You are on page 1of 17

1

AC1 51 7.2R-87
(Revised 1992)

Accelerated Curing of Concrete at Atmospheric Pressure-State of the Art


Reported by AC1 Committee 5 17
Luke M. Snell Chairman Robert M. Bamoff Russell J. Burley Frank V. Camarda Kevin D. Callahan Sidney Freedman Richard E. Galer Lee Polisner Vice Chairman Steven H. Gebler Mark B . Hogan Joseph J. Jerome Nicholas Kozin Roman Malinowski W. cahiin McCall* LeoB. Walbert Secretaiy Robert E. Price Leo E. Rivkind Jere H. Rose Thomas H. Sadler Joe A. Willett

Committee members voting on the 1992 revisions are listed on p. 517.2R-17


Accelerated curing of concrete is used extensivly in lhe production of precast concrete structural members, pipe, masonry units, and presressedproducts. Steam curing isprobably the mosi widely used mehod at the present time. Recent modi6 cations and changes in this method are discussed, as wellas effectof the curing cycles In addition t steam curing, the effect of variaiions in the concrete materials on o accelerated curing is discussed, as are special cements and accelerators. Special treatments, including carbonation, accelerated drying, and heating prior to molding, are also cover& In addition, other accelerated curing methods such as &~ca[ oil, and infrared heating, are discussed.
Keywords accelerated curing; admixtures. atmospheric
pressurre

Chapter 3-ERect 5f variati5ns in acceleratedcuring cycles, page 517.m-4


3.1-General 3.2-Curmg for concrete masonry units 3.3-Curing concrete pipe 3.4-Curing of precast andor prestressed concrete products

Chapter 4-Special treatments, page 537.m-57


4.1-General 4.2-Carbonation treatment methods 4.3-Methods of accelerated drying of concrete products 4.4-Heating prior to molding

steam curing. ca-

cium chlorides; carbonation; concrete blocks, concrete pipes; coolin& curing; electric curing; heating; infrared heating; kilns; masonry; pozzolans; precast concrete; prestressed concrete; regulated set cements: reviews.

Chapter .j;=E!ectrical, oil, and infrared methods, page 517.2R-?2 5. 1-General


5.2-Electncal curing methods 5.3-Use of hot oil or other fluids for heating forms 5.4-Infrared curing of concrete

Chapter B-References, page 537"2R"16


6.1-Recommended references 6.2-Cited references

Chapter 2-Accelerators and special cements, page 517.m-3


2.1-General 2.2-Accelerators 2.3-Special cements

I
AC1 Committee Reports, Guides, Standard Practices, and commentaries are intended for guidance in designing, planning, executing, or inspecting conshuction and in preparing specifications.Reference to these documents shall not be made in the Project Documents. If items found in these documents are desired to be part of the Project Documents they should be phrased in mandatory language and incorporated into the Project Documents.
--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

AC1 Committee 517 was organized in 1958 as the coinmittee on Low Pressure Steam Curing. Since then, its scope has been enlarged to include means of accelerating curing of structural concrete members, concrete block, pipe, and precast concrete, and the title has been changed to Accelerated Curing of Concrete at Atmospheric Pressure.
Copyright O 1987, American Concrete instituie. AU &?ha merved, includingri&is of rcQrduction and use in any form or bv anv nieans, including the making of copies by any photo process, or by any electronic OT mechanical device, printed, written,or oral, or recording for sound or visualreproduction or for use in any knowledge or retrieval system or device, unless permission in writing is ob517.2R-80. The 1992 tained frornthe copyright propnetors.AcI5172R-87supe~~AcI changesconsisted solely of deleting the year from the reference standards in Chapter 6 and became effective Nov.1,1992. *Assumed chairmanship March 1986. Licensee=Aramco HQ/9980755100
Not for Resale, 01/23/2006 00:28:13 MST

Copyright American Concrete Institute Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

5 17.2R-2

MANUAL OF CONCRETE PRACTICE

A previous report1 of the committee dealt exclusively with steam-curing methods and the effects of various ingredients, i.e., portland cement, aggregate, water, and admixtures. Accelerated curing involves the addition of heat and moisture to expedite concrete curing. By definition it includes, but is not limited to, steam curing. The primary purpose of accelerated curing of concrete is the early development of strength. Forms, casting beds, and curing devices or facilities can then be reused at frequent intervals, and a low in-process inventory maintained. The objective of this report is to review new developments in accelerated curing including new types of cements, curing methods, techniques, and their effects on products. Regulated set cements, shridtage compensated cements, and other special cements for high temperature curing are covered in addition to the effect of variations in steamcuring cycles, special treatments such as carbonation, heating fresh concrete, pressure molding, electric curing, and steam injection.

1.3-Aggregate Concrete aggregates should be tested for compliance with appropriate specifications such as ASTM C 33, C 330, or C 33 1. Aggregates with different thermal and absorptive properties, however, will react differently when subjected to elevated temperatures, such as concretes made with normal weight versus lightweight aggregates. 1.4-Water Water quality requirements for concrete subjected to accelerated curing are the same as for normally cured concrete. 1.5-Admixtures 1 5 1 Chemical admixtures-Most air-entraining and .. water-reducing admixtures perform as effectively in concrete subjected to accelerated curing as they do in concrete cured under normal temperatures. However, optimum dosage rates of water-reducing admixture may be different than manufacturer?s recommendations. Before an admixture is used, it is advisable to malte trial batches to determine optimum dosage for a cost-effective curing cycle. Water-reducing admixtures complying with ASTM C 494 types A, D, E, F and G requirements may allow mixing water reductions of 5 to 25 percent for concrete having similar or higher worltability. Concrete containing Types F and G high-range waterreducing admixtures are particularly benefited by delayed addition to the concrete mix. Laboratory and field data indicate that the increased compressive strengths associated with heat-cured concrete containing high-range water reducers are a result of their lower water-cement ratios. Most concretes with and without high-range water reducers have comparable compressive strengths and comparable density for the same water-cement ratios. Concretes containing chemical admixtures that retard the set normally benefit from an extended preset time, even though the total curing cycle remains the same as for nonretarded concrete. As is true for nonretarded concrete, the initial set must be attained before application of the steam or heat. When accelerating admixtures are used, the preset time may possibly be shortened. The time of initial set for freshly mixed concrete should be determined by the standard method of test ASTM C 403. Comparative evaluations are necessary to determine the most cost-effective class and type water-reducing admixture to use for a given set of concrete materials and an accelerated curing cycle. 1.5.2 Pozzolans and slags--Fly ash that meets the requirements of ASTM 6 18 has been used as a partial replacement for portland cement or an additive in concretes cured by accelerated means with satisfactory results. High-temperature moist curing is a means for accelerating the slow reaction between a pozzolan and the free calcium hydroxide Ca(OH)2, liberated during cement hydration. Temperatures above 190 F (88 C), however, are required to accelerate the reactions sufficiently to increase the early strengths. Ground iron blast-furnace slagl.1 that meets the requirements of ASTM C 989 has been used as a partial replaceLicensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

CHAPTER I-BASIC CONCRETE MATERIALS 1.1 -General Concrete products subjected to accelerated curing at atmospheric pressure use the same basic materials as normally cured concrete. Trial batches should be made to determine the effects of accelerated curing on the properties of the concrete. Rapid hydration, for example, may cause a reduction in the strength usually attained at later ages. The production benefits derived from rapid strength development must be balanced with the possible detrimental effects on ultimate properties. 1 .2-Cement All types of portland cement described i ASTM C 150 n can be used in concretes cured by any of the various accelerated methods. In addition, the blended cements described in ASTM C 595, as well as the special cements discussed in Chapter 2, can be used. The cement type to be used is determined in the same manner as normal curing. It should be recognized, however, that different cements of the same type will have significantly different characteristics when cured under accelerated conditions. Types I and III are used most frequently; but where special conditions warrant, such as sulfate exposure, Types II and V or blended cements should be used. Air-entraining cements which meet the requirements of ASTM C 150 and C 595 can be used interchangeably with comparable results except in the production of cellular concrete. For cellular concrete there may be an adverse reaction between the air-entraining addition and the foaming agent used to form and stabilize the cellular structure. The optimum accelerated curing cycle will depend in part on the type and source of cement selected. The complex cement hydration reactions are influenced by temperature, time, humidity, and other curing conditions. Copyright American Concrete Institute
--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-3

ment for portland cement in concrete production. When cured in accelerated conditions, it has been shown to be highly active resulting in increased early strength gain. Curing temperatures above 140 F (60 C) result in further activation of the slag.

When requested, admixture manufacturers generally will disclose the amount of chloride in their admixture. AC1 212.1R and AC1 2 12.2R provide detailed information on accelerating and other admixtures.

