You are on page 1of 101

KALTIM 5 PROJECT

2500 MTPD AMMONIA & 3500 MTPD UREA PLANT


GENERAL DESIGN SPECIFICATION FOR CIVIL &
STRUCTURE

Doc. No

: K5-00-E8-GS-001-I

Job No

: 10107/BA096300/11-018-01

Rev. No

:5

ATTACHMENT-1
SOIL BEARING CAPACITY FOR SHALLOW FOUNDATION

KALTIM 5 PROJECT
2500 MTPD AMMONIA & 3500 MTPD UREA PLANT
GENERAL DESIGN SPECIFICATION FOR CIVIL &
STRUCTURE

Doc. No

: K5-00-E8-GS-001-I

Job No

: 10107/BA096300/11-018-01

Rev. No

:5

GENERAL
This page is prepared to explain Bearing Capacity of Shallow Foundation for Kaltim-5 Project 2500 MTPD
Ammonia & 3500 MTPD Urea Plant of PT. Pupuk Kalimantan Timur Bontang, Kalimantan Timur, Indonesia

REFERENCE DOCUMENT
1. Soil Investigation for Kaltim 5 Project 2500 MTPD Ammonia and 3500 MTPD Urea Plant Bontang
3. East Kalimantan, Indonesia.
2. Foundation Analysis and Design - Bowles (1997)
3. Principle of Foundation Engineering, Braja M Das

SOIL BEARING CAPACITY OF SHALLOW FOUNDATION


The allowable bearing capacity of shallow foundation is based on the minimum of
a. The bearing capacity, which consider soil strength
b. Limiting the settlement of foundation
Bearing Capacity from SPT
The SPT is widely used to obtain the bearing capacity of soils directly. One of the earliest published relationships
was that of Terzaghi and Peck (1967). This has been widely used,but an accumulation of field observations has
shown these curves to be overly conservative.Meyerhof (1956, 1974) published equations for computing the
allowable bearing capacity for a 25-mm settlement. These could be used to produce curves similar to those of
Terzaghi and Peck and thus were also very conservative. Considering the accumulation of field obser-vations and
the stated opinions of the authors and others, this author adjusted the Meyerhof equations for an approximate
50 percent increase in allowable bearing capacity to obtain the following:

where qa = allowable bearing pressure for DH0 = 25-mm or 1-in. settlement, kPa or ksf
Kd = 1 + 0.33(D/B) < 1.33 [as suggested by Meyerhof (1965)]
F factors as follows :

F1
F2
F3
F4

N55
N70
SI
Fps
SI
Fps
0.05
2.5 0.04
2
0.08
4 0.06
3.2
0.3
1
same same
1.2
4

The result of bearing capacity for each borehole is presented in section 4.0

KALTIM 5 PROJECT
2500 MTPD AMMONIA & 3500 MTPD UREA PLANT
GENERAL DESIGN SPECIFICATION FOR CIVIL &
STRUCTURE

Doc. No

: K5-00-E8-GS-001-I

Job No

: 10107/BA096300/11-018-01

Rev. No

:5

Foundation Settlement
The settlement of individual foundations due to consolidation of underlying clay soils will depend upon foundation
size, shape, depth and magnitude of the applied load. The proximity of adjacent foundation will influence the
settlement experienced by foundation in a group.
Computations were made to estimate settlements for square footings of various width (B) and length width ratios
(L/B), for a range of applied net bearing pressures, which included beareng pressures, caused the dead load
plus operating live loads, but are less than the maximum allowable net bearing pressure. The foundation were
assumed to be placed at depth of 1.0 m below plant elevation. For these analysis used long term consoliation after
Terzaghi and Elastic Settlement Based on The Theory of Elasticity.
The maximum allowable of settlement is 25.4 cm (1 inch).
Total of settlement is calculated as follow :
Stot = Se + Sc
where :
S tot
Se
Sc

=
=
=

total settlement (m)


immediate settlement (m)
consolidation settlement (m)

A. Elastic Settlement Based on The Theory of Elasticity

However, if the foundation shown in picture above is rigid, the immediate settlement will be modified and
can be expressed as
The formula :

Se

qo (aB')

1- ms2

Is If
Es

where
q0

= net applied pressure on the foundation

ms

= Poisson's ration of soil

Es

= average modulus of elasticity of the soil under the foundation, measured from z = 0 to about
z = 4B
= B/2 for center of foundation
= B for corner of foundation
= a factor that depends on the location on the foundation where settlement is being calculated

B'
a

KALTIM 5 PROJECT
2500 MTPD AMMONIA & 3500 MTPD UREA PLANT
GENERAL DESIGN SPECIFICATION FOR CIVIL &
STRUCTURE

Doc. No

: K5-00-E8-GS-001-I

Job No

: 10107/BA096300/11-018-01

Rev. No

:5

To calculate settlement at the center of the foundation, we used


a
= 4
m'
= L/B
and
H
n'
=
(B/2)
To calculate settlement at a corner of the foundation
a
= 1
m'
= L/B
and
H
n'
=
B
This graphic below used to determine If (depth factor = f (Df/B) ms and L/B)

KALTIM 5 PROJECT
2500 MTPD AMMONIA & 3500 MTPD UREA PLANT
GENERAL DESIGN SPECIFICATION FOR CIVIL &
STRUCTURE
where :
Is

Doc. No

: K5-00-E8-GS-001-I

Job No

: 10107/BA096300/11-018-01

Rev. No

:5

Shape factor (Steinbrenner, 1934


1 - 2 ms

F1

F1

(A0 + A1)

F2

n'
2

tan-1 A2

A0

m'ln

A1

ln

A2

ln

1- ms

F2

(1 + m'2 + 1) m'2 + n'2


m' (1+ m'2 + n'2 + 1
(m' + m'2 + 1) 1 + n'2
m' (1+ m'2 + n'2 + 1
m'
n'

m' + n'2 + 1

B. Consolidation settlement:
Consolidation settlement or long term settlement is time dependent, and it occures in saturated clayey soils when
they are subjected to increased load caused by foundation construction

a. If Po > Pc

po p
Cc H
Sc
log

1 eo
po

KALTIM 5 PROJECT
2500 MTPD AMMONIA & 3500 MTPD UREA PLANT
GENERAL DESIGN SPECIFICATION FOR CIVIL &
STRUCTURE

Doc. No

: K5-00-E8-GS-001-I

Job No

: 10107/BA096300/11-018-01

Rev. No

:5

b. If Po < Pc and (Po + P)< Pc

po p
Cr H
Sc
log

1 e
po
c. If Po < Pc and (Po + P)> Pc

where :
Cc
Cr
H

Cr H pc Cc H po p
Sc

log
log
1 e po 1 e pc
=
=
=

Compression index
Recompression index
Layer thickness

e
Po
P

=
=
=

Initial void ratio


Overburden pressure
Additional pressure from upper structures

* Reference : "Principle of Foundation Engineering", Braja M Das


The result of Allowable bearing capacity considering allowable settlement 1" (25.4 mm) for each borehole
is presented in section 5.0

4.0. ALLOWABLE BEARING CAPACITY OF SHALLOW FOUNDATION


BASED ON SHEAR FAILURE

Safety Factor :

(kN/m2)

qa
(kN/m2)

qa
(t/m2)

1.20
1.20
1.20
1.20

106.40
77.04
67.16
62.55

35.47
25.68
22.39
20.85

3.55
2.57
2.24
2.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
106.40
77.04
67.16
62.55

35.47
25.68
22.39
20.85

3.55
2.57
2.24
2.08

1.33
1.17
1.11
1.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
425.60
308.14
268.62
250.19

141.87
102.71
89.54
83.40

14.19
10.27
8.95
8.34

17
17
17
17

1.33
1.33
1.22
1.17

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
452.20
373.77
313.69
286.09

150.73
124.59
104.56
95.36

15.07
12.46
10.46
9.54

2.00
1.20
1.20
1.20
1.20

m
212.80
175.89
160.93
144.16

70.93
58.63
53.64
48.05

7.09
5.86
5.36
4.81

BOR
NO.

B
(m)

Kd

F1

F2

F3

F4

NBL 13

1
2
3
4

4
4
4
4

1.33
1.17
1.11
1.08

0.05
0.05
0.05
0.05

0.08
0.08
0.08
0.08

0.30
0.30
0.30
0.30

NBL 14

1
2
3
4

4
4
4
4

1.33
1.17
1.11
1.08

BH 1
OFFSITE

1
2
3
4

16
16
16
16

BH 1
OFFSITE

1
2
3
4

qu

BH 1
OFFSITE

1
2
3
4

8
8
8
8

Kedalaman Fondasi =
1.33
0.05
0.08
0.30
1.33
0.05
0.08
0.30
1.33
0.05
0.08
0.30
1.25
0.05
0.08
0.30

BH 2 OFF
OFFSITE

1
2
3
4

9
9
9
9

1.33
1.17
1.11
1.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

3.00
1.20
1.20
1.20
1.20

m
239.40
173.33
151.10
140.73

79.80
57.78
50.37
46.91

7.98
5.78
5.04
4.69

BH 2 OFF
OFFSITE

1
2
3
4

9
9
9
9

1.33
1.33
1.22
1.17

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
239.40
197.88
166.07
151.46

79.80
65.96
55.36
50.49

7.98
6.60
5.54
5.05

11
11
11

Kedalaman Fondasi =
1.33
0.05
0.08
0.30
1.33
0.05
0.08
0.30
1.33
0.05
0.08
0.30

2.00
1.20
1.20
1.20

m
292.60
241.85
221.28

97.53
80.62
73.76

9.75
8.06
7.38

BH 2 OFF
OFFSITE

1
2
3

4.0. ALLOWABLE BEARING CAPACITY OF SHALLOW FOUNDATION


BASED ON SHEAR FAILURE

Safety Factor :
BOR
NO.

(kN/m2)

qa
(kN/m2)

qa
(t/m2)

1.20

198.23

66.08

6.61

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

3.00
1.20
1.20
1.20
1.20

m
159.60
115.55
100.73
93.82

53.20
38.52
33.58
31.27

5.32
3.85
3.36
3.13

1.33
1.17
1.11
1.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
133.00
96.29
83.94
78.19

44.33
32.10
27.98
26.06

4.43
3.21
2.80
2.61

40
40
40
40

1.33
1.17
1.11
1.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
1064.00
770.36
671.55
625.48

354.67
256.79
223.85
208.49

35.47
25.68
22.39
20.85

1.00
1.20
1.20
1.20
1.20

m
957.60
693.32
604.40
562.93

319.20
231.11
201.47
187.64

31.92
23.11
20.15
18.76

B
(m)

Kd

F1

F2

F3

F4

11

1.25

0.05

0.08

0.30

BH 1

1
2
3
4

6
6
6
6

1.33
1.17
1.11
1.08

BH 2

1
2
3
4

5
5
5
5

BH-3

1
2
3
4

qu

BH-4

1
2
3
4

36
36
36
36

Kedalaman Fondasi =
1.33
0.05
0.08
0.30
1.17
0.05
0.08
0.30
1.11
0.05
0.08
0.30
1.08
0.05
0.08
0.30

BH-5

1
2
3
4

5
5
5
5

1.33
1.17
1.11
1.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
133.00
96.29
83.94
78.19

44.33
32.10
27.98
26.06

4.43
3.21
2.80
2.61

BH-6

1
2
3
4

3
3
3
3

1.33
1.17
1.11
1.08

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20
1.20

m
79.80
57.78
50.37
46.91

26.60
19.26
16.79
15.64

2.66
1.93
1.68
1.56

Kedalaman Fondasi =

1.00

BOR

NO.

(m)

BH-7

1
2
3

Kd

F1

F2

F3

F4

4
4
4

1.17
1.08
1.06

0.05
0.05
0.05

0.08
0.08
0.08

0.30
0.30
0.30

1.20
1.20
1.20

qu

qa

(kN/m2)

(kN/m2)

93.20
71.58
63.83

31.07
23.86
21.28

3.11
2.39
2.13

4.0. ALLOWABLE BEARING CAPACITY OF SHALLOW FOUNDATION


BASED ON SHEAR FAILURE

Safety Factor :
BOR
NO.

(kN/m2)

qa
(kN/m2)

qa
(t/m2)

1.20

60.16

20.05

2.01

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

0.50
1.20
1.20
1.20
1.20

m
1165.00
894.75
797.84
752.06

388.33
298.25
265.95
250.69

38.83
29.83
26.59
25.07

1.17
1.08
1.06
1.04

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

0.50
1.20
1.20
1.20
1.20

m
209.70
161.06
143.61
135.37

69.90
53.69
47.87
45.12

6.99
5.37
4.79
4.51

9
9
9
9

1.17
1.08
1.06
1.04

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

0.50
1.20
1.20
1.20
1.20

m
209.70
161.06
143.61
135.37

69.90
53.69
47.87
45.12

6.99
5.37
4.79
4.51

0.50
1.20
1.20
1.20
1.20

m
239.40
197.88
166.07
151.46

79.80
65.96
55.36
50.49

7.98
6.60
5.54
5.05

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

2.00
1.20
1.20
1.20
1.20

m
133.00
109.93
92.26
84.14

44.33
36.64
30.75
28.05

4.43
3.66
3.08
2.80

Kedalaman Fondasi =

2.00

B
(m)

Kd

F1

F2

F3

F4

1.04

0.05

0.08

0.30

BH-8

1
2
3
4

50
50
50
50

1.17
1.08
1.06
1.04

BH-9

1
2
3
4

9
9
9
9

BH-10

1
2
3
4

BH-11

1
2
3
4

9
9
9
9

Kedalaman Fondasi =
1.33
0.05
0.08
0.30
1.33
0.05
0.08
0.30
1.22
0.05
0.08
0.30
1.17
0.05
0.08
0.30

BH-12

1
2
3
4

5
5
5
5

1.33
1.33
1.22
1.17

BOR

NO.

(m)

BH-13

BH-14

qu

qu

qa

(kN/m2)

(kN/m2)

Kd

F1

F2

F3

F4

1
2
3
4

12
12
12
12

1.33
1.17
1.11
1.08

0.05
0.05
0.05
0.05

0.08
0.08
0.08
0.08

0.30
0.30
0.30
0.30

1.20
1.20
1.20
1.20

319.20
231.11
201.47
187.64

106.40
77.04
67.16
62.55

10.64
7.70
6.72
6.25

1
2
3

2
2
2

1.33
1.33
1.33

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

1.00
1.20
1.20
1.20

m
53.20
43.97
40.23

17.73
14.66
13.41

1.77
1.47
1.34

4.0. ALLOWABLE BEARING CAPACITY OF SHALLOW FOUNDATION


BASED ON SHEAR FAILURE

Safety Factor :
BOR
NO.

(kN/m2)

qa
(kN/m2)

qa
(t/m2)

1.20

37.23

12.41

1.24

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

3.50
1.20
1.20
1.20
1.20

m
1165.00
894.75
797.84
752.06

388.33
298.25
265.95
250.69

38.83
29.83
26.59
25.07

1.17
1.08
1.06
1.04

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

0.50
1.20
1.20
1.20
1.20

m
93.20
71.58
63.83
60.16

31.07
23.86
21.28
20.05

3.11
2.39
2.13
2.01

7
7
7
7

1.17
1.08
1.06
1.04

Kedalaman Fondasi =
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30
0.05
0.08
0.30

0.50
1.20
1.20
1.20
1.20

m
163.10
125.27
111.70
105.29

54.37
41.76
37.23
35.10

5.44
4.18
3.72
3.51

3
3
3
3

Kedalaman Fondasi =
1.17
0.05
0.08
0.30
1.06
0.05
0.08
0.30
1.03
0.05
0.08
0.30
1.02
0.05
0.08
0.30

0.50
1.20
1.20
1.20
1.20

m
69.90
47.87
43.53
41.74

23.30
15.96
14.51
13.91

2.33
1.60
1.45
1.39

Kedalaman Fondasi =

0.50

B
(m)

Kd

F1

F2

F3

F4

1.29

0.05

0.08

0.30

BH-19

1
2
3
4

50
50
50
50

1.17
1.08
1.06
1.04

BH-20

1
2
3
4

4
4
4
4

BH-21

1
2
3
4

BH-22

1
3
5
7

qu

5.0. ALLOWABLE BEARING CAPACITY CONSIDERING MAXIMUM SETTLEMENT 1"


(LONG TERM SETTLEMENT AFTER TERZAGHI)
5.1. BOREHOLE BH - 1

Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
3.00
5.00
6.45
8.00
9.65
13.20
16.45
18.45
20.45
23.45
25.00
31.00
35.00
37.00
38.00
39.00

To
1.0
3.0
5.0
6.5
8.0
9.7
13.2
16.5
18.5
20.5
23.5
25.0
31.0
35.0
37.0
38.0
39.0
40.5

Soil Type
Medium Stiff Gravelly Clay
Medium Stiff Clay
Medium Dense Sand
Very Stiff Clay
Very Stiff Silt
Very Stiff Silt
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Medium Dense to Dense Sand
Very Stiff Clay
Very Stiff Organic Clay
Very Stiff Clay
Hard Clay
Very Stiff Silt
Medium Dense to Dense Sand
Very Stiff Clay

ELASTIC SETTLEMENT
Df/B =

1.00

1 m
1 m
54.4 kN
2
54.4 kN/m

OK

1 m

Thick
(m)
1
2
2
1.45
1.55
1.65
3.55
3.25
2
2
3
1.55
6
4
2
1
1
1.45

N'-SPTavr
6
6
18
18
23
17
16
21
28
20
34
15
22
26
51
27
60
27

E
(kN/m2)
6030
6030
21600
24120
30820
22780
21440
28140
33600
26800
40800
20100
29480
34840
68340
36180
72000
36180

m
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3

mavg

0.3

Eavg
(kN/m2)

16557

g'
(kN/m3)
8.3
10
8.2
9.8
7.5
10.1
11.6
10.5
10.2
10.7
11.2
14.7
10.6
11.2
11.4
11.1
12.2
11.1

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
40.02
40.02
120.06
153.41
113.39
106.72
140.07
133.40
100.05
146.74
173.42
340.17
180.09
180.09

(kN/m2)
4.15
18.30
36.50
51.81
64.72
78.87
107.79
145.44
172.71
193.61
221.11
249.30
292.49
346.69
380.49
397.44
409.09
423.24

(kN/m2)

(kN/m2)

13.60
3.40
1.66
1.04
0.70
0.47
0.25
0.18
0.16
0.11
0.09
0.07
0.05
0.04
0.04
0.04
0.03

31.90
39.90
53.46
65.76
79.57
108.26
145.69
172.88
193.77
221.22
249.39
292.56
346.74
380.53
397.48
409.13
423.27

PI

71.80
81.80
52.00
51.80
26.00
19.80
22.00
38.52
46.80
41.80
21.80
41.80
41.80

sc
(kN/m2)
231.00
900.00
1116.00
900.00
519.00
700.00
159.00
1122.00
1200.00
1200.00
1500.00
1200.00
1200.00

