Professional Practice Part I-Multiple Choice: 1.

In the code of Ethics, to whom does the Architect have responsibility to give reasonable aid for the full understanding of the Contract Documents. 2. A. Public B. Manufacturers & Dealers C. Contractor D. Owner 3. Under the Architects standard practice, how are projects classified in order to determine the basis for compensation of the Architect? A. Technical Considerations B. Structural system C. deg of complexity of structure D. material finish

4. For professional fee of Php 200,000.00, how much will be the retention fee for construction projects has not been completed? A. Php 15,000.00 B. Php 10,000.00 C. Php 30,000.00 D. Php 20,000.00

5. The Architect releases the _______ 90 days after the acceptance of the project A. Retention fee B. Guarantee Bond C. Liability D. Contract

6. In a typical owner-general contractor agreement, who is responsible for the payment of Performance Bond? A. Architect B. Owner C. Project Manager D. Contractor

7. The _______ are printed documents stipulating the administrative aspects of the contract. A. The Specifications B. C. The Gen. Conditions C. The Memo. Of Agreement D. The Contract

8. The _______ is the penalty for every day of delay in the contract time A. Penalty B. Liquidated Damages C. Penalty D. Interest Cost

9. Which of the following is not considered in the assessment of building permit fees A. Land area B. Occupancy/building use C. floor area D. height

10. The _______ is responsible for efficiently managing the Resources of the Construction only. A. Construction Manager Part II- True of False 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. The intent of the project is to legalized the project. The Architect is responsible for the As-Built plans of the project. The IAPOA fees are paid every 3 years. Project duration is computed immediately upon signing of the contract. The Developer is responsible for the payment of of Building Permit fee of the project. Civil Engineers are required to sign the structural plans for high-rise building. The Senate building is not required to acquire Building Permit. Architects should be remunerated for all his architectural services The Guarantee Bond is release immediately after the acceptance of the project The contractor can ethically order changes in the construction anytime. B. Project Manager C. Contractor D. Builder

Part III- Identification 21. The _________________ Services cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Achitect to initially conceptualized an array of architectural and allied solutions. 22. These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making.

23. _________________entales the conduct of primary and secondary researches and assembled facts used as basis for conclusion.

24. Under ___________________, the Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid put architectural services (whether public or private)

25. This method of compensation may be applied to government projects since they entail more paper work and time-consuming efforts.

26. This phase consist of the preparation of schematic design studies derived from the Project Definition Phase, leading to conceptual plans.

27. The Architect in this area of practice undertakes a scientific study on the built environments well-being, which allows the Architect to focus on the ways which the building/structure can best maintain itself and prolong its life in a cost-efficient manner, and finally provide recommendations to the Owner/Client.

28. The Consulting Architect in this area of practice must have much more than the basic knowledge of Site Analysis, Space Planning and Management, Architetcural Programming, and the other services under SPP Doucment 201.

29. Means the total cost of the project which includes but not limited to construction cost, fees for professional services, the cost of land, right-of-way (ROW), legal, administrative and other related expenses of the client.

30. This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution.