TENDER NO.

GTC/ 240 /2008 FOR ENGINEERING, PROCUREMENT AND CONSTRUCTION OF

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 9 SUBSTATIONS

TENDER DOCUMENTS

VOLUME 2

TECHNICAL AFFAIRS Electrical Projects Department

VOLUME 2 SECTION 3.1 PAGE 1 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

SECTION 3.1

VOLUME 2 SECTION 3.1 PAGE 2 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

CONTENTS PAGE 1. SCOPE OF WORKS 5


1.1 DESCRIPTION OF WORKS ....................................................................................... 5

2. BRIEF SCOPE OF WORKS: 5


2.1 PACKAGE S1 ............................................................................................................ 5 2.2 PACKAGE S-21 ......................................................................................................... 5 2.3 PACKAGE S-22 ......................................................................................................... 6 2.4 PACKAGE S3 ............................................................................................................ 6

2.5 PACKAGE S4 ............................................................................................................ 7 2.6 PACKAGE S5 ............................................................................................................ 7 2.7 PACKAGE S6 ............................................................................................................ 8 2.8 PACKAGE S7 ............................................................................................................ 8 2.9 PACKAGE S8 ............................................................................................................ 9 2.10 PACKAGE S9 .......................................................................................................... 10 2.11 PACKAGE TELECOMMUNICATIONS SYSTEM .................................................. 10

3. DETAILED SCOPE OF WORKS: 12


3.1 PACKAGE S1 .......................................................................................................... 12

3.1.1 400KV LOGISTIC ZONE SUPER (LZS GCC) SUBSTATION 13 3.1.2 400/11KV LOGISTIC ZONE SUPER (LZS KM) SUBSTATION 16 3.1.3 220/132KV DOHA SOUTH SUPER SUBSTATION (UPGRADE): 20 3.1.4 132/66/11KV NAEEJA WEST SUBSTATION (REPLACEMENT): 27

3.2 PACKAGE S-21: ...................................................................................................... 33


3.2.1 220/132/11KV UMM SALAL MOHD SUPER SUBSTATION: 33 3.2.2 132/11KV UMM SALAL EAST SUBSTATION 38 3.2.3 132/11KV NORTH ROAD SUBSTATION 41 3.2.4 132/11KV UNIVERSITY SOUTH SUBSTATION 44

3.3

PACKAGE S-22: ...................................................................................................... 47


3.3.1 132/11KV QATAR LEADERSHIP ACADEMY SUBSTATION 47 3.3.2 132/11KV UMM QARIN SUBSTATION 50 3.3.3 132/11KV SEMAISMA SUBSTATION 53

3.4 PACKAGE S3: ......................................................................................................... 56

VOLUME 2 SECTION 3.1 PAGE 3 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

3.4.1 220/66/11KV KHORE BEACH SUPER SUBSTATION 56 3.4.2 132/66/11KV KHORE SOUTH SUBSTATION 61 3.4.3 132/66/11KV KHORE NORTH SUBSTATION (UPGRADE) 65 3.4.4 66/11KV KHORE (UPGRADE) 70

3.5 PACKAGE S4: ......................................................................................................... 73


3.5.1 66/11KV GRAND HAMAD AVENUE NEW SUBSTATION 73 3.5.2 66/11KV UMM GHUWALINA SUBSTATION 77

3.5.3 66/11KV KHALIFAT SUBSTATION (REPLACEMENT) 82 3.5.4 66/11KV OLD GHANIM SUBSTATION (REPLACEMENT) 87 3.5.5 66/11KV NAEEJA LOCAL (UPGRADE) 90 3.5.6 66/11KV AL SAAD WEST SUBSTATION (MODIFICATION) 93

3.6 PACKAGE S5: ......................................................................................................... 96


3.6.1 220/132/66/11KV SALIYAH SUBSTATION (REPLACEMENT): 96 3.6.2 132/66/11KV WAKRAH SUBSTATION: 103 3.6.3 66/11KV SALIYAH CENTRAL SUBSTATION 109 3.6.4 66/11KV AL WAJBAH SOUTH SUBSTATION 113

3.7 PACKAGE S6: ....................................................................................................... 117


3.7.1 66/11KV MERGHAB AL REMATH SUBSTATION (REPLACEMENT) 117 3.7.2 132/33KV DUKHAN - 2 SUBSTATION: 124 3.7.3 132/11KV DUKHAN JUMAILIYAH JUNCTION SUBSTATION: 129 3.7.4 132/11KV AL NASRANIYA SUBSTATION: 134

