system vents to the sewage treatment plant vent. Carbon dioxide is formed during the aerobic process of waste treatment. This has no odour, is non-toxic, non-flammable and is released to atmosphere with saturated excess air that is not used in the stabilisation process. Itis important that no liquid pockets can form in the vent to restrict the free run of the gases. If liquid pockets are unavoidable then an automatic drain connection must be fitted and included in the maintenance schedule. Ensure that the water traps on all facilities on any drains connected to the sewage treatment plant inlets are of an adequate depth to isolate the living areas from any vent gases. Consideration must be given to worst trim and vent pressure conditions. This is especially important should any hazardous gases be generated from an incorrectly maintained or operated system. Although best avoided, a suitably specified vent fan can be used for difficult pipe arrangements that would give more than 15 mm water gauge back pressure. Flame traps or spark arresters are not necessary, however if required by local regulations they must be generously sized to meet the vent requirements between maintenance periods. A separate guide for vent pipes is available from Hamworthy. 7. EMERGENCY OVERFLOW FROM CONTACT TANK If this is piped directly overboard then the connection must be at least 1.5 m above the maximum sea water level to ensure that the discharge non return valves can be lifted and flow take place. If the available level is less than this a back-up will occur in the system until the required head is available. [ORIGINAL WA T 2 |W 7 MLS| Toe] WB SGGI 2977108 Hamworthy TYPICAL SUPER TRIDENT T0406028A $T8-C-ST60-C Water Systems Lid Fleets Bridge, Poole, Dorset SEWAGE TREATMENT PLANT BHI7 OUT, England INSTALLATION SHEET 8 OF 9 COPYRIGHT & DESIGN RIGHT HAW WORTHY WATER SYSTEMS LTD. ALL OTHER RIGHTS RESERVEL 8. DISCHARGE OVERBOARD - SIPHON PREVENTION If the top of the sewage treatment tank is above the minimum sea water level then the pump discharge pipeline must be looped above the top of the tank and a connection taken from the top of the loop to a point in the air vent above the discharge head of the pump. 9. DISCHARGE OVERBOARD - BACK FLOW PREVENTION If the sewage treatment tank is below the maximum sea water level then appropriate ship building regulations must be complied with. This may involve the fitting of suitable ship side valves and/or the running a siphon prevention loop (similar to that described in item 8) above the maximum sea water level. INSTALLATION OPTIONS 10. DUAL PUMP SET This can be supplied to give a mounted standby pump. 11. ASIATIC TYPE CONSTANT FLUSH TOILETS These will affect the size of the unit and Hamworthy should be consulted. 12. LOW FLUSH SEWAGE DELIVERY SYSTEMS (e.g. VACUUM) The concentrated black water soil from this type of system must be conditioned to facilitate the biological treatment. Conditioning should be with clean water, but it may be possible to use grey water subject to foam producing chemical control foam inducing detergents and/or use of anti-foam dosing equipment. Conditioning water should be fed to the aeration tank at a constant rate to prevent shock loading. Consult Hamworthy for the recommended flow rate of water to be added. Any grey water entering the sewage treatment plant must be subject to chemical control to ensure that only biologically friendly and low foaming chemicals are used. Consideration should also be given to installing anti-foam dosing equipment. This can be supplied by Hamworthy. EONNo, [ORIGINALT NIA NA ISSUE 7 2 3 DRAWN _|WuD/ MLS CHECKD [TMD / WE ART APPRD_|_SGOJ UB DATE | 29/708 Hamworthy TYPICAL SUPER TRIDENT T0406028A $T8-C-ST60-C Water Systems Lid Fleets Bridge, Poole, Dorset SEWAGE TREATMENT PLANT BHI7 OJT, England INSTALLATION COPYRIGHT & DESIGN RIGHT HANORTHY WATER SYSTEWS LTD. ALL OTHER RIGHTS RESERVED: SHEET 9 OF 9 13, ULTRA-VIOLET (UV) DISINFECTION An optional UV unit can be supplied where any chlorinated/dechlorinated discharge is unacceptable or not preferred by the ship owner. NOTE:- This equipment can be supplied to meet the requirements of the Environment of Canada Great Lakes Regulations. 14. EMERGENCY AIR SUPPLY Please refer to the sewage treatment plant manual technical data section or contract specific data for maximum and minimum air flow required for any particular model of sewage treatment plant. To avoid contamination of the process and clogging of the air diffuser elements the air supply must be free of oil, condensate and particles. [ORIGINAL T |W 7 MLS| TMD We SGGI 2977108

You might also like