Meet the SGT-750

Proven technology Perfected results 37 MW

Page 1

Siemens AG 2010. All rights reserved

Siemens Industrial gas turbine range


Utility Turbines

SGT5-8000H SGT5-4000F SGT6-8000H SGT6-5000F SGT5-2000E SGT6-2000E SGT-800 SGT-750 SGT-700 SGT-600 SGT-500 SGT-400 SGT-300 SGT-200 SGT-100
168 113 47 198 266 287

375

Industrial Turbines

36
31 25 17 13 8 7 5

Filling the gap

(MWe)

Page 2

Siemens AG 2010. All rights reserved

SGT-750 General description


13-stage compressor 4th generation DLE technology Dual-fuel capability Free power turbine 6 100 rpm

Shaft Electric Comb. cycle


Page 3

Power 37.1 MW 35.9 MW 47.7 MW

Efficiency 40.0% 38.7% 51.7%

Exhaust Mass flow Temperature

113 kg/s 462 C

Siemens AG 2010. All rights reserved

Compressor

2 variable guide vanes

3 Compressor Bleeds

13 stages Pressure ratio 24:1


Page 4

Siemens AG 2010. All rights reserved

SGT-750 Inlet and Compressor

Visual access to compressor inlet during operation

Electrical starter motor in front of compressor

Low-weight inlet plenum on wheels for easy maintenance

Borescope ports for each stage


Siemens AG 2010. All rights reserved

Page 5

Combustor system

4th generation DLE burner Single-digit NOx capability

8 combustor cans

Page 6

Siemens AG 2010. All rights reserved

Combustor design

Convective combustor cooling Combustor can Transition duct

Page 7

Siemens AG 2010. All rights reserved

4th generation DLE burner

Combustion air path Second main gas fuel First main gas fuel Pilot gas fuel RPL gas fuel
(Rich Pilot Lean)

Single digit NOx capability

Page 8

Siemens AG 2010. All rights reserved

Combustor Verification Experience from Siemens gas turbine fleet Atmospheric Test Combustion System Ignition Tests and Combustion Tests Flow tests Medium-pressure Test Optimization of burner Flame-detector test Ignition test High-pressure Test Burner tests Combustion test
Page 9

Flow test of casing, burner and combustor


Siemens AG 2010. All rights reserved

Turbine
Two-stage counter-rotating Un-cooled power turbine Two-stage air-cooled compressor turbine

Page 10

Siemens AG 2010. All rights reserved

Compressor Turbine

IR camera access to blades 1 & 2 Conventional materials

Two turbine stages

Bolted to compressor rotor


Page 11

Brush seals
Siemens AG 2010. All rights reserved

SGT-750 Infra-red camera ports A temperature-sensitive camera can measure the temperature pattern of each blade and if the temperature is out of range measures can be taken.
IR camera port

Blade

Page 12

Siemens AG 2010. All rights reserved

SGT-750 Industrial power turbine 2-stage high-speed (6100 rpm) Power Turbine Compact and efficient Suitable for both power generation and mechanical drive Power turbine inlet guide vane can be set for different ambient conditions
Two shrouded uncooled blades and honeycomb seals High efficiency diffuser

Bolted rotor

Two tilting pad (long life) bearings


Siemens AG 2010. All rights reserved

Page 13

Package layout Power generation


Air intake Exhaust

Auxiliary room

AC-generator

Main Gear Maintenance crane

GT room
Page 14

Maintenance door

Foot print Power generation 20,3 x 4,8 m

Siemens AG 2010. All rights reserved

Package layout Mechanical drive

Same driver as PG

Footprint: Driver package 12.8 x 4.3 m


Page 15

Siemens AG 2010. All rights reserved

Built-in serviceability In the full-scale 3D model it was discovered that it was difficult and time-consuming to exchange instrumentation on the power turbine. Solution: The Power turbine was redesigned utilizing the 3D model and the instrumentation exchange was verified in the 3D model. This is an example of how uptime is increased using new design tools.
Core engine 3-D model in studio

Page 16

Siemens AG 2010. All rights reserved

Maintenance

Page 17

Siemens AG 2010. All rights reserved

Excellent maintenance concept for lowest life-cycle cost Long time between major overhauls TBO 68,000 EOH Highest uptime - only 17 maintenance days in 17 years 24-hour gas generator exchange in the swap concept On-site or swap service concept Increased TBO at part-load operation Complete compressor reblading without rotor removal possible No casing disassembly for replacement of combustion parts Modular build-up for easy maintenance on site

Page 18

Siemens AG 2010. All rights reserved

Maintenance Plan 17 downtime days or 48 days on-site

Fast Maintenance
1 day A-inspection (Borescope) 2 days B-inspection (Gas Generator Exchange) 5 days C-inspection (Gas Generator Exchange with Power Turbine Inspection)

Normal Maintenance
1 day A-inspection (Borescope) 12 days B-inspection (Hot Section Parts Replacement) 16 days C-inspection (Overhaul)

Page 19

Siemens AG 2010. All rights reserved

SGT-750 Summary

Highest uptime in class High power output and high efficiency Siemens well proven DLE technology gives reliable combustion Smart service concept with 68 hours between major overhauls

Page 20

Siemens AG 2010. All rights reserved

Thanks for your attention