3.8 PACKAGE S7: ....................................................................................................... 136


3.8.1 132/11KV AL SHALAH SUBSTATION (REPLACEMENT) 136 3.8.2 132/11KV AL KARANA SUBSTATION: 141 3.8.3 132KV GULF CEMENT SWITCHING SUBSTATION: 144 3.8.4

33/11KV AL KHARSAA SUBSTATION: 148

3.9 PACKAGE S8: ....................................................................................................... 152


3.9.1 220/132/33KV QP RLF 4 SUBSTATION: 152 3.9.2 400/220/66/11KV LUSAIL DEVELOPMENT SUPER 2 (LDS2) SUBSTATION (UPGRADE): 157 3.9.3 220/66/11KV NEW DOHA N SUBSTATION 162 3.9.4 66/11KV BARWA AL DOHA SUBSTATION 167 3.9.5 66/11KV HEART OF DOHA 1 SUBSTATION 171 3.9.6 66/11KV HEART OF DOHA 2 SUBSTATION 174 3.9.7 66/11KV WYNDHAM HOTEL SUBSTATION 178

VOLUME 2 SECTION 3.1 PAGE 4 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

3.10 PACKAGE S9: ....................................................................................................... 182


3.10.1 220/132/33KV MESAIEED INDUSTRIAL D SUBSTATION: 182 3.10.2 220/66/11KV MESAIEED INDUSTRIAL CITY (MIC) SUPER (UPGRADE): 187 3.10.3 132/66/11KV MESAIEED A SUBSTATION (REPLACEMENT) 190 3.10.4 66/11KV MEDIUM SCALE INDUSTRY SUBSTATION 196 3.10.5 66/11KV MESAIEED INDUSTRIAL CITY -5 (MIC 5) SUBSTATION 199 3.10.6 66/11KV MESAIEED MARKET SUBSTATION 202

3.10.7 66/11KV ARKAN SUBSTATION 205 3.10.8 66/11KV BARWAH BUILDING MATERIAL SUBSTATION 208

3.11 PACKAGE TELECOMMUNICATIONS SYSTEM ................................................ 211


3.11.1 INTRODUCTION 211 3.11.2 SCOPE OF WORK 211

4. PROTECTION SCOPE OF WORK 224


4.1 GENERAL REQUIREMENTS ................................................................................. 224 4.2 GENERAL CT REQUIREMENT.............................................................................. 232 4.3 GENERAL SCOPE OF WORK FOR SUBSTATIONS TO BE UPGRADED/UPRATED AND REMOTE END MODIFICATION SUBSTATIONS: ......................................... 236

4.4 PROTECTION SCOPE WORK DETAILS............................................................... 237 4.5 ANNEXURE1......................................................................................................... 262

5. NOTES TO BIDDERS 280 6. IMPORTANT NOTES APPLICABLE FOR ALL PACKAGES: 282 7. EXTENT OF EPC CONTRACT 283
7.1 SCOPE OF SUPPLY .............................................................................................. 284 7.2 SCOPE OF SERVICES .......................................................................................... 284

VOLUME 2 SECTION 3.1 PAGE 5 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

1.

SCOPE OF WORKS
1.1 DESCRIPTION OF WORKS
KAHRAMAA intends to develop, expand and improve the existing power transmission network under the project entitled 'Qatar Power Transmission System Expansion Phase 9' to meet with the increased power demand of the development works in the State of Qatar. The substation works under the Phase 9 project includes establishment of new transmission substations as well as refurbishment/ modification/ upgrade/ replacement of existing transmission substations/ overhead lines/ underground power cables. The works of the Phase 9 project is spread all over the state of Qatar including newly developed areas and existing areas, the details of which as on today are shown on the Location maps enclosed. The final micro-location and platform levels shall be coordinated with the concerned authorities during the project execution stage. The brief scope of works for establishment of Phase 9 Transmission System Network expansion consists of the following eleven (11) Packages: 2.