OCR

wL

Cc

Cr

12.62
17.37
17.24
11.41
4.81
4.81
0.82
4.50
4.10
3.46
3.94
3.02
2.84

87.78
98.89
86.60
65.56
42.60
30.00
38.00
50.80
60.00
54.44
32.22
54.44
54.44

0.70
0.8000
0.7900
0.50
0.1900
0.1800
0.19
0.4700
0.45
0.4000
0.2000
0.4000
0.4000
Settlement

0.0700
0.0800
0.0790
0.0500
0.0190
0.0180
0.0190
0.0470
0.0450
0.0400
0.0200
0.0400
0.0400

e0
0.58
0.90
1.24
0.90
0.45
0.50
0.55
0.72
0.70
0.60
0.50
0.55
0.55
23.0012

Settlement location :
Thus

H
a
m'
n'

=
=
=
=

center
4.00
4
1
8

From the parameter above we obtain :


Ao

0.75765

A1

0.75765

A2

0.01539

F1

0.48234

F2

0.01959

Is

0.49425

If

from graph

Therefore :

=
Se =

0.65
0.00194 m

ST =

1.943348 mm
24.9446 mm

Sett
(m)
0.0214
0.0008
0.0004
0.0002
0.0001
0.0000
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
mm

5.1. BOREHOLE BH - 1
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
3.00
5.00
6.45
8.00
9.65
13.20
16.45
18.45
20.45
23.45
25.00
31.00
35.00
37.00
38.00
39.00

To
1.0
3.0
5.0
6.5
8.0
9.7
13.2
16.5
18.5
20.5
23.5
25.0
31.0
35.0
37.0
38.0
39.0
40.5

2 m
2 m
114.2 kN
2
28.5 kN/m
1 m

Soil Type
Medium Stiff Gravelly Clay
Medium Stiff Clay
Medium Dense Sand
Very Stiff Clay
Very Stiff Silt
Very Stiff Silt
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Medium Dense to Dense Sand
Very Stiff Clay
Very Stiff Organic Clay
Very Stiff Clay
Hard Clay
Very Stiff Silt
Medium Dense to Dense Sand
Very Stiff Clay

Thick
(m)
1
2
2
1.45
1.55
1.65
3.55
3.25
2
2
3
1.55
6
4
2
1
1
1.45

N'-SPTavr
6
6
18
18
23
17
16
21
28
20
34
15
22
26
51
27
60
27

ELASTIC SETTLEMENT
Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.757655
0.757655

A2 =

0.015386

F1 =

0.482338

F2 =

0.019589

Is =

0.494247

If =

from graph

=
Se =

0.65
0.00204 m

ST =

2.039944 mm
24.9000 mm

E
(kN/m2)
6030
6030
21600
24120
30820
22780
21440
28140
33600
26800
40800
20100
29480
34840
68340
36180
72000
36180

m
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8.3
10
8.2
9.8
7.5
10.1
11.6
10.5
10.2
10.7
11.2
14.7
10.6
11.2
11.4
11.1
12.2
11.1

(kN/m2)
40.02
40.02
120.06
153.41
113.39
106.72
140.07
133.40
100.05
146.74
173.42
340.17
180.09
180.09

(kN/m2)
4.15
18.30
36.50
51.81
64.72
78.87
107.79
145.44
172.71
193.61
221.11
249.30
292.49
346.69
380.49
397.44
409.09
423.24

(kN/m2)

(kN/m2)

12.69
4.57
2.52
1.69
1.18
0.82
0.46
0.34
0.30
0.21
0.18
0.14
0.10
0.08
0.08
0.07
0.07

30.99
41.07
54.33
66.41
80.05
108.61
145.90
173.04
193.91
221.32
249.48
292.63
346.79
380.57
397.52
409.16
423.31

16557

PI
71.80
81.80
52.00
51.80
26.00
19.80
22.00
38.52
46.80
41.80
21.80
41.80
41.80

sc
(kN/m2)
231.00
900.00
1116.00
900.00
519.00
700.00
159.00
1122.00
1200.00
1200.00
1500.00
1200.00
1200.00

OCR

wL

Cc

Cr

12.62
17.37
17.24
11.41
4.81
4.81
0.82
4.50
4.10
3.46
3.94
3.02
2.84

87.78
98.89
86.60
65.56
42.60
30.00
38.00
50.80
60.00
54.44
32.22
54.44
54.44

0.70
0.8000
0.7900
0.50
0.1900
0.1800
0.19
0.4700
0.45
0.4000
0.2000
0.4000
0.4000

0.0700
0.0800
0.0790
0.0500
0.0190
0.0180
0.0190
0.0470
0.0450
0.0400
0.0200
0.0400
0.0400
Settlement

e0
0.58
0.90
1.24
0.90
0.45
0.50
0.55
0.72
0.70
0.60
0.50
0.55
0.55
22.8600

Stt
(m)
0.0203
0.0013
0.0006
0.0003
0.0002
0.0001
0.0002
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
mm

5.1. BOREHOLE BH - 1
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
3.00
5.00
6.45
8.00
9.65
13.20
16.45
18.45
20.45
23.45
25.00
31.00
35.00
37.00
38.00
39.00

To
1.0
3.0
5.0
6.5
8.0
9.7
13.2
16.5
18.5
20.5
23.5
25.0
31.0
35.0
37.0
38.0
39.0
40.5

5 m
5 m
380.2 kN
2
15.2 kN/m

Soil Type
Medium Stiff Gravelly Clay
Medium Stiff Clay
Medium Dense Sand
Very Stiff Clay
Very Stiff Silt
Very Stiff Silt
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Medium Dense to Dense Sand
Very Stiff Clay
Very Stiff Organic Clay
Very Stiff Clay
Hard Clay
Very Stiff Silt
Medium Dense to Dense Sand
Very Stiff Clay

Thick
(m)
1
2
2
1.45
1.55
1.65
3.55
3.25
2
2
3
1.55
6
4
2
1
1
1.45

N'-SPTavr
6
6
18
18
23
17
16
21
28
20
34
15
22
26
51
27
60
27

ELASTIC SETTLEMENT
Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

1 m

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.49424652
from graph

Se =

0.65
0.00271697 m

ST =

2.71696927 mm
24.9000 mm

E
2

(kN/m )
6030
6030
21600
24120
30820
22780
21440
28140
33600
26800
40800
20100
29480
34840
68340
36180
72000
36180

m
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3

mavg

0.3

Eavg
2

(kN/m )

16557

g'

s'v

cu
3

(kN/m )
8.3
10
8.2
9.8
7.5
10.1
11.6
10.5
10.2
10.7
11.2
14.7
10.6
11.2
11.4
11.1
12.2
11.1

(kN/m )
40.02
40.02
120.06
153.41
113.39
106.72
140.07
133.40
100.05
146.74
173.42
340.17
180.09
180.09

Ds
2

(kN/m )
4.15
18.30
36.50
51.81
64.72
78.87
107.79
145.44
172.71
193.61
221.11
249.30
292.49
346.69
380.49
397.44
409.09
423.24

s1=s'v+Ds
2

(kN/m )

(kN/m )

10.56
5.94
4.02
3.02
2.31
1.74
1.07
0.83
0.76
0.55
0.48
0.37
0.28
0.24
0.22
0.21
0.20

28.86
42.44
55.83
67.74
81.18
109.53
146.52
173.53
194.36
221.66
249.77
292.86
346.97
380.73
397.66
409.30
423.44

PI
71.80
81.80
52.00
51.80
26.00
19.80
22.00
38.52
46.80
41.80
21.80
41.80
41.80

sc
2

(kN/m )
231.00
900.00
1116.00
900.00
519.00
700.00
159.00
1122.00
1200.00
1200.00
1500.00
1200.00
1200.00

OCR

wL

Cc

12.62
17.37
17.24
11.41
4.81
4.81
0.82
4.50
4.10
3.46
3.94
3.02
2.84

87.78
98.89
86.60
65.56
42.60
30.00
38.00
50.80
60.00
54.44
32.22
54.44
54.44

0.70
0.8000
0.7900
0.50
0.1900
0.1800
0.19
0.4700
0.45
0.4000
0.2000
0.4000
0.4000

Cr
0.0700
0.0800
0.0790
0.0500
0.0190
0.0180
0.0190
0.0470
0.0450
0.0400
0.0200
0.0400
0.0400
Settlement

e0

Stt
(m)

0.58
0.0175
0.90
0.0020
1.24
0.0011
0.90
0.0005
0.45
0.0003
0.50
0.0001
0.55
0.0004
0.72
0.0000
0.70
0.0001
0.60
0.0000
0.50
0.0000
0.55
0.0000
0.55
0.0000
22.1830 mm

5.2. BOREHOLE BH - 2
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-02
Depth (m)
From
0.00
1.00
4.00
5.00
7.35
12.00
19.50
22.50
25.25
30.95
33.00

To
1.0
4.0
5.0
7.4
12.0
19.5
22.5
25.3
31.0
33.0
40.5

2.9 m
2.9 m
170.0 kN
2
20.2 kN/m

Soil Type
Soft Clay
Soft Clay
Medium Dense Sand
Stiff Clay
Stiff Silt
Stiff Silt
Hard Organic Clay
Very Stiff Clay
Very Stiff Clay
Dense Sand
Dense Sand

Thick
(m)
1
3
1
2.35
4.65
7.5
3
2.75
5.7
2.05
7.45

N'-SPTavr
4
4
16
12
14
13
34
22
21
36
38

ELASTIC SETTLEMENT
Df/B =

0.34

Settlement location :
Thus

H
a
m'
n'

=
=

center
11.60
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.7576547
0.7576547

A2 =

0.0153864

Therefore :

OK
2.06125707

1 m

F1 =

0.482338

F2 =

0.0195891

Is =

0.4928877

If =

from graph

Se =

0.65
0.00311 m

ST =

3.1099516 mm
24.8407 mm

E
2

(kN/m )
4020
4020
19200
16080
18760
17420
45560
29480
28140
43200
45600

m
0.35
0.35
0.25
0.3
0.3
0.3
0.25
0.3
0.3
0.25
0.25

mavg

0.3

Eavg
2

(kN/m )

10874

g'

s'v

cu
3

(kN/m )
8.3
8.3
10.2
8.6
8.7
8.6
11.4
10.6
11.2
11.6
11.7

(kN/m )
26.68
26.68
80.04
93.38
86.71
226.78
146.74
140.07
-

Ds
2

(kN/m )
4.15
20.75
13.40
28.61
58.94
111.42
160.77
192.44
238.94
282.75
363.12

s1=s'v+Ds
2

(kN/m )

(kN/m )

8.78
4.15
2.61
1.27
0.55
0.52
0.26
0.19
0.18
0.11

29.53
17.55
31.21
60.21
111.96
161.28
192.70
239.12
282.93
363.22

PI
71.80
45.45
51.80
48.87
15.66
28.44
26.80
-

sc
2

(kN/m )
71.02
287.74
309.55
298.16
1350.35
681.79
669.68
-

OCR

wL

3.42
10.06
5.25
2.68
8.40
3.54
2.80
-

87.78
58.50
65.56
62.30
25.40
39.60
37.78
-

Cc
0.7000
0.4000
0.5000
0.6400
0.3000
0.2664
0.2500
Settlement

Cr
0.0700
0.0400
0.0500
0.0640
0.0300
0.0266
0.0250
-

e0

Stt
(m)

0.80
0.0178803
0.73
0.0020583
1.20
0.0009776
0.51
0.0006745
0.55
0.0000813
0.62
0.0000261
0.50
0.0000326
21.7308 mm

5.2. BOREHOLE BH - 2
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-02
Depth (m)
From
0.00
1.00
4.00
5.00
7.35
12.00
19.50
22.50
25.25
30.95
33.00

To
1.0
4.0
5.0
7.4
12.0
19.5
22.5
25.3
31.0
33.0
40.5

2 m
2 m
113.8 kN
2
28.5 kN/m

Soil Type
Soft Clay
Soft Clay
Medium Dense Sand
Stiff Clay
Stiff Silt
Stiff Silt
Hard Organic Clay
Very Stiff Clay
Very Stiff Clay
Dense Sand
Dense Sand

Thick
(m)
1
3
1
2.35
4.65
7.5
3
2.75
5.7
2.05
7.45

N'-SPTavr
4
4
16
12
14
13
34
22
21
36
38

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

From the parameter above we obtain :


Ao =
A1 =

Therefore :

OK

1 m

center
8.00
4
1
8

0.757655
0.757655

A2 =

0.015386

F1 =

0.482338

F2 =

0.019589

Is =

0.492888

If =

from graph

=
Se =

0.65
0.003019 m

ST =

3.019082 mm
24.8994 mm

E
(kN/m2)
4020
4020
19200
16080
18760
17420
45560
29480
28140
43200
45600

m
0.35
0.35
0.25
0.3
0.3
0.3
0.25
0.3
0.3
0.25
0.25

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8.3
8.3
10.2
8.6
8.7
8.6
11.4
10.6
11.2
11.6
11.7

(kN/m2)
26.68
26.68
80.04
93.38
86.71
226.78
146.74
140.07
-

(kN/m2)
4.15
20.75
13.40
28.61
58.94
111.42
160.77
192.44
238.94
282.75
363.12

(kN/m2)

(kN/m2)

9.29
3.76
2.21
1.00
0.41
0.39
0.18
0.13
0.13
0.07

30.04
17.16
30.82
59.94
111.82
161.15
192.62
239.07
282.87
363.19

10874

PI

71.80
45.45
51.80
48.87
15.66
28.44
26.80
-

sc
(kN/m2)
71.02
287.74
309.55
298.16
1350.35
681.79
669.68
-

OCR

wL

Cc

Cr

3.42
10.06
5.25
2.68
8.40
3.54
2.80
-

87.78
58.50
65.56
62.30
25.40
39.60
37.78
-

0.7000
0.4000
0.5000
0.6400
0.3000
0.2664
0.2500
Settlement

0.0700
0.0400
0.0500
0.0640
0.0300
0.0266
0.0250
-

e0

Stt
(m)

0.80
0.0187480
0.73
0.0017568
1.20
0.0007713
0.51
0.0005018
0.55
0.0000605
0.62
0.0000188
0.50
0.0000232
21.8803 mm

5.2. BOREHOLE BH - 2
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-02
Depth (m)
From
0.00
1.00
4.00
5.00
7.35
12.00
19.50
22.50
25.25
30.95
33.00

To
1.0
4.0
5.0
7.4
12.0
19.5
22.5
25.3
31.0
33.0
40.5

5 m
5 m
331.4 kN
2
13.3 kN/m

Soil Type
Soft Clay
Soft Clay
Medium Dense Sand
Stiff Clay
Stiff Silt
Stiff Silt
Hard Organic Clay
Very Stiff Clay
Very Stiff Clay
Dense Sand
Dense Sand

Thick
(m)
1
3
1
2.35
4.65
7.5
3
2.75
5.7
2.05
7.45

N'-SPTavr
4
4
16
12
14
13
34
22
21
36
38

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

From the parameter above we obtain :


Ao =
A1 =

Therefore :

OK

1 m

center
20.00
4
1
8

0.757655
0.757655

A2 =

0.015386

F1 =

0.482338

F2 =

0.019589

Is =

0.492888

If =

from graph

=
Se =

0.65
0.003516 m

ST =

3.516372 mm
24.9000 mm

E
(kN/m2)
4020
4020
19200
16080
18760
17420
45560
29480
28140
43200
45600

m
0.35
0.35
0.25
0.3
0.3
0.3
0.25
0.3
0.3
0.25
0.25

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8.3
8.3
10.2
8.6
8.7
8.6
11.4
10.6
11.2
11.6
11.7

(kN/m2)
26.68
26.68
80.04
93.38
86.71
226.78
146.74
140.07
-

(kN/m2)
4.15
20.75
13.40
28.61
58.94
111.42
160.77
192.44
238.94
282.75
363.12

(kN/m2)

(kN/m2)

7.84
4.59
3.20
1.77
0.85
0.81
0.43
0.32
0.31
0.19

28.59
17.99
31.81
60.71
112.26
161.57
192.87
239.26
283.06
363.30

10874

PI

71.80
45.45
51.80
48.87
15.66
28.44
26.80
-

sc
(kN/m2)
71.02
287.74
309.55
298.16
1350.35
681.79
669.68
-

OCR

wL

Cc

Cr

3.42
10.06
5.25
2.68
8.40
3.54
2.80
-

87.78
58.50
65.56
62.30
25.40
39.60
37.78
-

0.7000
0.4000
0.5000
0.6400
0.3000
0.2664
0.2500
Settlement

0.0700
0.0400
0.0500
0.0640
0.0300
0.0266
0.0250
-

e0

Sett
(m)

0.80
0.0162466
0.73
0.0025031
1.20
0.0013597
0.51
0.0010488
0.55
0.0001265
0.62
0.0000435
0.50
0.0000555
21.3836 mm

5.3. BOREHOLE BH - 3
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-03
Depth (m)
From
0.00
1.00
2.00
3.00
8.00
11.00
13.50
17.00
20.45
22.00
25.00
33.00
35.70
37.45

To
1.0
2.0
3.0
8.0
11.0
13.5
17.0
20.5
22.0
25.0
33.0
35.7
37.5
40.5

1 m
1 m
35.6 kN
2
35.6 kN/m
1 m

Soil Type
Hard Clay
Hard Clay
Very Loose Sand
Very Soft Clay
Very Stiff Organic Clay
Stiff Clay
Very Stiff Clay
Very Stiff Organic Clay
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Dense Sand

Thick
(m)
1
1
1
5.00
3.00
2.5
3.5
3.45
1.55
3
8
2.7
1.75
3

N'-SPTavr
40
40
4
3
24
10
21
22
17
28
28
36
27
37

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.757655
0.757655

A2 =

0.015386

F1 =

0.482338

F2 =

0.019589

Therefore :

OK

Is =

0.491379

If =

from graph

=
Se =

0.68
0.001986 m

ST =

1.986187 mm
24.8593 mm

E
(kN/m2)
53600
53600
4800
3015
32160
13400
28140
29480
22780
37520
37520
43200
36180
44400

m
0.25
0.25
0.2
0.4
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.25
0.35
0.25

mavg

0.4

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
11.7
11.7
5.2
5.9
10.6
8.3
10.1
10.3
9.8
10.8
10.8
12.2
10.7
12.2

(kN/m2)
266.80
266.80
20.01
160.08
66.70
140.07
146.74
113.39
186.76
186.76
180.09
-

(kN/m2)
5.85
17.55
26.00
43.35
74.00
100.28
128.33
163.77
189.13
212.93
272.33
332.00
357.83
385.49

(kN/m2)

(kN/m2)

15.80
5.69
1.18
0.39
0.24
0.19
0.10
0.08
0.07
0.04
0.03
0.03
0.02

33.35
31.69
44.53
74.39
100.51
128.51
163.87
189.21
212.99
272.36
332.03
357.85
385.51

10496

PI

21.80
101.00
70.74
29.00
25.00
31.80
33.80
22.00
26.80
26.80
-

sc
(kN/m2)
1399.35
41.37
430.63
306.95
691.70
644.56
482.39
975.76
892.90
861.02
-

OCR

wL

79.74
0.95
5.82
3.06
5.39
3.94
2.55
4.58
3.28
2.41
-

32.22
163.33
86.60
46.67
42.60
43.33
45.56
38.00
37.78
50.80
37.78
-

Cc

0.20
1.3800
0.3000
0.33
0.3000
0.3000
0.32
0.25
0.2500
0.25
Settlement

Cr

0.0200
0.1380
0.0300
0.0330
0.0300
0.0300
0.0320
0.0250
0.0250
0.0250
-

e0

Stt
(m)

0.40
0.0040
3.32
0.0186
0.00
0.0002
0.63
0.0001
0.73
0.0000
0.70
0.0000
0.75
0.0000
0.68
0.0000
0.60
0.0000
0.50
0.0000
22.8731 mm

5.3. BOREHOLE BH - 3
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-03
Depth (m)
From
0.00
1.00
2.00
3.00
8.00
11.00
13.50
17.00
20.45
22.00
25.00
33.00
35.70
37.45

To
1.0
2.0
3.0
8.0
11.0
13.5
17.0
20.5
22.0
25.0
33.0
35.7
37.5
40.5

2 m
2 m
54.7 kN
2
13.7 kN/m

Soil Type
Hard Clay
Hard Clay
Very Loose Sand
Very Soft Clay
Very Stiff Organic Clay
Stiff Clay
Very Stiff Clay
Very Stiff Organic Clay
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Dense Sand

Thick
(m)
1
1
1
5.00
3.00
2.5
3.5
3.45
1.55
3
8
2.7
1.75
3

N'-SPTavr
40
40
4
3
24
10
21
22
17
28
28
36
27
37

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

1 m

Is =
If =
=

0.49137908
from graph

Se =

0.68
0.00152901 m

ST =

1.52901315 mm
24.8999 mm

E
2

(kN/m )
53600
53600
4800
3015
32160
13400
28140
29480
22780
37520
37520
43200
36180
44400

m
0.25
0.25
0.2
0.4
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.25
0.35
0.25

mavg

0.4

Eavg
2

(kN/m )

10496

g'

s'v

cu
3

(kN/m )
11.7
11.7
5.2
5.9
10.6
8.3
10.1
10.3
9.8
10.8
10.8
12.2
10.7
12.2

(kN/m )
266.80
266.80
20.01
160.08
66.70
140.07
146.74
113.39
186.76
186.76
180.09
-

Ds
2

(kN/m )
5.85
17.55
26.00
43.35
74.00
100.28
128.33
163.77
189.13
212.93
272.33
332.00
357.83
385.49

s1=s'v+Ds
2

(kN/m )

(kN/m )

8.76
4.47
1.30
0.50
0.31
0.25
0.14
0.11
0.10
0.06
0.04
0.04
0.03

26.31
30.47
44.65
74.50
100.59
128.58
163.91
189.24
213.02
272.38
332.04
357.87
385.52

PI
21.80
101.00
70.74
29.00
25.00
31.80
33.80
22.00
26.80
26.80
-

sc
2

(kN/m )
1399.35
41.37
430.63
306.95
691.70
644.56
482.39
975.76
892.90
861.02
-

OCR

wL

79.74
0.95
5.82
3.06
5.39
3.94
2.55
4.58
3.28
2.41
-

32.22
163.33
86.60
46.67
42.60
43.33
45.56
38.00
37.78
50.80
37.78
-

Cc
0.20
1.3800
0.3000
0.33
0.3000
0.3000
0.32
0.25
0.2500
0.25
Settlement

Cr
0.0200
0.1380
0.0300
0.0330
0.0300
0.0300
0.0320
0.0250
0.0250
0.0250
-

e0

Stt
(m)

0.40
0.0025
3.32
0.0204
0.00
0.0003
0.63
0.0001
0.73
0.0001
0.70
0.0000
0.75
0.0000
0.68
0.0000
0.60
0.0000
0.50
0.0000
23.3709 mm

5.3. BOREHOLE BH - 3
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-03
Depth (m)
From
0.00
1.00
2.00
3.00
8.00
11.00
13.50
17.00
20.45
22.00
25.00
33.00
35.70
37.45

To
1.0
2.0
3.0
8.0
11.0
13.5
17.0
20.5
22.0
25.0
33.0
35.7
37.5
40.5

5 m
5 m
123.7 kN
2
4.9 kN/m
1 m

Soil Type
Hard Clay
Hard Clay
Very Loose Sand
Very Soft Clay
Very Stiff Organic Clay
Stiff Clay
Very Stiff Clay
Very Stiff Organic Clay
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Dense Sand

Thick
(m)
1
1
1
5.00
3.00
2.5
3.5
3.45
1.55
3
8
2.7
1.75
3

N'-SPTavr
40
40
4
3
24
10
21
22
17
28
28
36
27
37

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.49137908
from graph

Se =

0.68
0.0013819 m

ST =

1.38190088 mm
24.8998 mm

E
(kN/m2)
53600
53600
4800
3015
32160
13400
28140
29480
22780
37520
37520
43200
36180
44400

m
0.25
0.25
0.2
0.4
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.25
0.35
0.25

mavg

0.4

Eavg
(kN/m2)

10496

g'
(kN/m3)
11.7
11.7
5.2
5.9
10.6
8.3
10.1
10.3
9.8
10.8
10.8
12.2
10.7
12.2

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
266.80
266.80
20.01
160.08
66.70
140.07
146.74
113.39
186.76
186.76
180.09
-

(kN/m2)
5.85
17.55
26.00
43.35
74.00
100.28
128.33
163.77
189.13
212.93
272.33
332.00
357.83
385.49

(kN/m2)

(kN/m2)

4.09
2.93
1.37
0.68
0.47
0.39
0.24
0.19
0.17
0.11
0.08
0.08
0.07

21.64
28.93
44.72
74.68
100.74
128.72
164.01
189.32
213.10
272.43
332.08
357.90
385.56

PI

21.80
101.00
70.74
29.00
25.00
31.80
33.80
22.00
26.80
26.80
-

sc
(kN/m2)
1399.35
41.37
430.63
306.95
691.70
644.56
482.39
975.76
892.90
861.02
-

OCR

wL

Cc

Cr

79.74
0.95
5.82
3.06
5.39
3.94
2.55
4.58
3.28
2.41
-

32.22
163.33
86.60
46.67
42.60
43.33
45.56
38.00
37.78
50.80
37.78
-

0.20
1.3800
0.3000
0.33
0.3000
0.3000
0.32
0.25
0.2500
0.25
Settlement

0.0200
0.1380
0.0300
0.0330
0.0300
0.0300
0.0320
0.0250
0.0250
0.0250
-

e0
0.40
3.32
0.00
0.63
0.73
0.70
0.75
0.68
0.60
0.50
23.5179

Stt
(m)
0.0013
0.0216
0.0004
0.0001
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
mm

5.4. BOREHOLE BH - 4
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-04
Depth (m)
From
0.00
1.00
2.95
9.00
11.45
19.00
22.50
24.00
24.95
27.00
38.00

To
1.0
3.0
9.0
11.5
19.0
22.5
24.0
25.0
27.0
38.0
40.5

1 m
1 m
105.5 kN
2
105.5 kN/m

Soil Type
Very Stiff to Hard Clay
Gravelly Sand
Very Soft Organic Clay
Medium Stiff Clay
Stiff to Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Hard Organic Clay
Very Stiff Clay
Hard Organic Clay

Thick
(m)
1
1.95
6.05
2.45
7.55
3.5
1.5
0.95
2.05
11
2.45

N'-SPTavr
36
53
2
5
14
17
27
17
80
22
80

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.7576547
0.7576547

A2 =

0.0153864

Therefore :

OK

1 m

F1 =

0.482338

F2 =

0.0195891

Is =

0.4914455

If =

from graph

=
Se =
ST =

0.65
0.0041662 m
4.166163 mm
24.6436 mm

E
2

(kN/m )
48240
63600
2010
5025
18760
22780
36180
22780
107200
29480
107200

m
0.25
0.25
0.4
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
2

(kN/m )

14210

g'

s'v

cu
3

(kN/m )
11.4
12.2
7.5
8.3
9
9
10.6
9
11.4
9.8
11.4

(kN/m )
240.12
13.34
33.35
93.38
113.39
180.09
113.39
533.60
146.74
533.60

Ds
2

(kN/m )
5.70
23.30
57.88
90.73
134.88
184.60
208.30
220.53
236.49
302.07
369.94

s1=s'v+Ds
2

(kN/m )

(kN/m )

27.04
2.95
1.01
0.46
0.24
0.23
0.18
0.16
0.11
0.08

50.34
60.83
91.74
135.33
184.84
208.53
220.70
236.64
302.18
370.01

PI
47.00
62.00
26.00
25.00
16.80
23.00
11.80
36.00
11.80

sc
2

(kN/m )
31.00
526.00
348.00
592.00
1046.06
582.00
3472.60
426.00
3472.60

OCR

wL

0.54
5.80
2.58
3.21
5.02
2.64
14.68
1.41
9.39

87.80
97.80
46.00
45.00
26.67
43.20
21.11
57.80
21.11

Cc
0.39
1.1800
0.2600
0.24
0.1500
0.1900
0.10
0.27
0.1000
Settlement

Cr
0.0390
0.1180
0.0260
0.0240
0.0150
0.0190
0.0100
0.0270
0.0100

e0

Stt
(m)

1.59
0.0197
1.63
0.0005
0.62
0.0002
0.60
0.0000
0.60
0.0000
0.59
0.0000
0.40
0.0000
0.67
0.0000
0.30
0.0000
20.4775 mm

5.4. BOREHOLE BH - 4
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-04
Depth (m)
From
0.00
1.00
2.95
9.00
11.45
19.00
22.50
24.00
24.95
27.00
38.00

To
1.0
3.0
9.0
11.5
19.0
22.5
24.0
25.0
27.0
38.0
40.5

2 m
2 m
152.9 kN
2
38.2 kN/m

Soil Type
Very Stiff to Hard Clay
Gravelly Sand
Very Soft Organic Clay
Medium Stiff Clay
Stiff to Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Hard Organic Clay
Very Stiff Clay
Hard Organic Clay

Thick
(m)
1
1.95
6.05
2.45
7.55
3.5
1.5
0.95
2.05
11
2.45

N'-SPTavr
36
53
2
5
14
17
27
17
80
22
80

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.7576547
0.7576547

A2 =

0.0153864

Therefore :

OK

1 m

F1 =

0.482338

F2 =

0.0195891

Is =

0.4914455

If =

from graph

=
Se =
ST =

0.65
0.0030196 m
3.019578 mm
24.9000 mm

E
2

(kN/m )
48240
63600
2010
5025
18760
22780
36180
22780
107200
29480
107200

m
0.25
0.25
0.4
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
2

(kN/m )

14210

g'

s'v

cu
3

(kN/m )
11.4
12.2
7.5
8.3
9
9
10.6
9
11.4
9.8
11.4

(kN/m )
240.12
13.34
33.35
93.38
113.39
180.09
113.39
533.60
146.74
533.60

Ds
2

(kN/m )
5.70
23.30
57.88
90.73
134.88
184.60
208.30
220.53
236.49
302.07
369.94

s1=s'v+Ds
2

(kN/m )

(kN/m )

17.28
3.14
1.21
0.58
0.32
0.31
0.24
0.21
0.15
0.11

40.57
61.02
91.95
135.46
184.92
208.61
220.76
236.70
302.22
370.04

PI
47.00
62.00
26.00
25.00
16.80
23.00
11.80
36.00
11.80

sc
2

(kN/m )
31.00
526.00
348.00
592.00
1046.06
582.00
3472.60
426.00
3472.60

OCR

wL

0.54
5.80
2.58
3.21
5.02
2.64
14.68
1.41
9.39

87.80
97.80
46.00
45.00
26.67
43.20
21.11
57.80
21.11

Cc
0.39
1.1800
0.2600
0.24
0.1500
0.1900
0.10
0.27
0.1000
Settlement

Cr
0.0390
0.1180
0.0260
0.0240
0.0150
0.0190
0.0100
0.0270
0.0100

e0

Stt
(m)

1.59
0.0209
1.63
0.0006
0.62
0.0002
0.60
0.0000
0.60
0.0000
0.59
0.0000
0.40
0.0000
0.67
0.0000
0.30
0.0000
21.8804 mm

5.4. BOREHOLE BH - 4
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-04
Depth (m)
From
0.00
1.00
2.95
9.00
11.45
19.00
22.50
24.00
24.95
27.00
38.00

To
1.0
3.0
9.0
11.5
19.0
22.5
24.0
25.0
27.0
38.0
40.5

5 m
5 m
315.4 kN
2
12.6 kN/m

Soil Type
Very Stiff to Hard Clay
Gravelly Sand
Very Soft Organic Clay
Medium Stiff Clay
Stiff to Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Hard Organic Clay
Very Stiff Clay
Hard Organic Clay

Thick
(m)
1
1.95
6.05
2.45
7.55
3.5
1.5
0.95
2.05
11
2.45

N'-SPTavr
36
53
2
5
14
17
27
17
80
22
80

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.757655
0.757655

A2 =

0.015386

F1 =

0.482338

F2 =

0.019589

Therefore :

OK

1 m

Is =

0.491445

If =

from graph

=
Se =

0.65
0.002492 m

ST =

2.491809 mm
24.8999 mm

E
(kN/m2)
48240
63600
2010
5025
18760
22780
36180
22780
107200
29480
107200

m
0.25
0.25
0.4
0.3
0.3
0.3
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
11.4
12.2
7.5
8.3
9
9
10.6
9
11.4
9.8
11.4

(kN/m2)
240.12
13.34
33.35
93.38
113.39
180.09
113.39
533.60
146.74
533.60

(kN/m2)
5.70
23.30
57.88
90.73
134.88
184.60
208.30
220.53
236.49
302.07
369.94

(kN/m2)

(kN/m2)

8.84
3.17
1.56
0.85
0.51
0.49
0.39
0.35
0.25
0.19

32.13
61.05
92.29
135.73
185.11
208.79
220.91
236.84
302.32
370.12

14210

PI

47.00
62.00
26.00
25.00
16.80
23.00
11.80
36.00
11.80

sc
(kN/m2)
31.00
526.00
348.00
592.00
1046.06
582.00
3472.60
426.00
3472.60

OCR

wL

Cc

Cr

0.54
5.80
2.58
3.21
5.02
2.64
14.68
1.41
9.39

87.80
97.80
46.00
45.00
26.67
43.20
21.11
57.80
21.11

0.39
1.1800
0.2600
0.24
0.1500
0.1900
0.10
0.27
0.1000
Settlement

0.0390
0.1180
0.0260
0.0240
0.0150
0.0190
0.0100
0.0270
0.0100

e0

Stt
(m)

1.59
0.0211
1.63
0.0008
0.62
0.0003
0.60
0.0001
0.60
0.0000
0.59
0.0000
0.40
0.0000
0.67
0.0001
0.30
0.0000
22.4081 mm

5.5. BOREHOLE BH - 5
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-05
Depth (m)
From
0.00
1.00
2.00
7.00
7.95
9.45
12.00
16.95
21.50
23.00
33.95

To
1.0
2.0
7.0
8.0
9.5
12.0
17.0
21.5
23.0
34.0
40.5

1 m
1 m
305.2 kN
2
305.2 kN/m
1 m

Soil Type
Soft Clay
Loose Sand
Stiff Clay
Hard Cemented Clay
Very Stiff Clay
Hard Cemented Clay
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Hard Organic Clay

Thick
(m)
1
1
5.00
0.95
1.5
2.55
4.95
4.55
1.5
10.95
6.5

N'-SPTavr
5
5
13
32
19
37
15
17
24
21
32

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.7576547
0.7576547

A2 =

0.0153864

Therefore :

OK

F1 =

0.482338

F2 =

0.0195891

Is =

0.4940677

If =

from graph

Se =

0.65
0.0093439 m

ST =

9.3439054 mm
24.8999 mm

E
(kN/m2)
5025
6000
17420
42880
25460
49580
20100
22780
28800
28140
42880

m
0.35
0.3
0.3
0.2
0.3
0.25
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

19257

g'
(kN/m3)
7.5
6.2
8.7
10.6
9
11.1
8.9
9
10.2
9.5
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
33.35
86.71
213.44
126.73
100.05
113.39
140.07
213.44

(kN/m2)
3.75
10.60
35.45
62.24
74.02
94.92
131.10
173.61
201.73
261.39
347.86

(kN/m2)

(kN/m2)

135.63
15.07
5.46
4.03
2.65
1.85
0.83
0.62
0.37
0.23

146.23
50.52
67.70
78.05
97.58
132.95
174.43
202.35
261.76
348.09

PI
34.00
16.80
21.80
14.80
23.00
65.80
46.80
21.80

sc
(kN/m2)
367.73
1239.78
664.69
512.81
320.80
494.67
1119.48

OCR

wL

10.37
19.92
8.98
3.91
1.85
1.89
3.22

41.11
26.67
32.22
24.44
54.44
81.11
60.00
32.22

Cc
0.2800
0.1500
0.2000
0.1300
0.4000
0.6400
0.4500
0.2000
Settlement

Cr
0.0280
0.0150
0.0200
0.0130
0.0400
0.0640
0.0450
0.0200

e0

Stt
(m)

0.63
0.0132
0.40
0.0004
0.50
0.0005
0.45
0.0003
0.59
0.0008
1.21
0.0003
0.70
0.0002
0.40
0.0000
15.5560 mm

5.5. BOREHOLE BH - 5
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-05
Depth (m)
From
0.00
1.00
2.00
7.00
7.95
9.45
12.00
16.95
21.50
23.00
33.95

To
1.0
2.0
7.0
8.0
9.5
12.0
17.0
21.5
23.0
34.0
40.5

2 m
2 m
494.3 kN
2
123.6 kN/m
1 m

Soil Type
Soft Clay
Loose Sand
Stiff Clay
Hard Cemented Clay
Very Stiff Clay
Hard Cemented Clay
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Hard Organic Clay

Thick
(m)
1
1
5.00
0.95
1.5
2.55
4.95
4.55
1.5
10.95
6.5

N'-SPTavr
5
5
13
32
19
37
15
17
24
21
32

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.49406772
from graph

Se =

0.65
0.00756797 m

ST =

7.56796967 mm
24.9000 mm

E
(kN/m2)
5025
6000
17420
42880
25460
49580
20100
22780
28800
28140
42880

m
0.35
0.3
0.3
0.2
0.3
0.25
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

19257

g'
(kN/m3)
7.5
6.2
8.7
10.6
9
11.1
8.9
9
10.2
9.5
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
33.35
86.71
213.44
126.73
100.05
113.39
140.07
213.44