2.3-Special cements CHAPTER 2-ACCELERATORS AND SPECIAL CEMENTS 2.1-General


Materials which accelerate hardening and promote early strength development of concrete are advantageous in the manufacture of many concrete products. Early attainment of strength in a building block, for example, compensates in part for slow hardening in cold weather and decreases the time required to produce a fully matured block. Similar advantages are obtained in the manufacture of other concrete products. During warm weather, accelerators must be used judiciously so as not to produce too rapid a set. Many plants employ high temperature curing without accelerators during summer months and a combination of high temperature curing with an accelerator during the winter months. Calcium aluminate cements have been used to shorten the time of setting of portland cement.2.6,2.7 Due to problems of strength reduction by conversion of the hydrates, the committee recommends it not be used for this purpose. 2.3.1 Regulated-set cement-Regulated-set cement is a modified portland cement which contains a substantial amount of calcium fluoaluminate. Initial and final set occur almost simultaneously, and therefore the time between mixing and set is often referred to as handling time. Regulatedset cement can be manufactured to have a handling time from 2 to 45 min. The level of early strength gain is adjusted by the cement producer by controlling the amount of calcium fluoaluminate. The time of set is reduced and the compressive strength gain rate is increased in regulated cement mortars and concretes when: (a) the cement content of the mix is increased, (b) the water-cement ratio is reduced, (c) the mix temperature is increased, and (d) the curing temperature is increased. In hot weather it may be necessary to slow or retard the setting action of the cement to have adequate time to place and consolidate the concrete, especially when batch mixing and manually transporting the concrete. Setting time usually will not be a problem when the regulated set portland cement concrete is being produced in a continuous mixer and mechanically conveyed to the forms. When too rapid a set is encountered, citric acid can be added to the mix as a retarder. Conventional retarders for portland cement are not effective in slowing or controlling the set of regulated set cement. Where it is practical, the setting action can be effectively controlled by adjusting the mix temperature. All exposed surfaces of newly placed, regulated-set portland cement concrete should be protected from moisture loss. Chlorinated rubber, butadiene styrene, or styrene acrylate sealing and curing compounds, as well as polyethylene sheets or wet burlap are recommended for this purpose. When mixing mortars or concretes containing regulatedset cement, it has been found that excessive accumulations of hardened material in the mixers and processing equipment can be avoided when certain batching sequences and practices are followed. For example, it will usually be beneficial if at least a portion of the mix water and some of the sand or aggregate for the following batch is added to the mixer immediately following the discharge of the previous batch. The best utilization of the fast strength development characteristics of this cement is possible when the concrete or mortar is prepared in a continuous mixer with as low a water-cement ratio and as high a mix temperature and cement content as will permit proper placement, consolidation, and finishing of the concrete. It is desirable to keep placement and finishing time as short as possible because of the short setting time.
--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

2.2-Accelerators
Chemicals that accelerate the hardening of mixtures containing portland cement and water include some of the soluble chlorides, carbonates, silicates, nitrates, thiocyanates, fluosilicates, hydroxides, and also some organic compounds. Use of accelerators may result in a reduction of long-term strength. Those with a chloride base have occasionally had detrimental effects on plant equipment. Any chemical accelerating admixture should be trial tested prior to full production use. 2.2.1 Calcium chloride-The use of one percent calcium chloride by weight of the cement is usually sufficient to accelerate setting and increase strength sufficiently for cold weather concreting, with protection as described on AC1 306R. The selection of the optimum amount should be based on the setting time and the early strength desired. A complete discussion of the use of calcium chloride in concrete is given by Shideler.2.1 The effect of calcium chloride on corrosion of reinforcing steel is covered in AC1 201.2R, AC1 212.1R, AC1 212.2R, and AC1 222R, as well as in a number of other papers. 2.2-2s Proprietary organic accelerators are available for use where chloride-bearing admixtures are not acceptable because of the likelihood of corrosion. 2.2.2 Water-reducing accelerating admixtures- Waterreducing accelerators conforming to ASTM C 494, Type E, may be beneficial in accelerating setting time and in increasing strength at early and later ages. If adequate information is not available, tests should be made to evaluate the effect of a particular admixture using job materials with expected temperatures and manufacturing procedures. Since most of these materials contain calcium chloride, the user should determine the percent by weight of the cement which its use will introduce into the concrete. Copyright American Concrete Institute
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

517.2R-4

MANUAL OF CONCRETE PRACTICE

CHAPTER 3-EFFECT OF VARIATIONS IN ACCELERATED-CURING CYCLES 3.1-General


The application of steam at atmospheric pressure to the curing chamber is one of the oldest and most widely used methods of accelerated curing of concrete. Reference to this technique can be found in literature dating to 1912. Under ideal conditions the curing of concrete by steam at atmospheric pressure (low-pressure accelerated curing) has the advantage over other methods of accelerated curing in that the curing environment of the concrete is near saturation in regard to moisture. Evaporation of water from the product is minimized, which is especially important where demolded or partially demolded products (block, pipe, etc.) are involved. Although the steam curing of masonry units, pipe, and precast or prestressed concrete products follows the same basic rules, curing procedures are different for each. As an example, masonry units are of small mass and have a relatively large area-mass ratio. Heat transfer and evaporation will be fast. Pipe and precast products may be cured in a form where evaporation is minimum, or may be of such large mass that heat transfer is slow, and large temperature gradients and resultant stresses may exist between the center and the outside of the mass. Therefore, the curing of each type of concrete product is discussed in a separate section of this chapter.

sure) steam-curing lulns. The first footnote, however, implies that the preset time need be increased by only I hr when ambient temperature is below 32 F (O C). Research indicates that a longer period of time would be required to develop the same early strength as that achieved at 60 F (16 C). When ambient temperatures are below 32 F (O C), the best practice would be to introduce the molded units into the luln and slowly raise the temperature to at least 60 F (16 C) (in 1 to 11/2 hr). Then use the minimum preset time indicated in the table prior to increasing the temperature at the rate shown in the table. Research with lightweight aggregate block3.1 indicates that it would tale about 41/2 hr at 35 F (2 C) to achieve the strength that could be achieved in about 1/2 hr at 90 F (32 C) or in 1 hr at 70 F (21 C). The same research with sand and gravel aggregate block indicates that it would tale 5 % hr to achieve the same strength at 45 F (7 C) as could be achieved in 2 hr at 75 F (24 C). 3.2.1 Effect of variation in the curing cycle on compressive strength and other properties of concrete masonry-All portions of the curing cycle are completely interrelated. A change in one part of the curing cycle may cause adverse effects in another portion of the cycle. For example, the lack of an adequate preset period could be partially corrected by a slower rate of temperature rise, and conversely, a long preset period could be followed by a relatively rapid rate of temperature rise exceeding even the maximum of 60 F (16 C) per hr indicated. The prime reason for talung care in planning the preset time (time-temperature related) and steaming rate is due to the different coefficients of thermal expansion of water, air, and the cement paste and aggregates in the mix. If the concrete does not have sufficient early strength to resist the expansive forces during heating, damage can result. Under conditions of mass production and rapid turnover in automated block plants it is possible to reduce the time required for preset and temperature rise periods if the concrete temperatures are elevated above ambient conditions at the time of mixing. There has not been sufficient research on this method with concrete block, but studies3.2 indicate that elevating the temperature of the concrete mix through steam

3.2-Curing for concrete masonry units


As in the curing cycle for all concrete products, an adequate supply of moisture is essential to insure hydration of the cement. During steaming, ample moisture is generally provided through steam condensation. Lack of adequate moisture may result in reduced strengths and plastic cracking. The most distinguishing feature of concrete masonry units is the use of zero-slump, nonplastic concrete in manufacturing the product. The concrete becomes plastic only through intense vibration and pressure employed. Table 3.2 applies for the majority of those plants employing accelerated curing in conventional (atmospheric pres-

Table 3.2-Accelerated curing cycles for concrete masonry units


Temperature and rate of temperature change Curing period Preset* Lightweight block Normal weight block Rate of rise Maximum temperature Lightweight block Normal weight block Soaking (duration of time of initial set) Time, hr deg F deg C

II

I minimum 2 minimum
12 (minimum) for combined maximum temperature plus soaking periodst

II

60- 100
60-100 40-6Operhr 180-190 150-165

II

16-38
16-38 22-23 perhr 82-88 66-74

SFperhr
maximum average declinet

2.8 C per hr maximum average decline$

Copyright American Concrete Institute Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

Increase presei time Ir hr when ambient temperature is below 32 F +When pozzolans are employed as pari of the cementing medium, maximum temperatures of 200-2 O F (93-99 C) should be investigated for both lightweight and nomial weight aggregate units. Soaking period-In steam curing, the time during which the live steam supply is shut off and the concrete products are exposed to the residual heat and moisture. The curing cycle may include a soaking or a constant maximum temperature period, but need not include both. Soaking plus maximum temperature time should total 12 hr minimum. Soaking time may be reduced by an amount of time equal to the time at maximum temperature.
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

(oc)

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-5

injection would considerably shorten the steam-curing time now commonly used. 3.2.2 Preset period for concrete masonry-As noted, a minimum preset time of 1 hr is suggested for lightweight block and 2 hr for normal weight block prior to applying steam. This recommendation is based on average conditions and may be restrictive in some cases and inadequate in others. For instance, with a coarse-textured, poorly compacted lightweight aggregate block it is entirely possible to begin raising temperatures in the luln immediately without significant detriment to the concrete. The porosity allows the air and water to expand without causing internal tensile stresses. On the other hand, with the very high strength concrete block currently being produced for some architectural facing units and for high-rise, load-beating construction, a preset time of 2 hr at 60 F (16 C) may not be adequate. With these units, which have strengths of 3500 to 6000 psi (24 to 41 m a ) , it may be well to consider a minimum of 3 hr preset time at temperatures in excess of 60 F (16 C) and a minimum of 4 hr with temperatures between 40 and 60 F (4 and 16 C). 3.2.3 Temperature rise period for concrete masonry-As with the preset period, the temperature rise period or rate of temperature change should be tailored to the product and to its history prior to steaming. If the plant layout and facilities are such that long preset times are generally used, it is possible that for normal production units the rate of temperature rise could exceed that indicated in the table, that is, 60 F (33 C) per hr. However, with high-strength block 3500 to 6000 psi (24 to 41 MPa), the rate of temperature rise should probably not exceed 60 F (33 C) per hr, even if preset periods of 4 hr at temperatures above 60 F (16 C) are employed. In both the preset period and the temperature rise period, it is important that the relative humidity of the chamber surrounding the block be above 90 percent. 3.2.4 Steaming and soaking period for concrete masonry--The most common practice in the concrete masonry industry is to employ steaming and soaking periods of 12 or more hr of the normal 24 hr molding and curing process. It has been found that a combined steaming and soaking period of 12 hr is sufficient to produce the strength needed for purposes of product handling. If the steaming period is followed by a drying cycle, it is quite common to use less than 12 hr of steaming and soaking, followed by a drying period within the same luln. It is generally considered good practice to employ drying temperatures under 250 F (121 C) unless plant tests are conducted to show that higher temperatures would not be detrimental. Some steaming and drying processes have employed drying temperatures as high as 450 F (232 C) without affecting the units; however, these high temperatures usually have damaged the roof and walls of the lulns. Individual plant tests should be run to determine a reasonable drying cycle. The length of the drying cycle subsequent to the steam curing would be determined by the moisture content that is desired in the block. There is some information given in the literature3.3,3 4 with regard to drying times that may be expected for units manufactured with various Copyright American Concrete Institute aggregate types.
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

In the most extensive series of tests conducted on steam curing and drying of concrete masonry units at atmospheric pressure, W. H. Kuenning and C. C. Carlson,3.1 report in their summation that it appears that block concretes have some tolerance for high temperature curing conditions which provide relative humidities in the luln atmosphere that are less than 100 percent, but humidities lower than 90 percent cannot be used without some loss of strength. As a general guideline it is suggested that relative humidities as low as 90 percent can be tolerated without serious effects on the strength and other properties of concrete masonry units. 3.2.5 Conventional kilns and appurtenant facilities for steam curing concrete masonry-ACI 51 7 includes information with regard to equipment required, design of lulns, and the sizing of steam boilers. More extensive coverage is given on this subject by R. E. Copeland in an article published in 1971.3.5 3.2.6 Continuous or automated curing systems currently employed in the concrete masonry industry-Continuous or perhaps more properly termed automated curing systems are claimed to have a number of advantages over conventional materials handling and curing systems. Some of the claimed advantages are lower operating costs, less plant space required, and lower initial investment. These systems are designed to eliminate forldift truck handling of racks or cured block, less fuel consumption, and shorter curing cycles. While it is claimed that these systems produce a better product, some of the relatively short curing times employed are open to question. Because of the variety in the different systems, it is not possible to discuss in detail the operation of these systems. The reader is referred to the manufacturers literature for more information.

3.3-Curing c o n c m t e pipe
With few exceptions, concrete pipe is steam cured at atmospheric pressure. The particular methods, curing cycles, and temperatures employed depend on the type of manufacturing equipment used and the manner in which the concrete is placed and consolidated. For example, in some processes the molds are removed immediately after placement, while in others, all but a small portion are enclosed in the form during curing. Another difference important to the curing is the amount of water in the mix. Consistencies for the various processes range from earth-moist to slumps in excess of several inches. Depending on these and other differences, curing cycles affect pipes made by the various methods in different ways and to differing degrees. As in all curing systems, an adequate supply of moisture is essential to insure hydration of the cement. During accelerated curing, ample moisture is provided through steam condensation or by other means such as mist or water sprays. Pipe made of the drier mixes where the forms are stripped immediately, however, often require additional water during the preset and early temperature rise periods. Lack of adequate moisture at these times may lead to reduced strengths and plastic shrinkage cracking. 3.3.1 Delay or preset period-For optimum results, the preset period should be the same as the time required for initial set determined by ASTM C 403. These times are
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

51 7.2R-6

MANUAL OF CONCRETE PRACTICE

generally 2 to 3 hr for Type I and III cements, and 4 or 5 hr for Type II and V at 70 F (21 C). Where concrete or ambient temperatures are significantly higher or lower, the time should be adjusted accordingly. During the preset period the ambient temperature of the curing enclosure should be kept as close as possible to the temperature of the concrete and mold. The use of a shorter than optimum preset period can cause thermal expansion of the concrete before the structure of the material has attained sufficient strength to resist the internal stresses. As a result, cracks develop, usually microscopic but quite large in extreme cases, and the strength of the concrete is reduced. The drier earth-moist mixes used in machine pipe and the dry-cast process are able to withstand relatively short preset periods without damage because of their lower water content. At a total moisture content of 5 percent some mixes have shown no significant decrease in compressive strength with preset periods as short as 1 hr. In centrifugated pipe where the moisture content of the interior surface is quite high, an insufficient preset period will lead to blistering and scaling of the surface. Also, where the fresh concrete is dependent on the mold for support, early application of heat may cause the mold to expand away from the concrete, resulting in slumps and cracks. Too long a preset period is generally not as harmful as one that is too short. Although some reduction of strength will occur, it is usually not significant. Pipe in which large surface areas are exposed, however, are susceptible to plastic shridtage cracking if evaporation rates are high. This vulnerability is particularly high in centrifugated pipe where the water has been forced out of the concrete and there is little if any bleeding capacity left. Where such conditions are prevalent, fog sprays are used to keep the ambient humidity as high as practical. Refer to AC1 308 for more detailed information concerning plastic shridtage cracking. 3.3.2 Temperature rise periodforconcretepipe-Following the preset period, the temperature of the curing enclosure should gradually be raised to the desired curing temperature. Controlling the rate of temperature rise is important to avoid damage to the pipe. Should the temperature be raised too rapidly, stresses will develop because of the temperature gradients. Cast pipe cured with the inner and outer molds in place are particularly susceptible. The steel molds expand before the concrete has an opportunity to do so, resulting in longitudinal cracking. Large-diameter pipe are more vulnerable than the small-diameter pipe. Whereas small-diameter cast pipe have successfully withstood changes in temperature of 60 F (33 C) per hr, it is often necessary to limit the rate of temperature rise of a larger diameter pipe to temperature changes of 35 F (19 C) per hr to avoid cracking. The point of application of heat and moisture is also important. Care should be taken to avoid localized overheating of the product and the distribution should be arranged so as to minimize expansion of the molds. 3.3.3 Accelerated curing period for concrete pipe-Generally, the higher the curing temperatures, the lower the 28day strengths. The maximum temperature used should be the lowest possible consistent with production requirements. The Copyright American Concrete Institute reduction of the maximum accelerated curing
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

3.4-Curing of precast andlor prestressed concrete products


In the curing of precast and/or prestressed concrete products, all factors are interrelated. A change in one part of the operation may affect the others. The optimum curing cycle can generally be determined only by trial. Also, the size of the structural member may affect the optimum steam-curing cycle. As an example, small masses become heated faster than larger masses; however, a large mass of concrete will generate and retain more of its own heat through hydration. Such a large mass will reach a higher internal temperature than indicated by the ambient temperature. The water-cement ratio employed will also affect the steam-curing cycle. Low water-cement ratio concrete generally requires a shorter preset period. In some cases for members with high volume-to-surface ratios, the heat of hydration is all the heat that is needed to cure the product. In all cases, it is a significant contributor to the curing heat. The insulation and coverings used to protect and insulate the forms and fresh concrete must be designed for maximum thermal efficiency. This insulation should minimize air leakage and moisture loss. Since the heat of hydration is a significant contributor to curing-cycle efficiency, the internal concrete temperature rather than the ambient air temperature should be monitored to realize this quantity of heat. 3.4.1 Preset p e r i o d - 7 h preset period can be defined as the duration of time after the concrete has been batched until initial set is obtained. During this period, heat is not normally applied unless it is necessary for maintaining the initial temperature. The preset period should be established by determining the initial setting time of the concrete by procedures in ASTM C 403. It appears that energy conservation and optimum early-age strengths can be achieved by

*)ar(,-L

Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

temperature from 140 to 120 F (60 to 49 C) may not significantly reduce early compressive strengths. When the accelerated curing time required is in excess of 12 hr, it is common to interrupt the curing to strip and reuse the forms. American Water Works Association standards3.6 require at least 6 hr before this interruption, but in practice it is generally longer to insure adequate stripping strengths. There appear to be no noticeable effects on the strength or other qualities, but further studies are required to determine the exact significance of interrupted curing cycles. Large variations in temperature during accelerated curing due to the intermittent application of heat should be avoided. While the product can usually withstand thermal shoclts relatively well, proportional controllers should be employed wherever possible to minimize temperature variations, particularly with larger pipe and also toward the end of the cycle. 3.3.4 Cooling period f o r concrete pipe-There is no research to indicate to what extent rapid cooling of concrete after curing is detrimental. Under extreme temperature conditions, cracking during cooling has been reported where the pipe was restrained by the mold and large temperature gradients occurred. A controlled cooling period, however, is both practical and beneficial to the extent that thermal shock is minimized.

