Standard work

IISM PT KPP #1.2 100MW

Tgl :2012.10.23

Rev. :0 Page:1/4

KPP

Vapor Extractor Operation Procedure

Guidance

By

Achmad Gunawan

Purpose Of Work : Summary work

Assortment

Contents

Name and Place Of Work 1. Vapor Extractor Operation Procedure

Important Equipment

Quality Environme nt

1. Problem : 2. Cause :

Important Check Safety

Safety Consideration A. BRK input electrical shock caution B. Work clothes curling caution due to the rotor 2.Accident Case : Not Applicable

3.Near-Miss Case : Not Applicable 4.Fire Case 5.Work Permit Action Before Work APD Equipment Required Helmet, safety shoes, work gloves, ear plug. Walky talky, valve handle, detector noise & vibration, : Not Applicable : Not Applicable

Preparatio n

Standard work

IISM PT KPP #1.2 100MW

Rev. :0

KPP

Vapor Extractor Operation Procedure

Guidance

Page:3/4

1. Main Oil Pump Operation (A: Control Room, B: Local) How To Work With Order Of Operations 1)Check Before OP (B)

Safety Environment

(1) Oil quality (If necessary, operate the oil purifier.) BRK input electrical shock (2) Lube oil tank temperature [TEcaution MAV10CT001, TG-MAV10CT501] 10 C (In case that oil temperature < 10 C, start the main oil tank heater.)
(3)

Oil level of main oil tank (If insufficient, fill it up.) [LG-MAV10CL501, LT-MAV10CL001] Flow back oil level.

(4) (5)

Main oil tank drain valve [MAV10AA401, 402] Fully close Main oil tank sampling port valve (after [MAV10AA601]Fully checking the quality of oil) close

(6) Main oil tank inlet valve for oil portable system [MAV10AA001]Fully close (7) Main oil tank vapor extraction return line valve [MAV10AA251]Fully close (8) Control STOP (9) Mode selection.
MODE AB MODE BA MODE OPERATION ORDER AB BA STAND BY A B

oil

pump-

A,B[MAX21AP001,002]MANUAL ,

2) MOP start (A) 1.Control Room Start, A. Control Room Auto start - In operation, Pump fault - Main Oil Pump Pressure lower (4.6 barg) B. Control Room Man start - Graphic in DCS Choose Main Oil Pump - Choose Sub window Man Then Start

Standard work

IISM PT KPP #1.2 100MW

Rev. :0

KPP

Vapor Extractor Operation Procedure

Guidance

Page:3/4

3)Check After MOP start(Operation)

1. Vibration Check 2. Check Leakage 3. Main oil pump-A,B discharge Pressure (01/02 MAV21CP201,211) *4.6 BarG Stand-by MOP & EOP start autmatically. (*: Setting value corresponds to4.2 BarG at T/G center.) 4. Main oil tank level (01/02 MAV10CL001) NOL +50 mm (H), NOL -50 mm (L). - Confirm that there is no lube oil leakage. If any leakage is found out, repair it. - Confirm that main oil tank drain valve is closed. - Fill the tank with lube oil up to permissible level.

Work clothes curling caution due to the rotor

4) MOP stop(A) 1.Control Room stop Control Room Auto stop (After Stand by start) Control Room Man stop - Graphic di DCS Choose Main Oil Pump - In Sub window, Choose Man stop

finish

Standard work

IISM PT KPP #1.2 100MW

Rev. :0

KPP

Vapor Extractor Operation Procedure

Guidance

Page:4/4

Main Oil Pump Operation Flow