(kN/m2)
3.75
10.60
35.45
62.24
74.02
94.92
131.10
173.61
201.73
261.39
347.86

(kN/m2)

(kN/m2)

79.09
16.34
6.88
5.25
3.60
2.58
1.21
0.91
0.56
0.36

89.69
51.79
69.12
79.27
98.52
133.68
174.81
202.64
261.96
348.21

PI

34.00
16.80
21.80
14.80
23.00
65.80
46.80
21.80

sc
(kN/m2)
367.73
1239.78
664.69
512.81
320.80
494.67
1119.48

OCR

wL

Cc

Cr

10.37
19.92
8.98
3.91
1.85
1.89
3.22

41.11
26.67
32.22
24.44
54.44
81.11
60.00
32.22

0.2800
0.1500
0.2000
0.1300
0.4000
0.6400
0.4500
0.2000
Settlement

0.0280
0.0150
0.0200
0.0130
0.0400
0.0640
0.0450
0.0200

e0

Stt
(m)

0.63
0.0141
0.40
0.0005
0.50
0.0006
0.45
0.0004
0.59
0.0011
1.21
0.0004
0.70
0.0003
0.40
0.0000
17.3320 mm

5.5. BOREHOLE BH - 5
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-05
Depth (m)
From
0.00
1.00
2.00
7.00
7.95
9.45
12.00
16.95
21.50
23.00
33.95

To
1.0
2.0
7.0
8.0
9.5
12.0
17.0
21.5
23.0
34.0
40.5

5 m
5 m
1108.8 kN
2
44.4 kN/m
1 m

Soil Type
Soft Clay
Loose Sand
Stiff Clay
Hard Cemented Clay
Very Stiff Clay
Hard Cemented Clay
Very Stiff Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Hard Organic Clay

Thick
(m)
1
1
5.00
0.95
1.5
2.55
4.95
4.55
1.5
10.95
6.5

N'-SPTavr
5
5
13
32
19
37
15
17
24
21
32

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.49406772
from graph

Se =

0.65
0.00679006 m

ST =

6.79006125 mm
24.9000 mm

E
(kN/m2)
5025
6000
17420
42880
25460
49580
20100
22780
28800
28140
42880

m
0.35
0.3
0.3
0.2
0.3
0.25
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

19257

g'
(kN/m3)
7.5
6.2
8.7
10.6
9
11.1
8.9
9
10.2
9.5
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
33.35
86.71
213.44
126.73
100.05
113.39
140.07
213.44

(kN/m2)
3.75
10.60
35.45
62.24
74.02
94.92
131.10
173.61
201.73
261.39
347.86

(kN/m2)

(kN/m2)

36.65
15.35
8.42
6.87
5.11
3.90
2.06
1.61
1.04
0.69

47.25
50.80
70.66
80.89
100.04
135.00
175.66
203.34
262.43
348.55

PI

34.00
16.80
21.80
14.80
23.00
65.80
46.80
21.80

sc
(kN/m2)
367.73
1239.78
664.69
512.81
320.80
494.67
1119.48

OCR

wL

Cc

Cr

10.37
19.92
8.98
3.91
1.85
1.89
3.22

41.11
26.67
32.22
24.44
54.44
81.11
60.00
32.22

0.2800
0.1500
0.2000
0.1300
0.4000
0.6400
0.4500
0.2000
Settlement

0.0280
0.0150
0.0200
0.0130
0.0400
0.0640
0.0450
0.0200

e0

Stt
(m)

0.63
0.0134
0.40
0.0006
0.50
0.0008
0.45
0.0005
0.59
0.0016
1.21
0.0007
0.70
0.0005
0.40
0.0001
18.1099 mm

5.6. BOREHOLE BH - 6
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-06
Depth (m)
From
0.00
1.00
2.10
5.00
6.15
10.20
13.20
16.00
20.00
21.20
24.20
38.00

To
1.0
2.1
5.0
6.2
10.2
13.2
16.0
20.0
21.2
24.2
38.0
40.5

1 m
1 m
105.7 kN
2
105.7 kN/m
1 m

Soil Type
Very Soft Clay
Very Soft Clay
Dense Sand
Very Soft Clay
Very Soft Clay
Soft Clay
Soft Clay
Medium Stiff Clay
Stiff Clay
Hard Clay
Very Stiff Clay
Hard Clay

Thick
(m)
1
1.1
2.9
1.15
4.05
3
2.8
4
1.2
3
13.8
2.45

N'-SPTavr
3
3
31
2
3
4
4
6
18
35
25
36

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.757655
0.757655

A2 =

0.015386

F1 =

0.482338

F2 =

0.019589

Is =

0.492897

If =

from graph

=
Se =

0.65
0.002766 m

ST =

2.765985 mm
24.8800 mm

E
(kN/m2)
3015
3015
37200
2010
3015
4020
4020
8040
24120
46900
33500
48240

m
0.4
0.4
0.25
0.4
0.4
0.35
0.35
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

22040

g'
(kN/m3)
7.5
7.5
11.2
6.7
7.5
9
9
8.3
9.8
12.2
10.6
12.2

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
20.01
20.01
13.34
20.01
26.68
26.68
40.02
120.06
233.45
166.75
240.12

(kN/m2)
3.75
11.63
31.99
52.08
71.12
99.81
125.91
155.11
177.59
201.77
293.21
381.30

(kN/m2)

(kN/m2)

43.98
8.38
3.40
1.58
0.77
0.65
0.33
0.25
0.21
0.09
0.07

55.60
40.37
55.48
72.70
100.58
126.56
155.44
177.84
201.98
293.30
381.36

PI

26.80
38.16
47.07
52.20
31.14
45.00
11.80
24.12
11.80
38.52

sc
(kN/m2)
95.67
53.11
70.42
88.01
118.46
144.74
781.34
1171.68
1085.19
950.88

OCR

wL

Cc

Cr

8.23
1.02
0.99
0.88
0.94
0.93
4.40
5.81
3.70
2.49

37.78
50.40
60.30
66.00
42.60
58.00
21.11
34.80
21.11
50.80

0.25
0.00
0.2300
0.2500
0.30
0.3500
0.4400
0.10
0.08
0.1000
0.0500
Settlement

0.0250
0.0230
0.0250
0.0300
0.0350
0.0440
0.0100
0.0080
0.0100
0.0050

e0
0.70
0.67
1.48
1.65
1.30
1.13
0.70
0.51
0.20
0.10
22.1141

Stt
(m)
0.0110
0.0043
0.0039
0.0011
0.0010
0.0008
0.0000
0.0000
0.0000
0.0000
mm

5.6. BOREHOLE BH - 6
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-06
Depth (m)
From
0.00
1.00
2.10
5.00
6.15
10.20
13.20
16.00
20.00
21.20
24.20
38.00

To
1.0
2.1
5.0
6.2
10.2
13.2
16.0
20.0
21.2
24.2
38.0
40.5

2 m
2 m
173.5 kN
2
43.4 kN/m

Soil Type
Very Soft Clay
Very Soft Clay
Dense Sand
Very Soft Clay
Very Soft Clay
Soft Clay
Soft Clay
Medium Stiff Clay
Stiff Clay
Hard Clay
Very Stiff Clay
Hard Clay

Thick
(m)
1
1.1
2.9
1.15
4.05
3
2.8
4
1.2
3
13.8
2.45

N'-SPTavr
3
3
31
2
3
4
4
6
18
35
25
36

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

1 m

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.49289662
from graph

Se =

0.65
0.00227133 m

ST =

2.27132602 mm
24.9000 mm

E
2

(kN/m )
3015
3015
37200
2010
3015
4020
4020
8040
24120
46900
33500
48240

m
0.4
0.4
0.25
0.4
0.4
0.35
0.35
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
2

(kN/m )

22040

g'

s'v

cu
3

(kN/m )
7.5
7.5
11.2
6.7
7.5
9
9
8.3
9.8
12.2
10.6
12.2

(kN/m )
20.01
20.01
13.34
20.01
26.68
26.68
40.02
120.06
233.45
166.75
240.12

Ds
2

(kN/m )
3.75
11.63
31.99
52.08
71.12
99.81
125.91
155.11
177.59
201.77
293.21
381.30

s1=s'v+Ds
2

(kN/m )

(kN/m )

26.69
8.38
4.01
2.06
1.08
0.92
0.48
0.37
0.31
0.14
0.11

38.31
40.37
56.10
73.18
100.89
126.83
155.59
177.96
202.08
293.35
381.40

PI
26.80
38.16
47.07
52.20
31.14
45.00
11.80
24.12
11.80
38.52

sc
2

(kN/m )
95.67
53.11
70.42
88.01
118.46
144.74
781.34
1171.68
1085.19
950.88

OCR

wL

8.23
1.02
0.99
0.88
0.94
0.93
4.40
5.81
3.70
2.49

37.78
50.40
60.30
66.00
42.60
58.00
21.11
34.80
21.11
50.80

Cc
0.25
0.00
0.2300
0.2500
0.30
0.3500
0.4400
0.10
0.08
0.1000
0.0500
Settlement

Cr
0.0250
0.0230
0.0250
0.0300
0.0350
0.0440
0.0100
0.0080
0.0100
0.0050

e0

Stt
(m)

0.70
0.0084
0.67
0.0051
1.48
0.0051
1.65
0.0016
1.30
0.0013
1.13
0.0011
0.70
0.0000
0.51
0.0000
0.20
0.0000
0.10
0.0000
22.6287 mm

5.6. BOREHOLE BH - 6
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-06
Depth (m)
From
0.00
1.00
2.10
5.00
6.15
10.20
13.20
16.00
20.00
21.20
24.20
38.00

To
1.0
2.1
5.0
6.2
10.2
13.2
16.0
20.0
21.2
24.2
38.0
40.5

5 m
5 m
382.7 kN
2
15.3 kN/m
1 m

Soil Type
Very Soft Clay
Very Soft Clay
Dense Sand
Very Soft Clay
Very Soft Clay
Soft Clay
Soft Clay
Medium Stiff Clay
Stiff Clay
Hard Clay
Very Stiff Clay
Hard Clay

Thick
(m)
1
1.1
2.9
1.15
4.05
3
2.8
4
1.2
3
13.8
2.45

N'-SPTavr
3
3
31
2
3
4
4
6
18
35
25
36

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=
Se =
ST =

0.49289662
from graph
0.65
0.00200341 m
2.0034057 mm
24.9000 mm

E
(kN/m2)
3015
3015
37200
2010
3015
4020
4020
8040
24120
46900
33500
48240

m
0.4
0.4
0.25
0.4
0.4
0.35
0.35
0.3
0.3
0.25
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

22040

g'
(kN/m3)
7.5
7.5
11.2
6.7
7.5
9
9
8.3
9.8
12.2
10.6
12.2

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
20.01
20.01
13.34
20.01
26.68
26.68
40.02
120.06
233.45
166.75
240.12

(kN/m2)
3.75
11.63
31.99
52.08
71.12
99.81
125.91
155.11
177.59
201.77
293.21
381.30

(kN/m2)

(kN/m2)

12.42
6.71
4.17
2.58
1.55
1.36
0.79
0.63
0.54
0.27
0.20

24.05
38.70
56.26
73.70
101.36
127.27
155.90
178.22
202.31
293.48
381.50

PI
26.80
38.16
47.07
52.20
31.14
45.00
11.80
24.12
11.80
38.52

sc
(kN/m2)
95.67
53.11
70.42
88.01
118.46
144.74
781.34
1171.68
1085.19
950.88

OCR

wL

8.23
1.02
0.99
0.88
0.94
0.93
4.40
5.81
3.70
2.49

37.78
50.40
60.30
66.00
42.60
58.00
21.11
34.80
21.11
50.80

Cc
0.25
0.00
0.2300
0.2500
0.30
0.3500
0.4400
0.10
0.08
0.1000
0.0500
Settlement

Cr
0.0250
0.0230
0.0250
0.0300
0.0350
0.0440
0.0100
0.0080
0.0100
0.0050

e0

Stt
(m)

0.70
0.0051
0.67
0.0053
1.48
0.0063
1.65
0.0023
1.30
0.0020
1.13
0.0018
0.70
0.0000
0.51
0.0000
0.20
0.0000
0.10
0.0000
22.8966 mm

5.7. BOREHOLE BH - 7
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-07
Depth (m)
From
0.00
1.25
3.80
5.00
5.70
9.50
10.70
13.50
14.00
15.70
17.00
18.00
22.00
23.00
26.45
27.50
30.00
33.30
37.00

To
1.3
3.8
5.0
5.7
9.5
10.7
13.5
14.0
15.7
17.0
18.0
22.0
23.0
26.5
27.5
30.0
33.3
37.0
40.5

1 m
1 m
108.2 kN
2
108.2 kN/m

Soil Type
Soft Clay
Dense Gravelly Sand
Soft Clay
Very Soft Organic Clay
Very Soft Organic Clay
Medium Stiff Clay
Stiff Clay
Stiff Clay
Sand
Hard Clay
Moderately Strong to strong claystone
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Dense Sand
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Hard Clay

Thick
(m)
1.25
2.55
1.2
0.70
3.80
1.2
2.8
0.5
1.7
1.3
1
4
1
3.45
1.05
2.5
3.3
3.7
3.45

N'-SPTavr
4
40
4
2
2
6
8
15
36
42
42
25
20
23
33
27
22
28
33

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

1 m

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =

0.49295874
from graph

=
Se =

0.65
0.00216309 m

ST =

2.16309264 mm
24.8999 mm

E
(kN/m2)
4020
48000
4020
2010
2010
6030
8040
20100
43200
56280
56280
33500
26800
30820
39600
36180
29480
37520
44220

m
0.4
0.25
0.4
0.4
0.4
0.35
0.35
0.33
0.3
0.25
0.25
0.3
0.3
0.3
0.28
0.3
0.3
0.3
0.3

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8.3
10
8.2
9.8
7.5
10.1
11.6
10.5
10.2
10.7
11.2
14.7
10.6
11.2
11.4
11.1
12.2
11.1
11.1

(kN/m2)
26.68
26.68
13.34
13.34
40.02
53.36
100.05
280.14
280.14
166.75
133.40
153.41
180.09
146.74
186.76
220.11

(kN/m2)
5.19
23.13
40.80
49.15
66.83
87.14
109.44
128.30
139.60
155.22
167.78
202.78
237.48
262.10
287.40
307.26
341.27
381.93
421.61

(kN/m2)

(kN/m2)

20.91
6.28
4.16
2.00
1.12
0.79
0.59
0.51
0.46
0.37
0.28
0.22
0.18
0.15
0.13
0.11
0.09
0.08

44.04
47.08
53.31
68.83
88.25
110.22
128.89
140.10
155.68
168.14
203.05
237.69
262.28
287.55
307.39
341.37
382.02
421.70

28906

PI

91.80
67.40
52.00
14.10
26.00
21.80
33.50
41.80
38.52
27.90
26.80
28.80
28.80
26.80
21.80

sc
(kN/m2)
59.33
37.12
44.11
246.78
258.78
524.76
1197.44
1058.49
660.33
625.62
733.46
831.59
677.60
892.90
1154.46

OCR

wL

Cc

1.45
0.76
0.66
2.83
2.36
4.09
7.71
6.31
3.26
2.63
2.80
2.71
1.99
2.34
2.74

110.00
134.44
86.60
20.00
42.60
32.22
38.00
54.44
50.80
38.89
37.78
40.00
40.00
37.78
32.22

0.90
0.90
1.1200
1.1200
0.09
0.0800
0.2000
0.43
0.4000
0.3000
0.26
0.2500
0.2700
0.2700
0.2500
0.2000

Cr

0.0675
0.1120
0.1120
0.0090
0.0080
0.0200
0.0430
0.0722
0.0300
0.0260
0.0250
0.0270
0.0469
0.0250
0.0200
Settlement

e0

Stt
(m)

2.00
0.0017
2.96
0.0070
2.96
0.0138
0.49
0.0000
0.40
0.0000
0.35
0.0000
0.94
0.0000
0.94
0.0000
0.60
0.0000
0.65
0.0000
0.61
0.0000
0.55
0.0000
0.50
0.0000
0.40
0.0000
0.30
0.0000
22.7368 mm

5.7. BOREHOLE BH - 7
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-07
Depth (m)
From
0.00
1.25
3.80
5.00
5.70
9.50
10.70
13.50
14.00
15.70
17.00
18.00
22.00
23.00
26.45
27.50
30.00
33.30
37.00

To
1.3
3.8
5.0
5.7
9.5
10.7
13.5
14.0
15.7
17.0
18.0
22.0
23.0
26.5
27.5
30.0
33.3
37.0
40.5

2 m
2 m
149.8 kN
2
37.5 kN/m

Soil Type
Soft Clay
Dense Gravelly Sand
Soft Clay
Very Soft Organic Clay
Very Soft Organic Clay
Medium Stiff Clay
Stiff Clay
Stiff Clay
Sand
Hard Clay
Moderately Strong to strong claystone
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Dense Sand
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Hard Clay

Thick
(m)
1.25
2.55
1.2
0.70
3.80
1.2
2.8
0.5
1.7
1.3
1
4
1
3.45
1.05
2.5
3.3
3.7
3.45

N'-SPTavr
4
40
4
2
2
6
8
15
36
42
42
25
20
23
33
27
22
28
33

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

1 m

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.49295874
from graph

Se =

0.65
0.00149695 m

ST =

1.49695202 mm
24.9000 mm

E
2

(kN/m )
4020
48000
4020
2010
2010
6030
8040
20100
43200
56280
56280
33500
26800
30820
39600
36180
29480
37520
44220

m
0.4
0.25
0.4
0.4
0.4
0.35
0.35
0.33
0.3
0.25
0.25
0.3
0.3
0.3
0.28
0.3
0.3
0.3
0.3

mavg

0.3

Eavg
2

(kN/m )

28906

g'

s'v

cu
3

(kN/m )
8.3
10
8.2
9.8
7.5
10.1
11.6
10.5
10.2
10.7
11.2
14.7
10.6
11.2
11.4
11.1
12.2
11.1
11.1

(kN/m )
26.68
26.68
13.34
13.34
40.02
53.36
100.05
280.14
280.14
166.75
133.40
153.41
180.09
146.74
186.76
220.11

Ds
2

(kN/m )
5.19
23.13
40.80
49.15
66.83
87.14
109.44
128.30
139.60
155.22
167.78
202.78
237.48
262.10
287.40
307.26
341.27
381.93
421.61

s1=s'v+Ds
2

(kN/m )

(kN/m )

13.97
5.65
4.03
2.15
1.27
0.93
0.71
0.62
0.56
0.45
0.35
0.28
0.23
0.19
0.17
0.14
0.12
0.11

37.09
46.44
53.17
68.97
88.41
110.36
129.01
140.21
155.78
168.23
203.12
237.75
262.33
287.59
307.43
341.41
382.05
421.72