BRIEF SCOPE OF WORKS:


2.1 PACKAGE S-1

400kV Logistic Zone Super GCC (LZS GCC) transmission substation incorporating 400kV Gas Insulated Switchgear and associated equipment as required and as indicated elsewhere in the tender documents. 400kV Logistic Zone Super KM (LZS KM) transmission substation incorporating 400kV Gas Insulated Switchgear, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender documents. 220/132/11kV Doha South Super: establishing 132kV gas insulated switchgear and associated equipment to eventually replace existing 132kV open terminal switchyard, and establishing 11kV AIS/ GIS, and 132/11kV Power Transformers as required and as indicated elsewhere in the tender document. 132/66/11kV Naeeja West (Refurbishment): Upgrading of existing 66/11kV Naeeja West transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment

2.2 PACKAGE S-2-1


220/132/11kV Umm Salal Mohammad Super transmission substation incorporating 220kV and 132kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/132kV and 132/11kV Power Transformers, 11/0.433kV station transformers and

VOLUME 2 SECTION 3.1 PAGE 6 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

associated equipment as required and as indicated elsewhere in the tender document. 132/11kV Umm Salal East substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV North Road substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV primary substation at University South incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.3 PACKAGE S-2-2


132/11kV Qatar Leadership Academy substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the

tender document. 132/11kV primary substation at Umm Qarin incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as as required and as indicated elsewhere in the tender document. 132/11kV Semaisma substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as as required and as indicated elsewhere in the tender document.

2.4 PACKAGE S-3


220/66/11kV Khore Beach Super transmission substation incorporating 220kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/66/11kV Khore South transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/66/11kV Khore North (Upgrade): Upgrading of existing 66/11kV Khore North transmission substation by establishing 132kV gas insulated switchgear and

VOLUME 2 SECTION 3.1 PAGE 7 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Khore (Refurbishment): 66/11kV transformer feeder substation incorporating 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to replace existing 25MVA transformers, 11kV switchgear and associated equipment.

2.5 PACKAGE S-4


66/11kV Grand Hamad Avenue New transmission substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Umm Ghuwalina transmission substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Khalifat (Refurbishment): establishing 66kV GIS, 11kV AIS/ GIS,

66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment. 66/11kV Old Ghanim (Refurbishment): establishing 66kV GIS, 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment. 66/11kV Naeeaja Local (Refurbishment): transformer feeder substation incorporating 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to replace existing substation equipment. 66/11kV Al Saad West (modification): Shifting of 66kV supply arrangement at Al Saad West substation incorporating diversion of two 66kV cable circuits from Al Saad North substation to Al Sowaidi substation.

2.6 PACKAGE S-5


220/132/66/11kV Saliyah (Refurbishment) transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/132kV, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 132/66/11kV substation equipment.

VOLUME 2 SECTION 3.1 PAGE 8 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

132/66/11kV Wakrah (Refurbishment): transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing substation equipment 66/11kV primary substation at Saliyah Central incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV primary substation at Al Wajbah South incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.7 PACKAGE S-6


66/11kV primary substation Merghab Al Remath (Refurbishment): incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers,

11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment. 132/33kV Dukhan -2 transmission substation incorporating 132kV GIS and 33kV AIS/ GIS, 132/33kV Power Transformers, 33/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV Dukhan Jumailiyah Junction transmission substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV Al Nasaraniya transformer feeder substation incorporating 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.8 PACKAGE S-7


132/11kV Al Shalah (Refurbishment): Upgrading of existing 132/66/11kV Al Shalah transmission substation incorporating 132kV Gas Insulated Switchgear and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 132/66/11kV substation equipment.

VOLUME 2 SECTION 3.1 PAGE 9 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0

SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

132/11kV Al Kara'ana transmission substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132kV Gulf Cement Company Switching Station incorporating 132kV GIS and 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 33/11kV transformer feeder substation at Al Kharsa'a incorporating 11kV AIS/ GIS, 33/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.9 PACKAGE S-8


220/132/33kV QP RLF 4 transmission substation incorporating 220kV and 132kV Gas Insulated Switchgears and 33kV GIS, 220/132kV and 132/33kV Power Transformers, 33/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 400kV Lusail Development Super 2 transmission substation incorporating 400kV Gas Insulated switchgear and associated equipment as required and as

indicated elsewhere in the tender document. 220/66/11kV New Doha N transmission substation incorporating 220kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Barwa Al Doha substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Heart of Doha 1 substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Heart of Doha 2 substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV primary substation at Wyndham Hotel incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

TENDER NO. GTC/ 240 /2008 FOR ENGINEERING, PROCUREMENT AND CONSTRUCTION OF

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 9 SUBSTATIONS

TENDER DOCUMENTS VOLUME 2


TECHNICAL AFFAIRS Electrical Projects Department

VOLUME 2 SECTION 3.1 PAGE 1 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