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-7

starting the heat-curing process at times close to the initial set time. 3.4.2 Rate Of temperature rise-The rate of temperature rise employed in curing precast or prestressed concrete products normally varies from about 20 to 80 F (1 1 to 44 C) per hr. The rate of temperature rise during the initial heating period has little influence on early-age or later-age compressive strengths as long as a proper preset period is used. For Type I and III cements, rates of 40 to 80 F (22 to 44 C) per hr provide slightly higher early-age strengths than 20 F (11 C) per hr. The 28-day strengths are not significantly affected by variation in rate of rise from 20 to 80 (1 1 to 44 C) per hr. 3.4.3 Maximum curing temperature-The rate of temperature rise and maximum curing temperature can influence the required time of curing. Generally, a higher maximum temperature during the curing cycles reduces the type of curing required at the maximum temperature. This time period at maximum temperature is based upon the compressive strength obtained immediately after heat curing and possible at later ages.3.7 When the proper preset periods were used during the investigation by Brown,3.8 he concluded that no significant differences in early strengths could be found with Type II cement concretes for maximum curing temperatures of 140, 160, or 180 F (58, 70, or 82 C). The 28-day strengths of concretes cured at temperatures of 160 to 180 F (70 to 80 C) are slightly reduced from those cured at temperatures of 120 or 130 F (48 or 50 C). Concretes cured with a proper preset period will typically undergo a 5 percent strength reduction at 28 days. 3.4.4 Duration o maximum temperature-The duration f of the maximum temperature should not be confused with the time that the heat source is actually turned on. In most prestress applications, it is advantageous to turn off the heat after the temperature of the product has stabilized at the maximum.3,7 Numerous plant studies have shown that if the heat is turned off after the maximum temperature has been reached and the curing environment is well insulated, the 12-hr compressive strength is not significantly reduced. Significant strength was gained from age 4 to 10 hr, and then the rate of strength gain diminished very rapidly after 10 to 12 hr. The initial rate of strength gain from heat-cured concrete was measured to be as high as 900 psi (6.2 MFa) per hr and was as low as 300 psi (2.1 MPa) per hr for different but typical mixes used in prestressed concrete. The lower rates were associated with Type I or II cement concretes having moderate water-cement ratios. Generally, when a very high rate of initial strength gain was realized, it was obtained by using a low water-cement ratio in combination with a Type III cement. The rate of strength gain after about 10 to 12 hr of total age is small. When a low rate of initial strength gain is expected, longer duration of maximum temperature may be needed.3,9 3.4.5 Cooling period-There is little evidence that rapid cooling, even to freezing, after accelerated curing is detrimental to strength or durability, provided that with prestressed products, detensioning is performed immediately after the Copyright American Concrete Institute removal of the enclosure. Tests show that typical
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS
--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

precast concrete members cool off slowly at a maximum rate of 10 F (6 C) per hr during the first 4-hr period of exposure, no greater than 8 F (4 C) per hr during the second 4-hr period, and no greater than 4 F (2 C) per hr during the third period when exposed to freezing temperatures. These low rates of cooling suggest that thermal shock does not occur in typically sized precast prestressed concrete rnernbers. The data show that this gradual cooling period provides additional curing and air-drying time prior to the time when internal water might freeze. The data also show that even if the water did freeze, the compressive strength was not reduced.3.9 Even though extensive investigations show that rapid cooling rarely affects the concrete products, there are times when rapid cooling may cause the formation of cracking in the surface layers of very thick and large-sized units. A lower rate of cooling has been recommended for such units (AC1 224.1R). Occasionally, transverse cracks have been noticed in beams subjected to cooling prior to detensioning. For this reason, pretensioned members should be detensioned immediately after the steam-curing cycle has been completed.3.9,3.10 3.4.6 Effect o variations in the curing cycle on comf pressive strength and other properties-There is no one curing cycle that is best for all plants. Each plant is unique and the curing cycle that is optimum for one plant may not be effective in another. Many factors act and interact in the curing cycle, and they influence the strength and other properties of the product. Factors that are conducive to high early strengths usually conflict with the factors that are advantageous for later strengths. The use of automatic heat-curing systems for control cylinders using heated water or air were developed by John Laing Research and Development of England and by Pfeifer during the period of 1972 to 1976. These master-slave temperature-controller systems allow the off-bed curing of cylinders so that equal maturity of the cylinders and the fullsized prestressed concrete members is assured. These systems have been used in actual precast plant conditions, and they were found by test to be accurate in providing equal maturity, i.e., equal time-versus-temperature curves for the cylinder and the full-sized concrete product.3-9 Under these conditions, the master-slave system also provides proper graduated cooling for the cylinders and overheating because of improper positioning on the forms will be avoided.

CHAPTER 4-SPECIAL TREATMENTS 4.1 -General This chapter covers special treatments employed in the manufacture of precast concrete products which are used as a part of, or as a complement to, conventional curing procedures. The treatments discussed are carbonation, hot air drying, and preheating of concrete prior to molding. Artificial carbonation treatment was introduced on a commercial scale in the concrete products industry during the late 1950s and early 1960s. Research demonstrated that carbon dioxide (C02) in the normal atmosphere (about 0.03
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

517.2R-8
Reversible, 5 H P

MANUAL OF CONCRETE PRACTICE


Tripie

coil

rieom hcoieir

Recovery

L20

SIDE V I E W

-16FRONT
= a

VIEW

3-250.000 e T u
Buiners

Fig. 4.2.1-T~uo examples of use of boiler flue gases for drying-carbonation treatment

percent) reacts with hydrated portland cement to cause shrinkage4,l and indicated that concrete products could be artificially carbonated to reduce subsequent shrinkage.4.2 Hot air drying of hardened concrete products is achieved in a number of ways in addition to the use of flue or burner gases containing C02. Early in the history of precast concrete products, units were partially cured in damp air or fog rooms, or with steam, and then partially dried with steam radiators built in the luln walls. Some block plants built separate rooms and used oil-fired furnaces and duct systems, similar to those employed in home heating systems, to dry their concrete masonry units. Other plants accelerated the natural air drying rate by directing hot air through canvas-covered cubes of block in the storage yard. Both of these latter systems were primarily used to meet specifications on moisture content rather than to promote strength gain. Preheating concrete prior to molding is accomplished in one of two ways. Either the aggregates and/or water are heated prior to mixing, or the mixture itself is heated while still plastic. The first method is the natural adaptation of cold weather concreting practices, while the second is primarily based on European production techniques.

4.2-Carbonation treatment methods Carbonation of concrete is generally considered as an ongoing chemical reaction between CO2 gas and selected compounds formed in the concrete during the hydration of the portland cement. The principal reaction involves calcium hydroxide, Ca(OH)2, which, when exposed to C02, combines to form calcium carbonate (CaCO3) and water. Theoretically, the process continues until such time as complete carbonation has taken place, i.e., no Ca(OH)2 remains to be converted. Other hydration products which may have calcium oxide (Cao) as a constituent also appear to participate in the process, but not calcium sulfate (CaS04).4.3 CarCopyright American Concrete Institute
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