PI
91.80
67.40
52.00
14.10
26.00
21.80
33.50
41.80
38.52
27.90
26.80
28.80
28.80
26.80
21.80

sc
2

(kN/m )
59.33
37.12
44.11
246.78
258.78
524.76
1197.44
1058.49
660.33
625.62
733.46
831.59
677.60
892.90
1154.46

OCR

wL

Cc

1.45
0.76
0.66
2.83
2.36
4.09
7.71
6.31
3.26
2.63
2.80
2.71
1.99
2.34
2.74

110.00
134.44
86.60
20.00
42.60
32.22
38.00
54.44
50.80
38.89
37.78
40.00
40.00
37.78
32.22

0.90
0.90
1.1200
1.1200
0.09
0.0800
0.2000
0.43
0.4000
0.3000
0.26
0.2500
0.2700
0.2700
0.2500
0.2000

Cr
0.0675
0.1120
0.1120
0.0090
0.0080
0.0200
0.0430
0.0722
0.0300
0.0260
0.0250
0.0270
0.0469
0.0250
0.0200
Settlement

e0

Stt
(m)

2.00
0.0015
2.96
0.0068
2.96
0.0148
0.49
0.0000
0.40
0.0001
0.35
0.0000
0.94
0.0000
0.94
0.0000
0.60
0.0001
0.65
0.0000
0.61
0.0000
0.55
0.0000
0.50
0.0000
0.40
0.0000
0.30
0.0000
23.4030 mm

5.7. BOREHOLE BH - 7
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-07
Depth (m)
From
0.00
1.25
3.80
5.00
5.70
9.50
10.70
13.50
14.00
15.70
17.00
18.00
22.00
23.00
26.45
27.50
30.00
33.30
37.00

To
1.3
3.8
5.0
5.7
9.5
10.7
13.5
14.0
15.7
17.0
18.0
22.0
23.0
26.5
27.5
30.0
33.3
37.0
40.5

5 m
5 m
298.5 kN
2
11.9 kN/m
1 m

Soil Type
Soft Clay
Dense Gravelly Sand
Soft Clay
Very Soft Organic Clay
Very Soft Organic Clay
Medium Stiff Clay
Stiff Clay
Stiff Clay
Sand
Hard Clay
Moderately Strong to strong claystone
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Dense Sand
Very Stiff Clay
Very Stiff Clay
Very Stiff Clay
Hard Clay

Thick
(m)
1.25
2.55
1.2
0.70
3.80
1.2
2.8
0.5
1.7
1.3
1
4
1
3.45
1.05
2.5
3.3
3.7
3.45

N'-SPTavr
4
40
4
2
2
6
8
15
36
42
42
25
20
23
33
27
22
28
33

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.49295874
from graph

Se =

0.65
0.00119285 m

ST =

1.192852201 mm
24.8999 mm

E
(kN/m2)
4020
48000
4020
2010
2010
6030
8040
20100
43200
56280
56280
33500
26800
30820
39600
36180
29480
37520
44220

m
0.4
0.25
0.4
0.4
0.4
0.35
0.35
0.33
0.3
0.25
0.25
0.3
0.3
0.3
0.28
0.3
0.3
0.3
0.3

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8.3
10
8.2
9.8
7.5
10.1
11.6
10.5
10.2
10.7
11.2
14.7
10.6
11.2
11.4
11.1
12.2
11.1
11.1

(kN/m2)
26.68
26.68
13.34
13.34
40.02
53.36
100.05
280.14
280.14
166.75
133.40
153.41
180.09
146.74
186.76
220.11

(kN/m2)
5.19
23.13
40.80
49.15
66.83
87.14
109.44
128.30
139.60
155.22
167.78
202.78
237.48
262.10
287.40
307.26
341.27
381.93
421.61

(kN/m2)

(kN/m2)

7.58
4.49
3.60
2.32
1.56
1.21
0.97
0.86
0.80
0.67
0.53
0.43
0.37
0.32
0.28
0.24
0.20
0.19

30.70
45.29
52.75
69.14
88.69
110.64
129.27
140.46
156.02
168.44
203.30
237.91
262.46
287.72
307.54
341.50
382.13
421.80

28906

PI

91.80
67.40
52.00
14.10
26.00
21.80
33.50
41.80
38.52
27.90
26.80
28.80
28.80
26.80
21.80

sc
(kN/m2)
59.33
37.12
44.11
246.78
258.78
524.76
1197.44
1058.49
660.33
625.62
733.46
831.59
677.60
892.90
1154.46

OCR

wL

Cc

1.45
0.76
0.66
2.83
2.36
4.09
7.71
6.31
3.26
2.63
2.80
2.71
1.99
2.34
2.74

110.00
134.44
86.60
20.00
42.60
32.22
38.00
54.44
50.80
38.89
37.78
40.00
40.00
37.78
32.22

0.90
0.90
1.1200
1.1200
0.09
0.0800
0.2000
0.43
0.4000
0.3000
0.26
0.2500
0.2700
0.2700
0.2500
0.2000

Cr

0.0675
0.1120
0.1120
0.0090
0.0080
0.0200
0.0430
0.0722
0.0300
0.0260
0.0250
0.0270
0.0469
0.0250
0.0200
Settlement

e0

Stt
(m)

2.00
0.0012
2.96
0.0061
2.96
0.0159
0.49
0.0001
0.40
0.0001
0.35
0.0000
0.94
0.0001
0.94
0.0001
0.60
0.0001
0.65
0.0000
0.61
0.0000
0.55
0.0000
0.50
0.0000
0.40
0.0000
0.30
0.0000
23.7071 mm

5.8. BOREHOLE BH - 8
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-08
Depth (m)
From
0.00
0.40
1.00
1.80
3.10
4.00
5.00
5.70
10.00
11.00
13.00
16.00
20.80
27.00
29.00
37.00
39.00

To
0.4
1.0
1.8
3.1
4.0
5.0
5.7
10.0
11.0
13.0
16.0
20.8
27.0
29.0
37.0
39.0
40.5

1 m
1 m
292.3 kN
2
292.3 kN/m
1 m

Soil Type
Sandy Clay
Very Dense Sand
Very Dense Sand
Medium Stiff Clay
Soft Silt
Soft Silt
Very Stiff Clay
Medium Stiff Clay
Very Stiff Clay
Very Stiff Silt
Hard Cemented Clay
Very Stiff Clay
Dense Sand
Very Stiff organic Clay
Very Stiff Clay
Hard Silt
Hard Organic Clay

Thick
(m)
0.4
0.6
0.8
1.30
0.90
1
0.7
4.3
1
2
3
4.8
6.2
2
8
2
1.45

N'-SPTavr
30
50
50
5
3
3
20
8
25
26
37
25
34
25
25
31
42

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.49453117
from graph

Se =

0.65
0.00518348 m

ST =

5.18348119 mm
24.8994 mm

E
(kN/m2)
40200
60000
60000
5025
3015
3015
26800
8040
33500
34840
49580
33500
40800
33500
33500
41540
56280

m
0.3
0.25
0.25
0.3
0.35
0.35
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3
0.28
0.25
0.25

mavg

0.3

Eavg
(kN/m2)

33531

g'
(kN/m3)
11.9
12.2
12.2
7.5
5.9
5.9
9.8
9
10.1
10.1
11.4
10.1
11.2
10.1
10.1
10.8
11.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
200.10
33.35
20.01
20.01
133.40
53.36
166.75
173.42
246.79
166.75
166.75
166.75
206.77
280.14

(kN/m2)
2.38
8.42
16.96
26.72
34.25
39.85
46.23
69.01
93.41
108.56
135.76
177.10
236.06
280.88
331.38
382.58
401.79

(kN/m2)

(kN/m2)

172.96
73.08
31.42
16.97
11.24
9.27
4.09
2.37
1.84
1.24
0.81
0.49
0.36
0.26
0.20
0.18

181.38
90.04
58.14
51.22
51.09
55.50
73.10
95.78
110.40
137.00
177.91
236.55
281.24
331.64
382.78
401.97

PI
41.80
46.80
46.80
37.80
41.80
37.80
36.80
31.80
31.80
31.80
31.80
26.80
11.80

sc
(kN/m2)
300.00
200.00
150.00
150.00
317.00
200.00
724.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00

OCR

wL

Cc

7.49
4.38
3.76
6.86
2.90
7.75
5.53
4.42
3.39
2.14
1.81
1.57
1.49

54.44
60.00
60.00
50.00
54.44
50.00
48.89
43.33
43.33
43.33
43.33
37.78
21.11

0.20
0.4000
0.4500
0.45
0.3600
0.4000
0.36
0.35
0.3000
0.3000
0.3000
0.3000
0.2500
0.1000

Cr
0.0200
0.0400
0.0450
0.0450
0.0360
0.0400
0.0360
0.0350
0.0300
0.0300
0.0300
0.0300
0.0250
0.0100
Settlement

e0
0.90
1.05
0.95
0.89
0.75
0.61
0.65
0.70
0.74
0.55
0.50
0.45
0.40
19.7159

Stt
(m)
0.0092
0.0035
0.0025
0.0011
0.0025
0.0002
0.0003
0.0002
0.0002
0.0000
0.0001
0.0000
0.0000
mm

5.8. BOREHOLE BH - 8
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-08
Depth (m)
From
0.00
0.40
1.00
1.80
3.10
4.00
5.00
5.70
10.00
11.00
13.00
16.00
20.80
27.00
29.00
37.00
39.00

To
0.4
1.0
1.8
3.1
4.0
5.0
5.7
10.0
11.0
13.0
16.0
20.8
27.0
29.0
37.0
39.0
40.5

2 m
2 m
469.3 kN
2
117.3 kN/m

Soil Type
Sandy Clay
Very Dense Sand
Very Dense Sand
Medium Stiff Clay
Soft Silt
Soft Silt
Very Stiff Clay
Medium Stiff Clay
Very Stiff Clay
Very Stiff Silt
Hard Cemented Clay
Very Stiff Clay
Dense Sand
Very Stiff organic Clay
Very Stiff Clay
Hard Silt
Hard Organic Clay

Thick
(m)
0.4
0.6
0.8
1.30
0.90
1
0.7
4.3
1
2
3
4.8
6.2
2
8
2
1.45

N'-SPTavr
30
50
50
5
3
3
20
8
25
26
37
25
34
25
25
31
42

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

1 m

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=
Se =
ST =

0.49453117
from graph
0.65
0.00416121 m
4.1612131 mm
24.9000 mm

E
2

(kN/m )
40200
60000
60000
5025
3015
3015
26800
8040
33500
34840
49580
33500
40800
33500
33500
41540
56280

m
0.3
0.25
0.25
0.3
0.35
0.35
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3
0.28
0.25
0.25

mavg

0.3

Eavg
2

(kN/m )

33531

g'

s'v

cu
3

(kN/m )
11.9
12.2
12.2
7.5
5.9
5.9
9.8
9
10.1
10.1
11.4
10.1
11.2
10.1
10.1
10.8
11.6

(kN/m )
200.10
33.35
20.01
20.01
133.40
53.36
166.75
173.42
246.79
166.75
166.75
166.75
206.77
280.14

Ds
2

(kN/m )
2.38
8.42
16.96
26.72
34.25
39.85
46.23
69.01
93.41
108.56
135.76
177.10
236.06
280.88
331.38
382.58
401.79

s1=s'v+Ds
2

(kN/m )

(kN/m )

88.72
52.15
28.61
17.70
12.61
10.72
5.26
3.21
2.54
1.76
1.17
0.72
0.54
0.39
0.30
0.27

97.14
69.11
55.33
51.94
52.46
56.95
74.27
96.62
111.10
137.52
178.27
236.78
281.42
331.77
382.88
402.06

PI
41.80
46.80
46.80
37.80
41.80
37.80
36.80
31.80
31.80
31.80
31.80
26.80
11.80

sc
2

(kN/m )
300.00
200.00
150.00
150.00
317.00
200.00
724.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00

OCR

wL

Cc

7.49
4.38
3.76
6.86
2.90
7.75
5.53
4.42
3.39
2.14
1.81
1.57
1.49

54.44
60.00
60.00
50.00
54.44
50.00
48.89
43.33
43.33
43.33
43.33
37.78
21.11

0.20
0.4000
0.4500
0.45
0.3600
0.4000
0.36
0.35
0.3000
0.3000
0.3000
0.3000
0.2500
0.1000

Cr
0.0200
0.0400
0.0450
0.0450
0.0360
0.0400
0.0360
0.0350
0.0300
0.0300
0.0300
0.0300
0.0250
0.0100
Settlement

e0

Stt
(m)

0.90
0.0087
1.05
0.0036
0.95
0.0028
0.89
0.0012
0.75
0.0031
0.61
0.0003
0.65
0.0004
0.70
0.0003
0.74
0.0002
0.55
0.0000
0.50
0.0001
0.45
0.0000
0.40
0.0000
20.7388 mm

5.8. BOREHOLE BH - 8
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-08
Depth (m)
From
0.00
0.40
1.00
1.80
3.10
4.00
5.00
5.70
10.00
11.00
13.00
16.00
20.80
27.00
29.00
37.00
39.00

To
0.4
1.0
1.8
3.1
4.0
5.0
5.7
10.0
11.0
13.0
16.0
20.8
27.0
29.0
37.0
39.0
40.5

5 m
5 m
1086.7 kN
2
43.5 kN/m

Soil Type
Sandy Clay
Very Dense Sand
Very Dense Sand
Medium Stiff Clay
Soft Silt
Soft Silt
Very Stiff Clay
Medium Stiff Clay
Very Stiff Clay
Very Stiff Silt
Hard Cemented Clay
Very Stiff Clay
Dense Sand
Very Stiff organic Clay
Very Stiff Clay
Hard Silt
Hard Organic Clay

Thick
(m)
0.4
0.6
0.8
1.30
0.90
1
0.7
4.3
1
2
3
4.8
6.2
2
8
2
1.45

N'-SPTavr
30
50
50
5
3
3
20
8
25
26
37
25
34
25
25
31
42

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

1 m

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.49453117
from graph

Se =

0.65
0.00385425 m

ST =

3.85425023 mm
24.9000 mm

E
2

(kN/m )
40200
60000
60000
5025
3015
3015
26800
8040
33500
34840
49580
33500
40800
33500
33500
41540
56280

m
0.3
0.25
0.25
0.3
0.35
0.35
0.3
0.3
0.3
0.3
0.25
0.3
0.3
0.3
0.28
0.25
0.25

mavg

0.3

Eavg
2

(kN/m )

33531

g'

s'v

cu
3

(kN/m )
11.9
12.2
12.2
7.5
5.9
5.9
9.8
9
10.1
10.1
11.4
10.1
11.2
10.1
10.1
10.8
11.6

(kN/m )
200.10
33.35
20.01
20.01
133.40
53.36
166.75
173.42
246.79
166.75
166.75
166.75
206.77
280.14

Ds
2

(kN/m )
2.38
8.42
16.96
26.72
34.25
39.85
46.23
69.01
93.41
108.56
135.76
177.10
236.06
280.88
331.38
382.58
401.79

s1=s'v+Ds
2

(kN/m )

(kN/m )

38.69
30.19
21.86
16.36
13.12
11.74
7.01
4.77
3.94
2.90
2.05
1.34
1.02
0.77
0.60
0.55

47.11
47.15
48.58
50.61
52.97
57.97
76.02
98.18
112.50
138.66
179.15
237.40
281.90
332.15
383.18
402.34

PI
41.80
46.80
46.80
37.80
41.80
37.80
36.80
31.80
31.80
31.80
31.80
26.80
11.80

sc
2

(kN/m )
300.00
200.00
150.00
150.00
317.00
200.00
724.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00

OCR

wL

Cc

7.49
4.38
3.76
6.86
2.90
7.75
5.53
4.42
3.39
2.14
1.81
1.57
1.49

54.44
60.00
60.00
50.00
54.44
50.00
48.89
43.33
43.33
43.33
43.33
37.78
21.11

0.20
0.4000
0.4500
0.45
0.3600
0.4000
0.36
0.35
0.3000
0.3000
0.3000
0.3000
0.2500
0.1000

Cr
0.0200
0.0400
0.0450
0.0450
0.0360
0.0400
0.0360
0.0350
0.0300
0.0300
0.0300
0.0300
0.0250
0.0100
Settlement

e0

Stt
(m)

0.90
0.0071
1.05
0.0034
0.95
0.0029
0.89
0.0013
0.75
0.0041
0.61
0.0005
0.65
0.0007
0.70
0.0005
0.74
0.0004
0.55
0.0001
0.50
0.0002
0.45
0.0000
0.40
0.0000
21.0457 mm

5.9. BOREHOLE BH - 9
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-09
Depth (m)
From
0.00
1.00
2.00
5.50
8.95
10.45
13.65
16.00
20.00
21.00
23.00

To
1.0
2.0
5.5
9.0
10.5
13.7
16.0
20.0
21.0
23.0
40.5

1 m
1 m
201.2 kN
2
201.2 kN/m
1 m

Soil Type
Stiff Clay
Stiff Clay
Medium Dense Sand
Stiff Clay
Medium Dense Sand
Hard Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Cemented Clay
Very Stiff Clay

Thick
(m)
1
1
3.5
3.45
1.50
3.2
2.35
4
1
2
17.45

N'-SPTavr
9
9
16
10
21
39
21
28
27
52
25

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00856233 m

ST =

8.56232949 mm
24.7803 mm

E
(kN/m2)
9045
9045
19200
10050
25200
52260
28140
33600
36180
69680
33500

m
0.3
0.3
0.3
0.3
0.25
0.25
0.3
0.25
0.3
0.2
0.3

mavg

0.3

Eavg
(kN/m2)

13952

g'
(kN/m3)
8.3
8.3
7.2
8.4
9.2
11.4
10.3
10.2
10.6
12.2
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
60.03
60.03
66.70
260.13
140.07
180.09
346.84
166.75

(kN/m2)
4.15
12.45
29.20
56.29
77.68
102.82
133.16
165.67
191.37
208.87
313.55

(kN/m2)

(kN/m2)

89.42
14.31
3.85
2.14
1.39
1.21
0.62
0.48
0.42
0.16

101.87
43.51
60.14
79.82
104.21
134.38
166.29
191.84
209.28
313.71

PI
26.80
20.00
16.00
21.90
21.80
6.80
18.00

sc
(kN/m2)
287.01
362.50
1537.41
733.24
944.56
2566.14
944.22

OCR

wL

23.05
6.44
14.95
5.51
4.94
12.29
3.01

37.78
35.60
30.80
39.40
32.22
15.56
33.80

Cc
0.25
0.25
0.00
0.2500
0.0000
0.18
0.1800
0.0000
0.20
0.05
0.2000
Settlement

Cr
0.0250
0.0250
0.0250
0.0180
0.0180
0.0200
0.0050
0.0200

e0
0.60
0.58
0.56
0.56
0.75
0.40
0.75
16.2180

Stt
(m)
0.0143
0.0016
0.0002
0.0001
0.0000
0.0000
0.0000
mm

5.9. BOREHOLE BH - 9
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-09
Depth (m)
From
0.00
1.00
2.00
5.50
8.95
10.45
13.65
16.00
20.00
21.00
23.00