SECTION 3.1

VOLUME 2 SECTION 3.1 PAGE 2 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

CONTENTS PAGE 1. SCOPE OF WORKS 5


1.1 DESCRIPTION OF WORKS ....................................................................................... 5

2. BRIEF SCOPE OF WORKS: 5


2.1 PACKAGE S-1 ............................................................................................................ 5 2.2 PACKAGE S-2-1 ......................................................................................................... 5 2.3 PACKAGE S-2-2 ......................................................................................................... 6 2.4 PACKAGE S-3 ............................................................................................................ 6 2.5 PACKAGE S-4 ............................................................................................................ 7 2.6 PACKAGE S-5 ............................................................................................................ 7 2.7 PACKAGE S-6 ............................................................................................................ 8 2.8 PACKAGE S-7 ............................................................................................................ 8 2.9 PACKAGE S-8 ............................................................................................................ 9

2.10 PACKAGE S-9 .......................................................................................................... 10 2.11 PACKAGE TELECOMMUNICATIONS SYSTEM .................................................. 10

3. DETAILED SCOPE OF WORKS: 12


3.1 PACKAGE S-1 .......................................................................................................... 12
3.1.1 400KV LOGISTIC ZONE SUPER (LZS GCC) SUBSTATION 13 3.1.2 400/11KV LOGISTIC ZONE SUPER (LZS KM) SUBSTATION 16 3.1.3 220/132KV DOHA SOUTH SUPER SUBSTATION (UPGRADE): 20 3.1.4 132/66/11KV NAEEJA WEST SUBSTATION (REPLACEMENT): 27

3.2 PACKAGE S-2-1: ...................................................................................................... 33


3.2.1 220/132/11KV UMM SALAL MOHD SUPER SUBSTATION: 33 3.2.2 132/11KV UMM SALAL EAST SUBSTATION 38 3.2.3 132/11KV NORTH ROAD SUBSTATION 41 3.2.4 132/11KV UNIVERSITY SOUTH SUBSTATION 44

3.3 PACKAGE S-2-2: ...................................................................................................... 47


3.3.1 132/11KV QATAR LEADERSHIP ACADEMY SUBSTATION 47 3.3.2 132/11KV UMM QARIN SUBSTATION 50

3.3.3 132/11KV SEMAISMA SUBSTATION 53

3.4 PACKAGE S-3: ......................................................................................................... 56

VOLUME 2 SECTION 3.1 PAGE 3 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

3.4.1 220/66/11KV KHORE BEACH SUPER SUBSTATION 56 3.4.2 132/66/11KV KHORE SOUTH SUBSTATION 61 3.4.3 132/66/11KV KHORE NORTH SUBSTATION (UPGRADE) 65 3.4.4 66/11KV KHORE (UPGRADE) 70

3.5 PACKAGE S-4: ......................................................................................................... 73


3.5.1 66/11KV GRAND HAMAD AVENUE NEW SUBSTATION 73 3.5.2 66/11KV UMM GHUWALINA SUBSTATION 77 3.5.3 66/11KV KHALIFAT SUBSTATION (REPLACEMENT) 82 3.5.4 66/11KV OLD GHANIM SUBSTATION (REPLACEMENT) 87 3.5.5 66/11KV NAEEJA LOCAL (UPGRADE) 90 3.5.6 66/11KV AL SAAD WEST SUBSTATION (MODIFICATION) 93

3.6 PACKAGE S-5: ......................................................................................................... 96


3.6.1 220/132/66/11KV SALIYAH SUBSTATION (REPLACEMENT): 96 3.6.2 132/66/11KV WAKRAH SUBSTATION: 103

3.6.3 66/11KV SALIYAH CENTRAL SUBSTATION 109 3.6.4 66/11KV AL WAJBAH SOUTH SUBSTATION 113

3.7 PACKAGE S-6: ....................................................................................................... 117


3.7.1 66/11KV MERGHAB AL REMATH SUBSTATION (REPLACEMENT) 117 3.7.2 132/33KV DUKHAN - 2 SUBSTATION: 124 3.7.3 132/11KV DUKHAN JUMAILIYAH JUNCTION SUBSTATION: 129 3.7.4 132/11KV AL NASRANIYA SUBSTATION: 134

3.8 PACKAGE S-7: ....................................................................................................... 136


3.8.1 132/11KV AL SHALAH SUBSTATION (REPLACEMENT) 136 3.8.2 132/11KV AL KARANA SUBSTATION: 141 3.8.3 132KV GULF CEMENT SWITCHING SUBSTATION: 144 3.8.4 33/11KV AL KHARSAA SUBSTATION: 148

