Professional Documents
Culture Documents
Mg Aung Nay Myo Tun PH-10 Mg Wathon Oo PH-11 Mg Pyay Naing PH-26 Mg Pyone Mg Mg Kyaw PH-28 Mg Aung Minn Myatt PH-39
Mg Aung Nay Myo Tun PH-10 Mg Wathon Oo PH-11 Mg Pyay Naing PH-26 Mg Pyone Mg Mg Kyaw PH-28 Mg Aung Minn Myatt PH-39
A paper submitted to the Department of Port & Harbour Engineering in partial fulfillment of the requirement for the Award of the Degree of Bachelor of Engineering ( Port & Harbour Engineering )
Acknowledgements
Firstly, the authors want to express thanks to our Dearest Fathers and Mothers for their nurture and their love upon us. The authors would like to express heartfelt gratitude to Dr. Charlie Than, Rector of Myanmar Maritime University (MMU). The authors would like to express grateful thanks to Dr. Thein Tan, Advisor, MMU, for his kind advice, guidance and permission to carry out this project. The authors would like to specially thank U Myint Thein, Lecturer, Department of Port and Harbour Engineering for his goodwill, help and kindness. The authors would like to express specially thanks to our exsupervisor Dr. Htike Htike (now in U.S.A) and our new supervisor Daw Saw Nu Sanda Thein, Lecturer, for their supervision and guidance. The authors also give special thanks to Dr. Nyein Zin Latt for his guidance and technical help. The authors would also like to thank U Aung Win (Chairman, C.E.C.C), U San Htun ( M.D, C.E.C.C ) and U Thar Hlaing (Boring Engineer, C.E.C.C ) for their advice and help in finding the soil investigation data. We also specially thank to U Khin Maung Win (Assist. Engineer, MPA) for his help in some difficulties of pile cap calculation. Finally, the authors thank a lot to all those who offered great effort and help on this project to be written and accomplished it completely.
Abstract
This project is generally divided into two parts. The first one is about different types of pile and specifications. The second is about designs and calculations of driven piles for elven-storied building at Sin Min Bazaar. The ultimate capacity of driven pile is calculated by static formula. Some data for this study are obtained from Myanmar Port Authority and Civil Engineer Construction Co-operative Limited and some are from references.