bonation induces shrinkage which, once having occurred, tends to stabilize the moisture content and the volume of concrete. Thus, intentional carbonation as practiced by industry is an effort to promote drying shridcage prior to installation of a concrete product. Since the average concrete block requires about 1 lb (0.4536 leg) of CO2 to fully carbonate, an economic compromise to partially carbonate steam-cured block by introducing waste flue gases (from the boiler furnace) into the steam luln was necessary. Due to variable effectiveness, and the long time needed to produce favorable results, this procedure was not widely used. Various commercial systems evolved which combined a shorter than normal steam-curing cycle with hot air drying provided by gas and fuel oil burners. Even though the in-plant systems do not afford the degree of carbonation achieved in laboratory studies, some benefits are obtained by drying with hot air containing the products of combustion (including C02). Most of the carbonation treatment systems used today are actually a part of the curing process, but some are separate. In either case, the treatment is more correctly described as a curing and/or drying process using hot air containing CO2 gas. The often-used term carbonation curing is really a misnomer as the improvements achieved in product properties in plant operations (more rapid strength gain, reduction in moisture content, and reduction in potential drying shridcage) are affected more by the high temperature than by the presence of CO2 gas. 4.2.1 Drying with gases containing CO2 after accelerated curing-A number of plants have used a product drying system that uses the heat from flue gases which are diverted from the steam boiler. A stack switch automatically controls the flow of flue gases into the luln while prohibiting the entry of heavy smoke when the burner is first started (Fig. 4.2.1). Some of the plants also use steam-heating coils to obtain higher luln temperatures. A large diameter, propeller-type fan is use d to provide circulation within the luln. Tests conducted in plants with this type drying facility showed CO2 concentration in the lulns ranging from less than 1.0 to 3.8 percent. This low concentration, compared to the 8-10 percent desirable, was believed to be due to intermittent input of gases (to maintain constant maximum temperature), dilution by luln leakage, absorption of CO2 by water in the luln, and depletion of CO2 by the carbonation reaction.4,4 Results of the plant tests showed that reduction in drying shrinkage ranged from negligible to 42 percent for a 24 hr drying treatment. The plant reporting best results with concrete block used a maximum drying temperature of 175 F (79 C), 25 percent relative humidity, and a 3.8 percent CO2 concentration in the atmosphere of the kiln. Reduction in drying shridcage of up to 37 percent for concrete brick was obtained using normal production procedures with a treatment of 24 hr at 200 F (93 C), 30 percent relative humidity, and about 2 percent CO2 concentration in the atmosphere of the luln. It is recommended that plants considering a system of this type try the following: maximum temperatures of 150-2 12 F (66-100 C); relative humidities of 15-35 percent; CO2 concentrations as high as possible; and a treatment period of about 24 hr, consistent with production requirements.
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

ACCELERATED CURING AT ATMOSPHERIC PssGcyRs


KILN ROOF

517.2R-9

HIGH VELOCITY AIR

KILN VENT

U)NGITDINM SECTION THROUOH KILN SIKW INSTALLATION


ANO OPERATION Of JOHNSON KILN AIR CIRCULATOR

DUCTWORK VAPORIZING TANK


ELEVATION OF TYPICAL AUTOCURE INSTALLATION

BURNER

Fig. 4.2.2.2- h o versions T

of

a popular commercial curing-drying-carbonation system

4.2.2 Acceleruted-curing carbonation drying systems using kiln burners 4.2.2.1 &stem combining boiler-generated steam and gas burners-A system using a low pressure boiler to generate steam for the kiln, combined with gas burners to further increase temperature during curing and promote drying, is used by a number of concrete products plants. The curing-drying procedure is as follows: the block or precast units are allowed a presteaming period of 1 to 2 hr; the steam is then introduced through steam headers located at the rear ceiling and front floor locations; temperature increase is usually about 40-50 F (22-28 C) per hr (achieved with steam and burners on low fire); a maximum luln temperature of 160-200 F (71-93 C) is held about 6 hr (with steam and burners); the steam is reduced to the minimum sufficient to help circulation of heat in the luln and the burners are turned to high fire; and lastly, a maximum drying-carbonation temperature of 220-450 F (104-232 C) is achieved in about 4 hr and is held for an additional 6-8 hr. The advantages of this type of curing-drying-carbonation system are that one-day strengths are higher than normally obtained in ordinary steam curing, potential drying shrinkage is reduced by about 25 percent, and low moisture content is obtained. Disadvantages are high fuel consumption and disruptive stresses on existing kiln walls and roofs. Plants that used this system had problems with cracking of luln walls and roof slabs which were not designed to stand the higher temperature differential required in the process. Copyright American Concrete Institute
--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

4.2.2.2 Steam andbr hot moist air generated by gas burners passing through pipes immersed in water ta&This process is widely used in the concrete block industry, and two such systems are shown in the schematic drawings (Fig. 4.2.2.2). The system with circulating ductworlc has a better performance as it decreases the variation in curingdrying temperatures between the front, back, top, and bottom of lulns. When the steaming period is completed, the hot gases carrying the CO2 are diverted from the vaporizing tadc directly to the luln. This system has the advantage of low cost (with few lulns), low fuel consumption, and relatively good one-day strength and reduction in drying shridcage. Disadvantages are that costs would be greater than a steam boiler system for a large number of lulns. Also, long-term compressive strengths (60 days) are usually less than those of conventional low pressure steam-cured block (especially with relatively dry block mixes). 4.2.2.3 Oil-fired burners used to vaporize a mist sprayed onto steel plate-A system used in Australian concrete products plants is illustrated in Fig. 4.2.2.3 and described in the referenced document.4.5 Gun type oil-fired burners are fitted with a combustion air blower which forces hot gases into a mild steel combustion chamber (refractorylined) and then into the luln. Water is added with spray nozzles directed onto the hot entry duct. Axial flow fans, fastened to the rear wall of the lulns near the ceiling, provide some circulation. In the Australian concrete block inLicensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

517.2R-10

MANUAL OF CONCRETE PRACTICE

burne

Fig. 4.2.2.3-One popular Australian curing-drying-carbonation system


--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

dustry, 86 lulns use this method to cure and dry block. It is reported that a 10 percent reduction in compressive strength can be expected if the atmosphere is dry. There were some reports of color change and efflorescence by some producers, but others reported that the CO2 gases helped reduce these problems. It was reported that this system is more economical than a steam boiler system if not more than 8 lulns are involved. 4.2.2.4 Miscellaneous curing systems-There are other types of curing-drying-carbonation systems used in the products industry. Two such systems were developed by concrete block machinery manufacturers. The first consists of a doughnut-shaped boat which floats on heated water. Racks of freshly molded block are lowered into the boat and allowed to cure for two revolutions in the hot, humid atmosphere. No drying cycle is included. The second system consists of a round, doughnut-shaped luln with a continuous rack mounted on wheels that ride on rails. The roundhouse is sectioned into areas for preset, steaming, steam with hot air (from burners), and partial drying. The cycle is quite short, after which the block are expected to have sufficient strength for stacking. Further strength development comes with yard storage.
Copyright American Concrete Institute Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

4.3-Methods of accelerated drying of concrete products


Products specifications often contain a moisture content limitation to improve dimensional stability. High temperature drying after steam curing (separate chambers) has proven satisfactory in reducing the moisture content of concrete well below 30 percent of total absorption without significantly affecting other physical properties. Tests have indicated some reduction in ultimate compressive strength and impact-fracture resistance when drying temperatures in excess of 240 F (1 16 C) were used.4.6 These results, however, are not necessarily consistent, and plants should conduct their own comparative tests when considering using high drying temperatures for shortening the drying cycle. In addition to the two types of commercial drying runs shown in Fig. 4.3.1 and 4.3.2, yard storage drying of tarpaulin-enclosed stockpiles via forced warm air heating is used.4,7 In this system warm air from portable heaters is ducted into the enclosures which are vented at or near their tops. All surfaces of the block piles are kept clear for circulation of air within the enclosure, and the tarpaulins are held tightly closed except for the vents. A frame may be required to support the tarpaulins and to assure adequate
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

290

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-11

Ex haust Stack

-Mixing

Plenum

1,500,000 BTU Oil Furnace


Fig. 4.3.1-Drier at Cleveland Builders Supply Co.

DRY/#G ROOMS- SIDE

Fig. 4.3.2-Drying room at Standard Building Products CO.

airflow along the outside edges and across the tops of the piles. Block may be stacked with the cores either horizontal or vertical, the important consideration being their alignment so that channels are formed to allow a relatively unobstructed hot airflow from the heat duct to the exhaust vent. It has been reported that butane or natural gas are the preferred fuels for drying, as the use of oil has resulted in some staining of light-colored concrete products. This problem with oil can be reduced if the burners are adjusted for maximum efficiency.
Copyright American Concrete Institute Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

4.4-Heating concrete prior to molding


Heated or hot-mix concretes are defined as plastic concretes having a temperature i n excess of 90 F (32 C). Heating water and aggregates independently generally results in mixtures where the concrete temperature is less than can be readily attained when steam is injected into the plastic mass during mixing. Since the shorter curing time depends on being able to maintain elevated temperatures for some hours, the process necessarily includes heating andor insulating forms and molds. When steam injection is used,
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

I,
\

517.2R-12

MANUAL OF CONCRETE PRACTICE

H II

Fig. 4.4.2-Concrete mixer equipped with steam injection system

there appears to be additional benefits with the use of high pressure steam attributed to its capability of penetration coupled with reduced condensation. While both methods suggest the need for additional care during the production process, control of water in the mix when low pressure steam is used demands greater attention because of its variable moisture contribution. It should be expected that the ultimate strength of hot-mix concretes will be less than that of concretes which have equal water-cement ratios but are molded at 60-70 F (16-21 C) and subsequently are moistcured in that temperature range. 4.4.1 Hot water and a g g r e g a t e d number of plants have used hot water and warm aggregates to increase the temperature of concrete prior to molding, especially during the winter months. The degree of temperature increase obtainable with hot water is rather small, especially for low water content mixes such as those used in malung concrete block and pipe. 4.4.2 Steam injected into mixer to produce hot concrete-Commercial mixers can be equipped with steam outlet jets to inject steam into the mix to heat the concrete. One such arrangement is shown in Fig. 4.4.2. This method of accelerating the hardening of concrete is used for producing precast concrete panels in Europe, the Soviet Union, and Japan. The mixer steam-injection process does eliminate the uniformity and condensate problems associated with the heating of aggregates in silos. Heating with steam injected into the mixer, however, can result in too much water when aggregates are wet unless superheated steam is used. As with any method or process, both advantages and disadvantages are encountered. The advantages claimed for steam heating in a mixer are: 1. Time for stripping of molds can be appreciably reduced. Stripping times as short as 4 hr have been reported for lightweight concrete wall panels. 2. Steam-mixed concrete can reduce the cycle times normally employed with subsequent curing, and possibly eliminate the usual delay period prior to steam curing. 3. The steam-heated concrete process can be used during the winter months to help standardize the production-curing cycle on a year-round basis. Copyright American Concrete Institute
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