3.9 PACKAGE S-8: ....................................................................................................... 152


3.9.1 220/132/33KV QP RLF 4 SUBSTATION: 152 3.9.2 400/220/66/11KV LUSAIL DEVELOPMENT SUPER 2 (LDS2) SUBSTATION (UPGRADE): 157 3.9.3 220/66/11KV NEW DOHA N SUBSTATION 162 3.9.4

66/11KV BARWA AL DOHA SUBSTATION 167 3.9.5 66/11KV HEART OF DOHA 1 SUBSTATION 171 3.9.6 66/11KV HEART OF DOHA 2 SUBSTATION 174 3.9.7 66/11KV WYNDHAM HOTEL SUBSTATION 178

VOLUME 2 SECTION 3.1 PAGE 4 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

3.10 PACKAGE S-9: ....................................................................................................... 182


3.10.1 220/132/33KV MESAIEED INDUSTRIAL D SUBSTATION: 182 3.10.2 220/66/11KV MESAIEED INDUSTRIAL CITY (MIC) SUPER (UPGRADE): 187 3.10.3 132/66/11KV MESAIEED A SUBSTATION (REPLACEMENT) 190 3.10.4 66/11KV MEDIUM SCALE INDUSTRY SUBSTATION 196 3.10.5 66/11KV MESAIEED INDUSTRIAL CITY -5 (MIC 5) SUBSTATION 199 3.10.6 66/11KV MESAIEED MARKET SUBSTATION 202 3.10.7 66/11KV ARKAN SUBSTATION 205 3.10.8 66/11KV BARWAH BUILDING MATERIAL SUBSTATION 208

3.11 PACKAGE TELECOMMUNICATIONS SYSTEM ................................................ 211


3.11.1 INTRODUCTION 211 3.11.2 SCOPE OF WORK 211

4. PROTECTION SCOPE OF WORK 224


4.1 GENERAL REQUIREMENTS ................................................................................. 224

4.2 GENERAL CT REQUIREMENT.............................................................................. 232 4.3 GENERAL SCOPE OF WORK FOR SUBSTATIONS TO BE UPGRADED/UPRATED AND REMOTE END MODIFICATION SUBSTATIONS: ......................................... 236 4.4 PROTECTION SCOPE WORK DETAILS............................................................... 237 4.5 ANNEXURE1......................................................................................................... 262

5. NOTES TO BIDDERS 280 6. IMPORTANT NOTES APPLICABLE FOR ALL PACKAGES: 282 7. EXTENT OF EPC CONTRACT 283
7.1 SCOPE OF SUPPLY .............................................................................................. 284 7.2 SCOPE OF SERVICES .......................................................................................... 284

VOLUME 2 SECTION 3.1 PAGE 5 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

1.

SCOPE OF WORKS
1.1 DESCRIPTION OF WORKS
KAHRAMAA intends to develop, expand and improve the existing power transmission network under the project entitled 'Qatar Power Transmission System Expansion Phase 9' to meet with the increased power demand of the development works in the State of Qatar. The substation works under the Phase 9 project includes establishment of new transmission substations as well as refurbishment/ modification/ upgrade/ replacement of existing transmission substations/ overhead lines/ underground power cables. The works of the Phase 9 project is spread all over the state of Qatar including newly developed areas and existing areas, the details of which as on today are shown on the Location maps enclosed. The final micro-location and platform levels shall be coordinated with the concerned authorities during the project execution stage. The brief scope of works for establishment of Phase 9 Transmission System Network expansion consists of the following eleven (11) Packages: 2.

BRIEF SCOPE OF WORKS:


2.1 PACKAGE S-1
400kV Logistic Zone Super GCC (LZS GCC) transmission substation incorporating 400kV Gas Insulated Switchgear and associated equipment as required and as indicated elsewhere in the tender documents.

