Project Title : Date Prepared : Start Duration Days Schedule Actual Concrete Works Concrete Finishes Sub - Structure

Basement Level 1 Column 2 Beam 3 Detached Retwall Pre-cast Concrete at Canopy Super structure Basement Level 1 Column 2 Beam 3 Detached Retwall Pre-cast Concrete at Canopy Notes :
45 3/1/2012

Finish
Schedule 4/14/2012 Actual

Labor Quantity

Materials
Quantity Quality Requirements
Specs

Remarks

Reference

Avel

6,422.00 6,755.00 2,160.80 ?

sqm sqm sqm L.M


verify attached & detached

verify linear meter

6,422.00 6,755.00 2,160.80 ?

sqm sqm sqm L.M


verify attached & detached

verify linear meter

Remarks

Avel

verify attached & detached

verify linear meter

verify attached & detached

verify linear meter

Project Title : Date Prepared :

Holy Angel Proffesional Building 27-Sep-12 Start Duration Days Schedule Actual Finish
Schedule Actual Labor Quantity

Materials
Required Actual Percentage Quality Requirements
Specs

Remarks

Basement Floor Level Masonry Works CHB Wall 150mm thick 100mm thick Ground Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 3rd Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 4th Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 5th Floor Level Masonry Works CHB Wall 150mm thick 100mm thick 6th Floor Level Masonry Works CHB Wall

Reference

Avel
131 days 132 days 9/2/2012 9/2/2012 8/21/2012 1/9/2013 1/9/2013
23.74 50 961.27 592.09 61.59% 350 psi 350 psi S-01 S-01 Updated as of Sep. 27, 2012.

131 days 132 days

646.67 50 248.418

350 psi 350 psi

S-01 S-01

150mm thick 100mm thick 6th Floor Level Masonry Works CHB Wall 150mm thick 100mm thick

Notes :

Remarks

Avel
Updated as of Sep. 27, 2012.

Project Title : Date Prepared :


Duration Days

Start
Schedule 7/19/2012 12/14/2012 7/19/2012 Actual

Finish
Schedule 3/5/2013 1/27/2013 12/25/2012 Actual

Labor Quantity No/Pc.

Materials
Quantity Unit Ref. Quality Requirements
Specs

Remarks

Reference

Metal Works Structural Steel Framing Metal Decking Ground Floor Phase 1 Phase 2 Second Floor Phase 1 Phase 2 Third Floor Phase 1 Phase 2 Metal Stairs Basement Ground First Floor Metal Fabrications Metal Grating Baseboard

230 45 160

Avel
Separate Group/Team

Marielle

Check Area Check Area 60 12/14/2012 2/11/2013

Avel

75 7 30

12/14/2012 2/27/2013 1/10/2013

2/26/2013 3/5/2013 2/8/2013

Notes :

Remarks

Avel
Separate Group/Team

Avel

Project Title : Date Prepared :


Duration Days

Start
Schedule Actual

Finish
Schedule Actual

Labor Quantity

Materials
Quantity Quality Requirements
Specs

Remarks Marinell

Reference

Thermal and Moisture Protection


Damproofing and Waterproofing Damproofing Water Proofing Attached Ret Wall Detached Ret Wall Thermal Protection Flashing and Sheet Metal

253 190

6/19/2012 6/19/2012

2/26/2013 12/25/2012

1,023.00 sqm 210.00 sqm

90 45

11/29/2012 1/13/2013

2/26/2013 2/26/2013

Notes :

Remarks Marinell

Project Title : Date Prepared :


Duration Days

Start
Schedule Actual

Finish
Schedule Actual

Labor Quantity

Materials
Quantity Quality Requirements
Specs

Remarks Marinell

Reference

Site Work And Earth Works


Geotextile Water proofing

30 30

3/1/2012 3/1/2012

3/30/2012 3/30/2012 2,042.60 sq.

Notes :

Remarks Marinell

Project Title : Date Prepared :


Duration Days

Start
Schedule Actual

Finish
Schedule Actual

Labor Quantity

Materials
Required Actual Percentage Quality Requirements
Specs

Remarks Avel

Reference

Finishes
Wall Finishes
Basement Portland Cement Plaster
Portland Cement Plaster interior walls Perimeter Walls with Cementitious Water proofing Plastering - Perimeter Walls including openings Numbers - Doors Numbers - Windows Gypsum Board Wall Glass Walls Graphic Wall Films

10/12/2012

3/10/2013 Cement Plaster : 1,871.73 70.48 590.31 S-01 213-A n/a A.201 interior = 7,244.21 sqm 213-A exterior = 10,702.17 sqm

0.00

Ground Floor Portland Cement Plaster


Portland Cement Plaster interior walls Perimeter Walls with Cementitious Water proofing Plastering - Perimeter Walls including openings Perimeter - Doors and Windows Gypsum Board Wall Glass Walls Graphic Wall Films

Cement Plaster : interior = 7,244.21 sqm 1,346.38 646.64 443.36 exterior = 10,702.17 sqm

Notes :

Remarks Avel

Plaster : 7,244.21 sqm

= 10,702.17 sqm

Plaster : 7,244.21 sqm

= 10,702.17 sqm

Project Title : Date Prepared :


Duration Days

Start
Schedule Actual

Finish
Schedule Actual

Labor Quantity

Materials
Quantity Quality Requirements
Specs

Remarks Avel

Reference

Finishes
Floor Finishes Basement
Tiling Works Wood Flooring Stone Works Non- Skid concrete

150

10/12/2012

3/10/2013

see attachements needs to be separate per floor

Ground Floor
Tiling Works Wood Flooring Stone Works Non- Skid concrete

Notes :

Project Title : Date Prepared :


Duration Days

Start
Schedule Actual

Finish
Schedule Actual

Labor Quantity

Materials
Quantity Quality Requirements
Specs

Remarks Avel

Reference

Finishes
Floor Finishes Basement
Tiling Works Wood Flooring Stone Works Non- Skid concrete

150

10/12/2012

3/10/2013

see attachements needs to be separate per floor

Ground Floor
Tiling Works Wood Flooring Stone Works Non- Skid concrete

Notes :