CHAPTER 5-ELECTRICAL, OIL, AND INFRARED CURING METHODS 5.1 -General Methods discussed in this chapter include electrical, hotoil, and infrared curing techniques. In all of these methods heat is used to accelerate cement hydration. Generally, highearly-strength portland cement is also used to further accelerate the strength gain of the concrete. The first attempt to use electrical curing was made in America in 1924. In Sweden, formal recommendations were made in 1932 for the accelerated curing of concrete using wet concrete as an electrical conductor. Following the Swedish work, additional investigations were conducted in Germany, France, England, USSR, and Japan.5.1-5.6 These studies also generally used the fresh concrete as a conductor. Other methods of using electrical energy for curing purposes were tried in England, Japan, and the USSR; however, the first wide-scale use of electrical curing took place in France in 1960.5.1 In addition to accelerated curing, the French engineers found the method to be effective in prevention of freezing of fresh concrete in cold weather. To avoid problems encountered in earlier work, the French introduced insulated resistance wires. Infrared radiation curing was first used by Russian engineers. Concrete cured by this method showed a more rapid strength gain than concrete cured by steam. The system used by the Russians was particularly applicable to the manufacture of hollow core concrete products.
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

4. Cost of fuel needed to obtain stripping strength is claimed to be much lower with steam-injected concrete mixes than with other heating methods. It is reported that only 57.4 lb (26 kg) of injected steam is needed to obtain demolding strengths for lightweight concrete, as compared to 840-1340 lb (381-608 kg) of steam required to heat tarpaulins.4.8 Disadvantages or problems which should be anticipated with steam heating concrete are: 1. Increased corrosion of mixing and batching equipment. 2. Difficulty in controlling the desired amount of mix water, and more variable performance with different cements (due to variable percent of aluminates in cements, with higher aluminate contents resulting in lower strengths). 3. Ten to twenty percent less strength at age 1 year than is typically obtained from concretes cast and cured at normal temperatures. This is comparable to that experienced in steam curing of concrete products. 4. An increase in the amount of mix water may be required with hot concrete to obtain the same workability as obtained at normal temperatures. 5. Thermal shrinlcage should not be a significant problem with precast concrete, but it may be a problem with cast-inplace applications. Overall steam injection heating of concrete in mixers offers potential for accelerating the hardening of precast concrete products with a possible savings in the amount of energy required.

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-13

5.2-Electrical curing methods Current applications of electrical curing in the United States are mostly limited to precast, prestressed concrete members. While fabricating plants have installed electrical curing systems, and the method has progressed past the experimental stage, it is still being improved. This method has several advantages, among which are: 1. Low capital expense for equipment 2. Relatively small amount of equipment required 3. Automatic and reliable controls 4. Small labor requirement 5. High-early-compressive strength can be attained 6. No fuel storage 7. Uniform temperature and curing over the entire cross section. There are several methods available for using electrical energy as a heat source to accelerate concrete curing. One of the first methods used the wet concrete as an electrical conductor. Although the basic theory is sound, there are several problems associated with the method. One is the difficulty in controlling the temperature as the electrical resistance changes during the hydration of the concrete. Difficulty is also encountered when reinforcing steel is used in the concrete, as there is a possibility that corrosion can occur. Another method tried uses the electrical resistance of the reinforcing wires or bars to produce heat. To accomplish this a large current at low voltage is required. The method accelerates the hydration of the concrete near the reinforcement which creates an internal core of hardened concrete permitting handling of the members at an early age. Since the reinforcement is heated to temperatures higher than the surrounding concrete, the differential temperature causes a slight prestressing of the concrete upon cooling and further resistance to cracking. The use of reinforcing steel as a conductor, however, also has problems. One is the high current requirement which affects the economy of the method. Other problems are the danger of corrosion and the tendency to short-circuit through metal forms or other metal reinforcements. To overcome some of the above problems, a seven-wire prestressing strand was developed having a center wire which is electrically insulated from the surrounding wires. Pilot tests on this strand were promising, but projected production costs have restricted its use. Still another method developed to use electrical energy as a heat source is the utilization of electrical heating blankets. The heating blankets are economical, portable, and can be used for heating large areas such as slabs. In addition, if the blanket is properly constructed, it acts as a vapor barrier to prevent the escape of moisture. In Europe, wire-mesh heating elements have been used for heating slabs. Problems with the use of electric blankets are that hot spots can occur if complete contact is not maintained between the concrete and the blanket. The most popular method of using electric heat at the present time is electrically heated steel forms. The heating elements are applied directly to the outside of the forms and then covered with insulation, which is very efficient for thin precast sections such as T-beams. Since each section of Copyright American Concrete Institute
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

form is a separate system, heat can be applied and regulated along the length of the precasting bed. The most efficient method of using electrical energy to accelerate curing is to have embedded, insulated resistance wires in the concrete. Proper spacing of the wires can provide a uniform heat throughout the cross section. After the desired strength has been attained, the wires are cut and remain in the concrete member. Control specimens can be cast and cured with conditions identical to the prototype member by using independent automatic controls to regulate the heat intensity. The use of internal resistance wires to heat concrete has several advantages including low cost, uniform heating, automatic controls, and safety. 5.2.1 Equipment f o r internal electrical curing-The equipment required for electrical curing of concrete varies with the method used. In general, the equipment consists of heating elements, power supply, heat controls, and electrical measuring devices. A brief description of equipment that is commonly used follows: Heating elements. There are three types of insulated conductors that can be used for the curing process: 1. Longitudinal reinforcement coated with synthetic films. Compounds with a base of phenolformaldehyde resin have been found to insulate the steel, while a good bond to concrete is still formed. 2. Insulated, center core wire of a prestressing strand. This method may be the most effective. At the present time the only production of this type strand has been experimental and is very expensive. 3. Insulated resistance wire. The type commonly accepted for large-scale adoption of electrical curing as an economical process uses low-cost insulated wire. This wire can be drawn from common metals which satisfy the minimum strength requirement. The insulating sheaths must also have sufficient resistance to high temperatures, be flexible enough to conform to the shape of the product, and tough enough to withstand the tensile, bending, and abrasive forces. Irradiated polyvinyl chloride (PVC) or Teflon coatings satisfy the requirements for insulation. 5.2.2 Heat controlling instrument-One of the advantages of electrical curing is that temperatures can be easily controlled. The same curing temperature can be reproduced repeatedly in the product. There are several major instruments which can be used for heating control, some of which are briefly described below: 1. Circuit switch unit: An instrument which can be operated manually on and off to obtain temperatures following a design curve. 2. Variac: A variable voltage transformer. Increasing or decreasing the voltage will change the power input to prod u c e the desired temperature curve. 3. Versatronilc control and circuit breaker: An automatic circuit breaker controlled by the desired temperature. The temperature can be monitored with a thermocouple. 5.2.3 Limitations and suggestions for internal electrical curing-Although the resistance wire is well insulated, there is no guarantee that the resistance wire will function properly after casting and consolidating the concrete. Personnel using vibrators must be trained to prevent damage to the heating elements. It is recommended that the voltage be