To
1.0
2.0
5.5
9.0
10.5
13.7
16.0
20.0
21.0
23.0
40.5

2 m
2 m
424.6 kN
2
106.2 kN/m
1 m

Soil Type
Stiff Clay
Stiff Clay
Medium Dense Sand
Stiff Clay
Medium Dense Sand
Hard Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Cemented Clay
Very Stiff Clay

Thick
(m)
1
1
3.5
3.45
1.50
3.2
2.35
4
1
2
17.45

N'-SPTavr
9
9
16
10
21
39
21
28
27
52
25

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00903558 m

ST =

9.03557983 mm
24.9000 mm

E
(kN/m2)
9045
9045
19200
10050
25200
52260
28140
33600
36180
69680
33500

m
0.3
0.3
0.3
0.3
0.25
0.25
0.3
0.25
0.3
0.2
0.3

mavg

0.3

Eavg
(kN/m2)

13952

g'
(kN/m3)
8.3
8.3
7.2
8.4
9.2
11.4
10.3
10.2
10.6
12.2
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
60.03
60.03
66.70
260.13
140.07
180.09
346.84
166.75

(kN/m2)
4.15
12.45
29.20
56.29
77.68
102.82
133.16
165.67
191.37
208.87
313.55

(kN/m2)

(kN/m2)

67.94
18.82
6.28
3.71
2.49
2.20
1.18
0.92
0.80
0.32

80.39
48.02
62.57
81.39
105.31
135.36
166.84
192.28
209.67
313.87

PI
26.80
20.00
16.00
21.90
21.80
6.80
18.00

sc
(kN/m2)
287.01
362.50
1537.41
733.24
944.56
2566.14
944.22

OCR

wL

23.05
6.44
14.95
5.51
4.94
12.29
3.01

37.78
35.60
30.80
39.40
32.22
15.56
33.80

Cc
0.25
0.25
0.00
0.2500
0.0000
0.18
0.1800
0.0000
0.20
0.05
0.2000
Settlement

Cr
0.0250
0.0250
0.0250
0.0180
0.0180
0.0200
0.0050
0.0200

e0
0.60
0.58
0.56
0.56
0.75
0.40
0.75
15.8644

Stt
(m)
0.0127
0.0025
0.0004
0.0002
0.0000
0.0000
0.0001
mm

5.9. BOREHOLE BH - 9
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-09
Depth (m)
From
0.00
1.00
2.00
5.50
8.95
10.45
13.65
16.00
20.00
21.00
23.00

To
1.0
2.0
5.5
9.0
10.5
13.7
16.0
20.0
21.0
23.0
40.5

5 m
5 m
1193.9 kN
2
47.8 kN/m
1 m

Soil Type
Stiff Clay
Stiff Clay
Medium Dense Sand
Stiff Clay
Medium Dense Sand
Hard Clay
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Cemented Clay
Very Stiff Clay

Thick
(m)
1
1
3.5
3.45
1.50
3.2
2.35
4
1
2
17.45

N'-SPTavr
9
9
16
10
21
39
21
28
27
52
25

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :

Therefore :

OK

Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.01016191 m

ST =

10.1619066 mm
24.9000 mm

E
(kN/m2)
9045
9045
19200
10050
25200
52260
28140
33600
36180
69680
33500

m
0.3
0.3
0.3
0.3
0.25
0.25
0.3
0.25
0.3
0.2
0.3

mavg

0.3

Eavg
(kN/m2)

13952

g'
(kN/m3)
8.3
8.3
7.2
8.4
9.2
11.4
10.3
10.2
10.6
12.2
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
60.03
60.03
66.70
260.13
140.07
180.09
346.84
166.75

(kN/m2)
4.15
12.45
29.20
56.29
77.68
102.82
133.16
165.67
191.37
208.87
313.55

(kN/m2)

(kN/m2)

39.47
19.88
9.48
6.36
4.63
4.18
2.47
1.99
1.77
0.77

51.92
49.08
65.77
84.04
107.45
137.34
168.13
193.35
210.63
314.32

PI
26.80
20.00
16.00
21.90
21.80
6.80
18.00

sc
(kN/m2)
287.01
362.50
1537.41
733.24
944.56
2566.14
944.22

OCR

wL

23.05
6.44
14.95
5.51
4.94
12.29
3.01

37.78
35.60
30.80
39.40
32.22
15.56
33.80

Cc
0.25
0.25
0.00
0.2500
0.0000
0.18
0.1800
0.0000
0.20
0.05
0.2000
Settlement

Cr
0.0250
0.0250
0.0250
0.0180
0.0180
0.0200
0.0050
0.0200

e0
0.60
0.58
0.56
0.56
0.75
0.40
0.75
14.7381

Stt
(m)
0.0097
0.0037
0.0007
0.0004
0.0001
0.0000
0.0002
mm

5.11. BOREHOLE BH - 11
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-11
Depth (m)
From
0.00
1.00
2.00
10.00
11.00
13.95
15.95
20.95
25.45
38.00

To
1.0
2.0
10.0
11.0
14.0
16.0
21.0
25.5
38.0
40.5

1 m
1 m
54.3 kN
2
54.3 kN/m
1 m

Soil Type
Very Soft Clay
Very Soft Clay
Medium Stiff Clay
Medium Dense Sand
Stiff Clay
Stiff Clay
Very Stiff Silt
Cemented Clay
Very Stiff Clay
Very Dense Sand

Thick
(m)
1
1
8
1.00
2.95
2
5
4.5
12.55
2.45

N'-SPTavr
1
1
8
26
12
15
16
51
26
55

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =

0.50192704

If =

from graph

=
Se =
ST =

0.65
0.00630146 m
6.3014607 mm
24.8377 mm

E
(kN/m2)
769
769
4779
12000
8716
10895
11621
31639
18038
27500

m
0.4
0.4
0.3
0.25
0.3
0.3
0.35
0.2
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

5100

g'
(kN/m3)
5.1
5.1
8.3
10.7
9
9.2
9.2
11.7
10.5
11.2

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
6.67
6.67
53.36
80.04
100.05
106.72
340.17
173.42
-

(kN/m2)
2.55
7.65
43.40
81.95
100.58
123.05
155.25
204.58
296.79
376.40

(kN/m2)

(kN/m2)

24.14
1.51
0.49
0.35
0.24
0.18
0.10
0.05
0.05

31.79
44.91
82.44
100.92
123.29
155.43
204.68
296.84
376.45

PI
51.80
26.00
25.20
31.70
42.40
16.80
26.80
-

sc
(kN/m2)
22.11
258.78
393.82
440.19
399.88
1975.89
829.13
-

OCR

wL

2.89
5.96
3.92
3.58
2.58
9.66
2.79
-

65.56
42.22
32.22
32.22
32.22
26.67
37.78
-

Cc
0.50
0.29
0.0000
0.2000
0.20
0.2000
0.1500
0.25
0.00
Settlement

Cr
0.0500
0.0290
0.0200
0.0200
0.0200
0.0150
0.0250
-

e0
0.90
0.62
0.64
0.68
0.68
0.30
0.40
18.5363

Stt
(m)
0.0163
0.0021
0.0001
0.0000
0.0000
0.0000
0.0000
mm

5.11. BOREHOLE BH - 11
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-11
Depth (m)
From
0.00
1.00
2.00
10.00
11.00
13.95
15.95
20.95
25.45
38.00

To
1.0
2.0
10.0
11.0
14.0
16.0
21.0
25.5
38.0
40.5

2 m
2 m
119.4 kN
2
29.9 kN/m
1 m

Soil Type
Very Soft Clay
Very Soft Clay
Medium Stiff Clay
Medium Dense Sand
Stiff Clay
Stiff Clay
Very Stiff Silt
Cemented Clay
Very Stiff Clay
Very Dense Sand

Thick
(m)
1
1
8
1.00
2.95
2
5
4.5
12.55
2.45

N'-SPTavr
1
1
8
26
12
15
16
51
26
55

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00693032 m

ST =

6.93031853 mm
24.9000 mm

E
(kN/m2)
769
769
4779
12000
8716
10895
11621
31639
18038
27500

m
0.4
0.4
0.3
0.25
0.3
0.3
0.35
0.2
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

5100

g'
(kN/m3)
5.1
5.1
8.3
10.7
9
9.2
9.2
11.7
10.5
11.2

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
6.67
6.67
53.36
80.04
100.05
106.72
340.17
173.42
-

(kN/m2)
2.55
7.65
43.40
81.95
100.58
123.05
155.25
204.58
296.79
376.40

(kN/m2)

(kN/m2)

19.11
2.44
0.90
0.66
0.47
0.35
0.20
0.11
0.11

26.76
45.84
82.85
101.23
123.52
155.60
204.78
296.90
376.51

PI
51.80
26.00
25.20
31.70
42.40
16.80
26.80
-

sc
(kN/m2)
22.11
258.78
393.82
440.19
399.88
1975.89
829.13
-

OCR

wL

2.89
5.96
3.92
3.58
2.58
9.66
2.79
-

65.56
42.22
32.22
32.22
32.22
26.67
37.78
-

Cc
0.50
0.29
0.0000
0.2000
0.20
0.2000
0.1500
0.25
0.00
Settlement

Cr
0.0500
0.0290
0.0200
0.0200
0.0200
0.0150
0.0250
-

e0

Stt
(m)

0.90
0.0143
0.62
0.0034
0.64
0.0001
0.68
0.0000
0.68
0.0001
0.30
0.0000
0.40
0.0000
17.9696 mm

5.11. BOREHOLE BH - 11
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-11
Depth (m)
From
0.00
1.00
2.00
10.00
11.00
13.95
15.95
20.95
25.45
38.00

To
1.0
2.0
10.0
11.0
14.0
16.0
21.0
25.5
38.0
40.5

5 m
5 m
365.2 kN
2
14.6 kN/m
1 m

Soil Type
Very Soft Clay
Very Soft Clay
Medium Stiff Clay
Medium Dense Sand
Stiff Clay
Stiff Clay
Very Stiff Silt
Cemented Clay
Very Stiff Clay
Very Dense Sand

Thick
(m)
1
1
8
1.00
2.95
2
5
4.5
12.55
2.45

N'-SPTavr
1
1
8
26
12
15
16
51
26
55

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00847654 m

ST =

8.47653808 mm
24.9000 mm

E
(kN/m2)
769
769
4779
12000
8716
10895
11621
31639
18038
27500

m
0.4
0.4
0.3
0.25
0.3
0.3
0.35
0.2
0.3
0.25

mavg

0.3

Eavg
(kN/m2)

5100

g'
(kN/m3)
5.1
5.1
8.3
10.7
9
9.2
9.2
11.7
10.5
11.2

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
6.67
6.67
53.36
80.04
100.05
106.72
340.17
173.42
-

(kN/m2)
2.55
7.65
43.40
81.95
100.58
123.05
155.25
204.58
296.79
376.40

(kN/m2)

(kN/m2)

12.07
3.65
1.74
1.35
1.02
0.80
0.49
0.29
0.29

19.72
47.05
83.69
101.92
124.07
156.05
205.07
297.07
376.68

PI
51.80
26.00
25.20
31.70
42.40
16.80
26.80
-

sc
(kN/m2)
22.11
258.78
393.82
440.19
399.88
1975.89
829.13
-

OCR

wL

2.89
5.96
3.92
3.58
2.58
9.66
2.79
-

65.56
42.22
32.22
32.22
32.22
26.67
37.78
-

Cc
0.50
0.29
0.0000
0.2000
0.20
0.2000
0.1500
0.25
0.00
Settlement

Cr
0.0500
0.0290
0.0200
0.0200
0.0200
0.0150
0.0250
-

e0

Stt
(m)

0.90
0.0108
0.62
0.0050
0.64
0.0002
0.68
0.0001
0.68
0.0001
0.30
0.0001
0.40
0.0001
16.4235 mm

5.12. BOREHOLE BH - 12
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-12
Depth (m)
From
0.00
1.00
4.00
5.70
8.00
9.40
12.35
13.70
15.45
16.95
20.00
23.00
24.60
26.00
30.00
33.20

To
1.0
4.0
5.7
8.0
9.4
12.4
13.7
15.5
17.0
20.0
23.0
24.6
26.0
30.0
33.2
40.5

1 m
1 m
25.9 kN
2
25.9 kN/m

Soil Type
Soft Clay
Soft Clay
Very Soft Organic Clay
Very Soft Organic Clay
Soft Clay
Loose Sand
Very Stiff Clay
Hard Clay
Dense Sand
Very Stiff Clay
Very Stiff Clay
Hard Clay
Medium Dense Sand
Hard Cemented Clay
Very Stiff Clay
Very Stiff Clay

Thick
(m)
1
3
1.7
2.30
1.40
2.95
1.35
1.75
1.5
3.05
3
1.6
1.4
4
3.2
7.25

N'-SPTavr
4
4
3
2
3
9
15
36
35
16
21
40
26
38
26
24

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

2.63654734

1 m

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

OK

Is =
If =
=

0.50192704
from graph

Se =

0.68
0.0048532 m

ST =

4.85320433 mm
24.9000 mm

E
(kN/m2)
4020
4020
3015
2010
3015
10800
20100
48240
42000
21440
28140
53600
31200
50920
34840
32160

m
0.35
0.35
0.4
0.4
0.35
0.35
0.3
0.2
0.25
0.3
0.3
0.2
0.3
0.2
0.3
0.3

mavg

0.4

Eavg
(kN/m2)

3116

g'
(kN/m3)
9
9
7.5
5.1
7.5
8.2
10.1
10.6
12.2
12.2
9
12.2
10.2
12.2
10.6
10.1

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
26.68
26.68
20.01
13.34
20.01
100.05
240.12
106.72
140.07
266.80
253.46
173.42
160.08

(kN/m2)
4.50
22.50
42.38
54.62
65.73
83.08
101.99
118.08
136.51
164.26
196.37
219.63
236.53
268.07
309.43
363.00

(kN/m2)

(kN/m2)

4.14
1.10
0.55
0.34
0.22
0.20
0.12
0.10
0.08
0.06
0.05
0.04
0.03
0.03
0.02

26.64
43.47
55.17
66.07
83.29
102.19
118.20
136.60
164.34
196.42
219.67
236.57
268.10
309.45
363.02

PI
121.80
93.00
126.80
121.80
17.20
16.80
26.00
34.20
21.80
27.80
31.30
31.80

sc
(kN/m2)
47.59
44.07
23.03
35.69
576.19
1394.75
517.56
592.16
1399.35
1190.74
767.99
703.15

OCR

wL

2.11
1.04
0.42
0.54
5.65
11.81
3.15
3.02
6.37
4.44
2.48
1.94

143.33
148.89
148.89
143.33
32.00
26.67
33.33
55.30
32.22
56.00
51.00
43.33

Cc
1.20
1.25
1.2500
1.2000
0.1980
0.1500
0.21
0.4077
0.2000
0.4140
0.3690
0.3000
Settlement

Cr
0.1200
0.1250
0.1250
0.1200
0.0198
0.0150
0.0210
0.0408
0.0200
0.0414
0.0369
0.0300

e0
2.30
2.38
2.35
2.00
0.44
0.30
0.50
0.81
0.20
0.97
0.59
0.30
20.0468

Stt
(m)
0.0080
0.0070
0.0037
0.0013
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
mm

5.12. BOREHOLE BH - 12
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-12
Depth (m)
From
0.00
1.00
4.00
5.70
8.00
9.40
12.35
13.70
15.45
16.95
20.00
23.00
24.60
26.00
30.00
33.20

To
1.0
4.0
5.7
8.0
9.4
12.4
13.7
15.5
17.0
20.0
23.0
24.6
26.0
30.0
33.2
40.5

2 m
2 m
42.2 kN
2
10.5 kN/m

Soil Type
Soft Clay
Soft Clay
Very Soft Organic Clay
Very Soft Organic Clay
Soft Clay
Loose Sand
Very Stiff Clay
Hard Clay
Dense Sand
Very Stiff Clay
Very Stiff Clay
Hard Clay
Medium Dense Sand
Hard Cemented Clay
Very Stiff Clay
Very Stiff Clay

Thick
(m)
1
3
1.7
2.30
1.40
2.95
1.35
1.75
1.5
3.05
3
1.6
1.4
4
3.2
7.25

N'-SPTavr
4
4
3
2
3
9
15
36
35
16
21
40
26
38
26
24

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

1.07485492

1 m

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

OK

Is =
If =
=

0.50192704
from graph

Se =

0.68
0.00395706 m

ST =

3.95706194 mm
24.8998 mm

E
(kN/m2)
4020
4020
3015
2010
3015
10800
20100
48240
42000
21440
28140
53600
31200
50920
34840
32160

m
0.35
0.35
0.4
0.4
0.35
0.35
0.3
0.2
0.25
0.3
0.3
0.2
0.3
0.2
0.3
0.3

mavg

0.4

Eavg
(kN/m2)

3116

g'
(kN/m3)
9
9
7.5
5.1
7.5
8.2
10.1
10.6
12.2
12.2
9
12.2
10.2
12.2
10.6
10.1

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
26.68
26.68
20.01
13.34
20.01
100.05
240.12
106.72
140.07
266.80
253.46
173.42
160.08

(kN/m2)
4.50
22.50
42.38
54.62
65.73
83.08
101.99
118.08
136.51
164.26
196.37
219.63
236.53
268.07
309.43
363.00

(kN/m2)

(kN/m2)

3.44
1.23
0.68
0.45
0.30
0.28
0.17
0.14
0.12
0.08
0.07
0.06
0.05
0.04
0.03

25.94
43.61
55.30
66.18
83.37
102.26
118.25
136.65
164.38
196.45
219.69
236.59
268.12
309.46
363.03

PI
121.80
93.00
126.80
121.80
17.20
16.80
26.00
34.20
21.80
27.80
31.30
31.80

sc
(kN/m2)
47.59
44.07
23.03
35.69
576.19
1394.75
517.56
592.16
1399.35
1190.74
767.99
703.15

OCR

wL

2.11
1.04
0.42
0.54
5.65
11.81
3.15
3.02
6.37
4.44
2.48
1.94

143.33
148.89
148.89
143.33
32.00
26.67
33.33
55.30
32.22
56.00
51.00
43.33

Cc
1.20
1.25
1.2500
1.2000
0.1980
0.1500
0.21
0.4077
0.2000
0.4140
0.3690
0.3000
Settlement

Cr
0.1200
0.1250
0.1250
0.1200
0.0198
0.0150
0.0210
0.0408
0.0200
0.0414
0.0369
0.0300

e0

Stt
(m)

2.30
0.0067
2.38
0.0078
2.35
0.0046
2.00
0.0017
0.44
0.0000
0.30
0.0000
0.50
0.0000
0.81
0.0000
0.20
0.0000
0.97
0.0000
0.59
0.0000
0.30
0.0000
20.9428 mm

