Project Objective
The primary objective of this pilot project is to improve the reliability and performance of 11kV/ 220V distribution network by the implementation of Network Management System there by resulting in reduce fault clearance time. Following are the benefit that KESC intends to obtain from this pilot project. Gain visibility into the distribution network by monitoring network health Improve on fault response and rectification times through the use of technology Digitize its network management and fault reporting procedures Localize faults and link consumers Provide greater info to other systems in a integrated manner Provide knowledge for preventive and reactive maintenance
2 Scope of Work
The scope of work for the pilot project should include, but not limited to the following:
Devices should be able to raise alarm based on pre-set criteria. In case of faults and alarms/ information should be displayed on the digital representation of the network.