aOi3-

Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

517.2R-14

MANUAL OF CONCRETE PRACTICE

kept low and other precautions talen to insure the safety of personnel from electrical hazards. Research on the compressive strength of concrete has shown that the strength at a particular time is a function of the total thermal energy absorbed by the freshly cast concrete.5.7 From an economic point of view, it is preferable to use the minimum number of heating elements and locate them where they will be most effective. In addition to the heat source provided by the electrical resistors, the heat of hydration of the cement provides a significant amount, thus reducing the total power requirement. Results from temperature distribution shidies5.7 indicate that with internal electrical curing the temperature along the surface of the beam is uniform due to the high thermal conductivity of the steel forms. It is also noted that the heat flows from the inside of the mass to the outside, which is opposite to the heat flow in steam-cured members. Cores talen from test specimens5.7 showed some variation in the modulus of rupture and compressive strength. This variation was similar for the specimens with equal distribution of heat, unequal distribution of heat, and specimens cured by steam. Higher strengths were obtained from the thicker sections of all specimens. For all specimens, the 28day strength exceeded the design strength of the concrete. 5.2.4 Effect of internal electrical curing on properties of prestressed concrete beams-Extensive tests were conducted at The Pennsylvania State University5.7 on prestressed concrete beams to determine the effect of electrical curing on prestress loss, bond, transfer length, cracking loads, and strength. These tests were conducted on small beams and full-scale I-beams with steam and internal electrical energy. The prestress loss studies indicated that a 10 percent lower prestress loss was obtained with the electrically cured beams than with the steam-cured beams. The bond transfer length in the electrically cured beams, however, was 20 percent greater than for the steam-cured beams. Hammerhead-type beams were tested to evaluate the flexural bond strength of the concrete cured by the different methods. These tests did not show any significant difference in the flexural bond strength. Four full-scale, prestressed I-beams were cast from identical concrete on the same prestressing bed. Three of the beams were cured with electrical energy, and one was cured by steam at atmospheric pressure. No significant difference was found between the two curing methods in camber, flexural stiffness, beam cracks, or surface strain under load. The electrically cured members showed less prestress loss than the steam-cured beam, but more strand slip at transfer of the prestressing force. The ultimate strength of the electrically cured beams was higher than for the steam-cured beam. This ultimate strength was based on yielding of the steel strand and not on complete destruction of the beams. 5.2.5 !ierrnal and mechanical properties of concrete during the curing cycle--In the design of any system to be used for accelerated curing of concrete, it is essential that the thermal and mechanical properties of the fresh concrete be laiown. As part of their studies on electrical curing, researchers at The Pennsylvania State University5.8 evaluCopyright American Concrete Institute
Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

ated the modulus of elasticity, ultimate strength, coefficient of linear expansion, heat of hydration, modulus of heat transfer, and specific heat of concrete for the first 24 hr of the curing cycle. These tests were conducted on a highearly-strength concrete having a design strength of 6000 psi (41 MPa). Curing temperatures studied were 75 F, 125 F, and 175 F (24 C, 52 C, and 78 C). Concretes cured at 75 F (24 C) were used as the basis of comparison for the higher curing temperatures. In addition to studying the thermal and mechanical properties, an analytical procedure was developed to predict the temperatures and energy requirements for heating irregular-shaped concrete members with either internal or external heat sources. While only one concrete mix was tested, these results are indicative of the behavior of most commonly used portland cement concretes. 5.2.5.1 Mechanical properties-Since the effect of the preset time was studied in previous research,s it was not considered as a variable. Specimens cured at elevated temperatures were heated immediately after casting. As a result of this zero preset time the mechanical properties exhibited erratic behavior. The results, however, did indicate that the modulus of elasticity of concrete cured at 175 F (78 C) for 24 hr was 25 percent higher than that for the same concrete cured at 75 F (24 C). Also the compressive strength at 24 hr for concrete cured at temperatures above 125 F (52 C) for 24 hr was 50 percent greater than that for concrete cured at 75 F (24 C). 5.2.5.2 !ierrnal properties-To investigate the coefficient of linear thermal expansion, concrete specimens were cast at room temperatures 75 F (24 C) on a roller assembly. At different preset times for each specimen, a uniform heat was applied, and the elongation of the specimen was carefully measured. Results of this series of tests are shown in Fig. 5.2.5.2. This graph, which plots the coefficient of linear thermal expansion versus the preset time, shows that the Coefficient of expansion varies by a factor of ten during the first few hours after mixing the concrete. Therefore, it is important that when heat is used to accelerate the curing of concrete, it should not be applied until a preset time of 4 or 5 hr have elapsed to permit the concrete to reach a constant coefficient of thermal expansion that is very close to that of the steel forms and molds. Previous tests indicated that preset times less than 4 hr affected the compressive strength of the concrete, but data are not available to indicate the probable cause of this loss of strength. The free water in the freshly mixed concrete may be the cause of this large variation in the Coefficient of expansion. After hydration is initiated, the amount of free water is decreased and the thermal properties of the solid materials become predominant. This phenomenon is also apparent in the other thermal properties discussed below. The thermal, dimensional changes in plastic concrete are especially critical in molded, precast structural products. In this type product the molds usually restrain dimensional changes in one or more directions, and since thermal deformation is a volumetric change, deformations larger than those indicated by the Coefficient of thermal expansion can tale place in the unrestrained direction of the concrete. The heat of hydration is increased as the temperature increases, and the magnitude is approximately ten times
93s.10

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-15
U

greater at 175 F (78 C) than at 75 F (24 C) during the first 6 hr. Thereafter, the values remain relatively constant. The modulus of heat transfer decreases rapidly in magnitude during the first 6 to 8 hr at all temperatures and then remains relatively constant. Higher temperatures yield higher moduli of heat transfer values which are approximately proportional to the thermal conductivities at elevated temperatures. The movement of water within the concrete during the first 2 hr may not materially affect the conductivity, but it does sharply influence the flow of heat. The specific heat of uncured concrete increases with increased temperature. Test results showed an increase of 20 percent from 75 F (24 Cl to 175 F (78 C). The water content during the first few hours before hydration is completed appears to exert a major influence. 5.2.6 Problems with electrical curing-Since electrical curing is still in the development stage, it can be anticipated that problems still persist with the method. Some of the problems are associated with the electrical distribution systems and controls; however, improvements are constantly being made with these devices. When thin sections are cured with electrical energy there is a tendency for cracking to occur. This cracking usually takes place at the junction of a thin section and a larger mass, such as in a T-beam where the flange meets the stem. The exact cause of this cracking has not been determined, but it is possible that thermal stresses caused by rapid cooling may be high in this area. There has not been sufficient research to determine when internal curing or external curing should be used. Applying heat through the steel forms appears to work well for thin sections, but for uniform heat in thick sections, internal resistance wires give better results. Heated metal forms and electric blankets present other problems. Warping of steel forms has been detected and attributed to differential temperatures in the forms. When electric blankets are used, hot spots occur unless the blanlcets have complete contact with the wet concrete. Rapid loss of moisture from the wet concrete does not appear to be a problem. Adequate moisture barriers can be placed on the wet concrete and the proper amount of mixing water will provide sufficient moisture for complete hydration. 5.3-Use of hot oil or other fluids for heating forms Hot oil has been extensively used to accelerate the curing of concrete by heating the steel forms. The oil is heated at an external point and circulated through pipes or cavities provided in the steel forms. This method provides a uniform and constant temperature to the outside of the fresh concrete when the pipes or cavities are properly located and the forms are properly protected to minimize heat loss. The properties of the concrete cured by this method should not differ from those cured with electrically heated forms, as oil is used only as the vehicle to transfer heat from some external source to the exterior of the concrete. In essence, it is another method of applying dry heat to fresh concrete. One of the advantages of using hot oil is that a constant temperature can be maintained in the heated forms. Since
Copyright American Concrete Institute Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS
--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

O . 600

0.500

1-

Ls
O

0.400
v
r(

I_
r (

8 *

0.300

0.2001

o. 1oc
O . O75

0.0X 0.02:

O.OO(

20

40

60

80

P r e s e t Time H o u r s

Fig. 5.2.5.2-CoefJicient o linear thermal expansion durf ing the preset period

steel forms are used with this method, their high thermal conductivity usually produces a constant uniform temperature on the exterior surfaces of the concrete. A disadvantage of the method is that heat remaining in the oil at the completion of the curing cycle is usually wasted unless it can be diverted to other casting beds.

5.4-Infrared curing of concrete Thermal radiation in the form of infrared rays has had limited application in accelerated curing of concrete. This method was tried in the Soviet Union and found to be both effective and economical according to Mironov and Malinina (I 964).5. l l Recently, idfared heaters were used in Sweden to accelerate curing of concrete in tunnel liners. Radiation was not applied directly to the concrete but was directed to the steel forms. Unpublished reports indicate that the curing results were satisfactory, even though the heaters were not uniformly distributed. This nonuniform heat naturally produced nonuniform concrete strengths. Temperatures near the heaters were 70 C (158 F). Infrared curing was also used in Sweden on horizontal surfaces of concrete. In these applications the concrete surface was sometimes covered by plastic foil, and LPG-fired infrared radiation heaters were used. For concrete enclosed in steel forms it was found that 1000 watt heaters located 6-7 in. (150- 175 mm) from the forms produced the best results. More data are needed on infrared curing before specific recommendations can be made on this method.
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

517.2R-16

MANUAL OF CONCRETE PRACTICE

CHAPTER 6-REFERENCES 6.1 -Recommended references


The documents of the various standards-producing organizations referred to in this document are listed below with their serial designation.