5.12. BOREHOLE BH - 12
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-12
Depth (m)
From
0.00
1.00
4.00
5.70
8.00
9.40
12.35
13.70
15.45
16.95
20.00
23.00
24.60
26.00
30.00
33.20

To
1.0
4.0
5.7
8.0
9.4
12.4
13.7
15.5
17.0
20.0
23.0
24.6
26.0
30.0
33.2
40.5

5 m
5 m
100.5 kN
2
4.0 kN/m
1 m

Soil Type
Soft Clay
Soft Clay
Very Soft Organic Clay
Very Soft Organic Clay
Soft Clay
Loose Sand
Very Stiff Clay
Hard Clay
Dense Sand
Very Stiff Clay
Very Stiff Clay
Hard Clay
Medium Dense Sand
Hard Cemented Clay
Very Stiff Clay
Very Stiff Clay

Thick
(m)
1
3
1.7
2.30
1.40
2.95
1.35
1.75
1.5
3.05
3
1.6
1.4
4
3.2
7.25

N'-SPTavr
4
4
3
2
3
9
15
36
35
16
21
40
26
38
26
24

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.50192704
from graph

Se =

0.68
0.00377322 m

ST =

3.77321943 mm
24.8998 mm

E
(kN/m2)
4020
4020
3015
2010
3015
10800
20100
48240
42000
21440
28140
53600
31200
50920
34840
32160

m
0.35
0.35
0.4
0.4
0.35
0.35
0.3
0.2
0.25
0.3
0.3
0.2
0.3
0.2
0.3
0.3

mavg

0.4

Eavg
(kN/m2)

3116

g'
(kN/m3)
9
9
7.5
5.1
7.5
8.2
10.1
10.6
12.2
12.2
9
12.2
10.2
12.2
10.6
10.1

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
26.68
26.68
20.01
13.34
20.01
100.05
240.12
106.72
140.07
266.80
253.46
173.42
160.08

(kN/m2)
4.50
22.50
42.38
54.62
65.73
83.08
101.99
118.08
136.51
164.26
196.37
219.63
236.53
268.07
309.43
363.00

(kN/m2)

(kN/m2)

2.38
1.28
0.85
0.62
0.45
0.43
0.29
0.25
0.21
0.15
0.13
0.12
0.10
0.08
0.06

24.88
43.66
55.47
66.35
83.53
102.41
118.37
136.75
164.47
196.52
219.76
236.64
268.16
309.50
363.06

PI
121.80
93.00
126.80
121.80
17.20
16.80
26.00
34.20
21.80
27.80
31.30
31.80

sc
(kN/m2)
47.59
44.07
23.03
35.69
576.19
1394.75
517.56
592.16
1399.35
1190.74
767.99
703.15

OCR

wL

2.11
1.04
0.42
0.54
5.65
11.81
3.15
3.02
6.37
4.44
2.48
1.94

143.33
148.89
148.89
143.33
32.00
26.67
33.33
55.30
32.22
56.00
51.00
43.33

Cc
1.20
1.25
1.2500
1.2000
0.1980
0.1500
0.21
0.4077
0.2000
0.4140
0.3690
0.3000
Settlement

Cr
0.1200
0.1250
0.1250
0.1200
0.0198
0.0150
0.0210
0.0408
0.0200
0.0414
0.0369
0.0300

e0

Stt
(m)

2.30
0.0048
2.38
0.0081
2.35
0.0058
2.00
0.0023
0.44
0.0000
0.30
0.0000
0.50
0.0000
0.81
0.0000
0.20
0.0000
0.97
0.0000
0.59
0.0000
0.30
0.0000
21.1266 mm

5.13. BOREHOLE BH - 13
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-13
Depth (m)
From
0.00
1.00
3.40
6.00
7.70
13.00
14.00
17.00
18.00
20.00
26.20
28.45
29.50
33.40
36.00

To
1.0
3.4
6.0
7.7
13.0
14.0
17.0
18.0
20.0
26.2
28.5
29.5
33.4
36.0
40.5

1 m
1 m
133.1 kN
2
133.1 kN/m
1 m

Thick
(m)
1
2.4
2.6
1.70
5.30
1
3
1
2
6.2
2.25
1.05
3.9
2.6
4.45

Soil Type
Stiff Clay
Stiff Clay
Medium Dense Sand
Medium Stiff Clay
Stiff Clay
Stiff Silt
Stiff Clay
Medium Dense Sand
Stiff Clay
Medium Dense Sand
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Hard Clay
Very Stiff Clay

N'-SPTavr
12
10
10
7
9
9
10
22
14
28
21
26
20
56
30

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00649413 m

ST =

6.49412505 mm
24.8999 mm

E
(kN/m2)
14740
14740
12000
9380
12060
12060
13400
26400
18760
33600
28140
31200
26800
75040
40200

m
0.3
0.3
0.25
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.2
0.3

mavg

0.3

Eavg
(kN/m2)

12317

g'
(kN/m3)
8.7
8.7
8.2
9.5
9.8
9.8
10
9.7
9.8
11.2
10.3
11.7
10
11.4
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
80.04
66.70
46.69
60.03
60.03
66.70
93.38
140.07
133.40
373.52
200.10

(kN/m2)
4.35
19.14
40.24
79.86
93.02
123.89
143.79
163.64
178.29
222.81
269.12
286.85
312.49
346.81
385.22

(kN/m2)

(kN/m2)

27.49
6.02
2.84
1.24
0.73
0.54
0.43
0.37
0.27
0.19
0.16
0.13
0.11
0.09

46.63
46.26
82.69
94.26
124.62
144.33
164.07
178.66
223.08
269.31
287.01
312.62
346.92
385.31

PI
31.80
37.80
18.80
18.80
17.80
26.40
23.80
21.80
11.80
16.80

sc
(kN/m2)
292.98
186.86
334.32
334.32
379.28
449.63
707.21
699.67
2430.82
1162.29

OCR

wL

15.31
2.34
3.59
2.70
2.64
2.52
2.63
2.24
7.01
3.02

43.33
50.00
28.89
28.89
27.78
37.33
34.44
32.22
21.11
26.67

Cc
0.30
0.00
0.3600
0.1700
0.17
0.1600
0.0000
0.25
0.00
0.2200
0.0000
0.20
0.1000
0.1500
Settlement

Cr
0.0300
0.0360
0.0170
0.0170
0.0160
0.0246
0.0220
0.0200
0.0100
0.0150

e0
0.60
0.82
0.49
0.49
0.45
0.49
0.30
0.25
0.15
0.20
18.4058

Stt
(m)
0.0174
0.0005
0.0003
0.0000
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
mm

5.13. BOREHOLE BH - 13
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-13
Depth (m)
From
0.00
1.00
3.40
6.00
7.70
13.00
14.00
17.00
18.00
20.00
26.20
28.45
29.50
33.40
36.00

To
1.0
3.4
6.0
7.7
13.0
14.0
17.0
18.0
20.0
26.2
28.5
29.5
33.4
36.0
40.5

2 m
2 m
266.6 kN
2
66.7 kN/m

Thick
(m)
1
2.4
2.6
1.70
5.30
1
3
1
2
6.2
2.25
1.05
3.9
2.6
4.45

Soil Type
Stiff Clay
Stiff Clay
Medium Dense Sand
Medium Stiff Clay
Stiff Clay
Stiff Silt
Stiff Clay
Medium Dense Sand
Stiff Clay
Medium Dense Sand
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Hard Clay
Very Stiff Clay

N'-SPTavr
12
10
10
7
9
9
10
22
14
28
21
26
20
56
30

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.50

Settlement location :
Thus

H
a
m'
n'

=
=

center
8.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.7576547
0.7576547

A2 =

0.0153864

Therefore :

OK

1 m

F1 =

0.482338

F2 =

0.0195891

Is =

0.501927

If =

from graph

=
Se =

0.65
0.006507 m

ST =

6.5069656 mm
24.9000 mm

E
(kN/m2)
14740
14740
12000
9380
12060
12060
13400
26400
18760
33600
28140
31200
26800
75040
40200

m
0.3
0.3
0.25
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.2
0.3

mavg

0.3

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8.7
8.7
8.2
9.5
9.8
9.8
10
9.7
9.8
11.2
10.3
11.7
10
11.4
10.6

(kN/m2)
80.04
66.70
46.69
60.03
60.03
66.70
93.38
140.07
133.40
373.52
200.10

(kN/m2)
4.35
19.14
40.24
79.86
93.02
123.89
143.79
163.64
178.29
222.81
269.12
286.85
312.49
346.81
385.22

(kN/m2)

(kN/m2)

26.04
8.21
4.33
2.07
1.27
0.95
0.78
0.67
0.50
0.36
0.30
0.25
0.21
0.17

45.18
48.45
84.18
95.09
125.16
144.74
164.42
178.96
223.31
269.47
287.14
312.74
347.02
385.39

12317

PI

31.80
37.80
18.80
18.80
17.80
26.40
23.80
21.80
11.80
16.80

sc
(kN/m2)
292.98
186.86
334.32
334.32
379.28
449.63
707.21
699.67
2430.82
1162.29

OCR

wL

Cc

Cr

15.31
2.34
3.59
2.70
2.64
2.52
2.63
2.24
7.01
3.02

43.33
50.00
28.89
28.89
27.78
37.33
34.44
32.22
21.11
26.67

0.30
0.00
0.3600
0.1700
0.17
0.1600
0.0000
0.25
0.00
0.2200
0.0000
0.20
0.1000
0.1500
Settlement

0.0300
0.0360
0.0170
0.0170
0.0160
0.0246
0.0220
0.0200
0.0100
0.0150

e0

Stt
(m)

0.60
0.0168
0.82
0.0008
0.49
0.0006
0.49
0.0001
0.45
0.0001
0.49
0.0001
0.30
0.0000
0.25
0.0000
0.15
0.0000
0.20
0.0000
18.3930 mm

5.13. BOREHOLE BH - 13
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-13
Depth (m)
From
0.00
1.00
3.40
6.00
7.70
13.00
14.00
17.00
18.00
20.00
26.20
28.45
29.50
33.40
36.00

To
1.0
3.4
6.0
7.7
13.0
14.0
17.0
18.0
20.0
26.2
28.5
29.5
33.4
36.0
40.5

5 m
5 m
794.7 kN
2
31.8 kN/m
1 m

Thick
(m)
1
2.4
2.6
1.70
5.30
1
3
1
2
6.2
2.25
1.05
3.9
2.6
4.45

Soil Type
Stiff Clay
Stiff Clay
Medium Dense Sand
Medium Stiff Clay
Stiff Clay
Stiff Silt
Stiff Clay
Medium Dense Sand
Stiff Clay
Medium Dense Sand
Very Stiff Clay
Medium Dense Sand
Very Stiff Clay
Hard Clay
Very Stiff Clay

N'-SPTavr
12
10
10
7
9
9
10
22
14
28
21
26
20
56
30

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.20

Settlement location :
Thus

H
a
m'
n'

=
=

center
20.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

OK

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00775718 m

ST =

7.75718167 mm
24.9000 mm

E
(kN/m2)
14740
14740
12000
9380
12060
12060
13400
26400
18760
33600
28140
31200
26800
75040
40200

m
0.3
0.3
0.25
0.3
0.3
0.25
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.2
0.3

mavg

0.3

Eavg
(kN/m2)

12317

g'
(kN/m3)
8.7
8.7
8.2
9.5
9.8
9.8
10
9.7
9.8
11.2
10.3
11.7
10
11.4
10.6

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
80.04
66.70
46.69
60.03
60.03
66.70
93.38
140.07
133.40
373.52
200.10

(kN/m2)
4.35
19.14
40.24
79.86
93.02
123.89
143.79
163.64
178.29
222.81
269.12
286.85
312.49
346.81
385.22

(kN/m2)

(kN/m2)

20.67
10.50
6.75
3.86
2.59
2.04
1.72
1.50
1.17
0.86
0.73
0.63
0.53
0.45

39.81
50.74
86.61
96.88
126.48
145.83
165.36
179.79
223.98
269.98
287.58
313.12
347.34
385.66

PI

31.80
37.80
18.80
18.80
17.80
26.40
23.80
21.80
11.80
16.80

sc
(kN/m2)
292.98
186.86
334.32
334.32
379.28
449.63
707.21
699.67
2430.82
1162.29

OCR

wL

Cc

Cr

15.31
2.34
3.59
2.70
2.64
2.52
2.63
2.24
7.01
3.02

43.33
50.00
28.89
28.89
27.78
37.33
34.44
32.22
21.11
26.67

0.30
0.00
0.3600
0.1700
0.17
0.1600
0.0000
0.25
0.00
0.2200
0.0000
0.20
0.1000
0.1500
Settlement

0.0300
0.0360
0.0170
0.0170
0.0160
0.0246
0.0220
0.0200
0.0100
0.0150

e0

Stt
(m)

0.60
0.0143
0.82
0.0012
0.49
0.0011
0.49
0.0001
0.45
0.0002
0.49
0.0001
0.30
0.0001
0.25
0.0001
0.15
0.0000
0.20
0.0000
17.1428 mm

5.14. BOREHOLE BH - 14
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-14
Depth (m)
From
0.00
1.00
1.00
4.00
8.45
11.00
20.00
23.80
27.50
34.00
35.00
37.00

To
1.0
1.9
4.0
8.5
11.0
20.0
23.8
27.5
34.0
35.0
37.0
40.5

5.5 m
5.5 m
230.0 kN
2
7.6 kN/m

Thick
(m)
1
0.85
3
4.45
2.55
9
3.8
3.7
6.5
1
2
3.45

Soil Type
Gravelly Sand
Gravelly Sand
Medium Stiff Silt
Very Soft Organic Clay
Medium Stiff Silt
Stiff Clay
Very Stiff Clay
Dense Sand
Very Stiff Clay
Hard Clay
Very Stiff Clay
Hard Clay

N'-SPTavr
50
50
8
2
7
12
20
34
28
41
26
32

0.18

Settlement location :
Thus

H
a
m'
n'

=
=

center
22.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.75765471
0.75765471

A2 =

0.01538644

F1 =

0.48233797

F2 =

0.01958907

Therefore :

0.77532126

1 m

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

OK

Is =
If =
=

0.50192704
from graph

Se =

0.65
0.00237646 m

ST =

2.37645577 mm
23.9083 mm

E
(kN/m2)
60000
60000
8040
2010
7035
16080
26800
40800
37520
54940
34840
42880

m
0.2
0.2
0.3
0.4
0.3
0.3
0.3
0.25
0.3
0.2
0.35
0.2

mavg

0.3

Eavg
(kN/m2)

10128

g'
(kN/m3)
12.2
12.2
9
7.5
8.9
9.5
9.8
11.2
10.5
11.4
10.3
10.8

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)
53.36
13.34
46.69
80.04
133.40
186.76
273.47
173.42
213.44

(kN/m2)
6.10
17.39
36.07
66.26
94.29
148.39
209.76
249.10
303.95
343.77
359.77
388.70

(kN/m2)

(kN/m2)

6.55
3.73
1.72
1.01
0.53
0.50
0.24
0.18
0.17
0.13
0.12

23.94
39.80
67.97
95.30
148.92
210.26
249.34
304.12
343.94
359.90
388.82

PI

91.80
147.80
17.80
19.80
42.80
24.30
16.80
27.80
21.80

sc
(kN/m2)
118.67
20.31
265.50
436.76
497.09
934.22
1588.46
814.71
1119.48

OCR

wL

Cc

Cr

3.29
0.31
2.82
2.94
2.37
3.07
4.62
2.26
2.88

110.00
172.22
27.78
30.00
55.56
35.00
26.67
38.89
32.22

0.90
1.4600
0.1600
0.18
0.4100
0.23
0.15
0.2600
0.2000
Settlement

0.0675
0.1095
0.0256
0.0295
0.0741
0.0382
0.0237
0.0450
0.0334

e0
2.00
3.02
0.62
0.48
0.76
0.60
0.40
0.68
0.60
21.5319

Stt
(m)
0.00289
0.01795
0.00019
0.00028
0.00017
0.00004
0.00000
0.00001
0.00001
mm

5.1. NBL - 13
Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : NBL-13
Depth (m)
From
0.00
1.00
4.00
4.79
8.00
11.75
15.00
16.50
20.00
20.70
22.05
22.50
27.00
27.60
30.00
30.45

To
1.0
4.0
4.8
8.0
11.8
15.0
16.5
20.0
20.7
22.1
22.5
27.0
27.6
30.0
30.5
32.0

1 m
1 m
87.4 kN
2
87.4 kN/m

Soil Type
Soft Clay
Soft Clay
Very Soft Organic Clay
Loose Sand
Stiff Clay
Dense Sand
Very Dense Sand
Very Stiff Clay
Very Soft Organic Clay
Stiff Clay
Very Stiff Clay
Very Dense Sand
Hard Clay
Very Dense Sand
Hard Clay
Very Stiff Sandy Silt

Thick
(m)
1
3
0.79
3.21
3.75
3.25
1.5
3.5
0.7
1.35
0.45
4.5
0.6
2.4
0.45
1.55

N'-SPTavr
7
7
4
3
10
35
60
16
20
23
27
80
60
52
34
30

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :


Ao =
A1 =

0.757654708
0.757654708

A2 =

0.015386436

F1 =

0.482337968

F2 =

0.019589073

Therefore :

OK

1 m

Is =
If =
=

0.501927041
from graph

Se =

0.68
0.008465096 m

ST =

8.465096309 mm
24.9000 mm

E
(kN/m2)
3000
3000
2500
10000
12000
35000
45000
23000
3000
12000
23000
46000
24000
50000
24000
25000

m
0.35
0.35
0.4
0.35
0.3
0.25
0.2
0.3
0.4
0.3
0.3
0.2
0.25
0.2
0.25
0.25

mavg

0.4

Eavg

g'

cu

s'v

Ds

s1=s'v+Ds

(kN/m2)

(kN/m3)
8
8
7.5
10
8
12
15
10
7.5
9
10
17
12
12.2
12.2
11

(kN/m2)
46.69
46.69
26.68
66.70
106.72
133.40
153.41
180.09
400.20
226.78
-

(kN/m2)
4.00
20.00
34.96
53.98
85.03
119.53
150.28
179.03
199.15
207.85
216.18
256.68
298.53
316.77
334.15
345.42

(kN/m2)

(kN/m2)

13.98
4.52
2.14
0.90
0.49
0.45
0.26
0.21
0.19
0.18
0.14
0.12
0.11
0.10
0.09

33.98
39.49
56.11
85.92
120.01
150.73
179.29
199.36
208.04
216.35
256.82
298.64
316.87
334.25
345.51

6154

PI

41.80
93.00
11.80
11.80
21.80
26.00
34.20
6.80
31.30
-

sc
(kN/m2)
176.42
58.75
434.08
694.52
699.67
743.99
761.35
2960.94
1004.30
-

OCR

wL

Cc

Cr

8.82
1.68
5.11
3.88
3.51
3.58
3.52
9.92
3.01
-

54.44
121.11
21.11
21.11
32.22
21.11
21.11
15.56
15.56
-

0.40
1.00
0.1000
0.1980
0.1000
0.20
0.10
0.1000
0.05
0.0500
Settlement

0.0400
0.1000
0.0100
0.0198
0.0100
0.0334
0.0100
0.0100
0.0043
0.0050
-

e0

Stt
(m)

1.20
0.0126
0.10
0.0038
1.50
0.0001
1.50
0.0000
0.70
0.0000
1.50
0.0000
1.60
0.0000
2.00
0.0000
2.00
0.0000
16.4349 mm

LONG TERM SETTLEMENT AFTER TERZAGHI


Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-14
Depth (m)
From
0.00
1.00
1.00
4.00
8.45
11.00
20.00
23.80
27.50
34.00
35.00
37.00

To
1.0
1.9
4.0
8.5
11.0
20.0
23.8
27.5
34.0
35.0
37.0
40.5

Soil Type
Gravelly Sand
Gravelly Sand
Medium Stiff Silt
Very Soft Organic Clay
Medium Stiff Silt
Stiff Clay
Very Stiff Clay
Dense Sand
Very Stiff Clay
Hard Clay
Very Stiff Clay
Hard Clay

7.3 m
9.8 m
220.0 kN
2
3.1 kN/m
3m

Thick
(m)
1
0.85
3
4.45
2.55
9
3.8
3.7
6.5
1
2
3.45

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

0.41

OK

N'-SPTavr
50
50
8
2
7
12
20
34
28
41
26
32

E
(kN/m2)
60000
60000
8040
2010
7035
16080
26800
40800
37520
54940
34840
42880

m
0.3
0.3
0.3
0.3
0.35
0.35
0.35
0.25
0.35
0.4
0.3
0.4

mavg

0.3

Settlement location :
Thus

H
a
m'
n'

=
=

center
29.20 m
4
1.342466
8

From the parameter above we obtain :


Ao =
A1 =

0.759962
0.795897

A2 =

0.020531

F1 =

0.495245

F2 =

1.497578

Is =

1.992824

If =

from graph

Therefore :

For All Calculation See Note Tab.