400kV Logistic Zone Super KM (LZS KM) transmission substation incorporating 400kV Gas Insulated Switchgear, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender documents. 220/132/11kV Doha South Super: establishing 132kV gas insulated switchgear and associated equipment to eventually replace existing 132kV open terminal switchyard, and establishing 11kV AIS/ GIS, and 132/11kV Power Transformers as required and as indicated elsewhere in the tender document. 132/66/11kV Naeeja West (Refurbishment): Upgrading of existing 66/11kV Naeeja West transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment

2.2 PACKAGE S-2-1


220/132/11kV Umm Salal Mohammad Super transmission substation incorporating 220kV and 132kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/132kV and 132/11kV Power Transformers, 11/0.433kV station transformers and

VOLUME 2 SECTION 3.1 PAGE 6 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

associated equipment as required and as indicated elsewhere in the tender document. 132/11kV Umm Salal East substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV North Road substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV primary substation at University South incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.3 PACKAGE S-2-2


132/11kV Qatar Leadership Academy substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV primary substation at Umm Qarin incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station

transformers and associated equipment as as required and as indicated elsewhere in the tender document. 132/11kV Semaisma substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as as required and as indicated elsewhere in the tender document.

2.4 PACKAGE S-3


220/66/11kV Khore Beach Super transmission substation incorporating 220kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/66/11kV Khore South transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/66/11kV Khore North (Upgrade): Upgrading of existing 66/11kV Khore North transmission substation by establishing 132kV gas insulated switchgear and

VOLUME 2 SECTION 3.1 PAGE 7 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Khore (Refurbishment): 66/11kV transformer feeder substation incorporating 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to replace existing 25MVA transformers, 11kV switchgear and associated equipment.

2.5 PACKAGE S-4


66/11kV Grand Hamad Avenue New transmission substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Umm Ghuwalina transmission substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Khalifat (Refurbishment): establishing 66kV GIS, 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment.

66/11kV Old Ghanim (Refurbishment): establishing 66kV GIS, 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment. 66/11kV Naeeaja Local (Refurbishment): transformer feeder substation incorporating 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to replace existing substation equipment. 66/11kV Al Saad West (modification): Shifting of 66kV supply arrangement at Al Saad West substation incorporating diversion of two 66kV cable circuits from Al Saad North substation to Al Sowaidi substation.

2.6 PACKAGE S-5


220/132/66/11kV Saliyah (Refurbishment) transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/132kV, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 132/66/11kV substation equipment.

VOLUME 2 SECTION 3.1 PAGE 8 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

132/66/11kV Wakrah (Refurbishment): transmission substation incorporating 132kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 132/66kV and 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing substation equipment 66/11kV primary substation at Saliyah Central incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV primary substation at Al Wajbah South incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.7 PACKAGE S-6


66/11kV primary substation Merghab Al Remath (Refurbishment): incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 66/11kV substation equipment.

132/33kV Dukhan -2 transmission substation incorporating 132kV GIS and 33kV AIS/ GIS, 132/33kV Power Transformers, 33/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV Dukhan Jumailiyah Junction transmission substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132/11kV Al Nasaraniya transformer feeder substation incorporating 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.8 PACKAGE S-7


132/11kV Al Shalah (Refurbishment): Upgrading of existing 132/66/11kV Al Shalah transmission substation incorporating 132kV Gas Insulated Switchgear and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document to eventually replace existing 132/66/11kV substation equipment.

VOLUME 2 SECTION 3.1 PAGE 9 OF 286

GTC/240/2008 QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 9 SUBSTATIONS TITLE:- SCOPE OF WORKS
Revision: 0
SECTION 3.1 SCOPE OF WORKS

TECHNICAL AFFAIRS Electrical Projects Dept.

132/11kV Al Kara'ana transmission substation incorporating 132kV GIS and 11kV AIS/ GIS, 132/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 132kV Gulf Cement Company Switching Station incorporating 132kV GIS and 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 33/11kV transformer feeder substation at Al Kharsa'a incorporating 11kV AIS/ GIS, 33/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.

2.9 PACKAGE S-8


220/132/33kV QP RLF 4 transmission substation incorporating 220kV and 132kV Gas Insulated Switchgears and 33kV GIS, 220/132kV and 132/33kV Power Transformers, 33/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 400kV Lusail Development Super 2 transmission substation incorporating 400kV Gas Insulated switchgear and associated equipment as required and as indicated elsewhere in the tender document. 220/66/11kV New Doha N transmission substation incorporating 220kV and 66kV Gas Insulated Switchgears and 11kV AIS/ GIS, 220/66kV and

66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Barwa Al Doha substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Heart of Doha 1 substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV Heart of Doha 2 substation incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document. 66/11kV primary substation at Wyndham Hotel incorporating 66kV GIS and 11kV AIS/ GIS, 66/11kV Power Transformers, 11/0.433kV station transformers and associated equipment as required and as indicated elsewhere in the tender document.