Checklist Report - Rev.

0 - 01 July 2006

Cebarco - WCT
CHECKLIST
Report No. Date Location Grid Ref. Material Used

W.L.L.

1124-VL-TR-P-0004
19 July, 2006 Time 09:00 AM

Project
Drawing No. System Service Dimension

Bahrain City Centre


CW/BCC/M/M/1000-12 Under Ground Drainage

Central Mall Area Grid A - F, 27 - 28

Foul Water Pipe

Item
1 2 3 4 5 6 7 8 9 10 11 12

Description
Confirm compliance with approved Material Submittal Confirm compliance with approved Method Statement Confirm Material is in usable condition (no damage / defects) Check conformance to dimensional aspects Check and ensure proper fitting of the coupling Check and ensure the mounting to be flush with floor level Check and ensure proper supports are provided Check and ensure proper supports of grating Check for proper seating of sealing ring Check for proper installation and installation of spigot with socket

Reference
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No No
Shop Drawing Material Approval Request Method Statement

Remarks

Checked by Sub-contractor:
Designation : Signature : Date :
19 July, 2006

MAP Manager Review and Approval :


Comments :

Signature : Date :

Consultant Acknowledgement :
Comments :

Approved :

Yes

No
Signature : Date :

Bahrain City Centre


CW/BCC/M/M/1000-12 Under Ground Drainage

Foul Water Pipe

Remarks

19 July, 2006

Presssure Test Report - Rev. 0 - 01 July 2006

Cebarco - WCT

W.L.L.

PRESSURE TEST REPORT


Report No. Date Location Grid Ref.

1124-VL-TR-P-0008
19 July, 2006 Time Central Mall Area Grid A - F, 27 - 28 09:00 AM

Project
Drawing No. System Service

Bahrain City Centre


CW/BCC/M/M/1000-12 Under Ground Drainage

Foul Water Pipe

Pressure Test Item 1 2 3 4 5 6 7 8 9 10 Test Duration : SL No. Line No. Drawing No.
Required Observed

Remarks

Checked by Sub-contractor:
Designation : Signature : Date :
19 July, 2006

MEP Manager Review and Approval :


Comments :

Signature : Date :

Consultant Acknowledgement :
Comments :

Approved :

Yes

No
Signature : Date :

PROJECT

HYDROSTATIC TEST REPORT


Report No. Date & Time System Location Grid Ref. Material Used Gauge Serial No.

Project
Drawing No. Calibration date of Pressure Gauge

xxx

Item
1 2

Description
Specs/Dwgs System Working Pressure(bar) Test Pressure(bar)

Value
Actual % Variation

Duration of Test(Hrs) 3 4 Test Started at 5 Test Finished at Remarks:

Checked by Sub-contractor:
Designation : Signature : Date :

Main Contactor Review and Approval :


Comments :

Signature : Date :

Anexure to Doc. No.BCA-WI-M-T03-040_WI for Installation of Piping and Sprinkler Piping _00_100510.xlsx

Page 4 of 8

Drainage Water Test Report - Rev. 0 - 01 July 2006

Cebarco - WCT
DRAINAGE WATER TEST REPORT
Date : Location : Grid Line : Time :

W.L.L.

Project
Drawing No. : Discipline : Services :

BAHRAIN CITY CENTRE

Item 1 2 3 4 5 6 7 8 9 10

Description
Minimum Head Clearance ( from lowest invert level to top of pipe: 1.5m = 5 feet) Actual Measured Head Duration of Test Drop of Water Level (mm) Pipe joints / connection Overall Length Diameter of Pipe Calculation : Actual Water Loss; Ltr. / 30 mins. / Permissible Water Loss Ltr. / 30 mins. / Overall Visual Inspection
Pipe Diameter (mm) in mm a

Value

Remarks

PERMISSIBLE WATER LOSS Ltr/Mtr/30 Min. 0.05 0.075 0.1

b c

100 mm 150 mm 200 mm

Checked by Sub-contractor;
Designation : Signature : Date :

MEP Manager Review and Approval


Comments :

Signature : Date :

Consultant Acknowledgement
Comments :

Approved :

Yes

No
Signature : Date :