Se =

0.57
0.004218 m

ST =

4.218007 mm
24.9364 mm

Eavg
2

(kN/m )

10725

g'

s'v

cu
3

(kN/m )
12.2
12.2
9
7.5
8.9
9.5
9.8
11.2
10.5
11.4
10.3
10.8

(kN/m )
53.36
13.34
46.69
80.04
133.40
186.76
273.47
173.42
213.44

s1=s'v+Ds

Ds
2

(kN/m )
6.10
17.39
36.07
66.26
94.29
148.39
209.76
249.10
303.95
343.77
359.77
388.70

(kN/m )

(kN/m )

1.92
1.09
0.55
0.32
0.24
0.21
0.14
0.13
0.12

68.18
95.38
148.94
210.08
249.34
304.15
343.91
359.90
388.82

PI

147.80
17.80
19.80
42.80
24.30
16.80
27.80
21.80

sc
(kN/m2)

20.31
265.50
436.76
497.09
934.22
1588.46
814.71
1119.48

OCR

0.31
2.82
2.94
2.37
3.07
4.62
2.26
2.88

wL

Cc

Cr

e0

Stt
(m)

e0
0.00

172.22
27.78
30.00
55.56
35.00
26.67
38.89
32.22

1.4600
0.1600
0.18
0.4100
0.23
0.15
0.2600
0.2000
Settlement

0.1095
0.0256
0.0295
0.0741
0.0382
0.0237
0.0450
0.0334

3.02
0.62
0.48
0.76
0.60
0.40
0.68
0.60

0.02006
0.00020
0.00029
0.00010
0.00005
0.00000
0.00001
0.00001
20.7184 mm

2.00
3.02
0.62
0.48
0.76
0.00
0.60
0.40
0.68
0.60

LONG TERM SETTLEMENT AFTER TERZAGHI


Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-22
Depth (m)
From
0.00
1.00
8.00
12.45
18.00
20.00
26.95
39.00

To
1.0
8.0
12.5
18.0
20.0
27.0
39.0
45.5

Soil Type
Gravelly Sand
Gravelly Sand
Very Soft Clay
Soft Clay
Soft Organic Clay
Soft Organic Clay
Very Stiff Clay
Medium Dense To Dense Sand

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

1m
1m
23.0 kN
2
23.0 kN/m

OK

1m

Thick
(m)
1
7
4.45
5.55
2.00
6.95
12.05
6.45

N'-SPTavr
3
3
2
2
3
5
18
30

E
(kN/m2)
3600
3600
2010
2010
3015
5025
18090
36000

m
0.2
0.2
0.3
0.3
0.3
0.3
0.35
0.3

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1

From the parameter above we obtain :


Ao =
A1 =

0.757655
0.87374

A2 =

0.015386

F1 =

0.519289

F2 =

1.122371

Is =

1.249721

If =

from graph

Therefore :

For All Calculation See Note Tab.

Se =

0.65
0.013083 m

ST =

13.08343 mm
14.6966 mm

mavg

0.3

Eavg
2

(kN/m )

2665

g'

s'v

cu
3

(kN/m )
6.2
6.2
7.5
7.5
7.5
7.8
9
11.2

(kN/m )
13.34
13.34
20.01
33.35
120.06
-

s1=s'v+Ds

Ds
2

(kN/m )
3.10
27.90
22.89
60.39
88.70
123.31
204.64
294.98

(kN/m )

(kN/m )

2.07
0.22
0.10
0.06
0.04
0.03
0.01

29.97
23.11
60.49
88.76
123.35
204.67
294.99

PI
65.20
52.40
39.40
37.30
52.70
-

sc
(kN/m2)
37.98
43.90
78.23
134.47
393.65
-

OCR

wL

Cc

Cr

e0

1.66
0.73
0.88
1.09
1.92
-

99.20
83.00
64.00
65.00
78.00
-

0.61
0.5500
0.7000
0.48
0.3700
Settlement

0.0458
0.0413
0.0675
0.0634
0.0278
-

1.53
1.46
1.50
1.36
0.94
-

Stt
(m)
0.00033
0.00088
0.00017
0.00021
0.00001
1.6132 mm

e0
0.00
0.00
1.53
1.46
1.50
1.36
0.94
0.00

LONG TERM SETTLEMENT AFTER TERZAGHI


Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
2.95
8.95
9.65
10.00
13.00
15.00
21.00
21.45
22.95
23.50
25.50
27.45

To
1.0
3.0
9.0
9.7
10.0
13.0
15.0
21.0
21.5
23.0
23.5
25.5
27.5
30.5

Soil Type
Stiff Silt
Very Stiff Clay
Stiff Silt
Stiff Organic Clay
Stiff Clay
Silty Sand Medium Dense
Sand Medium Dense
Sand Medium Dense
Sandy Clay
Sandy Silt
Stiff Clay
Stiff Clay
Very Stiff Clay
Very Stiff Clay

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

1m
1m
50.0 kN
2
50.0 kN/m

OK

1m

Thick
(m)
1
1.95
6
0.70
0.35
3
2
6
0.45
1.5
0.55
2
1.95
3

N'-SPTavr
16
17
10
12
12
13
17
16
24
16
13
13
22
32

E
(kN/m2)
12256
13022
7660
9192
9192
9958
13022
12256
18384
12256
9958
9958
16852
24512

m
0.3
0.35
0.3
0.3
0.3
0.3
0.3
0.3
0.35
0.3
0.3
0.3
0.35
0.35

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1

From the parameter above we obtain :

Therefore :

Ao =
A1 =

0.757655
0.87374

A2 =

0.015386

F1 =

0.519289

F2 =

1.122371

Is =

1.134403

If =

from graph

For All Calculation See Note Tab.

Se =

0.65
0.007405 m

ST =

7.405064 mm
24.8677 mm

mavg

0.3

Eavg
2

(kN/m )

8993

g'

s'v

cu
3

(kN/m )
9.31
10.19
9.31
9.31
9.31
8.11
9.11
9.11
12.11
10.11
9.31
9.31
11.11
12.11

(kN/m )
106.72
113.39
66.70
80.04
80.04
160.08
106.72
86.71
86.71
146.74
213.44

s1=s'v+Ds

Ds
2

(kN/m )
4.66
19.25
57.11
88.30
93.19
106.98
128.26
164.70
194.75
205.06
215.20
227.07
247.21
276.21

(kN/m )

(kN/m )

12.82
1.41
0.58
0.52
0.38
0.33
0.15
0.11
0.09
0.09
0.08
0.07
0.06

32.06
58.52
88.88
93.70
107.36
128.59
164.85
194.86
205.15
215.30
227.15
247.28
276.27

PI
31.80
71.80
71.80
71.80
41.80
41.80
51.80
51.80
31.80
31.80

sc
(kN/m2)
498.07
177.55
213.07
213.07
604.85
403.23
287.44
287.44
644.56
937.54

OCR

wL

Cc

Cr

e0

25.88
3.11
2.41
2.29
3.11
1.97
1.34
1.27
2.61
3.39

43.33
87.78
87.78
87.78
54.44
54.44
65.56
65.56
43.33
43.33

0.30
0.70
0.7000
0.7000
0.00
0.0000
0.0000
0.40
0.40
0.5000
0.5000
0.30
0.3000
Settlement

0.0528
0.0525
0.0525
0.0525
0.0722
0.0722
0.0375
0.0375
0.0528
0.0528

0.51
0.51
0.51
0.51
0.50
0.50
0.87
0.87
0.70
0.70

Stt
(m)
0.0151
0.0022
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
17.4627 mm

e0
0.51
0.51
0.51
0.51
0.51
0.51
0.00
0.00
0.50
0.50
0.87
0.87
0.70
0.70

LONG TERM SETTLEMENT AFTER TERZAGHI


Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
2.00
2.95
8.95
9.65
10.00
13.00
15.00
21.00
21.45
22.95
23.50
25.50
27.45

To
1.0
2.0
3.0
9.0
9.7
10.0
13.0
15.0
21.0
21.5
23.0
23.5
25.5
27.5
30.5

Soil Type
Stiff Silt
Very Stiff Clay
Very Stiff Clay
Stiff Silt
Stiff Organic Clay
Stiff Clay
Silty Sand Medium Dense
Sand Medium Dense
Sand Medium Dense
Sandy Clay
Sandy Silt
Stiff Clay
Stiff Clay
Very Stiff Clay
Very Stiff Clay

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

2.00

1m
1m
42.0 kN
2
42.0 kN/m

OK

2m

Thick
(m)
1
1
0.95
6
0.70
0.35
3
2
6
0.45
1.5
0.55
2
1.95
3

N'-SPTavr
16
17
17
10
12
12
13
17
16
24
16
13
13
22
32

E
(kN/m2)
12256
13022
13022
7660
9192
9192
9958
13022
12256
18384
12256
9958
9958
16852
24512

m
0.3
0.3
0.35
0.3
0.3
0.3
0.3
0.3
0.3
0.35
0.3
0.3
0.3
0.35
0.35

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

Ao =
A1 =

0.7576547
0.8737399

A2 =

0.0153864

F1 =

0.519289

F2 =

1.1223712

Is =

1.6416603

If =
=

For All Calculation See Note Tab.

from graph

Se =

0.65
0.0095948 m

ST =

9.59480756 mm
24.7831 mm

mavg

0.3

Eavg
2

(kN/m )

8466

g'

s'v

cu
3

(kN/m )
9.31
10.19
10.19
9.31
9.31
9.31
8.11
9.11
9.11
12.11
10.11
9.31
9.31
11.11
12.11

(kN/m )
106.72
113.39
113.39
66.70
80.04
80.04
160.08
106.72
86.71
86.71
146.74
213.44

s1=s'v+Ds

Ds
2

(kN/m )
4.66
14.41
15.03
47.80
78.99
83.88
97.67
118.95
155.39
185.44
195.75
205.89
217.76
237.90
266.90

(kN/m )

(kN/m )

19.30
1.71
0.61
0.54
0.38
0.25
0.16
0.07
0.09
0.09
0.07
0.06
0.05

34.34
49.51
79.60
84.42
98.05
119.19
155.55
185.51
195.84
205.98
217.83
237.97
266.95

PI

71.80
71.80
71.80
71.80
41.80
41.80
51.80
51.80
31.80
31.80

sc
(kN/m2)

301.84
177.55
213.07
213.07
604.85
403.23
287.44
287.44
644.56
937.54

OCR

20.08
3.71
2.70
2.54
3.26
2.06
1.40
1.32
2.71
3.51

wL

87.78
87.78
87.78
87.78
54.44
54.44
65.56
65.56
43.33
43.33

Cc

0.7000
0.7000
0.7000
0.7000
0.00
0.0000
0.0000
0.40
0.40
0.5000
0.5000
0.30
0.3000
Settlement

Cr

0.0525
0.0525
0.0525
0.0525
0.0722
0.0722
0.0375
0.0375
0.0528
0.0528

e0

0.51
0.51
0.51
0.51
0.50
0.87
0.87
0.70
0.70
0.70

Stt
(m)

0.0119
0.0032
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
15.1883 mm

e0
0.51
0.51
0.51
0.51
0.51
0.51
0.00
0.00
0.50
0.50
0.87
0.87
0.70
0.70
0.70

LONG TERM SETTLEMENT AFTER TERZAGHI


Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
2.95
8.95
9.65
10.00
13.00
15.00
21.00
21.45
22.95
23.50
25.50
27.45

To
1.0
3.0
9.0
9.7
10.0
13.0
15.0
21.0
21.5
23.0
23.5
25.5
27.5
30.5

Soil Type
Stiff Silt
Very Stiff Clay
Stiff Silt
Stiff Organic Clay
Stiff Clay
Silty Sand Medium Dense
Sand Medium Dense
Sand Medium Dense
Sandy Clay
Sandy Silt
Stiff Clay
Stiff Clay
Very Stiff Clay
Very Stiff Clay

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

3.00

1m
1m
30.0 kN
2
30.0 kN/m

OK

3m

Thick
(m)
1
1.95
6
0.70
0.35
3
2
6
0.45
1.5
0.55
2
1.95
3

N'-SPTavr
16
17
10
12
12
13
17
16
24
16
13
13
22
32

E
(kN/m2)
12256
13022
7660
9192
9192
9958
13022
12256
18384
12256
9958
9958
16852
24512

m
0.3
0.35
0.3
0.3
0.3
0.3
0.3
0.3
0.35
0.3
0.3
0.3
0.35
0.35

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

Ao =
A1 =

0.757655
0.87374

A2 =

0.015386

F1 =

0.519289

F2 =

1.122371

Is =

2.774018

If =

from graph

For All Calculation See Note Tab.

Se =

0.67
0.012865 m

ST =

12.86472 mm
24.1695 mm

mavg

0.3

Eavg
2

(kN/m )

7888

g'

s'v

cu
3

(kN/m )
9.31
10.19
9.31
9.31
9.31
8.11
9.11
9.11
12.11
10.11
9.31
9.31
11.11
12.11

(kN/m )
106.72
113.39
66.70
80.04
80.04
160.08
106.72
86.71
86.71
146.74
213.44

s1=s'v+Ds

Ds
2

(kN/m )
4.66
19.25
57.11
88.30
93.19
106.98
128.26
164.70
194.75
205.06
215.20
227.07
247.21
276.21

(kN/m )

(kN/m )

7.50
0.56
0.48
0.33
0.21
0.13
0.08
0.07
0.07
0.06
0.05
0.04

64.61
88.85
93.67
107.31
128.46
164.83
194.83
205.13
215.27
227.13
247.26
276.25

PI

71.80
71.80
71.80
41.80
41.80
51.80
51.80
31.80
31.80

sc
(kN/m2)

177.55
213.07
213.07
604.85
403.23
287.44
287.44
644.56
937.54

OCR

3.11
2.41
2.29
3.11
1.97
1.34
1.27
2.61
3.39

wL

87.78
87.78
87.78
54.44
54.44
65.56
65.56
43.33
43.33

Cc

0.70
0.7000
0.7000
0.00
0.0000
0.0000
0.40
0.40
0.5000
0.5000
0.30
0.3000
Settlement

Cr

0.0525
0.0525
0.0525
0.0722
0.0722
0.0375
0.0375
0.0528
0.0528

e0

0.51
0.51
0.51
0.50
0.50
0.87
0.87
0.70
0.70

Stt
(m)

0.0112
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
11.3048 mm

e0
0.51
0.51
0.51
0.51
0.51
0.51
0.00
0.00
0.50
0.50
0.87
0.87
0.70
0.70
0.70

LONG TERM SETTLEMENT AFTER TERZAGHI


Bg
Lg
Pg

=
=
=

Pg

=
=

Depth of Foundation (Df)


Location : BH-01
Depth (m)
From
0.00
1.00
7.00
8.50
11.00
11.95
16.95
21.95
24.00
25.00

To
1.0
7.0
8.5
11.0
12.0
17.0
22.0
24.0
25.0
30.5

Soil Type
Silty Coral Gravel
Silty Coral Gravel
Silty Coral Gravel
Silty Coral Gravel
Medium Stiff Clay
Soft Clay
Soft Clay
Medium Stiff Clay
Silty Sand
Medium Dense Sand

ELASTIC SETTLEMENT SETTLEMENT


Df/B =

1.00

1m
1m
79.8 kN
2
79.8 kN/m

OK

1m

Thick
(m)
1
6
1.5
2.50
0.95
5
5
2.05
1
5.45

N'-SPTavr
9
9
38
13
4
2
2
4
26
27

E
(kN/m2)
6894
6894
29108
9958
3064
1532
1532
3064
19916
20682

m
0.25
0.25
0.35
0.3
0.3
0.25
0.3
0.3
0.3
0.35

Settlement location :
Thus

H
a
m'
n'

=
=

center
4.00
4
1
8

From the parameter above we obtain :

Therefore :

Ao =
A1 =

0.757655
0.87374

A2 =

0.015386

F1 =

0.519289

F2 =

1.122371

Is =

1.210576

If =

from graph

For All Calculation See Note Tab.

Se =

0.65
0.010545 m

ST =

10.54524 mm
10.5452 mm

mavg

0.3

Eavg
2

(kN/m )

10992

g'

s'v

cu
3

(kN/m )
6
6
9
7
7.6
6
6
7.6
8
8.5

(kN/m )
26.68
13.34
13.34
26.68
-

s1=s'v+Ds

Ds
2

(kN/m )
3.00
24.00
48.75
64.25
76.61
95.22
125.22
148.01
159.80
186.96

(kN/m )

(kN/m )

4.99
1.33
0.84
0.61
0.38
0.32
0.15
0.13
0.10

28.99
50.08
65.09
77.22
95.60
125.54
148.16
159.93
187.06

PI
71.80
41.80
41.80
31.80
-

sc
(kN/m2)
71.02
50.40
50.40
117.19
-