These publications may be obtained from the following organizations: American Association of State Highway and Transportation Officials 444 N. Capitol St., NW, Suite 225 Washington, DC 20001 American Concrete Institute PO. Box 19150 Detroit, MI 48219-0150

Copyright American Concrete Institute Provided by IHS under license with ACI No reproduction or networking permitted without license from IHS

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---

AASHTO Standard Specifications for Highway Bridges, American Concrete Institute 201.2R Guide to Durable Concrete
212.1R 212.2R 222R 224.1R Admixtures for Concrete Guide for Use of Admixtures in Concrete Corrosion of Metals in Concrete Causes, Evaluation, and Repair of Cracks in Concrete Structures Cold Weather Concreting Standard Practice for Curing Concrete

ASTM 1916 Race St. Philadelphia, PA 19 103

6.2-Cited references Introduction


1.AC1 Committee 517, Low Pressure Steam Curing, AC1 JOURNAL, V. 60, No. 8, Aug. 1963, pp. 953-986. Chapter 1 1.1. Hogan, F. J., and Meusel, J. W., Evaluation for Durability and Strength Development of a Ground Granular Blast Furnace Slag, Cement, Concrete. and Aggregates, V. 3, No. 1. Summer 198 1, pp. 40-52. Chapter 2 2.1. Shideler, J. J., Calcium Chloride in Concrete, AC1 JOURNAL. Proceedings V. 48, No. 7, Mar. 1952, pp. 537-559. 2.2a. Evans, R. H.. Use of Calcium Chloride in Prestressed Concrete, Proceedings, World Conference on Prestsessed Concrete (San Francisco, July 1957), University of California, 19-57, pp. A31-1-A31-8. 2.2b. Evans, R. H.. and Williams, Alan, Use of X-Rays in Measuring Bond Stress in Prestressed Concrete, Proceedings, World Conference on Prestressed Concrete (San Francisco, July 1957), University of California, 1957, pp. A32-1-A32-8. 2.3. Godfrey, Howard J., Corrosion Tests on Prestressed Concrete Wire and Strand, Journal, Prestressed Concrete Institute, V. 5, No. I, Mar. 1960, pp. 45-51. 2.4. Monfore, G. E., and Verbeck, G. J., Corrosion of Prestressed Wire in Concrete, AC1 JOURNAL, Proceedings V. 57, No. 5, Nov. 1960, pp. 491-515. 2.5. Wright, T. E., An Unusual Case of Corrosion of Aluminum Conduit in Concrete, Engineering b u m a l (Montseal), V. 38, No. 10, Oct. 1955. pp. 1357-1362. 2.6. High Alumina Cements, Building Research Digest No. 27, Building Research Establishment, Garston, Watford, Feb. 1951, 6 pp. 2.7. Robson, T. D., Characteristics and Applications of Mixtures of Portland and High-Alumina Cement, ChemistQ and IndmtQ (London), Jan. 1952, pp. 2-7. Chapter 3 3.1. Keunning, William H., and Carlson, C. C., Effect of Variations in Curing and Drying on the Physical Properties of Concrete Masonry Units, Development Department Bulletin No. D13, Portland Cement Association, Skokie, 1956, 129 pp. 3.2. Hanson, J. A., Optimum Steam Curing Procedure in Precasting Plants, AC1 J ~ ~ R Proceedings V. 60, No. 1, Jan. 1963, pp. 75-100. N ~ ~ , 3.3. Kirkbride, T., Review of Accelerated Curing Procedures, Precast Concrete (London), V. 2, No. 2, Feb. 1971,pp. 87-90. 3.4. Mansfield, G. A., Curing-A Problem in Thermodynamics, Rock Products, V. 51, No. 8, Aug. 1948, p. 212. 3.5. Copeland, R. E., Kilns and Appurtenant Facilities for Low Pressure Steam Curing, National Concrete Masonry Association, Hemdon, 1971. 3.6. Concrete Pressure Pipes, AWWA Manual No. M-9, American Water Works Association, Denver. 3.7. Pfiefer, D. W., and Landgren, J. R., Energy Efficient Accelerated Curing of Concrete-A Laboratory Study for Plant-Produced Prestressed Concrete, Prestressed Concrete Institute, Chicago, Dec. 1981, 66 pp.
Proceedings
Licensee=Aramco HQ/9980755100 Not for Resale, 01/23/2006 00:28:13 MST

306R 308

ASTM c 33 c 150
c 330

c 331

c 403

c 494

c 595
C 618

c 9x9

Standard Specification for Concrete Aggregates Standard Specification for Portland Cement Standard Specification for Lightweight Aggregates for Structural Concrete Standard Specification for Lightweight Aggregates for Concrete Masonry Units Standard Test Method for Time of Setting of Concrete Mixtures by Penetration Resistance Standard Specification for Chemical Admixtures for Concrete Standard Specification for Blended Hydraulic Cements Standard Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete Standard Specification for Ground Iron Blast-Furnace Slag for Use in Concrete and Mortars

ACCELERATED CURING AT ATMOSPHERIC PRESSURE

517.2R-17

3 8 Brown, H. E., ?An Investigation of the Effect of the Gypsum .. Content and Steam Curing Variation on the Compressive Strength of Portland Cement Concrete,? MSc thesis, University of Virginia, Charlottesville, Aug. 1963. 3.9. Pfiefer, D. W., and Marusin, S., ?Energy-Efficient Accelerated Curing of Concrete-A State of the Art Review,? Prestressed Concrete Institute, Chicago, Mar. 1981, 116 pp. 3.10. Preston, H. Kent, ?Effect of Temperature Drop on Strand Stresses in a Casting Bed,? Journal, Prestressed Concrete Institute, V. 4, No. 1, June 1959, pp. 54-57. Chapter 4 4.1. Shideler, Joseph J., ?Investigation of the Moisture-Volume Stability of Concrete Masonry Units,? Development Department Bulletin No. 03, Portland Cement Association, Skokie, Mar. 1955, 54 pp. 4.2. Toennies, Henry T., ?Artificial Carbonation of Concrete Masonry Units,? A C I J O U R N A L . Proceedings V. 56, No. 8, Feb. 1960, pp. 737-756. 4.3. Verbeck, G. J., ?Carbonation of Hydrated Portland Cement,? Cement and Concrete, STP-205, ASTM, Philadelphia, 1958, pp. 17-36. Also, Research Department Bulletin No. 87, Portland Cement Association. 4.4. Toennies, Henry T., and Shideler, Joseph J., ?Plant Drying and Carbonation of Concrete Block-NCMA-PCA Cooperative Program,? Proceedings V. 60, No. 5, May 1963, pp. 617-634. Also, AC1 JOURNAL, Development Department Bulletin No. D64, Portland Cement Association. 4.5. Kirkbride, T. W.. ?Bumer Curing,? Precast Concrete (London), V. 2, No. 11, Nov. 1971, pp. 644-646. 4.6. ?Accelerated Drying of Concrete Masonry Units,? National Concrete Masonry Association, Hemdon, 1955. 4.7. ?Accelerated Drying Facilities, Methods and Costs,? Convention Reprint, National Concrete Masonry Association, Hemdon, 1956. 4.8. Schneider, Dietmar K., ?Increasing Production and Profits with Hot Concrete,? Journal, Prestsessed Concrete Institute, V. 18, No. 4, JulyAug. 1973, pp. 21-32.

Chapter 5 5.1. Martinet, C., ?Electsical Process of Curing Precast Reinforced Concrete,? Concrete Building and Concrete Products, Dec. 1963. 5.2. Fleming, A. G., ?Electrical Curing of Concrete and Mortar,? Concrete, Dec. 1939, pp. 11-12. 5.3. Brund, A., and Bohlm, H., ?Electrical Heating of Concrete,? Building Science Abstracts (London), V. 5, Aug. 1932, Abstract No. 1498. 5.4. Rethy, A., ?Progress in Electrical Heating of Concrete,? Building Science Abstracts (London), V. 7, Nov. 1934, Abstract No. 1886. 5.5. Skramtaeu, B. G., Shuhenkin, P. F.. and Bazhenov, Yu M., ?Complex Use of Chemical and Electrical Heating for the Production of V. Precast Reinforced Concrete,? Beton i Zhelezobeton (MOSCOW), 6 , 1964, pp. 243-246. 5.6. Ady, Nancy, ?Electrical Curing of Concrete,? Special Bibliography No. 20, Library, Research and Development Division, Portland Cement Association, Skokie, Mar. 1966. 5.7. Chi, C. T., and Bamoff, R. M., ?Intemal Electrical Curing of Restressed Concrete,? Small Industries Research, Pennsylvania State University, University Park, 1970. 5.8. Book, Norman L., and Bamoff, Robert M., ?Time Temperature Study of Accelerated Curing of Concrete,? Structural Research Report, Department of Civil Engineering, Pennsylvania State University, University Park, Sept. 1973. 5.9. Pu, Dennis C., ?Electrical Curing of Concrete,? MSc thesis, Pennsylvania State University, University Park, 1967. 5.10. Cadwallader, G. H., ?Electrical Curing of Concrete,? MSc thesis, Pennsylvania State University, University Park, 1968. 5.11. Mironov, S. A., and Malinina, L. A., ?Uskorienie tvierdienia betona,? Moskva (U.S.S.R.).

This report was submitted to letter ballot of the committee and was approved in accordance with AC1 balloting requirements.

Committee members voting on the 1992 revisions:

W. Calvin McCall Chairman


Steven H. Gebler Eugene D. Hill, Jr. Frank A. Kozelisla Ken B. Rear Thomas H. Sadler Billy M. Scott Bryce P. Simons Luke M. Snell

--`,,,,,,,`,`,,,,`,,``,,``,,,,,-`-`,,`,,`,`,,`---